81 of 1915 - A resolution that P. J. Moran and P. J. Moran, Contractor, Incorporated, be ordered and directed to f REMARKS: --- n _
Resolution No.
F
By Commissioner ORRI S Ia ,
i y"hat...P....J.....Moran...and..P.J !ii <i
Moran, Contractor, Incorporated,
i
;: be ordered and directed to proc eft
t at once to comply with provisioxa y
. oY--contracts..in..r �ar.d.
.e ..t.o.. u� garaxkte;
cif repairs, etc. ` "
N t
as
CA AND 'MCPTED
k
11 :3 ;Q, ,
ill
t
`-. •. ' � x7 � . Kk:
. .,._, '''
y . Kte ,2 ,,a
`. �� � fins r .`,:..? . .�t- S� rs - .�+( ydw3 t. # '� y.4 r 1/47 „ uA gv , '1Y , s yr ; {' 'r , .,.. ..„sar te ' a" .; a ,
7.
'a ~ t' -z1 ' � '._..a. -' c ,.4sn `':' :r arl.- � .i ,,, :1 k y '4. " ,- :- bc }__— . ., - . .zs * ,W � ,11,, " �
.1x4e � a" x ,§ 'z t' A." •,s `;,M°-4 -,ITA. ,sp- a,A4M: :1," � r
r$ s
RESOLUTION .
WHEREAS, Under divers contracts for the construction of public
improvements in Salt Lake City, P. J. Moran and P. J. Moran, Con-
tractor, Incorporated, heve each guaranteed the stability of such
improvements, and have agreed that in case the same shall get out
of repair, to repair the same for a period of years mentioned in
the contract; and
WHEREAS, Some of said improvements have become out of repair
and the said contractors have been notified to comply with the
provisions of said contracts with a statement of where repairs vier-
to be made, which notification they have disregarded:
NOW THEREFORE, Be it resolved that P. J. Moran end P. J. Mora.,
Contractor, Incorporated, be, and they are hereby ordered end
direoted to proceed at once to comply with the provisions of all
contracts for publio improvements in regard to guaranties and
repairs now in force, and to heve the same completed within ninety
days after receipt of a copy of this resolution.
That a copy of this resolution be served upon said contractor:
by the City Engineer.
E-32-•tt-o-t---4... h4.40-1—i-T___,.
Adopted by the Board of Commissioners of Salt Lake City, Utah,
November rJ , , 1915. Cd
j42
I m-p oraZ hal man
•
C)-eg it of-L4•
City Recorder.
SALT LAKE CITY CORPORATION
SYLVESTER O.CAN NON
SALT LAKE CITY, UTAH
CITY ENGINEER
F.N-HUDDLESON
PRINCIPAL ASSISTANT
Sovember 11, 1915.
Honorable RICHARD P. IdORRIS,
Commissioner of Streetsu& Public Improvements,
Salt Lake City, Utah.
Dear Sir:
I beg to submit herewith a list of repairs that
should be made on various pavements under guarantees which should
have expired in 1913, 1914 and 1915. These pavements were laid
by P. J. Moran, Contractor, and on account of repairs not having
been made as required, the bonds on the same have not as yet been
released.
The contractor has been notified each year of the
work necessary to be done to put these pavements in fit condition
before releasing the guarantee. This year notice was given him
on April 5th and a statement furnished him Again on October 12th,
but so far without results.
Whenever the contractor is ready to proceed with these
repairs upon notice to this department, a man will be detailed to
mark out the places needing repair.
Very respectfully,
CITY LEG I1I R. ---CZ
80C- I
RAPAIR3 TO BE MAnt ON PAVEMLNTS UNBER GnARINTAh BY P. J. MOAN
CONTRACTOR INC.
(November 11, 1915)
Repairs on Paving Guarantees. ]9t3
2nd South- State to 3rd'East:
Badly cracked in spots, where resurfacing is needed.
Some patches needed.
1st South- State to 2nd lost:
Bad cracks in planes; patches.
lst South- and to 13th Fast:
Curb and gutter repairs; parts of inteatseetions at 5th and
6th East need resurfacing.
5th Sast- South Temple to 3rd South:
Curb and gutter repairs.
Repairs on Paving- Guarantees. 1914
let Avenue- State to A Street
Intersection at A Street needs some reaarfaoing.
A & B- Some resurfacing.
B Street- 1st to 3rd Avenue:
Intersection with 1st Avenue and part of distance between
1st and 2nd Avenue needs some resurfacing; some gutter repairs.
South Temple- State to 7th Last:
Resurfacing needed at 2nd, 3rd and 4th Bast Streets and at H
Street intersections and at sundry other spots.
Canyon Road- State to 2nd Avenue:
Glitter repairs; some resurfacing.
3rd South- West Temple to 3rd West:
Gutter repairs.
lst 'Nest- South Temple to 3rd South:
Gutter repairs.
3rd West- North Temple to 3rd South:
Gutter repairs.
6th South- Main to let West:
Gutter repairs; some cracks.
West Temple- 5th to 9th South:
Curb and gutter repairs.
State Street- 7th to 9th South:
Gutter repairs; resurfacing at intersection with 7th South
Repairs; 1914, (Continued)
9th Bast- South Temple to Garfield:
Gutter repairs; some patches.
7th Fast- South Teeple to 3rd South:
Badly creaked; oeneiderable resurfacing.
12th Bast- South Teanple to 2nd South:
Badly cracked; considerable resurfacing.
Repairs on Paving Guarantees; 1915
South Temple- 7th to 10th Bast:
Intersections need resurfacing; some patches; gutter repairs.
Rio Grande- 2nd to 4th South Streets:
Curb and gutter repairs; some patohes.
3rd South- 3rd West to Rio Grande:
Gutter repairs.
Repairs to be marked out by representative of City Engineer
Whenever eontraotor is ready to proceed.
Where resurfacing is necessary it should be done with a
surface heater.