028 of 2020 - Capital Improvement Program ProjectsApproved As To Form
Salt Lake City Attorney’s Office
______________________________
Katherine Lewis
SALT LAKE CITY RESOLUTION
NO. 28 OF 2020
(Adopting Capital Improvement Program Allocations for fiscal year 2020-2021)
WHEREAS, in June the City Council adopted a final budget for the City fiscal year 2020-
21.
WHEREAS, the budget adopted by the City Council included a budget for the capital
improvement program.
WHEREAS, the City Council now wishes to formalize the allocations for the capital
improvement program.
NOW THEREFORE, be it resolved by the City Council of Salt Lake City, Utah:
SECTION 1. Purpose. The purpose of this resolution is to adopt the capital improvement
allocations for the City for fiscal year 2020-21.
SECTION 2. Adoption of Capital Improvement Allocations. The capital improvement
allocations for fiscal year 2020-21, which were included in the 2020-21 budget, shall be and hereby
are adopted according to the specific terms and conditions set forth on Exhibit A attached hereto.
SECTION 3. Public Inspection. The City budget officer is hereby authorized and directed
to certify and file copies of these capital improvement program allocations in the office of said
budget officer and in the office of the City Recorder, which allocations shall be available for public
inspection during regular business hours.
SECTION 4. Effective Date. This resolution shall take effect upon adoption.
Passed by the City Council of Salt Lake City, Utah, this 18th day of August, 2020.
SALT LAKE CITY COUNCIL
_____________________________
Chris Wharton, Council Chair
ATTEST AND COUNTERSIGN:
_______________________________
Cindy Lou Trishman, City Recorder
R 20-1
B 20-1
Katherine Lewis (Aug 28, 2020 17:19 MDT)
Chris Wharton (Sep 3, 2020 12:44 MDT)
Chris Wharton
Cindy Trishman (Sep 4, 2020 07:58 MDT)
Proposed Funds 955,027$ 3,907,824$ 2,046,329$ 2,400,000$ 1,380,000$ 33,000$ 4,177,733$ 955,027$ 3,907,824$ 2,046,329$ 2,400,000$ 1,380,000$ 33,000$ 1,875,000$
Department Category Application Title Scope of Work Requested General
Funds Requested Class C Requested Street
Impact Fees
Requested FOF
Street
Requested
Other FOF Bond Rescope Funds Proposed General Funds Proposed Class C Proposed FOF Street Proposed Other FOF Proposed FOF Transit Impact Fees Bond Rescope Funds Proposed General Funds Proposed Class C Proposed FOF Street Proposed Other FOF Proposed FOF Transit Impact Fees
Art New Current balance of the account is $351,850 of which $84,652 has not been identified for use in projects. 87,878$ -$ 39,078$ 24,000$ 13,800$ 11,000$ 39,078$ 24,000$ 13,800$ 11,000$
Cost Overrun New Current balance of the account is $350,749.175,156$ 78,156$ 48,000$ 27,600$ 22,000$ 78,156$ 48,000$ 27,600$ 22,000$
Engineering New
Bridge Rehabilitation
(400 South and 650
North over the Jordan
River)
The purpose of this project is to rehabilitate the 400 South and 650 North vehicle bridges over the Jordan River. A
bridge inspection performed by UDOT gave these bridges a Health Index score of 48.55 and 46.58, respectively, out of
100. Combining the two bridges into one project will result in economies of scale since the rehabilitation work for both
bridges will be similar. The existing asphalt surface will be removed and the underlying deck will be treated for cracking
and delaminated concrete. The deck will receive a waterproofing membrane, a new asphalt overlay, and deck drains to
remove storm water from the deck. The under surface of the bridge will be treated for cracking and delaminated
concrete on the deck, girders, pier caps, and abutments. The steel piles supporting the piers exhibit heavier than typical
corrosion. The piles will be dewatered and treated for corrosion. The existing damaged parapet wall will be removed
and rebuilt which will widen the sidewalk and improve the pedestrian access route. Additionally, aesthetic
enhancements will be incorporated including replacing the chain link fence and railings mounted on the outside of the
sidewalk with decorative railings. A consulting firm with specialized experience will be used for this project.
