Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
01/04/1990 - Minutes
Iv , C1D- Minutes of the Meeting of the Committee of the Whole January 4, 1990 5:00 to 8:00 p.m. City Council Conference Room 325 City and County Building 451 South State Street Salt Lake City, UT 84111 In Attendance: Ron Whitehead, District One; Nancy Pace, District Three; Tom Godfrey, District Five ; Roselyn Kirk, District Six; Don Hale, District Seven, Palmer DePaulis, Mayor; Cindy Gust-Jenson, Executive Director; Emilie Charles, Mayor's Assistant; other City and Council Staff members. Councilmembers Alan Hardman and Wayne Horrocks arrived later in the evening. Council Vice-Chair Nancy Pace conducted the meeting since Council Chair Alan Hardman would be arriving late due to another meeting commitment. BOARD APPOINTMENT INTERVIEW Eldon Marshall was interviewed for consideration of his appointment to the Mosquito Abatement District Board. He indicated he has been active in the community and expressed a personal interest in serving on this board. POLICE DEPARTMENT POLICY BRIEFING Chief Chabries and other members of the Police Department were present to provide a briefing to the Council on policy issues. He indicated the focus of the presentation would focus on policy and resulting implications rather than on budget issues, which had not yet been presented in full to the Mayor. He stated the need for additional staffing, citing the volume of calls per officer had increased from 1980 to 1990, officer response times had tripled and dispatch times from time of call to officer arrival at the scene had doubled, backlogs of up to four hours were typical. He stated the department was compromised in their ability to properly handle calls, and the element of proactivity was absent. He estimated the need for 250 officers to equal the call per officer ratio of ten years ago. He indicated the Department's second area of need as being the ability to respond and handle criminal activity-specifically gang and drug activity. He stated that the education programs in schools had been effective and by September, these programs would be operating in all 27 grade schools, but that enforcement efforts were needed on the street. He reported the need for interfacing with the community with neighborhood councils and residents in solving, not just reporting, problems. Councilmember Godfrey commented that the Police Department staffing level had never been up to full force, and inquired if the Chief had anticipated this in his budget. Chief Chabries responded by explaining that it took nine months to train a new officer, and that during that time other officers would leave the department, leaving them without full staffing. Councilmember Godfrey inquired as to how the Metro Narcotics Squad operated. Deputy Chief Bob Nievaard explained this was a cooperative effort with other agencies, funded by all of the participating agencies and monies from a federal grant and that staffing was contributed by the participating agencies. Councilmember Godfrey asked if the funding should be increased instead of the City carrying as great a responsibility. It was explained that the funds were for operations costs and not staffing. Councilmember Godfrey inquired about the redistribution of funds from properties seized in drug arrests. It was explained that the state distributes the monies on a 25% match basis and requires a multi-agency task force to qualify. Councilmember Godfrey inquired about the residual monies being used for staffing. Chief Chabries indicated that the federal monies had to be used for activities and programs and could not be used for personnel. Councilmember Kirk expressed her interest in seeing the City develop ways to better work with the families to better target gang problems, and to evaluate if the City was really doing the best it could in this respect. The Chief replied that the gangs couldn't be eliminated since they were social groups by nature, and that involvement from all community groups would be vital in controlling the gangs. Councilmember Kirk asked if there was a City that was a good model for the way they dealt with the gangs. Major Peck indicated that Salt Lake City was right in line with their approach. Chief Chabries indicated that other cities have contacted Salt Lake City for advice. He further indicated that the department has been meeting with key members of these gangs and that these meetings have been helpful. There will be another such meeting in January. The Council recessed and then reconvened at 6:30 p.m. to be briefed by members of the Public Utilities Department on policy issues. Present for the briefing were Leroy Hooten, Director; Wendell Evensen, Superintendent of Water Supply; Tim Doxey, Superintendent of Water Reclamation; James Lewis, Finance and Accounting Officer and George Jorgensen, Chief Engineer. Leroy Hooten began by stating the purpose of the briefing was to present and discuss three issues: the five year Capital Improvement Plan (CIP) , earthquake preparedness and the water sales moratorium. Regarding the five-year CIP, Mr. Hooten stated the need for a long-range plan, rather than the year-to-year plan. He indicated that environmental standards had become a greater issue and that greater compliance with federal regulations was required. Last year, the department submitted a new five-year plan to spend $50 million for water system projects and $30 million for sewer projects, and that most of this would be needed to replace aging facilities. He indicated that the required improvements identified in the 201 plan study completed in the 1980's were funded through the City's $30 million bonding program in 1981 , and that $63 million in Capital Improvements over the last ten years had been funded mostly through bonds. The department is recommending that money be loaned from the Sewer Utility Fund to finance the seismic improvements at the Parley's Water Treatment Plant, to purchase watershed land and to purchase water rights. Prior estimates for upgrading Parley's Treatment were lower than originally anticipated because earthquake measures had not been taken into account. The new estimate for the upgrade is $12.3 million. Sandy City will pay for $7.6 million. The remainder will come from current reserves and an interfund loan between water and sewer. The department is not requesting a rate increase this year, but the Council should be aware that some water main replacements may be delayed until next year because of this. Mr. Hooten discussed the issue of earthquake preparedness and mitigation. He indicated that improvements to water and sewage treatment facilities would be needed to meet current seismic standards, enabling the facilities to withstand a major earthquake and continue to provide emergency services in its aftermath. The department estimates $10 million to complete the improvements to the water treatment plants to meet seismic standards and a greater amount to bring the sewer facilities up to standard. Additional water revenues and changes in the City's adoption of the 201 plan would be necessary to finance these projects. A study to determine cost and necessary action is currently underway. Mr. Hooten discussed the Water Sales Moratorium in the Canyon Watersheds, effected in 1981 , on any new surplus water sales agreements within the canyon watersheds. The Public Utilities Advisory Committee will begin their study of the issue of this moratorium and make a recommendation to maintain, replace or modify it. If continued, growth and development in the canyons will be limited to the existing contracts. If it is relaxed, more growth will occur. Mr. Hooten indicated this is a highly charged topic and that water usage will become an issue. He indicated the cloud seeding program had been successful, producing an additional 9% in rainfall last year. The cloud seeding will be repeated this year. ORDINANCE CHANGE - WATER AND SEWER MAIN CONNECTIONS The Public Utilities Department briefed the Council on a proposed ordinance change relating to water and sewer main connections. This ordinance proposes that streets be rough graded and connection fees be paid before water and sewer pipelines are installed to allow for better control and inspection. Freezing of lines has been a problem with lines that have not be set deep enough. A fee of ten dollars would be imposed on each lot. This is being proposed due to a problem with some builders who will use water at the sites and not pay for it. COUNCILMEMBER TRAVEL REQUEST The Council reviewed a request from Councilmember Nancy Pace to attend the conference "Creating a Great City Center" sponsored by the Urban Land Institute. It was suggested that the Redevelopment Agency be approached about sharing the cost if her attendance were approved. Ms. Gust-Jenson clarified that money was available in the budget for this trip, since one additional "unforeseen" trip per member was planned for each year. In a straw poll, the members indicated unanimous support for Councilmember Pace to attend this conference. STAFF MEMBER TRAVEL REQUEST The Council reviewed a request from Staff Member Cam Caldwell to travel to Scottsdale, Arizona to conduct a study in conjunction with the one-stop counter audit. The Executive Director indicated this trip would require the Council's approval, since this member had already attended a conference earlier this year. She indicated that a member of the Planning and Zoning staff would attend as well. Councilmembers Horrocks and Whitehead expressed concern about a duplication of effort and time, since someone from the Planning Department had previously travelled to Scottsdale to study their program. The Council requested additional information about the trip and what information would be obtained that was not obtained in the previous visit prior to any further consideration of this matter. PARTICIPATION ON ULCT COMMITTEES Councilmember Tom Godfrey extended an invitation to all Councilmembers to express their interest to him in serving on a committee for the Utah League of Cities and Towns. He indicated that he is serving on the Community and Economic Development Committee and that there were four other committees on which interested Councilmembers might serve. He indicated the other committees were Human Development, Transportation, and Energy, Environment and Natural Resources. He asked that any member with an interest in serving on one of these committees should let him know before the end of the night's meeting. SPECIAL MEETINGS Ms. Gust-Jenson indicated the Mayor-Council retreat would be February 10th, and the Council-Staff retreat would be held February 24th. She indicated the Bonding Seminar on January 8th would be at the Marriott at 5:30, and dinner would be provided by the Finance Department. PARKING Ms. Gust-Jenson indicated that Support Services had redesignated the area in which Council should park their vehicles. The new area would be the south side of the circle. New parking stickers would be obtained and distributed. Ms. Gust-Jenson took a count of those requiring more than one sticker. The meeting was adjourned. 