REMARKS: Resolution No. 102
By Cou7Lcilman0'DONNELL
1.1
That watermains be laid or, z`
south side of 6th South bet. 4
1st West and State Streets at
cost of---0Z 86-:-83-.
6 `
P r f. .i4 ta t°.& Mt.y, Ur'F�.ilt
• -
i_. ....1.,,
,,,,,,„:"....1.7.,. '.,--, ,,
.y',. Orr RFC('-
. I
READ AND ADOPTED
1
- ,) e',rr Fc4oRnrP.,
t • M AY va j
.+Pik •s • ae • 4
RESOLUTION .
RESOT1VED, that watermains be laid on the south side of
6th South Street between lst West and State Streets at an estimated
cost of $3286.83, before paving of said street, cost to he paid
out of the Water Bond Fund.
-
IIIW
SALT LAKE CITY. UTAH.
G. F. MCGONAGLE.
CITY ENGINEER.
PRELIMINARY ESTIMATE
OF THE COST OF
CONSTRUCTING WAS"'FAMAIII___EXTENSION No
IN DISTRICT No. _
SALT LA KE CITY. __tita7 _lath. __ • _191
CITY'S PORTION
0n S to to 1st. West Street
NATURE OF WORK QUANTITIES Ii PRICE AMOUNTS
Excavation & Backfilling 660 cu.ycs. 70 462,00
Furnishing & Laying C.I. Pipe 61 1985 feet • 90 1786 50
Furnishing & Setting Special
Castings , 1250 lbs. • 05 62 50'
Furnishing & Setting 6" Valves 6 1700 ' 10200
" " " Hydrants 3 68i75 206; 25
C6nstructing Brick Valve Boxes
C.I. Covers 7 • 32 00 22400,
" Brick Hydrant Boxes 3 46 00 138 00 29811 25
Incidentals 5% 149 06
• i 3130 31
Engineering & Inspection 5% j 156 52
*3286 83
• I f
•
TOTAL-CITY'S PORTION
{ Grand Total,
I hereby certify that the above statement is correct,
Made by •
City Engineer.