3,000,000$ 648,507$ 2,000,000$ 648,507$ 2,000,000$
Engineering Renewal
Street Improvements
2020/2021:
Reconstructions and
Overlays
Deteriorated city streets will be reconstructed or rehabilitated using funding from this program. This will provide
replacement of street pavement, curb and gutter, sidewalk, drainage improvements as necessary. Where appropriate,
the program will include appropriate bike way and pedestrian access route improvements as determined by the
Transportation Division per the Complete Streets ordinance.
-$ 3,500,000$ 2,046,329$ -$ 2,046,329$ -$
Engineering Renewal
Rail Adjacent Pavement
Improvements
2020/2021
This program addresses uneven pavement adjacent to railway crossings. There are currently three known locations to
be addressed. In this second year of the program Engineering is designing improvements and performing a survey of
additional locations to address in future years.70,000$ 70,000$ 70,000$
Engineering Renewal Bridge Preservation
2020/2021
There are 23 bridges in Salt Lake City, most crossing either the Jordan River or the Surplus Canal. UDOT inspects these
bridges every two years and provides the city with a basic condition report. The city is responsible for performing
appropriate maintenance activities based on statements in the UDOT report. City Engineering has prepared an ongoing
bridge maintenance strategy with the objective of extending the functional life of these structures, and extending the
time between major repairs. The requested funds will be used to address needed repairs and routine maintenance.
300,000$ 258,000$ 42,000$ 258,000$ 42,000$
Engineering New
Bridge Replacement
(200 South over Jordan
River)
This project will include the complete removal and replacement of the existing vehicle bridge for 200 South over the
Jordan River. Design will consider complete streets features, accommodations for the adjacent Jordan River Trail, and
the historic nature of the adjacent Fisher Mansion, and potential art components incorporated into or around the new
bridge.
MAYORAL FUNDING RECOMMENDATION WITHDRAWN
3,500,000$ 3,500,000$ 2,302,733$
Facilities Phase
Facilities Capital Asset
Replacement Program
($6M investment)
(Deferred Capital
Replacement)
The Facilities Division’s Facility Condition Index database categorizes asset renewal projects based on the criticality of
projects starting with Priority 1, Life Safety. To eliminate the $52,900,000 in total deferred capital renewal, Facilities
proposes an annual investment through CIP of $7,000,000. For FY21 abbreviated CIP funding, Facilities is requesting
funding for Projects in Priority 1 and a portion of Priority 2 for $2,503,710. Projects in the Priority 1 category must be
replaced to meet OSHA, Federal, State, and local regulations and codes; to maintain security; or ensure safe building
occupancy. These are not discretionary projects. FY2020 CIP investment funded many of the Priority 1 projects. This
request is to fund the remaining current Priority 1 projects totaling $374,907. (Priority 1 projects will never be
completely eliminated as different assets fall into the category annually as they reach the end of their expected
lifespan.) Projects in Priority 2 address Structural Integrity, Property Loss, and Contractual Obligations. The latter is
funding obligated through Interlocal Agreements with Salt Lake County for 50% of capital renewal at the Sorenson
Campus and Salt Lake Sports Complex, and through a contract with the Salt Lake Bees at the Smiths Ballpark to
maintain the facility. These are also non-discretionary projects. Typically, the County can fund 100% of projects upfront,
and the City reimburses its portion at project completion. The FY21 County Interlocal Agreement obligations amount to
$763,557. The County and City have identified the need to address $10 million in deferred capital renewal for both
facilities. The Bees contract obligations for FY21 total $688,907; however, the Bees contract partially funds capital
renewal from annual naming rights revenue, so $224,637 is available to offset the requested amount for the Ballpark
for a total FY21 CIP request of $464,270. The total of deferred capital renewal at the Ballpark is currently $8,804,973.
The funds requested for Priority 1, Life Safety, and Priority 2, Contractual Obligations, will address the most critical and
contractually obligated needs for Facilities. The amount requested is derived from an initial 2017 facility assessment to
which a 3% annual inflationary rate and 21% Engineering fee rate have been applied. It should be noted that the
current construction environment is very heated; Facilities has included an additional 10% contingency rate to cover
expected inflated contract costs for a total request of $2,503,710.