4-4.Leet44-et.,p, 2_- D Alan G. Hardman, Council Chair Date at 'yn rsha 1, City Recorder Date J s'-1 ' OU -PrinIOgj OFFICE ,OF ;THE :.CITY,-COUt4CIL ?.SUITE300; CITY HALL 324-SOUTH STATE STREET .;. SALT•LAKE'CIZY,UTAH.84-1-'F1- A G E N D A SALT LAKE CITY COUNCIL COMMITTEE OF THE WHOLE MEETING DATE: Thursday, January 4, 1990 TIME: 5:00 p.m. PLACE: City Council Conference Room City & County Building, Room 325 451 South State Street Salt Lake City, Utah The Council will interview Eldon G. Marshall prior to consideration of his appointment to the Mosquito Abatement District Board. The Police Department will brief the City Council on policy issues. The Public Utilities Department will-brief the City Council on policy issues. The Public Utilities Department will brief the Council on a proposed change to an ordinance relating to water and sewer main connections. The Council will review a request for a Councilmember to travel to a conference sponsored by the Urban Land Institute, and will consider a request for a staff member to travel to Scottsdale, Arizona in conjunction with a staff audit. cc: Mayor Palmer DePaulis, Mike Zuhl, Emilie Charles, Roger Cutler, Kathryn Marshall, Department Heads, Press OFFICE OF THE -CITY COUNCIL CITY AND COUNTY BUILDING 451 SOUTH STATE STREET, SUITE 304 -SALT,LAKE CITY, UTAH 84111 535-7600 • January 3, 1990 MEMORANDUM • TO: COUNCILMEMBERS & MEMBERS ELECT FROM: CINDY GUST-JENSON ./'1' SUBJECT: STAFF TRAVEL FOR AUDIT A question relating to staff travel has arisen. I have discussed this with the Chair, and he has asked me to provide the information to the entire Council for consideration. It has been added to the Thursday, January 4 agenda since the topic of travel was already on that agenda. The Council authorized several audits to be conducted by Council staff this year. The One Stop Counter audit is in progress right now. It has come to our attention that Scottsdale, Arizona has an excellent program in this area. We do have funds in our staff travel area to accommodate a trip to review the Scottsdale program, and it is very common for auditors to view other programs to get new ideas and identify ways to iron out existing problems. Since our office travel policy doesn't address travel for audit purposes, the Council needs to decide if they are comfortable with such a trip. The approximate cost is $500. One trip per year is budgeted for each Council staff member. The staff member who would be sent on this trip did attend a conference earlier this year, and so this trip would need Council approval. I recommend the Council authorize the trip. mom'! a CET EgtO •Mi OFFICE OF THE CITY COUNCIL CITY AND COUNTY BUILDING 451 SOUTH STATE STREET, SUITE 304 SALT LAKE CITY, UTAH 84111 535-7600 January 2, 1990 MEMORANDUM TO: COUNCILMEhBERS FROM: CINDY GUST-JENSON SUBJECT: TRAVEL REQUEST Councilmenber Nancy Pace has become aware of a January conference sponsored by the Urban Land Institute on "Creating a Great City Center. " She is interested in attending, if the Council is supportive of the idea. Nancy has indicated this conference offers information on a variety of topics she is interested in pursuing as a Councilmember. Attached for your information are copies of the two Council Office policies on travel. The first policy outlines the basic meetings generally attended, and also indicates Members may decide to attend other conferences and conventions related to City business. The second policy indicates that trips not listed in the policy should be approved by majority vote of the Council. We could accommodate this trip in the Council Office budget. It would count as one of the two budgeted "unforeseen trips. " For your information, the balance of travel for this year is expected to be to the National League of Cities conference in March. We have budgeted for five members to attend that conference. If all members were interested in attending, we could use the second increment of "unforeseen trip" money, and use the balance we have left in unused staff travel. If there are other members who wish to attend this conference, and all members wish to attend the March League of Cities conference, the Council will need to have the staff look more closely at the budget to see if alternative sources could be identified. If any members wish to attend this conference rather than the League conference, that would work fine within the budget. ACTION NEEDED: Take a straw poll on Councilmember Pace's reciuest to travel to the Urban Land Institute Conference "Creating a Great City Center. " COUNCIL OFFICE TRAVEL POLICY POLICY: It is a formal policy of the City Council that any or all City Council Members may travel to conferences and conventions related to City business. Council staff are encouraged to attend one conference or convention per year which is directly related to their job duties. PROCEDURE: The Council Office travel policy is an informal policy which has not been officially adopted by the Council. The Council currently budgets for travel by asking each Member at the beginning of the budget formulation process which of the following conferences/activities they intend to attend: National League of Cities and Towns Congressional City Convention (Washington, D.C. ) Congress of Cities Utah League of Cities and Towns Mid-Year Convention (St. George) Based on this information, staff prepare cost estimates for inclusion in the Council Office travel budget. In addition, Council Members may decide to attend other conferences and conventions related to City business. The name of the conference/convention is submitted to staff for preparation of a cost estimate and inclusion in the Council Office travel budget. The Council has also budgeted for two unforeseen trips per year. The Council has been committed to a well trained professional staff. As a result, the Council has budgeted for one conference per year per staff person. Members of the Council usually attend conventions/conferences sponsored by the National Association of Housing and Redevelopment Officials. They attend as the Board of Directors of the Redevelopment Agency. These costs are budgeted and paid for by the Redevelopment Agency. I - 4 OFFICE OF THE SALT LAKE CITY COUNCIL Effective Date POLICIES & PROCEDURES MANUAL Subject _ Chairperson's Signature TRAVEL It is the policy of the City Council to provide for travel to Council-related functions within appropriated travel budgets. A. Council Members may travel to the following functions, within appro- priated travel budgets: 1 . Functions sponsored by the National League of Cities. 2. Functions sponsored by the Utah League of Cities and Towns . 3. Functions sponsored by the National Association of Housing and Redevelopment Officials. 4. The.Annual Rocky Mountain Pedestrian Conference. B. Council Members wishing to travel to functions not listed above shall submit a request to the Council , and the Council , by majority vote shall determine whether the requested travel is appropriate. C. Travel requests for Council Staff shall be submitted to the Council Chairperson for approval . Public Utilities Policy Analysis - 1990 Council Staff Review Lee King Summary of the Issues Public Utilities has three major issues facing the department in the next year. The first two issues, a Five Year Capital Improvements Program and Earthquake Preparedness and Mitigation will have a major budgetary impact. The third issue, that of a Water Sales Moratorium in the Canyon Watersheds will have an impact on development in the canyon watersheds and will be one of the major environmental policy issues facing the Council in 1990. Background and Questions The department has done an excellent job in preparing the necessary background information on each of these topics so I will not add a lot of detail. The first policy issue is formally adopting a Five Year Capital Improvement Plan for the Water Utility. The City currently adopts a one-year plan during the budget. Funding is on a year-to-year basis, with little analysis on future requirements. Public Utilities has developed a long range plan for the Water Utility much like they did several years age for the Sewer Utility. They have included very detailed schedules for the Five-Year Capital Improvements Plan for both the Water and Sewer Utilities. The schedules include specific projects, expected revenues and operating costs, and projected shortfalls. Their written narrative does not specifically address long term funding options. LeRoy Hooton and Jim Lewis are prepared and will present these options in their presentation Thursday night. The attached report does state that Water and Sewer Utilities can maintain current rates through the next budget year (through June 91 ), but depending on federal legislation and the degree of seismic upgrade, both utilities could possibly require additional funding in 1992 and beyond. You may wish to focus your questions in this area. If you will recall, Public Utilities raised water rates and decreased sewer rates in each of the last two budget years. The rate increase for the Water Utility in 1989-90 was specifically for capital improvements (water main replacements). If_ the Council elects to go with a formal 5 Year CIP for the Water Utility you will be faced with a major funding decision during the upcoming budget process. The options that LeRoy will present for you to begin to consider range from bonding to pay as-you-go. Both options will probably require rate increases in FY 91-92 (July 1991 ) with the size of the rate increase dependent on the option selected. The same funding situation applies to Earthquake Preparedness and Mitigation. Water Sales Moratorium is a volatile subject with several new issues emerging that were not considered when the moratorium was first implemented. The department will brief you on the history and current situation. The Public Utilities Advisory is starting a major study on this issue and will be preparing options and recommendations to present to you later this calendar. year. Police Policy Analysis - 1990 Council Staff Review Cam Caldwell Summary of the Issues Operations Bureau The Police Department Operations Bureau policy presentation cites statistical information documenting the need to increase the staff of the Operations Bureau by twenty-five officers and nine support personnel. Eighteen officers are slated for the Patrol Unit and seven for the Traffic Unit. All nine support personnel are slated for the Information Systems Unit. The department will be making an oral presentation which will supplement their written report. In that oral presentation they will equate levels of service for each of the organizational subdivisions of the Operations Bureau with the staffing levels they are requesting. For example, the following is the format which may be used in presenting information for Patrol, Traffic, and Informations Systems: Patrol Unit Current Optimal Staffing Level 137 155 Response Time 2 hr. * 30 min. Additional Cost $0 $774,000 *Routine non-emergency calls Traffic Unit Current Optimal Staffing Level 20 27 Traffic Tickets Issued 59K 73K Additional Cost ;0 $301,000 Information Systems Unit Current Optimal Staffing Level 44 53 Processing Time 240 hr. 24 hr. Additional Cost 0 $180,000 The policy implications of this presentation relate to the level of service which the department provides in serving the community, and the costs associated with providing that. service. Investigative Bureau For the Investigative Bureau the department cites information documenting the City's drug related problems, and the need for additional staffing in the Detective Unit. A total of thirty-eight sworn and three non-sworn positions -1- are identified for additional funding. Twenty-four sworn positions and one non-sworn support position have been requested for Special Investigations. Special Investigations is the narcotics program. Eight sworn positions and one non-sworn staff member are requested to expand the Drug Abuse Resistance Education (DARE) program which was instituted this past year. Six positions are requested to support the Detective Unit. The same format for documenting levels of service for the Operations Bureau is anticipated to be used by the department in their presentation of information for the Investigative Bureau. The anticipated total cost to address department requests are Special Investigations, 1,052,000; Youth, $364,000, and Detective Unit, $278,000. Administrative Bureau The Administrative Bureau written report includes a description of work with neighborhood groups to address specific police problems germane to those neighborhoods. Plans are also detailed to expand the crime prevention programs. Two sworn personnel and one non-sworn position are requested for the Community Affairs Unit to fund these program expansions. The approximate cost to accomplish these service increases is $106,000. Background and Questions on Each Issue Operations Bureau Total Calls for Service increased by 3. 3% to 124,688 in 1988. Calls increased to nearly 134,000 in 1989. According to the department calls are projected to increase to about. 145,000 in 1990. The total number of staff as of December. 31, 1988, was 420, with 303 sworn officers. Those figures compare with 434. 