2,503,710$ -$ 1,803,710$ -$ 700,000$ 1,803,710$ -$ 700,000$
Public Lands New
Allen Park Urgent
Property Protection,
Planning & Public
Access
The project scope includes (a) installation of fencing, lighting and irrigation to secure, protect and maintain the historic
structures, artworks, and natural environment on the Allen Park property; (b) stabilization of historic buildings and
artworks to prevent collapse or additional degradation while the City prepares comprehensive plans for adaptive reuse
and activation of the site, and potentially limited demolition of collapsing structures where necessary to protect public
safety; (c) installation of a public pathway around and/or through the site; (d) consultant services to provide technical
analysis, public engagement support and preparation of an Improvements & Activation Plan for the property.
450,000$ 450,000$ 450,000$
Public Lands Renewal Parks critical asset
renewal
This project would fund the repair or replacement of park amenities and play features that are currently out-of-service
or near closure. Many of the facilities are still functional, however, their poor condition discourages use. Features that
may be replaced with this funding may include:• Basketball and tennis courts in deteriorated condition in parks such as
Liberty Park and Poplar Grove Park; • Paving surfaces that are tripping hazards in high use parks such as Memory
Grove; • Pavilions in disrepair in Cottonwood Park and Poplar Grove Park; • Playgrounds that are deteriorated and at
risk for closure in parks such as Pioneer Park and Taufer Park • Inefficient and ineffective irrigation systems that
increase operations and staffing costs in locations such as 1200 East Islands and Warm Springs Park. Specific
information on priorities for these amenities are as follows:
1. Irrigation systems at 1200 East Islands and Warm Springs Park
2. Pavilions at Cottonwood Park and Poplar Park
3. Paving surface at Memory Grove Park
4. Basketball Court at Liberty Park and Poplar Grove Park
5. Tennis Courts at Poplar Grove Park
6. Playground at Pioneer Park and Taufer Park
1,500,000$ 478,400$ 596,600$ 478,400$ 596,600$
Public Lands New
Foothills Trail System
Master Plan - High
Priority Projects
The project scope includes completion of shovel-ready trail projects in the Foothills Natural Area, consistent with the
specific implementation recommendations of the SLC Foothill Trails Master Plan and SLC Open Space Master Plan, likely
including construction of the Dry Creek Alternate Trail in the Central Foothills and the Lakeview Trail in the North
Foothills, and other trail segments as funding allows. The project scope also includes professional consulting services to
support the completion of federally-compliant environmental analysis, required to permit implementation of Phase II of
the Foothill Trails Master Plan.
565,000$ 505,027$ 59,973$ 505,027$ 59,973$
Council Funding AllocationsMayor Funding RecommendationsRequested FundingFY2020-2021 Capital Improvement Program (CIP) Funding Log
Proposed Funds 955,027$ 3,907,824$ 2,046,329$ 2,400,000$ 1,380,000$ 33,000$ 4,177,733$ 955,027$ 3,907,824$ 2,046,329$ 2,400,000$ 1,380,000$ 33,000$ 1,875,000$
Department Category Application Title Scope of Work Requested General
Funds Requested Class C Requested Street
Impact Fees
Requested FOF
Street
Requested
Other FOF Bond Rescope Funds Proposed General Funds Proposed Class C Proposed FOF Street Proposed Other FOF Proposed FOF Transit Impact Fees Bond Rescope Funds Proposed General Funds Proposed Class C Proposed FOF Street Proposed Other FOF Proposed FOF Transit Impact Fees
Council Funding AllocationsMayor Funding RecommendationsRequested FundingFY2020-2021 Capital Improvement Program (CIP) Funding Log
Transportation Renewal Transportation Safety
Improvements
Traffic safety projects include the installation of warranted crossing beacons, traffic signals, or other traffic control
devices and minor reconfiguration of an intersection or roadway to address safety issues. Salt Lake City's program
places a strong emphasis on pedestrian and bicyclist safety, particularly in support of access to and from transit. This
funding will further the City’s on-going effort to reduce injuries to pedestrians and bicyclists citywide and to improve
community health and livability by promoting walking and bicycling. This funding will be used for the installation of
safety improvements throughout the city as described in the Pedestrian & Bicycle Master Plan, and also to address
ongoing needs as safety studies are completed. Crossing improvements such as HAWK's or Toucans, flashing warning
lights at crosswalks or intersections, refuge islands, bulb-outs, improved signalized crossings and new or improved
pavement markings are examples of the safety devices that are installed with this funding. Projects are identified by
using data to analyze crash history, roadway configuration and characteristics, and with citizen input. Identified projects
to improve traffic safety involve conditions that pose a higher relative risk of injury to those traveling within SLC and are
therefore deemed a high priority for implementation.
375,000$ 375,000$ 375,000$ 375,000$ 375,000$ 375,000$
Transportation Renewal Traffic Signal &
Intersection Upgrades
• Upgrade five aging traffic signals • Combine with safety and operational improvements for all modes • Possible transit-
focused signal improvements on key Frequent Transit Network corridors - This project will remove the existing traffic
signal equipment that has reached the end of its useful life, including steel poles, span wire, signal heads, and traffic
signal loops and will upgrade the intersections with mast arm poles, new signal heads, pedestrian signal heads with
countdown timers, improved detection, and left turn phasing, as needed. Fluctuations in construction pricing are
particularly relevant to this project, with steel tariffs, labor costs, and overall construction costs all affecting price.
Possible Upgrade Locations: West Temple/1300 South; 1100 East/1700 South; Glendale/California; South Temple/500
East; North Temple/West Temple; 100 South/1300 East; various.
875,000$ 875,000$ 425,000$ 875,000$ 425,000$ 875,000$
Transportation Renewal Complete Streets and
Urban Trails
This project will help implementation of the City's Pedestrian & Bicycle Master Plan, Transit Master Plan, Downtown In
Motion Master Plan, and Sugar House Circulation Plan (update in progress), by providing funds to be used for bike lanes
and multi-use trails; development of neighborhood byways to allow local streets to better serve bicyclists and
pedestrians as through-routes; and the outreach, planning, and design of complete streets, including demonstration
projects leading to permanent construction. Funds will be used specifically for signing, striping, and multi-use trail
design and construction; improvement of pedestrian and bicycle crossings; outreach materials and technical studies;
purchase or contracting of materials for demonstration projects similar to the 900 South roundabout "pop-up" which
led directly to community buy-in for the permanent roundabout construction. A similar process is likely in the next
couple years as part of the implementation of the Green Loop, the urban linear park along several downtown streets,
as recommended in the Downtown Plan. These funds may also be used to augment reconstruction or resurfacing
projects being implemented by the Engineering or Streets divisions.
625,000$ 625,000$ 625,000$ 625,000$
Engineering Renewal Public Way Concrete
2020/2021
This project will address displacements in public way concrete through saw-cutting, slab jacking, and removal and
replacement of deteriorated or defective concrete sidewalks, accessibility ramps, curb and gutter, retaining walls, etc.
750,000$
Engineering New Wingpointe Levee
Design
The cost estimate includes conceptual design, final design, and geotechnical investigations performed by Engineering
consultants. Current levee conditions will be evaluated, required improvements identified, and modifications
recommended. Typical sections of levee reconstruction determined in order to develop construction cost estimates and
required plans and documents for permitting, then construction. This design effort will inform future funding
construction requests to bring the levee into compliance.
800,000$
Public Lands New
Library Square
Feasibility Study, Civic
Engagement, and
Design Development
Feasibility study: Library Square has multiple paving and wall system failures due to settling of the parking structure. A
comprehensive study is needed to determine appropriate solutions to ameliorate safety hazards. Existing conditions
analysis and feasibility studies will determine a critical path to correct site failures and propose appropriate solutions.
Project may involve selective investigations of systems and substructure. Civic engagement: The Public spaces at Library
Square are underutilized outside of the four major events that occur during the summer. Salt Lake City’s rapidly
growing and densifying population needs places to be outside. A civic engagement study would identify desired
community elements to be incorporated on the Square that would increase positive activity throughout the day and
week. Design development and implementation strategy: A comprehensive design for the Square will provide solutions
for the site system failures and include new uses that reflect community priorities. The design will identify a phasing
strategy with estimates of probable costs and implementation strategies.