48 full-time positions in the 1989-90 fiscal year, with 320 approved sworn officer positions. The major policy question which the Council may wish to address is the opportunity which may exist to increase the use of non-sworn personnel to conduct routine police business. For example, according to department and national statistics, 60 to 70 percent of all calls for service are actually service calls which do not require a criminal enforcement response. The Council -'ay wish to ask the department to develop a series of recommendations to address how the City can handle many of these calls with non-sworn personnel. Council may also wish to consider conducting a Council Staff audit of the information Systems Unit to review its operattons and staffing-needs. Investigative Bureau The department notes that 80% of all crimes committed in Salt Lake City are drr.ig related. This statement is not based upon hard documentation, but is an inference drawn from national crime statistics. According to the department, the Metro Narcotics Task Force does not totally meet the needs of. the City's drug problem. Despite the successes of the Metro -2- Narcotics Task Force in the past., the Salt Lake City drug problem is more extensive than that which exists in many of the County suburbs. At least twelve more narcotics officers would be necessary for the City to bring its enforce: ent program up to an acceptable level, according to Police Department Act::ini strati on. The DARE Program is an excellent drug education program which was initiated in Salt Lake City this past year. The expanded level of funding is consistent with the plan proposed last year by the department. Council may wish to explore with the department how the additional Detective Unit staff will be able to increase the level of service in that service area. Administrative Bureau The Community Affairs Crime Prevention and Community Policing programs are two programs which the department gave expanded emphasis to last year. Council may wish to ask the department to provide more information about the results of these programs. Council Members may also wish to obtain feedback from their Community Councils about the effectiveness of these programs in the neighborhoods. -3- Salt Lake City Police Department POLICY ISSUES 1990 Olk ‘./k3,1Th INTRODUCTION It is a pleasure to present the Police Department' s Policy Issues for 1990-91 . These issues represent the future direction of this department if it is to meet the public safety needs of this city. This document contains a table of contents, three policy issues, a current status of new programs/concerns , along with an appendix. Your careful review and consideration of these issues is appreciated. Thank you. i POLICY 1 Operations Bureau The policy of the Salt Lake City Police Department is . to provide an acceptable public safety response to our citizens. This includes the ability to respond to calls for service in a timely fashion. In addition, officers should be deployed in the community for the purpose of deterring criminal activity. Current case loads for officers have increased 50 .8% during the previous ten years. However, uniform officers have realized a reduction of 19% since 1981 (194 vs 157) . It is not uncommon for the uniform division to be backlogged on calls for 2 hours during much of the year. Today, officers spend virtually all their time going from call to call and completing reports . Opportunities for pro-active patrol are virtually nonexistent. The lack of manpower also contributed to a 29% reduction in traffic enforcement city-wide. This includes a reduction of 28% in DUI arrests from 1987 - 1988 . The increase in case load has resulted in a substantial delay for the Records Division. Today, it takes 10 days before a report reaches the investigation division for follow-up investigation. It is absolutely crucial that follow-up investigative work be more timely. The uniform division represents the department' s front lines of defense in the effort to reduce criminal activity in the city. Their visibility and timely response will play a major role in providing the public safety this community needs . -1- POLICY 2 Investigative Bureau It is the policy of this department to actively investigate criminal activity in this city. This not only serves to bring criminals to justice, it also serves to deter criminal activity in the city. It is now estimated that over 80% of all crimes committed in Salt lake City are drug related. In addition, we are noting a significant number of homes in the city that are distributing drugs. Current staffing levels do not allow us to investigate every complaint. In addition, the city is experiencing increased criminal gang-related activity which represents a significant threat to the public safety of many city neighborhoods. A police response will not solve the gang problem but it can certainly impact it. The DARE Program is now completing its first year in nine elementary schools in the Salt Lake City School district. 1990 will find DARE in every elementary school in the district. This program has been extremely well received both in the schools and in the community. The Investigative Bureau will work actively to address the problems of increased Part I Crimes in the city. The increase of Aggravated Assaults , Sexual Crimes , and Auto Theft must be met with an appropriate and timely police investigation. The efforts of the Investigative Bureau will serve to minimize the danger to this community resulting from drugs, gangs, and dangerous criminals . -2- POLICY 3 Administrative Bureau COMMUNITY POLICING EFFORT The Salt Lake City Police Department' s commitment to a "Community Policing Effort" was defined by a policy statement included in THE FUTURE which was published in January 19 , 1989 . The Community Affairs Division was established in November 1988 to emphasize and give direction to the Community Policing Effort. Briefly stated, the primary goal of the Community Affairs Division is the police department' s "interface with our citizens" , to work closer with our neighborhood/community councils than in the past, and to look to "solving" problems in the neighborhoods with the neighbors as our partners . The Community Affairs Division reports directly to the Assistant Chief of Police, and includes the Crime Prevention Unit, the Public Information Officer, Operations Analysis , Planing and Research, and the Police Chaplains Corps. This reorganization provides the Chief of Police with the coordinated resources which can be directed toward the Community Policing Effort. The establishment of a formalized Community or Problem Police program remains a long term goal- contingent on adequate staffing and budgetary requirements . However, considerable progress has been made toward our stated Community Policing effort. This new environment has made it possible for the Crime Prevention Unit to intensify its programs and activities as well as play a major role in our neighborhood problem solving efforts . A "task force" approach has been adopted to work with the neighborhoods in dealing with problems which require help from multiple resources., i.e. : Police, other city departments , and community resources. One of the benefits of this approach is to bring the people from the involved resources and the community members together. This personal involvement sensitizes the service givers to the needs of the community. It also provides an opportunity for the community members to understand the limitations and problems of the service givers. Working together they can develop tactics which are often more effective and acceptable to both. -3- • Community Policing Effort - con't The task force concept was first employed to respond to concerns expressed by a Capitol Hills neighborhood committee regarding drug problems, residence burglaries and car prowls. A good relationship was established between the community and the assigned Patrol and Crime Prevention Officers. Many committee members and block leaders have taken advantage of our invitation to participate in our "Ride-a-Long" Program. As a result of this task force, a drug house in the neighborhood was shut down by units of the Special Investigations Division. Car prowls decreased 50% . While residence burglaries have not decreased, the police/community partnership is continuing and is directed at a reduction of residence burglaries and the prevention of other problems . The task force concept has also been used to work with other community/neighborhood groups expressing concerns regarding problems at : Miller Park: Disturbances, drinking, drug use by after-hour trespassers in the park. Downtown (area of 300 South & Main) : Transients and drunks affecting local businesses . Rio Grand Street: Transients and drunks affecting local businesses. Five "Policing Goals" were listed in THE FUTURE publication to initiate the Community Policing Effort. Those goals and our progress toward achieving them are as follows : 1. Introduce the concept of Crime Prevention Through Environmental Design. A Crime Prevention Officer completed the training course and is being very successful in introducing the concept. She is working with the Parks Department to employ these concepts with problems in Miller Park and Old Canal Park. She is a member of the Wasatch Hollow Committee whic.h is attempting to create a new neighborhood park. CPTED concepts are being considered in the design of this park to discourage criminal activity. She was consulted by Westminster College administration concerning the consideration of CPTED concepts for the remodeling project. A number of the concepts were used. She is teaching classes and her last class involved police personnel, a City Council member, -4- Community Policing Effort - con' t representative from the Mayor' s Office, Parks Department and Building and Planning. Also included were neighborhood representatives and an architect from the Salt Lake City School District. Community and - government response to these concepts is very encouraging. A one week seminar sponsored by Salt Lake City is being considered. 2. Reestablish "Officer Friendly" as a full time position to allow the development of 'Youth Against Crime Program" . The position has been established in the manning table, but is yet unfilled. The new police officers hired to bring us up to full strength have been assigned to higher priority field assignments due to unanticipated retirements and resignations. 3. Enhance the "Victim Contact" Program. Develop a more convenient method for first response officers to advise victims of available Crime Prevention assistance. An updated community human resource directory has been distributed to all divisions within the Police Department. Crime Prevention personnel met with all Patrol Division sergeants to brief them regarding existing programs. A more convenient method referral is being developed and will be implemented as soon as possible. 4. SPECIFIC COMMUNITY POLICING SQUAD -GOALS. A. Create added visual aids for use in neighborhood meetings. This allows citizens to see that all of the burglary locations are not in their immediate neighborhood. Pin maps showing the location of burglaries and other crimes are being constructed, and it is anticipated that with the assistance of the new Police Volunteer Program these maps can be maintained. Other visual aids have been developed and include display racks to hold printed Crime Prevention information. The racks are easily transported while loaded and provide easy access for interested citizens at meetings. A purchased portable metal display structure enables Crime Prevention to display posters, charts, maps, etc. , at meetings or other functions. These visual aids enhanced the Crime Prevention display at the Animal Fair, City Fest, the West Jordan Crime Fair, and other neighborhood meetings . -5- Community Policing Effort - con' t B. Expand the Senior Citizen Training Programs. This is to be accomplished by asking the Senior Activity Centers to host regular meetings , about four per year, to allow us to inform senior citizens of several different problems. 