185,000$
Public Lands New
Parleys Historic Nature
Park Historic Structures
Preservation
The proposed CIP project will fund the following work in Parleys Historic Nature Park (PHNP): 1.) identify key historic
structures and artifacts, assess preservation needs, and create detailed rehabilitation/protection recommendations for
each; 2.) develop fully-engineered designs and construction cost estimates for historic structural rehabilitation; 3.) if
feasible, develop and secure a conservation easement to protect irreplaceable historic and natural features, per the
recommendations of the 2011 PHNP Management Plan. 4.) if feasible within project budget, develop a detailed signage
& interpretive materials plan to improve public awareness/appreciation of historic features & structures, and
construct/install the recommended interpretive signage.
250,000$
Public Lands New
Jordan River Trail
Infrastructure Safety &
Repair
Salt Lake City’s Jordan River Parkway Trail has become a valued and critical amenity to recreational users and residents
within Salt Lake City. Since the completion of the North Temple bridge project in November 2017 use of the Jordan
River Parkway Trail has continued to increase annually. With increased use and aging trail infrastructure along many
sections of the JRP Trail, the City’s Trails and Natural Lands Division is faced with unique critical maintenance needs that
exceed our annual operating budget for associated trail maintenance. Without investment into the into the critical
infrastructure needs along the Jordan River Parkway Trail, several sections of the JRP Trail are at risk of deterioration
that create both safety concerns and may require permanent trail closures until repairs are complete. Examples of
critical infrastructure needs along the Jordan River Parkway Trail include items such as; 1.) Trail deterioration repair a.
Asphalt paving, patching, crack repair
b. Stabilization and associated landscape improvements along the banks of Jordan River that are currently causing
erosion of existing trail. 2.) Bridge decking repair and replacement a. Repair structural deficiencies on JRP Trail bridges.
3.) Neighborhood connections and conflict mitigation. a. Replace and repair cycling and pedestrian connections to JRP
Trail. b. Fencing repair and replacement to eliminate and reduce encroachments into the JRP Trail.
550,000$
Notes:
Text in blue font was added by Council staff
The Community Development and Capital Improvement Program (CDCIP) resident advisory board did not provide funding recommendations this year
🎨 Arts Council
801-596-5000 |info@saltlakearts.org
Project Scope of Work Funding
1 1% for Art Adds art features to other CIP projects as required by City
ordinance $87,878
💵 Cost Overrun
801-535-6230 |cipinfo@slc.gov
Project Scope of Work Funding
2 Cost Overrun Account Allows additional funding flexibility for small cost increases
over budget $175,756
🚦 Engineering
801-535-7961 |engineeringinfo@slcgov.com
Project Scope of Work Funding
3 Bridge Rehabilitation 400 South and 650 North over the Jordan River $2,648,507
4 Street Improvements Reconstructions and asphalt overlays $2,046,329
5 Rail Adjacent Pavement Improvements Repairs and improvements to pavement next to railway
crossings $70,000
6 Bridge Preservation Preventative maintenance and repairs to City-owned
bridges $300,000
🔨 Facilities
801-535-7116 |publicservicesinfo@slcgov.com
Project Scope of Work Funding
7 Facilities Capital Asset Replacement Program Implements the Facilities Condition Index which identifies
all maintenance needs at 83 City-owned buildings $2,503,710
>>> More project descriptions and funding source details on the Funding Log
Questions on Council funding?Contact Ben Luedtke,City Council Staff, at benjamin.luedtke@slcgov.com or
801-535-7622
🌳 Parks & Public Lands
801-535-7800 |parks@slcgov.com
Project Scope of Work Funding
8 Allen Park Urgent property protection, planning & public access $450,000
9 Parks Critical Asset Renewal Repair and replacement of amenities in multiple parks $1,075,000
10 Foothills Trail System Master Plan
High Priority Projects
Construction of new trail segments identified in the master
plan and federally required environmental analysis $565,000
🚦 Transportation
801-535-6630 |slc.transplan@slcgov.com
Project Scope of Work Funding
11 Transportation Safety Improvements
Flexible funding to tailor safety improvements to the
location such as enhanced pedestrian crosswalks or an
intersection reconfiguration
$750,000
12 Traffic Signal & Intersection Upgrades Replace old traffic signals with modern equipment $1,300,000
13 Complete Streets and Urban Trails Adding bike lanes and multi-use trails to streets $625,000
Unfunded Projects
801-535-7622 |benjamin.luedtke@slcgov.com
Project Division Requested Funding
1 Public Way Concrete Engineering $750,000
2 Wingpointe Levee Design Engineering $800,000
3 Library Square Feasibility Study, Civic Engagement,and Design Development Public Lands $185,000
4 Parleys Historic Nature Park Historic Structures Preservation Public Lands $250,000
5 Jordan River Trail Infrastructure Safety & Repair Public Lands $550,000
>>> More project descriptions and funding source details on the Funding Log
W H A T S H O U L D T H E C I T Y F U N D N E X T ?