1 - Security in the Home 2 - Street Safety 3 - Frauds and Con Games 4 - As selected by officer/specialist and audience Crime Prevention personnel have conducted at least one meeting at the Senior Activity and residential facilities and this is an ongoing program. C . Creation of a 'Block Leader Bulletin'. This would be a one page flier informing the block leaders of specific problems or information pertaining to their neighborhood. Two (2) bulletins have been sent to date. In addition, a special bulletin was distributed concerning the Miller Park problems and the Wasatch Hollow Park development. 5 . Specific goals by council district. These goals were listed in THE FUTURE. All have been addressed and most are now ongoing programs. -6- STATUS REPORT COMPUTERS Several areas have had personal computers purchased far them and have already proved beneficial. Those areas are: Checks/Fraud Squad, Fiscal Unit, and Vice/Intelligence Unit. Additions to the Burroughs Micro System in the Detective Division have made available 3 more work stations and upgraded the main processor to current technology. One additional work station has been made available to the Youth Division. The Records Division is in the process of upgrading the processors. Three additional work stations will be added shortly. POLICE VOLUNTEER PROGRAM At the present time, 11 volunteers have completed applications , background checks and attended an orientation class . They will be operational in the future. FOOT AND BICYCLE PATROL We feel that the program has proven itself. The tactical use of bikes has allowed the officers assigned to cover more territory , respond quicker, and patrol more effectively . These two examples are included to illustrate. Officers have reduced car prowls in parking lots. They made six arrests in the first month and performed over 1 , 500 parking lot checks during August. Prowls dropped from dozens a day to one or two a week . In a two-hour period, while working in Sugar House Park, three officers wrote 22 citations for various offenses It would have been difficult to have had this success except by using bikes. POLICE SERVICE DOGS The implementation of a Police Service Dog Unit is currently underway. Three officers have been selected and busy-- building the program from the ground up. We are waiting for their dogs to arrive. -7- Status Report — con' t PUBLIC SAFETY PARKING The parking at the Public Safety Building has not improved. Other parking in the area of the Public Safety Building has been used to a limited extent. It is our understanding that a study has been started to address the parking problem we are faced with. A.F.I.S. The Automated Fingerprint Identification System is coming on line as anticipated. Training is underway with our Crime Lab personnel. The System should be up and working by the first of January 1990 . The fingerprint data base was installed in July and the State system has been up for several weeks. The system has already provided the ID of a Tooele County homicide victim. APPENDIX -9 Of the new personnel requested, they would be allocated by bureau/division as follows: BUREAU/DIVISIONS OFFICERS SUPPORT ° Administrative Bureau Total 2 1 Administration 0 0 Community Affairs 2 1 Staff Inspections 0 0 Investigative Bureau Total 38 3 Special Investigations 24 1 Youth 8 1 Detective 6 1. Operations Bureau Total 25 9 Patrol 18 0 Traffic 7 0 Information Systems 0 9 TOTAL 65 13 Salt Lake City ceDepartment'poli Total Police Oases by Year 140000 - ' 978-1989 135000 _ 132400 +33 1 a 9 130000 �� 124927 124888 �♦ 125000 ♦" 122693 ♦ - ♦ ��� 120718 \♦� � 120000 * ♦ ....-r •2♦ ♦•♦ 115959 114959 115585 2$ : 115000 ••• •♦♦ 111988 i♦♦ '�' i' -�• • � ♦ 110000 • 108355 ?i• . .� i!i 212 +4 •$ A. . •. 103398 1�� ♦� •♦♦ ♦ ♦♦ ♦� ♦♦ • ♦♦ ♦ 105000 *p !♦• :►♦ il ♦� ♦♦ • P. ♦♦ • !< 100000 ► • . +{! ♦� •♦i• • •95000 ♦� • •♦ • • - i1Js • • •Z•• • . + ♦♦ • 80000 • 78 79 80 81 82 83 . 84 85 86 87 88 89 * Annual totals —*1989 forecast as of 7/89 E r tom, ..) „„.:. Salt Lake CityPolice Department Uniform Officers and Average Caseloads by year Uniform Response Officers Average Annual Caseload 900 change — 16.5% change +58.0% 843 800 770 j 722 700 � 671 ', '� 618 600 599 598 f 571 63 603 I 534 5"500 7: 0 0- 0- 0 : % f r 400 1001 . 1 I 300 l r<200 , 188 / 190 181 194 186 f 196 / 183 187 0 173 180 ❖ PII j!::1 H :g / .:/ .e r i q •j16q •i`. :•d •_.:Y j O• I .JII 4 - I / ilk ilV 1:./ iiii/ V iii :::1 0 •••/A !Jiig / :IS! ••• 1I10, _111 • 0 2. 1•••1 iio A 78 79 80 81 82 83 84 85 86 87 88 89* fnff nt mid—venr. *1989 rnsetcrnd estlmnted1 Salt Lake CityPolice Department • Total Sworn Strength and Average Caseload Total Sworn Officers Average Cases per Officer 450 430 + 50.8% 410 390 370 r 350330 _,`\ - 1 2.5% 310 290 270 250 78 79 80 81 82 83 84 85 86 87 88 89* Staff at Mid —years Calender Year Cases (*1989 forecast 7/89) SALT LA < E CITY POLICE DEPAHTMINT ' event Staffing History Uniform Non—sworn Sworn Field Response Support Supervisor IV / l '/i/-/A r - - - - -4.4 200 78 89 — 16.5% 78/89 — 53.4% 78/89 — 34.2% 188 190 r 194 7 196 1 80 ' 181 / 186 183 T 187 180 j / T173 1' i G r r. r 162 r ��152 r r r r 2 7157 160 t r;1 %/ ✓ r / / � r rr 140 �r r s �► 137 jr %� % / i r / 120 �%/ i r %/ i 123 i 126 rr/ 127 i-126 r/ 124 r 121 i �mi , 11 �•(� , r r r/ rp rr rJ izr r/ rr /� , 110 11 100 7r 1 ,r j% // r� �f r2 %� 2 / /r /rr r/ / r/ , . it , , r 80 rig r'l c/ i/ % %'r 5-/ /7, r �� �, r� �/ f �� �r /. 7/. r � f62 60 / / �/ // / r/ 3B r // r40 4 r / , r ,s/ DEl 36 35 f/ 35 r/ 34 r _ 36 ' 35 J 35 % 2925 rJ25 20 r� r � �` ,r. Jlr ' ram rprii, ' ' r✓ �2 r! x r' iI/ r ��9I � ri 78 79 80 81 82 83 84 85 86 87 88 89 Staff by category at mid—year • LEROY W. HOOTON, JR. DIRECTOR WENDELL E. EVENSEN, P.E. < e ®1 ©Y SALT 41 STY/G0RPO. SUPERINTENDENT ':94,.s..s � _ WATER SUPPLY&WATERWORKS E. TIM DOXEY DEPARTMENT OF PUBLIC UTILITIES SUPERINTENDENT Water Supply & Waterworks PALMER DEPAULIS WATER RECLAMATION Water Reclamation MAYOR JAMES M. LEWIS, C.P.A. CHIEF FINANCE& 1530 SOUTH WEST TEMPLE ACCOUNTING OFFICER SALT LAKE CITY, UTAH 84115 GEORGE JORGENSEN, P.E. CHIEF ENGINEER December 21, 1989 The Honorable Palmer A. DePaulis and City Council of Salt Lake City City & County Building Salt Lake City, UT 84111 RE: 1990 Policy Issues Dear Mayor and City Council Members: n� Pursuant to your request for policy issues that will be before the City Council during the next year, the Public Utilities Department would like to submit the following: 1 . Five Year Capital Improvements Program. As we go forward into the next decade, one of the major issues facing the Department of Public Utilities is its ability to finance essential programs such as plant and system replacements, compliance with more stringent environmental standards and meeting the increasing cost to operate and maintain aging facilities. Last year, the department submitted a new five year capital improvements program, which outlined the need to spend $50 million for water system projects and $30 million for sewer projects. The plan is reviewed annually and updated as needed . The water and sewer profession recommends that utilities practice such planning to meet the growing needs of the industry. The policy issue is to formally adopt the Five-Year Capital Improvements Program and to commit to financing it to. insure the continued high levels of service in the future. Currently the City only adopts a single year water utility capital budget and the program depends on year-to-year approval. On the other hand the Sewer Capital Improvements Program is part of the City ' s adopted 201-Facilities Plan which is a combination capital projects program and a financial plan to fund it. Most will agree that the sewer program has been a success and proves the wisdom of long-range capital improvements planning. Mayor and City Council December 21 , 1989 Page 2 To adopt the Five-Year Capital Improvements Program for both the water and sewer utilities would require the City to recognize the importance of such a plan and as the need arises to raise the necessary revenue to finance it. As part of the Public Utilities Department ' s 1989-90 budget, the department will recommend that funds be borrowed by the Water Utility Fund from the Sewer Utility Fund to finance the seismic improvements at the Parley' s Water Treatment Plant, purchase watershed land and purchase water rights during first budget opening in 1990. 2. Earthquake Preparedness and Mitigation. Salt Lake City is located in an active seismic zone that could produce earthquakes in a magnitude of 7 . 5 and greater. The public drinking water and sanitary sewer systems (considered "Lifeline" facilities ) are subject to widespread damage in the event of a major earthquake episode. It has been the policy of the City to bring critical public facilities up to current seismic standards in order for them to withstand a major earthquake and continue to provide emergency services in the aftermath of such an event. However, there is great expense and there has not been a funding source to finance the necessary improvements. The Department has estimated that it will take over $10 million to bring its water treatment plants up to seismic standards and perhaps even a greater amount to bring the sewage pumping and treatment facilities up to standard. Currently the department is conducting an engineering study at the sewage facilities to determine what action is needed and an estimated cost. To finance the necessary improvements would require additional water revenues and an altering of the City' s adopted 201-Facilities Plan. 3 . Water Sales Moratorium in the Canyon Watersheds. In 1981 , the Department of Public Utilities placed a "moratorium" on any new surplus water sales agreements within the canyons watersheds. In 1988, the City adopted its "Watershed Management Plan" which directed the department ( Public Utilities Advisory Committee ) to evaluate the moratorium after Salt Lake County had adopted its "Wasatch Canyon Master Plan, " to determine if the moratorium should remain, be replaced or modified. The recommendation would either be adopted as a policy or formalized by ordinance. The Public Utilities Advisory Committee will begin studying this issue in their January meeting and expects to submit their recommendation to the Mayor sometime this coming spring. Mayor and City Council December 21 , 1989 Page 3 This is a highly charged issue, because it will have a dramatic impact on development in the Wasatch Canyon watersheds . If the moratorium is kept in place it will limit growth in the canyons to existing contracts. If the moratorium is relaxed it will allow additional development within the canyons. Within the past two months the Department has denied approval of two proposed developments due to the moratorium. I and my staff are looking forward to discussing these important policy issues with you on January 4, 1990. Sincerely, LeRoy 1 Hooton, Jr. Director LWH:mfs -v 0 r t--- 1 c) 4 N c m N Issue 1 GP\-� LAKE C�Tj Five-Year Capital Improvements Master Plan 0A99160co rOF PU6\-\' The Department of Public Utilities is at the tion fees over a three-year period from beginning of a new, five-year capital im- $300 to $500 for each residential equi- provements program. valent the first year then to $700 the next year and then to $1,000 the final year. Based on long-range plans needed to pro- vide high quality service to our customers, In January 1986,after reviewing the cash the program is flexible enough to permit flow plan, it was decided to lower sewer reassessment and modification as condi- rates from $1.08 to $.90. Rates were re- tions change. It does not answer funding duced during in 1988 to $.85 and to $.80 problems. It does list options for policy in 1989. makers. A low inflation rate, change in discharge The sewer staff, a citizens advisory panel, permit standards, higher interest on in- and engineering consultants designed a 20- vestments, and postponement in con- year cash flow plan. This plan raised rates struction of the new treatment plant from $.54 to $1.08 per hundred cubic feet allowed these reductions. of winter water used and increased connec- WATER UTILITY FUND CAPITAL/EXPENDITURES 13 12 - 11 - 10 - 9 - 8 - 7 - 6 - f 5 - f I I 4 - 3 2 - III LIM ani MI 0 80 81 82 83 84 85 86 87 88 89 YEARS MI BOND I: CURRENT EARNINGS The water utility initiated a $30 million crease of$1.9 million was approved.This bonding program to fund major conduits increase,however,is only a small amount and reservoirs. Therefore, the water utility of the ever-increasing capital require- is not as strong financially as the sewer util- ments of a large water utility. ity fund. It is not generating enough funds for all required projects. Current capital improvement require- ments continue to be greater then future Both plans have been implemented during funds.During the current year, the water a decade phased activity to match cash utility will borrow nearly $4.5 million flows.The pay-as-you-go financial plan and from the sewer utility for watershed land the original bond resolution approved in purchases and construction costs asso- 1981 came to an end this summer with com- ciated with the Parley's Water Treatment pletion of all projects.These plans allowed Plant expansion. the department to fund $114.2 million in water and sewer capital improvements. The financial structure of the water util- ity also continues to decline as reserves Bond construction funds used to finance are spent on the strong capital improve- the water utility program are reflected in ment program. Most of the water utility the accompanying chart. facilities such as deep pump wells, pump stations, storage reservoirs, treatment During the 1989-90 budget process, the plants, and major conduits are near an water utility required additional funds to age that requires rehabilitation or re- finance water line replacements. A rate in- placement. PUBLIC UTILITIES WATERMAIN BREAKS 500 -- 450 400 350 300 250 200 150 - 100 50 0 77 78 79 80 81 82 83 84 85 86 87 88 89 YEARS WATERMAIN BREAKS Key facilities such as our treatment plants be added every three years after that,well are 35 years old. In addition, the chart into the next century. shows the result of not maintaining a water- main replacement program.During each of This concerns Salt Lake City because it the years that an active watermain replace- has more than 50 water sources and ad- ment program was kept, the number and ditional costs will be required to test, severity of watermain breaks dropped. In monitor and perhaps treat many of them. 1986-87 and 1987-88 we held back replace- Each new regulation brings more costs. ments and the number of main breaks in- creased, causing additional costs. Volatile organic compounds were added to the list of regulated compounds in The proposed five-year capital improve- 1989. The entire Salt Lake City system ment plan which is attached currently is not has been analyzed for VOCs. Only one balanced and shows a deficit of $677,668 site was found with a detectable organic proposed for the next budget year. The -- well below the allowable limit. Each major change from last year's program is VOC test costs $155. If contamination is the inclusion of funding of seismic im- noted and treatment required, treatment provements at the Parleys Water Treat- costs are substantial. ment Plant and the associated debt service payment proposed for a $3 million loan Proposed regulations for SOCs (syn- between the water utility fund and the thetic organics) and IOCs (inorganic sewer utility fund.In addition,the five-year compounds) would cost $700 sampling capital improvement plan does not include and testing for each source.As proposed, funding for the following items: initial analysis means quarterly sampling at all sites. EPA has indicated that the I. Chlorine Scrubbers --$1,250,000 treatment technologies available for re- duction of SOCs and IOCs are affordable Salt Lake City uses chlorine at the City for large metropolitan systems. Creek,Parley's and Big Cottonwood Water Treatment Plants. Chlorine also is used at The best available technology uses the Third East Pump Station to treat water granular activated carbon or packed from the artesian basin and at Neffs Tank tower aeration, depending on the chemi- in Neffs Canyon to chlorinate a spring water cal present in the water. Installing either supply. of these in treatment systems is expen- sive. Proposed regulations which may The 1988 Fire Code calls for chlorine scrub- have an impact on Salt Lake City include bers to be installed wherever there is a the tap analysis of homes and businesses chance for a chlorine spill. These chlorine for lead,surface water treatment rule and scrubbers cost at least $250,000 each. the disinfection by product rule. II.Water Quality Changes -- $1,000,000 Lead analysis at the tap is proposed based on population and may involve hundreds The Federal Safe Drinking Water Act of samples for a system the size of Salt Amendments (SDWA) require promulga- Lake. We are gearing up to run these tion of numerous regulations within the analyses in house. Costs will run between next five years. Additional regulations will $5 and $10 per sample. The final EPA rule is expected by spring, 1990. standards will require additional funding and rate increases in the future. The sewer utility is in a better financial position. It generates about $4 million a Water and sewer rates can maintain cur- year for capital improvements which corn- rent rates through the next year. How- bined with current reserves, meets current ever, it is important to realize the water needs. Legislation affecting sludge and sewer utilities could require addi- management and waste water treatment tional funding. SEWER UTILITY FUND CAPITAL/EXPENDITURES 14 13 - 12 - 11 - 10 - 9 - 8 - 7 - 6 - 5 - 4 - 3 - 2 - 0 • 80 81 82 83 84 85 86 87 88 89 YEARS ME BONDI ° J CURRENT EARNINGS Issue 2 GP. LAKE Earthquake Preparedness and Mitigation 99TFNT OF PO CJ�\��, Its not"if'but "when." line. The Jordan Aqueduct runs along the west side of the valley. It, too, is vul- The city's water and sewer systems are ma- nerable to liquefaction and to damage jor lifeline facilities that could be damaged where it crosses a fault at the mouth of heavily when a major earthquake strikes the Provo Canyon.There are 146 million gal- Salt Lake Valley. Experts believe such a Ions of treated water in the valley's distri- quake can strike during the next century. bution reservoirs. Access could be limited by damaged pipes. It is the department's goal to prepare for an emergency, protect its employees from in- Expansion plans at the Parley's Water jury and bring its facilities up to seismic Treatment Plant include a $4.66 million standards.It is estimated that approximate- earthquake mitigation project.It will sta- ly$10 million to $15 million will be needed bilize the roof of the treatment plant and to accomplish this goal. its sedimentation basins to withstand a major earthquake. Eleven faults criss-cross the department's service area which has more than 650,000 Other studies are needed for the Big Cot- feet of conduits and supply lines. The tonwood Treatment Plant which sits less AWWA Journal of January, 1973, said no than 300 feet above the Wasatch Fault pipes of current construction or design and the City Creek Treatment which sup- could withstand an earthquake of 6.6 on the plies essential water to the downtown Richter scale. The department's water sys- area and Avenues. tern will suffer extensive damage and re- quire months to restore. A contract to study effects of liquefaction near the water reclamation plant is un- Half the city's water supply runs along the derway. Another study outlines damage Wasatch and/or East Bench Fault. that can be caused by shaking. Informa- tion will tell engineers what action must Major sewer lines require constant pump- be taken to mitigate damage. Although ing to halt flooding of the northwest and new construction at the plant meets central areas of the city. earthquake codes, older portions need upgrading. The department believes it is wise to pro- tect existing facilities, make contingencies The current capital plan includes and train its employees how to respond to $400,000 for structural improvements to an earthquake. reduce earthquake damage. Alternate sources of supply have been de- Emergency generators are ready for veloped.Wells throughout the valley are on power outages at both water pump and sewer lift stations. The department has six families, then report to work stations or portable generators, each of which can run department's operations center. For a sewer lift station. those persons on shift,another employee will verify the safety of their family. "Fail-safe" pumps are in the production stage. Dropped into a major sewer inter- Supplies of food,water and batteries are ceptor, they will lift more than 10 million available at many locations. Maps of the gallons of raw sewage a day into nearby system are kept in strategic places. The natural drainages--protecting houses and department has an emergency radio sys- business from flooding. tem and can operate many of its radio units in a non-trunked mode. Stores of The department's main administration gasoline and diesel fuel are maintained building also will undergo stabilization as as well as an emergency electrical system part of its$580,000 remodeling project.The needed to run maintenance and repair roof will be secured to the building's walls, facilities. protecting occupants from being crushed. The department keeps lists of available A similar study and project is needed for the contractors and suppliers of pipe,pumps department's operations center.This build- and other supplies. These lists are up- ing holds a major supply of equipment and dated on a semi-annual basis. parts needed to repair system damage after an earthquake. It also is the work-site for Extensive capital improvements are between 20 and 150 employees. The build- needed to meet current standards and to ing serves as the 24-hour dispatch center, protect the water supply, sewer collec- houses the department's water and sewer tion and wastewater treatment system.In telemetry system and provides a critical link the event of a natural disaster, they will to other emergency services. be critical for response and maintaining the public safety. Employees are told to take care of their Issue 3 Watershed Protection, �P Sales Moratorium A �FNrOF PUB�\c'J On April 19, 1988,the Salt Lake City Coun- * Salt Lake City's bid for the Olym- cil adopted the Watershed Management pics Plan prepared by Bear West. This plan made recommendations for policies affect- * Legislation submitted by Con- ing all the Wasatch canyons in Salt Lake gressman Wayne Owens, D- County, and protecting the city's water- Utah, designating the Wasatch sheds and its drinking water quality. Front as part of a National Recreation Area. As part of the plan, a recommendation was made that the city should maintain its exist- * Ski interconnect Park City and ing moratorium on new water sales con- the major ski resorts in Big and tracts until the Salt Lake County Master Little Cottonwood Canyons. Plan has been adopted.The only exceptions are: * Continued efforts to promote the "Super Tunnel." * Utilization of water under existing These issues were fully addressed in the contracts. county's plan, and were resolved as fol- lows: * Contracts to settle disputes with ex- isting users over water rights. * If Salt Lake City gets the bid for the Olympics, no events will be * Finalization of negotiations with held in Big or Little Cottonwood those who applied for water sales Canyons. contracts before the moratorium. The Salt Lake County Commission adopted * The only event that will be al- its Wasatch Canyons Master Plan in Sep- lowed in our watershed canyons tember, 1989.The issue of the moratorium will be Nordic track and the event should be brought before the City Council will be held at Mountain Dell this summer after the Public Utilities Ad- Golf Course. The state's elec- visory Committee prepares a recommenda- torate approved the measure in tion. November, 1989. Since the City Council approved the city's * If our watershed canyons are in- plan, and during the period of time the cluded in a National Recreation county prepared its plan,a number of issues Area, the county's plan requires emerged that could have an impact on the that the official National Recrea- moratorium. These issues were not fully tion Area designation must pro- considered during preparation of the city's vide funds to mitigate the effect plan.These issues include: of potential increased user levels, improve existing recreation facili- canyons. Surplus sales should be limited ties and to acquire lands for water- to springs which meet acceptable