I have a project idea! How do I let the City know?
>>> To submit a constituent request, please fill out this form at tinyurl.com/SLCCIP
Salt Lake City welcomes and values your input for potential capital improvement projects throughout the City. Constituent
requests are accepted year-round and will be reviewed by the assigned City division (Engineering, Public Lands, etc).
The City division will review your request to see if it aligns with current City priorities. If they find that it doesn’t align with
current City priorities, they will not recommend funding for your request. Please keep in mind that the City runs on a July -
June Fiscal Year and that the CIP process takes at least one year to complete.
The constituent request must:
❏Cost between $50,000 - $500,000 (cost estimates are conducted by the Engineering Division)
❏Have a useful life of 5 or more years
❏Be a Salt Lake City-owned asset
❏Have Community Outreach or Alternative Public Engagement
Questions on Council funding?Contact Ben Luedtke,City Council Staff, at benjamin.luedtke@slcgov.com or
801-535-7622
Resolution 28 of 2020 adopted 8-18-2020 (CIP)
Final Audit Report 2020-09-04
Created:2020-08-28
By:Scott Crandall (scott.crandall@slcgov.com)
Status:Signed
Transaction ID:CBJCHBCAABAA9rndzIvJSgeeOusXEfTjkGbLYqWuewi-
"Resolution 28 of 2020 adopted 8-18-2020 (CIP)" History
Document created by Scott Crandall (scott.crandall@slcgov.com)
2020-08-28 - 10:53:39 PM GMT- IP address: 204.124.13.151
Document emailed to Katherine Lewis (katherine.lewis@slcgov.com) for signature
2020-08-28 - 10:56:25 PM GMT
Email viewed by Katherine Lewis (katherine.lewis@slcgov.com)
2020-08-28 - 11:19:35 PM GMT- IP address: 67.164.250.15
Document e-signed by Katherine Lewis (katherine.lewis@slcgov.com)
Signature Date: 2020-08-28 - 11:19:49 PM GMT - Time Source: server- IP address: 67.164.250.15
Document emailed to Chris Wharton (chris.wharton@slcgov.com) for signature
2020-08-28 - 11:19:51 PM GMT
Email viewed by Chris Wharton (chris.wharton@slcgov.com)
2020-09-03 - 6:44:45 PM GMT- IP address: 73.20.17.210
Document e-signed by Chris Wharton (chris.wharton@slcgov.com)
Signature Date: 2020-09-03 - 6:44:56 PM GMT - Time Source: server- IP address: 73.20.17.210
Document emailed to Cindy Trishman (cindy.trishman@slcgov.com) for signature
2020-09-03 - 6:44:58 PM GMT
Document e-signed by Cindy Trishman (cindy.trishman@slcgov.com)
Signature Date: 2020-09-04 - 1:58:03 PM GMT - Time Source: server- IP address: 73.98.240.108
Signed document emailed to Katherine Lewis (katherine.lewis@slcgov.com), Chris Wharton
(chris.wharton@slcgov.com), Scott Crandall (scott.crandall@slcgov.com), and Cindy Trishman
(cindy.trishman@slcgov.com)
2020-09-04 - 1:58:03 PM GMT