stand- shed protection. ards in regard to protection zones,water The county's plan includes ski interconnect quality and quantity. and the super tunnel concepts as part of the mountain transportation system. The plan Drilling of wells, construction of surface also states that no specific transportation water treatment facilities,importation of mode is recommended at the time and the water from outside the canyons and the implementation of a system will require transfer of water rights from the valley amendment of the plan. upstream into the canyons will be op- posed. The city's water sales contract moratorium was recommended in 1981 by the Public Existing surplus sales will only be hon- Utilities Advisory Committee for two rea- ored from sources identified in the con- sons; 1) protect the watersheds from over- tracts. These cannot be transferred or development and 2) at that time there was another source used. concern that the city would not have enough water to serve its full growth potential. The Salt Lake County Wasatch Canyon Master Plan,generally met the approval The moratorium has had a significant im- of Salt Lake City.It was supported by the pact on development in the canyons and environmental community and opposed over the eight years that it has been in ef- by the ski industry and Salt Lake Area fect, there has been a backlog of users who Chamber of Commerce. It is viewed as a have been waiting for the moratorium to be "preservation"plan which limits develop- lifted.This backlog could be enlarged if any ment. or all the new issues listed above come to fruition (i.e. ski interconnect). In the final outcome,the city's water sales contracts policy in the canyons and the Currently, Salt Lake City has water sales county's Master Plan will determine the contracts for a total of 954 units within extent of development in the canyons. Lambs Canyon,Millcreek,Big Cottonwood Likewise, if the moratorium is not lifted, and Little Cottonwood canyons of which greater pressure will come to bear on the 533 are in use. This leaves another 421 lots city to make water available by either that can be developed.However,more than political or legal means. 20 percent of the land in the Wasatch Canyons is in private ownership. Another relevant factor is the effect of storm water runoff on water quality from In order to limit the development of addi- urban development. On August 2, 1988, tional private lands, the Department of Salt Lake City,the Salt Lake City-County Public Utilities has set forth guidelines in Health Department and the U.S. Forest the event the moratorium is lifted, these Service entered into an interlocal agree- guidelines are included in the County's ment to begin monitoring the effects of Master Plan and are as follows: storm water discharges.It will be several years before conclusive data will be avail- Available water within the canyons is a con- able to determine the effects of dischar- straining factor in the development in the ges into the canyon streams and to be able to segregate the specific effects due to might be very helpful in determining development, during the summer of 1989 whether the moratorium on water sales the Department of Public Utilities began contracts should be modified or lifted. collecting data from storm water.The data ry} -H -CR' rT% ,\ PUBLIC UTILITIES WATER UTILITY FUND SCHEDULE OF CAPITAL IMPROVEMENTS & EQUIPMENT REPLACEMENT 7/1/89 THROUGH 6/30/95 SIZE SIX YEAR DEPARTMENT / PROJECT OF FISCAL FISCAL FISCAL FISCAL FISCAL FISCAL PROGRAM PUBLIC UTILITIES LINE 1989-90 1990-91 '1991-92 1992-93 1993-94 1994-95 TOTAL OTHER EQUIPMENT WATER STOCK 530,000 30,000 30,000 30,000 30,000 30,000 650,000 LAND PURCHASES 1,250,000 25,000 25,000 25,000 25,000 25,000 1,350,000 CULVERTS FLUMES & BRIDGES 30,000 30,000 30,000 30,000 30,000 30,000 150,000 AUTOMOBILES 663,000 500,000 350,000 500,000 350,000 500,000 2,363,000 PUMPING EQUIPMENT 57,500 30,000 30,000 30,000 30,000 30,000 177,500 TELEMETERING 200,000 50,000 50,000 50,000 50,000 50,000 400,000 TREATMENT PLANT EQUIPMENT 64,000 30,000 30,000 30,000 30,000 30,000 184,000 OFFICE EQUIPMENT 40,489 25,000 25,000 25,000 25,000 25,000 140,489 OTHER EQUIPMENT 112,095 150,000 150,000 150,000 150,000 150,000 712,095 TOTAL CAPITAL OUTLAY 21,456,274 4,138,968 4,724,412 4,018,570 3,885,894 20,697,135 56,551,325 CAPITAL OUTLAY 2,947,084 870,000 720,000 870,000 720,000 870,000 6,127,084 CAPITAL IMPROVEMENTS 18,509,190 3,268,968 4,004,412 3,148,570 3,165,894 19,827,135 50,424,241 FUNDING SOURCES CURRENT EARNINGS 3,560,274 3,200,000 2,800,000 2,400,000 2,000,000 1,600,000 15,560,274 CONTRIBUTIONS 261,300 261,300 261,300 261,300 261,300 261,300 1,567,800 SEWER LOAN FOR LAND PURCHASES 1,500,000 1,500,000 SEWER LOAN FOR PARLEY'S T. P. 3,000,000 3,000,000 SANDY'S CONTRIBUTION 7,671,000 7,671,000 METROPOLITAN CONTRIBUTION 2,500,000 2,500,000 RESERVES 2,963,700 2,963,700 TOTAL FUNDS AVAILABLE 21,456,274 3,461,300 3,061,300 2,561,300 2,261,300 1,861,300 34,762,774 CIFFERENCE BETWEEN REQUIREMENTS AND ACTUAL REVENUE 0 -677,668 -1,663,112 -1,357,270 -1,624,594 -18,835,835 -21,788,551 PUBLIC UTILITIES WATER UTILITY FUND SCHEDULE OF CAPITAL IMPROVEMENTS & EQUIPMENT REPLACEMENT 7/1/89 THROUGH 6/30/95 SIZE SIX YEAR DEPARTMENT / PROJECT OF FISCAL FISCAL FISCAL FISCAL FISCAL FISCAL PROGRAM PUBLIC UTILITIES LINE 1989-90 1990-91 1991-92 1992-93 1993-94 1994-95 TOTAL TREATMENT PLANTS I IMPROVEMENTS TO PARLEY'S PLANT ENGINEERING 499,000 499,000 IMPROVEMENTS TO PARLEY'S PLANT CONSTRUCTION 11,833,300 11,833,300 BIG COTTONWOOD INTAKE STRUCTURE 300,000 300,000 BIG COTTONWOOD PLANT IMPROVEMENT 150,000 150,000 300,000 CITY CREEK PLANT IMPROVEMENTS 2,050,000 2,050,000 MILL CREEK PLANT (NEW) 200,000 3,200,000 3,400,000 DAMS AND RESERVIORS LAKE MARY'S DAM 250,000 250,000 MOUNTAIN DELL DAM 500,000 500,000 TWINLAKES DAM 50,000 50,000 OAK HILLS RESERVOIR AND LINE 350,000 350,000 ENSIGN DOWNS RESERVOIR 250,000 1,250,000 1,500,000 45TH SOUTH RESERVOIR AND LINE 1,700,000 1,700,000 MORRIS RESERVOIR AND PUMP 250,000 250,000 BASKIN RESERVIOR COVER 140,000 140,000 PUMP STATIONS EAST BENCH PUMP STATION 10,000 10,000 62nd SOUTH PUMP STATION 60,000 60,000 WELLS AND WATER SOURCES WALKER LANE WELL 50,000 50,000 50,000 50,000 50,000 50,000 300,000 1100 EAST AND 4800 SOUTH WELL 50,000 50,000 EMIGRATION TUNNEL 235,000 235,000 ARTESIAN BASIN WELL 75,000 75,000 RED BUTTE CANYON WELL (NEW) 270,000 270,000 RE-HAB EXISTING WELL 19TH EAST 75,000 75,000 HIGHLAND DRIVE 39TH SOUTH WELL (NEW WELL) 270,000 270,000 CULVERTS FLUMES & BRIDGES HIGHLAND DRIVE IRRIGATION FLUME 250,000 250,000 250,000 250,000 250,000 1,250,000 JORDAN & SALT LAKE CANAL 50,000 50,000 100,000 PUBLIC UTILITIES WATER UTILITY FUND SCHEDULE OF CAPITAL IMPROVEMENTS & EQUIPMENT REPLACEMENT 7/1/89 THROUGH 6/30/95 SIZE SIX YEAR DEPARTMENT / PROJECT OF FISCAL FISCAL FISCAL FISCAL FISCAL FISCAL PROGRAM PUBLIC UTILITIES LINE 1989-90 1990-91 1991-92 1992-93 1993-94 1994-95 TOTAL WATER CONDUITS & SUPPLY LINES CALIFORNIA GLADIOLA TO PIONEER 30 475,000 475,000 NORTH TEMPLE 2200 - 3800 W 36 120,000 120,000 GADIOLA CALIFORNIA TO 500 WEST 36 330,000 330,000 FAYETTE AVE MAIN TO WEST TEMPLE 8 30,000 30,000 AFFLECK PARK WATER LINE --- 8,000 8,000 700 WEST 1700 TO 2100 SOUTH 12 250,000 250,000 TANNER RESERVOIR CONDUIT 36 150,000 150,000 SUNNYSIDE CONDUIT 36 6,000,000 6,000,000 3RD EAST 33RD SOUTH TO MARCUS 36 1,174,635 1,174,635 70TH SOUTH TO PROMENADE TO 13TH 24 1,732,500 1,732,500 21ST SOUTH 4400 WEST TO 5600 W 16 675,000 675,000 CALIFORNIA REDWOOD TO 800 WEST 24 743,700 743,700 300 EAST 1700 TO 2100 SOUTH 36 360,000 360,000 FRONTAGE ROAD 1600 TO 2000 NORTH 12 145,000 145,000 1300 WEST ILLINOIS TO MEAD 6 48,000 48,000 CATHERINE ST 1000 N TO GOODWIN 6 39,000 39,000 BECK STREET 900 TO 1300 NORTH 12 167,057 167,057 OAKLEY STREET 1200 NORTH /DUPONT 6 35,000 35,000 BECK STREET 1300 N 2200 N 12 463,968 463,968' EASTWOOD DRIVE 3680 TO 3750 E 8 29,000 29,000 EASTWOOD DRIVE 3370 TO 3660 S 6 99,598 99,598 1200 NORTH VICTORIA TO COLORADO 6 119,814 119,814 1000 NORTH COLORADO TO CATHERINE 6 25,878 25,878 LOUISE AVENUE 2700 E 2835 E 6 147,934 147,934 DELSA DRIVE 2700 E 2835 E 5 33,478 33,484 VENUS DRIVE 2500 E/MORNINGSTAR 6 47,348 47,354 VALLEY STREET METRO-WAY TO 3300S 6 34,162 34,168 2400 SOUTH 900 WEST TO 300 W 12 53,838 53,850 WARR ROAD WASATCH BLVD/CASCADE 6 38,000 30,932 68,938 MONTGOMERY STREET 1300 S/GLENDAL 6 59,280 59,286 AMERICAN AVE CHEYENNE ST .TO PUEB 6 24,966 24,972 METROPOLITAN WAY VALLEY/GREGSON 4 53,048 53,052 MT OLYMPUS BARBARA WAY/FOUBERT 4 35,264 35,268 EVELYN DRIVE GARY ROAD TO RUTH 4 72,466 72,470 500 WEST 1200 SOUTH TO 17.00 S 6 70,870 70,876 TETON TANKS TO CRESTWOOD DR 6 22,000 22,006 PUBLIC UTILITIES WATER UTILITY FUND SCHEDULE OF CAPITAL IMPROVEMENTS & EQUIPMENT REPLACEMENT 7/1/89 THROUGH 6/30/95 SIZE SIX YEAR DEPARTMENT / PROJECT OF FISCAL FISCAL FISCAL FISCAL FISCAL FISCAL PROGRAM PUBLIC UTILITIES LINE 1989-90 1990-91 1991-92 1992-93 1993-94 1994-95 TOTAL ROWLAND DRIVE FROM MELONY/2655 E 6 55,000 55,000 BLUEBELL DRIVE 4275 S TO 3100 E 6 60,000 60,000 300 WEST FROM 900 S TO 1300 S 16 230,000 230,000 300 WEST FROM 1300 S TO 1700 S 6 110,000 110,000 300 WEST FROM 1700 S TO 2100 S 6 115,000 115,000 900 WEST 2250 TO 2500 SOUTH AND 2500 SOUTH 800 SOUTH TO 900 W 12 183,000 183,000 2700 EAST NORA DR. TO NILA WAY 100,000 100,000 PUBLIC WORKS PROJECTS 50,000 50,000 50,000 50,000 50,000 50,000 300,000 FIRE HYDRANT REPLACEMENT 30,000 50,000 50,000 50,000 50,000 50,000 280,000 VALVES 20,000 50,000 50,000 50,000 30,000 30,000 230,000 DONATED LINES 100,000 100,000 100,000 100,000 100,000 100,000 600,000 VARIOUS WATER LINES 102,433 150,000 150,000 150,000 150,000 150,000 852,433 CLEAN TRANSMISSION MAINS 50,000 50,000 100,000 OTHER IMPROVEMENTS REPLACEMENT OF CANYON TOILETS 50,000 50,000 50,000 50,000 50,000 200,000 GEOGRAPHICAL INFORMATION SYSTEM AND CADD SYSTEM 50,000 50,000 50,000 50,000 150,000 EMERGENCY GENERATOR FOR SHOPS 75,000 75,000 SERVICE CONNECTIONS SMALL METER PROGRAM 421,200 75,000 75,000 75,000 75,000 75,000 721,200 NEW SERVICES 135,000 135,000 135,000 135,000 135,000 135,000 675,000 SERVICE LINE REPLACEMENT 500,000 500,000 500,000 500,000 500,000 500,000 2,500,000 LARGE METER RERPLACEMENT 365,500 100,000 100,000 100,000 100,000 100,000 765,500 DEBT SERVICE PAYMENT P & I PAYMENT FOR 3.M/15Y/7.5% FOR CONSTRUCTION OF PARLEY'S 340,000 340,000 340,000 340,000 340,000 1,360,000 P & I PAYMENT FOR 1.5M/10Y/7.5% FOR LAND PURCHASES 225,000 225,000 225,000 225,000 225,000 900,000 REPAYMENT TO LAND FUND FOR WATER STOCK PURCHASES 25,000 25,000 25,000 25,000 25,000 100,000 I( !D I I1-1 !nv ID i I PUBLIC UTILITIES D1/SEWER SEWER UTILITY FUND CAP/SIX/YEAR SCHEDULE OF CAPITAL IMPROVEMENTS & EQUIPMENT REPLACEMENT 12-13-89 7/01/89 THROUGH 6/30/95 SIX YEAR FISCAL FISCAL FISCAL FISCAL FISCAL FISCAL PROGRAM DESCRIPTION 1989-90 1990-91 1991-92 1992-93 1993-94 1994-95 TOTAL EQUIPMENT-OTHER AUTOMOBILES & TRUCKS 339,400 373,300 410,600 451,700 496,900 546,590 2,618,490 FIELD MAINTENANCE EQUIPMENT 124,888 137,400 151,100 166,200 182,800 201,080 963,468 TELEMETERING EQUIPMENT 20,000 22,000 24,200 26,600 29,300 32,230 154,330 OFFICE FURNITURE & EQUIPMENT 97,100 106,800 117,500 129,200 142,100 156,300 749,000 OTHER NON-MOTIVE EQUIPMENT 118,865 130,800 143,900 158,300 174,100 191,500 917,465 TOTAL CAPITAL OUTLAY 15,756,156 8,720,300 7,787,300 7,072,000 6,510,200 6,612,700 52,458,656 CAPITAL OUTLAY 1,150,253 1,455,300 1,732,300 1,692,000 1,635,200 1,737,700 9,402,753 CAPITAL IMPROVEMENTS 14,605,903 7,265,000 6,055,000 5,380,000 4,875,000 4,875,000 43,055,903 1 FUNDING SOURCES CURRENT EARNINGS 4,921,693 4,675,608 4,441,828 4,219,737 4,008,750 3,808,312 26,075,928 RESERVES 10,834,463 4,044,692 3,345,472 1,587,745 0 0 19,812,372 TOTAL FUNDS AVAILABLE 15,756,156 8,720,300 7,787,300 5,807,482 4,008,750 3,808,312 45,888,300 DIFFERENCE BETWEEN REQUIREMENTS AND ACTUAL REVENUE 0 0 0 -1,264,518 -2,501,450 -2,804,388 -6,570,356 PUBLIC UTILITIES D1/SEWER SEWER UTILITY FUND CAP/SIX/YEAR SCHEDULE OF CAPITAL IMPROVEMENTS & EQUIPMENT REPLACEMENT 12-13-89 7/01/89 THROUGH 6/30/95 SIX YEAR FISCAL FISCAL FISCAL FISCAL FISCAL FISCAL PROGRAM DESCRIPTION 1989-90 1990-91 1991-92 1992-93 1993-94 1994-95 TOTAL BUILDINGS ADMIN.BLDG.ADDITON 1530 S W TEM. 500,000 150,000 650,000 LABORATORY ADDITIONS 445,000 100,000 545,000 REHAB.MAINT.STOREHOUSE 275,000 275,000 ENG.FOR MAINT.BLDG. 30,000 30,000 METAL STORAGE BLDG.-EQUIPMENT 45,000 45,000 BLDG.FOR RAG RAKE(ODOR CONTROL) 60,000 15,000 75,000 ODOR CONTR.FOR SLUDGE THICKENERS 400,000 400,000 ROOF OVER ASPHALT STORAGE 50,000 50,000 CHLORINE DISINFECTION PROGRAM 250,000 250,000 LIFT STATIONS BILLY MITCHELL STATION UPGRADE 50,000 50,000 PIONEER ROAD UPGRADE 50,000 50,000 AIRPORT STATION:4000 W N TEMPLE 25,000 25,000 900 S W TEMPLE (NEW) 150,000 150,000 AIRPORT GATE UPGRADE 75,000 75,000 AIRPORT FUEL FARM UPGRADE 75,000 75,000 BONNEVILLE STATION UPGRADE 20,000 20,000 1800 NORTH REDWOOD RD. UPGRADE 75,000 75,000 5850 W. AMELIA EARHART UPGRADE 75,000 75,000 NO.STAR DR & PATERCIA WY UPGRADE 25,000 25,000 1805 INDEPENDENCE BLVD. 20,000 20,000 N.W.QUADRANT L.STATION C89218 (ENGINEERING) 500,000 500,000 4130 W & CENTENNIAL PARK 50,000 50,000 350 N 4800 W L.STATION 50,000 50,000 5300 W N TEMPLE L.STATION 69,000 69,000 NEW LIFT STATIONS 100,000 100,000 100,000 100,000 100,000 500,000 BYPASS PUMPING 100,000 100,000 75,000 75,000 75,000 425,000 UPGRADE EXISTING STATIONS INCLUDING SEISMIC 100,000 100,000 100,000 100,000 100,000 500,000 PUBLIC UTILITIES D1/SEWER SEWER UTILITY FUND CAP/SIX/YEAR SCHEDULE OF CAPITAL IMPROVEMENTS & EQUIPMENT REPLACEMENT 12-13-89 7/01/89 THROUGH 6/30/95 SIX YEAR FISCAL FISCAL FISCAL FISCAL FISCAL FISCAL PROGRAM DESCRIPTION 1989-90 1990-91 1991-92 1992-93 1993-94 1994-95 TOTAL TREATMENT PLANT SHORT TERM AERATION EXP.C87669 50,000 50,000 SHORT TERM AERATION EXP.C87025 4,100 4,100 FREEWAY IRRIGATION DEMO. 125,090 1,000,000 1,000,000 1,000,000 1,000,000 1,000,000 5,125,000 IMPROVEMENT TO INFLUENT GATE AT PRETREATMENT PLANT 25,000 25,000 REPLACE GRIT SCREW-MAIN PLANT 25,000 25,000 CORRECT ROOF TIE PROBLEMS FOR SEISMIC PROTECTION 100,000 100,000 EARTHQUAKE LIQUEFATION STUDY 50,000 50,000 IMPROVEMENT TO PROTECT FACILITY FROM EARTHQUAKE 50,000 50,000 PRETREATMENT PLANT FUEL TANK MODIFICATIONS 10,000 10,000 FUEL SYSTEM CONTROL FOR ENERGY RECOVERY SYSTEM-UPGRADE 20,000 20,000 SLUDGE DRYING BEDS IMPROVEMENT 2,000,000 2,000,000 4,000,000 WETLAND ENHANCEMENT 300,000 100,000 400,000 EXPANDING SLUDGE MANAGE.PROGRAM 10,000 30,000 30,000 30,000 100,000 LOWERING SLUDGE STORAGE TANK AND PAINT INTERIOR 100,000 100,000 NEW CLARIFIER 500,000 500,000 DIGESTER STEAM BOILERS REPLACE. 50,000 50,000 DIGESTER MIXING SYSTEM UPGRADE 50,000 100,000 150,000 VARIABLE SPEED DRIVE AT PRE- TREATMENT PLANT UPGRADE 50,000 50,000 METHANE GAS STORAGE 350,000 350,000 STRUCTURAL REPAIRS - TRICKLING FILTER UNITS 500,000 500,000 DIGESTER MODIFICATION 10,000 10,000 20,000 EMERGENCY BYPASS PUMPING 200,000 100,000 300,000 RAG DEWATERING PRETREAT.PLANT 30,000 30,000 60,000 GRIT REMOVAL AT PRETREAT. PLANT 40,000 40,000 ENG.FOR SLUDGE BEDS 120,000 120,000 SITE CURBING 15,000 15,000 30,000 FIBERGLASS GRATING 15,000 15,000 FAN HOUSE RADIATOR 10,000 10,000 ASBESTOS REMOVAL & REINSULATION 25,000 25,000 SEAL CONCRETE FLOORS 20,000 20,000 POWER FACTOR CORRECTION 15,000 15,000 REPLACE TRICKLING FILTER UNDERORAINS 500,000 500,000 1,000,000 REPLACE SERVICE WATER PIPING 300,090 300,000 SEISMIC UPGRADING 200,000 200,000 200,000 600,000 PUBLIC UTILITIES D1/SEWER, SEWER UTILITY FUND CAP/SIX/YEAR SCHEDULE OF CAPITAL IMPROVEMENTS & EQUIPMENT REPLACEMENT 12-13-89 7/01/89 THROUGH 6/30/95 SIX YEAR FISCAL FISCAL FISCAL FISCAL FISCAL FISCAL PROGRAM DESCRIPTION 1989-90 1990-91 1991-92 1992-93 1993-94 1994-95 TOTAL SEWER COLLECTION LINES 1050-1100 E 300 S 8IN 100 FT 45,000 45,000 400 W 225-300 S 650 FT 8 IN 45,000 45,000 LAKE ST LOVELAND AVE.300 FT 8IN 55,000 55,000 MEAD AVE.EMERY ST 300 FT 12 IN 40,000 40,000 ALLEY,900S 700-800 W 780 FT 10IN 50,000 50,000 200 w FAYETTE,BROOKLiNE WASHINGTON 1300 FT 10 IN 80,000 80,000 ALPINE PLACE,GILMER DR 350FT 8IN 35,000 35,000 ALLEY,100S EUCLID 100-1100 W 65,000 65,000 700 S I-15 700 FT 5 IN 55,000 55,000 500 S I-15 600 W 1100 FT 24 IN 115,000 115,000 800 S 300-400 W 8900 FT 24 IN 75,000 75,000 600 S 800-900 W 800 FT 30 IN 95,000 95,000 BALTIC COURT 360 FT 8 IN 45,000 45,000 300 w (E SIDE)442-500 N 35,000 35,000 w.TEMPLE,1080-1180 S 45,000 45,000 MAIN ST.(E SIDE)200-300 N 45,000 45,000 500 N (N SIDE) 240-295 W 35,000 35,000 600 w 700-300 S 60,000 60,000 600 S 1000-1100 W 21 IN 75,000 75,000 600 S 1100-1170 W 21 IN 50,000 50,000 EMERY ST. ,700-1000 S 15 IN 75,000 75,000 VARIOUS COLLEC.LINES REPLACE 200,000 1,000,000 1,000,000 1,000,000 1,000,000 1,000,000 5,200,000 2024 PRINCTON AVE 55,000 55,000 SEWER TRUNK LINES 1340 N BECK ST 600•FT 64 IN 200,000 200,000 800 N 1000-1200 W 1600 FT 42 IN 350,000 350,000 800-700 S 500 W 1-15 24IN 2400FT 225,000 225,000 4800 w 700-1300 S 4500 FT 24 IN 500,000 500,000 NW QUADRANT TRUNK LINE(49-Q-10) 1,000,000 1,000,000 5600 W 2100 S NW TRUNKLINE 1,800,000 1,800,000 3500 w 500-1800 S C89711 1,800,000 1,800,000 5TH S GLADIOLA TO 47TH W.P.STAT. 1,437,803 1,437,803 MISCELLANEOUS LOCATIONS • 1,000,000 3,000,000 2,000,000 2,000,000 2,000,000 10,000,000 PUBLIC UTILITIES DI/SEWER SEWER UTILITY FUND CAP/SIX/YEAR SCHEDULE OF CAPITAL IMPROVEMENTS & EQUIPMENT REPLACEMENT 12-13-89 7/01/89 THROUGH 6/30/95 SIX YEAR FISCAL FISCAL FISCAL FISCAL FISCAL FISCAL PROGRAM DESCRIPTION 1989-90 1990-91 1991-92 1992-93 1993-94 1994-95 TOTAL i TREATMENT PLANT EQUIPMENT , MODIFICATION CHLORINATION SYSTEM 50,000 50,000 MODIFICATION TO GREASE COLLECT. & PUMPING SYSTEM 50,000 50,000 100,000 COMPUTER PROJ.CONTROL PHASE II 3,000 3,000 ENERGY ENGINE TIMING 2,000 2,000 FILTER PUMP IMPROVEMENT 5,000 5,000 PRIMARY SLUDGE PUMPS REPLACEMENT 40,000 40,000 REPLACEMENT OF SERV.WATER PUMPS 25,000 25,000 25,000 75,000 FLOW MEASURING DEVICE SEWER INTERCEPTORS SAMPLES 50,000 50,000 100,000 INFLUENT PUMP HOIST 20,000 20,000 SERVICE WATER FILTRATION 10,000 10,000 10,000 30,000 SLUDGE TRANSFER PUMP 20,000 20,000 PARTS FOR INFLUENT PUMPS 125,000 150,000 150,000 425,000 GATE OPERATORS-CLARIFIERS 10,000 10,000 MODULAR STORAGE SYSTEM 40,000 40,000 LAB INSTRUMENTATION TREAT.PLANT 50,000 100,000 10,000 10,000 10,000 180,000 I EQUIPMENT REPLACEMENT 500,000 600,000 600,000 600,000 600,000 2,900,000 Salt Lake City Public Utilities Department 201 Wastewater Plan Review 1 '. . - f . :-- .• - . i i''-IOC CI' . , _ • ..de + + ` - .., a �` •+ -k psi •} �•ffo , y� 7 f :i' _ 1.11111. I ine swoon Lam I... . _,,,,_ ,..iti.........14 in i to a .7.- -1......11111•1•••• JIM I lily Yiriil'o " 1� , MiMilk ! , Qi . ' - = 1 r—�Gk� M.wa-z. -m.__,_ ---.4 ii.. irgi 1.16..;1-LA&SINE i ail . ......,....., ..... is. _ ,� 11111111• w a .:.�_ #_ICES i#_M UM INN 5iIii !i M �r5 m 04e, • � 6 ' Updated A t �'' . - * . a December 29, 1989 2 �� - y~ Salt Lake City 0P-,1 LAKE c��� Public Utilities 201 Wastewater Plan Review o� Updated December 29,1989 99f�F' OF PUB�\ � Introduction In 1979, the City's Wastewater Treatment Plant was experiencing operating problems including odor episodes that caused the local neighborhood to "march on City Hall" to demand that the problems be corrected. These problems had been building for many years and the City Commission decided in late 1978 to transfer the sewer department to the water department to form the Public Utilities Department.The sewer division, before the transfer,was funded through the City's general fund and the Commission recognized that the financing of major improvements could better be accomplished through an enterprise fund.The water department had operated as an enterprise fund since 1963 when the Uniform Fiscal Procedures Act was passed by the Legislature. Emergency Measures (Phase I) In response to the City Commission's mandate to solve the wastewater treatment problems, the Public Utilities Department hired the firm of Horrocks & Carollo En- gineers on Aug. 7, 1979 to conduct an"odor study" and to recommend an odor mitigation program.The department implemented the study's recommendation to abate odor sources at the facility. However,the study also concluded that major im- provements would be necessary to permanently eliminate the problem. At that time the plant was operating at 90-percent of design hydraulic capacity, had inadequate solids handling facilities, the disgesters were partially filled with grit and much of the plant's equipment was in need of repair or replacement. Between 1980 and 1983 the department spent $2,081,503 (hereafter referred to as Phase I) from current earnings to correct the most serious problems while a 201 Facilities Plan was being conducted to determine the long term solution.Also, during this early period the City attempted to gain federal assistance through EPA construction grants,but from the beginning it was obvious that these funds would not be available and that the City would have to finance its own program. SLC Public Utilities 201 Wastewater Plan Review Page 2 Phase I - Emergency Measures Current Earnings Chlorine Building&Equipment $ 25,669.52 Electrical Equipment Relocation 104,502.66 Sludge Beds 692,606.64 Grit Line Repairs 80,991.47 Filter Arms Replacement 644,461,78 New Lagoon 308,070.52 New Restroom Facilities 55,043.17 Variable Speed Controls 170.157.00 $2,081,502.76 201 Wastewater Facilities Study On April 1, 1981, the City contracted with the engineering firm of CH2M-Hill to con- duct a"201 Facilities Study."The study was conducted in compliance with the EPA regulations just in case future EPA funds became available and to assure that the State and Federal regulating agencies were in agreement with the City's plan and its NPDES compliance efforts.The study was conducted with extensive citizen par- ticipation.There were two citizen groups directly involved in the decision making process, numerous public hearings and even paid advertisements in the local newspapers.The EPA and State Department of Health, Division of Environmental Health both commended the City on its citizen participation efforts.The final plan was formally adopted by the City Council on Dec. 7, 1982, and the EPA accepted the plan on Apr. 5, 1984,with a"Finding of No Significant Impact/Environmental Assess- ment Report." The 201 Plan as adopted by the City Council included a financial plan that would fund the construction of facilities on a cash flow pay-as-you-go basis. Sewer user charges were increased from $.54 to $1.08 per 100 cubic feet of water discharged into the sanitary sewer system, increasing the average residential sewer bill from $4.32 to $8.64 per month. Connection fees were increased from $300 per residential equivalent to $1,000 over a three-year period.These funds would completely finance the 201 Plan on a cash flow basis.The cash flow plan saved millions of dollars in debt service and provided maximum flexibility in making future decision.This flexibility allowed the City to reduce sewer rates on Jan. 1, 1986,July 1, 1988 and July 1, 1989. Near Term Improvements (Phase II) During the early phases of the 201 Plan study the consultants identified the most serious treatment process deficiencies and these improvements (refer to Phase II Construction)were included in the City's 1981, $30 million bonding program which was approved by the City Council in Aug. 17, 1981.The funds for sewer construction SLC Public Utilities 201 Wastewater Plan Review Page 3 improved the plant's solids handling facilities and provided a new chlorine contact chamber. The near term construction began on Aug. 26, 1982 and was completed on Apr. 24, 1984.The retention basin was completed in January, 1985. With these facilities, the wastewater treatment plant came into compliance with its EPA NPDES limitations. Phase II -Near Term Improvements Near Term Improvements $3,309,056.84 Chlorine Retention Basin* 701,952.37 Digester Wall 173,102.76 $4,184,111.97 *In the original bonding program this project was designed as a replacement of the outfall line. An engineering evaluation determined that the chlorine retention basin was more effective and cost efficient. 201 Facilities Plan The recommended plan consisted of the following elements: •Upgrade and expand the existing plant at 56 MGD: Conduct pilot study to determine if short-term aeration process will meet polished secondary standard and/or will ensure meeting 25/25 standard at 56 MGD rate. Construct a sewage pump station and transfer line from the existing plant to the proposed new facility in the Northwest Quadrant. This would be postponed until needed. Site investigation and purchasing of necessary land and rights-of-way for new treatment plant. Included would be wetlands study, applica- tion for a discharge permit, all necessary soils and geo-technical studies and identifying needed rights-of-way. Construct emergency power/energy recovery facilities. Construct administration building and renovate laboratory. Land reclamation with sludge at airport farm land. Effluent polishing. • Solids Handling (Sludge) Confirm airport site suitability. Prepare a permit application for demonstration project. SLC Public Utilities 201 Wastewater Plan Review Page 4 Conduct the demonstration project. Design a full-scale system. Implement interim operations. Construct permanent facilities. •Suggested method of extending the existing plant capacity: Use of the South Salt Lake Treatment Plant Use of temporary new treatment facilities in the Northwest Quadrant. Discontinue service to Chesterfield Improvement District. Replacement of the Redwood Road trunk line(0.5 MGD infiltration) Continued televised sewer inspection and sewer sealing. Removal of storm drain connections (1 MGD) •Construct sewer trunk lines in the northwest quadrant. The capital costs to implement the selected plan through the year 2005 were es- timated at approximately$137 million. 201 Plan Implementation - Phase Ill This phase of the plan cost a total of$24,847,696.49, and included various studies and treatment plant construction. Solids Handling-Apr. 5, 1983, the firm of Black& Veatch was hired to conduct the solids handling study at the Salt Lake City International Airport farm land leased to Mr. Hinkley. The final study was accepted by the Public Utilities Department on Dec. 5, 1985.The final plan called for the application of dried sludge to the Hinkley farm land. Sludge, soil and plant tissue analyses are required by the City/County Health Department in the issuance of a permit to apply the plant sewage sludge to croplands. Northwest Quadrant Site - On Dec. 20, 1983, the firm of Montgomery Engineering was hired to conduct the Northwest Quadrant second plant site study at a cost of $136,327.The study was accepted on Aug. 6, 1986 and 200 acres of land was pur- chased on July 31, 1986 at a cost of$2,655,129.56 On Apr. 16, 1985, the City Council amended the 201 Facilities Plan to reflect the conclusions of the wetlands treatment, sludge disposal and the second wastewater treatment plant site in the Northwest Quadrant studies. Existing Plant Upgrade & Expansion- On Aug. 14, 1984, the design of the existing plant improvements was awarded to CH2M Hill and later the preliminary design was SLC Public Utilities 201 Wastewater Plan Review Page 5 value engineered Horrocks & Carollo Engineers.The actual construction work began with the first contract award on Mar. 26, 1985.The entire project has been contracted in phases. With the completion of the short term aeration project during October, 1989 the cost for the wastewater treatment plant upgrade and expansion to- taled $22,056,239.93 Phase III -201 Facilities Plan Northwest Site Study& Land Purchases $2,791,456.56 Sludge Management & Sludge Storage 852,335.15 Pretreatment Plant Rehab 4,465,761.17 Main Plant Rehab& Energy Recovery 7,564,091.84 Admin. & Lab Bldg. & Operations 1,251,417.48 Short Term Aeration 5,862,555.88 Project Engineering, Inspection, 2,060,078.41 Construction Management& Operations Manual - Value Engineering $24,847,696.49 Sewer Collection System-Under the 201 Plan it was specified that $15,345,000 in sewer lines would be needed in the Northwest Quadrant.Also, in the cash flow plan, funds were provided for the department's normal operations and maintenance in- cluding sewer pipeline replacement.As of this date, the department has spent $3,920,116.43 in sewer line replacements form current earnings and over $6,571,565.64 has been spent in sewer line replacements and trunk lines for the Northwest Quadrant from 201 funds.Also as of this date the plan has funded the upgrading and expansion of sewer lift stations in the amount of$987,129.85 and equipment outlay items of$345,055.02. Utah Wastewater Disposal Regulations, Municipal Wastewater Facilities Planning & Compliance Criteria In accordance with State Requirements, the Public Utilities Department submitted to the Bureau of Water Pollution Control its adopted 201 Facilities Plan and a progress report on Dec. 20, 1985. Conclusion The City's 201 Plan has been successfully implemented over the past eight years of phased activity matching the cash-flow pay-as-you-go financial plan.The final con- struction work at the existing plant was completed in fall, 1989.This brings to an end this chapter of the 201 Plan. Additional projects will be developed and included in the plan and presented SLC Public Utilities 201 Wastewater Plan Review Page 6 through the annual budget process. Currently, five projects are in the design or con- struction phase.These include: 1) additional sludge beds and modifying existing beds, 2) expansion of the existing laboratory to accommodate both water and was- tewater analysis,3) a wetlands park to be built north of the administration building, 4)implementation of an odor control study and related modifications, and 5) seismic studies. The work performed under the 201 Plan has been in accordance to the plan and cost less than the original estimated cost. Each year the Public Utilities Advisory Com- mittee reviews the current cash-flow projections and has recommended the second plant in the Northwest Quadrant be postponed until 2005.These decisions are based on the City's successful flow mitigation program and slower than expected growth in the Northwest Quadrant. In the last four years the cash flow plan has been amended, decreasing the sewer rates. In 1986, the sewer rates were reduced by 17 percent,with a 6 percent Wastewater Treatment Plant Performance decrease in 1988 and 1989, totalling a 29 percent Average Daily Influent In MGD decrease over the last four 50 Capacity 45 year period. 40,/ % / The goals of the 201 Plan 35 / / / / 7 have been achieved at the ex- 30 fisting wastewater plant.The 25 plant has been compliance 20 with the EPA NPDES lumta- ,5 tions and for the ninth con- ,0 secutive year there has been no odor episode.The City's o wastewater program has been 79 80 81 82 aa 84 85 88 87 88 89 recognized by the State Division of Environmental Average Daily Effluent in Parts Per Million Health and the EPA. In 1987, 30 the City's plant received the 28 EPA Region Vffi Main- 7 \ \ Permit Level tenance and Excellence / Award. In 1988, it received the 20 \ \ 7\ 7\\\ /\\ �� Association of Metropolitan 18 7\ \ /\ /\ /\ \ /\ /\ 7 Sewer Agencies' (AMSA) 14 f\ 7\\ 7\7\ n / //\\ 7\\ 7\ 7\\ 7\\ n Gold Award for full com- 2-/\ /\ /\ /\ /\ /\ \ /\ /\ 7\ ✓\ /\ /\ /\ /\ /\ /\ / /\ /\ /\ pliance. o._/\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ 8_/\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ 8-/\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ i\ /\ /\ 4-/\ /\ /\ /\ /\ /\ /\ /\ /\ /\ /\ 2 \ 7\\ 7\\ //\\ //\\ 7\\ 7\\ /�\ /\ /\\ 7\\ 0 /\ i\ i\ /\ /\ /\ /\ /\ i\ /\ /\ 79 80 81 82 83 84 85 88 87 88 89 177 BOO Residuals N.V Suspended Solids _ 1 -;---:,,L ' __ _1.-.Er•- letim 1 n_.... !JI • —X 1 timh: %rut.. Trickling filters at the �� - F� Salt Lake City '" ' - Wastewater Reclama- _ .- - - - tion Plant can now �u . treat 56 MGD with f the completion of short-term aeration . facility which was - - built under the 201 Wastewater Plan. ArAle \1161":411/01.10.1Milmmm Cover Photo: Crews pour concrete for additional clarifier built as part of the 201 Wastewater Plan. 1 .r } Mayor Palmer A. - - DePaulis and " r. Wastewater Superinten- lilli .- "'I 'r e dent Joseph S.Fenton '• '`-' '�,if receive Region VIII EPA Award during - Alb 1988 ceremonies. - I ..-D i 0 in a ft ......,. .,. )7 , The award was more significant because of 1. i - plant's ongoing t' . a * - ""��''_ ... construction which coin- r- r plicated the daily 1 • operations. Viiii r SLC Public Utilities 201 Wastewater Plan Review Page 8 Sewer Utility Fund 201 Rate Increase Revenue Fiscal Years 6-30-83 Through 6-30-89 Total 201 201 Rate 201 Rate Increase Increase Increase Sewer Charges Conn.Fees Interest Total June 30, 1983 1,469,113.05 1,469,113.05 June 30, 1984 5,710,487.61 335,068.00 6,045,555.61 June 30, 1985 5,707,867.73 722,347.00 796,932.27 7,227,147.00 June 30, 1986 5,327,882.22 528,727.00 776,763.70 6,633,372.92 June 30, 1987 4,612,112.67 620,769.00 500,877.02 5,733,758.69 June 30, 1988 4,841,745.42 235,798.55 594,457.59 5,672,001.56 June 30, 1989 3,998,026.55 144,676.75 729,577.21 4,872,280.51 Total: 31,667,235.25 2,587,386.30 3,398,607.79 37,653,229.34 Budget 6-30-90 3,300,000.00 289,000.00 837,000.00 4,457,000.00 Total 34,967,235.25 2,876,386.30 4,235,607.79 42,110,229.34 Expenditures and encumbered as of September 30, 1989 30,185,866.50 Funds set aside for future improvements 11,924,362.84 SLC Public Utilities 201 Wastewater Plan Review Page 9 Public Utilities Department Sewer Utility Fund 201 Cash Flow Budget Comparison Original 201 Actual And Plan Cost Encumbered Estimates Cost of Plan Budget As of 9-81 As of 10-89 Variance Bond and Insurance 1,105,000.00 -1,105,000.00 Emergency Power/ 1,735,000.00 2,805,477.51 1,070,477.51 Energy Recovery Administrative Building Lab 1,036,000.00 1,251,417.48 215,417.48 and Operations Modifications Site Work 4,034,000.00 -4,034,000.00 Land Reclamation with Sludge 4,801,000.00 852,335.15 -3,948,664.85 Miscellaneous 2,800,000.00 -2,800,000.00 Contingency for Rehab 7,841,000.00 -7,841,000.00 Effluent Polishing 11,777,000.00 5,862,555.88 -5,914,444.12 Pump and Transfer Pipeline 10,627,000.00 -10,627,000.00 Main Plant Rehab 4,758,614.33 4,758,614.33 Pretreatment Plant Rehab 4,465,761.17 4,465,761.17 Sub Total 45,756,000.00 19,996,161.52 -25,759,838.48 Engineering, Legal 3,398,000.00 2,060,078.41 -1,337,921.59 Administration Sub Total 49,154,000.00 22,056,239.93 -27,097,760.07 Less Pump and Transfer -10,627,000.00 10,627,000.00 Pipeline Budget Reduction Savings -8,502,067.00 8,502,067.00 on Sludge Disposal and 1985 State Legislative Change in Water Quality Standards Total 30,024,933.00 22,056,239.93 7,968,693.07 SLC Public Utilities 201 Wastewater Plan Review Page 10 Sewer Utility Fund 201 Rate Increase Expenditures and Encumbered For Fiscal Years 6-30-83 Through 6-30-89 And For 7-1-89 Through 9-30-89 201 Current Bond Rate Increase Total Earnings Proceeds Revenue Revenue Phase I Emergency Improvements Chlorine Building 25,660.52 25,669.52 Relocate Electrical 104,502.66 104,502.66 Sludge Beds 692,606.64 692,606.64 Grit Line Repairs 80,991.47 80,991.47 Filter Arms 644,461.78 644,461.78 New Lagoon 308,070.52 308,070.52 New Restrooms/Showers 55,043.17 55,043.17 Variable Speed 170,157.00 170,157.00 Controls Total Phase I 2,081,502.76 2,081,502.76 Phase II Near Term Near Term Improvements 4,184,111.97 4,184,111.97 Phase III 201 Implementation I. Sludge Mgmt and Pilot Study 547,726.20 547,726.20 Sludge Dewatering 47,239.47 47,239.47 Road Improvements, Pad, Equipment 257,369.48 257,369.48 Total Items I 852,335.15 852,335.15 II. Land Purchase 2,791,456.56 2,791,456.56 III.Pretreatment Plant Rehab. 1,537,581.65 2,928,179.52 4,465,761.17 IV.Main Plant Modifications 4,758,614.33 4,758,614.33 Energy Recovery 2,805,477.51 2,805,477.51 Total Items IV 7,564,091.84 7,564,091.84 SLC Public Utilities 201 Wastewater Plan Review Page 11 Sewer Utility Fund 201 Rate Increase Expenditures and Encumbered For Fiscal Years 6-30-86 Through 6-30-89 And For 7-1-89 Through 9-30-89 201 Current Bond Rate Increase Total Earnings Proceeds Revenue Revenue Phase III Implementation Continued V.Aciministration and Lab Building 1,251,417.48 1,251,417.48 VI.Short Term Aeration Engineering 564,436.30 564,436.30 Trickling Filters/Solids Contact 5,009,506.77 5,009,506.77 Aeration Pilot Study Engineering 138,594.31 138,594.31 Equipment 150,018.50 150,018.50 Total Items VI 5,862,555.88 5,862,555.88 VII.Engineering 1,027,998.95 1,032,979.46 2,060,078.41 VIII.Collection Lines 3,920,116.43 6,571,565.64 10,491,682.07 IX.Buildings 434,365.40 987,129.95 1,421,486.35 X.Miscellaneous Expenses 345,055.02 345,055.02 Grand Total 6,435,975.59 6,749,692.57 30,185,866.50 43,371,534.66