_ FAC20044 - EARTHQUAKE
- DAMAGE REPAIRS
- � a
I!�
Agenda
Insurance and Funding
• Testing of Structural Isolators
x • Construction Mock-ups
• Construction Documents
Coordination
�3
• Tentative Schedule
WIN MR
_ R _
�'AIAl11Ai' _ -
Ili �16
„ r
y-
r
• C ••�. 2022 2
Insurance and Funding
FM GLOBAL HAS DISBURSED 2M TO CONTINUE TO COMPLETE THE CONSTRUCTION
DOCUMENTATION PROCESS.
INSURANCE COMPANY HAS AGREED TO REIMBURSE THE CITY FOR ALL EXPENSES
INCURRED UP TO DATE TO COMPLETE THE INVESTIGATION AND DOCUMENTATION
PROCESS.
THE CITY IS LOOKING TO BE REIMBURSED FOR THE FULL VALUE OF DAMAGES AT
THE TIME OF THE EARTHQUAKE.
IF THE FINAL CONSTRUCTION ESTIMATE EXCEEDS THE CONSTRUCTION BUDGET,
WE MIGHT HAVE TO SPLIT THE PROJECT INTO TWO BIDDING PHASES.
Salt Lake County Building Earthquake Repairs 2022 3
Testing of Building Bearings
Isolators were shipped to the University
of California on August 18th, 2022
Received on August 29t", 2022
Testing was conducted at the end of
October. The city is waiting for the test
results and instructions to ship the
isolators back to Salt Lake City
i-
Salt Lake County Building Earthquake Repairs 2022 4
`•11III �` /� •
Construction Mock-ups
The interior Construction mock-ups are finalized.
The architect selected the Council Chambers
and the 5t" Floor Lobby to conduct those.
Testing has been done, and we have issued final
process approval.
Contractor will put together a report with
instructions on material and methods to achieve nr
the desired results.
Architect is waiting for this information to be
included in the Construction Documents for
Bidding.
t
Salt Lake County Building Earthquake Repairs ` -- r
Roof Inspection
2022 NOVEMBER MONDAY .. ..
-. "FAR 11 ON IF FIRST DAY OF WEEK
Monday Tuesday Wednesday Thursday Friday Saturday Sunday -
31 01 02 03 04 05 06
07 OB 09 10 11 12 13
14 15 16 17 19 19 20 `
STAGE CRANE.EARLY ~
ROOF INSPECTION TO
START AT 9:OD AM.
CONSTRUCT A SAFETY ZONE WITH SAFETY _
FENCING CONDUCT INSPECTIONS WITH CRANE AND
BASKET
REMOVE SAFETY FENCING AND CRANE ,
r'tt.:: w
East Council East I �
j —vey
Parking Accessible
NO CAFE OU I DOOR SEA I ING :r
ij
r
S^
ALL PEDESTRIAN ENTRANCES WILL BE ACCESSIBLE _ �� ',' � ! iuiii4
I
21 22 23 24 21 24 27
Ei;_ faP n Non 3
Salt Lake County Building Earthquake Repairs _ T
Roof Inspection Safety Fence
Untitled Ma Lipind
Write a desmpaon fo,
yaw rnap. Sak Lake Crty and County Building ;
Y.
t
l `1
4.
f��a - s: � \\ . _r..t. sal'`. � a '� .• � --
Salt Lake County Building Earthquake Repairs 2022 7
Construction Documents
Coordination
Artwork Moving Services
Salt Lake City Arts Council has reviewed Don Harward will be conducting the
the Art inventory and updated artwork coordination and contracting of all
locations. furniture moving services.
The Art Council has found a suitable Some of the furniture will be slid away
moving company to remove the artwork in
from repairs, and others will have to be
phases and put it back in place after
moved outside the room, possibly to a
construction. About $40K estimate.
secured area outside the department,
Public Services has offered one of their until the phase is finalized.
rooms to store the art during
construction. The rooms will be
habilitated before construction to receive
the art and keep it safe.
There is no particular repair on the
exterior art.
Salt Lake County Building Earthquake Repairs 2022 8
LEVEL 1
LEGEND
m�
.E
7 _ X X
4 , r m
o
LEVEL 1
Salt Lake County Building Earthquake Repairs 2022 9
LEVEL 2
LEGEND
r�-ti r
J ,I„
r {
LEVEL 2
Salt Lake County Building Earthquake Repairs 2022 10
LEVEL 3
LEGEND
A L 0
J Al Irw
i ] oo - —
LEVEL 3
Salt Lake County Building Earthquake Repairs 2022 11
LEVEL 4
LEGEND
FzTF
O C -
LEVEL 4
Salt Lake County Building Earthquake Repairs 2022 12
LEVEL 5
LEGEND
m�
o, .nF v� o
LEVEL 5
Salt Lake County Building Earthquake Repairs 2022 13
Timeline
151h -191h Roof 161h - Final 71h to 25th - Bidding, Value Start of
Inspection Construction Project Bidding Engineering Construction:
-Insurance Drawings and and March 2023
Funding Specifications Contracting 11 Phases of
Discussion - Contractors -Departments 6 weeks each
RFQ's Meetings and Estimated
Phasing completion
Coordination Date: July
2024
Salt Lake County Building Earthquake Repairs 2022 14
Phase 1 - Open stairs Phase 4- Level 4 North Phase 7 - Level 3 South Phase 9 - Level 2 South —
west—start 3/1/2023 —start 7/15/2023 —start 12/1/2023 start 3/1/2024
(Mayor's office prefers
Phase 2 - Open stairs Phase 5 - Level 4 South to be completed in Phase 10- Level 1 North
east—start 4/15/2023 —start 9/1/2023 November) —start 4/15/2024
Phase 3 - Level 5 —start Phase 6 - Level 3 North Phase 8 - Level 2 North Phase 11 - Level 1 South
6/1/2023 —start 10/15/2023 —start 1/15/2023 —start 6/1/2024
TENTATIVE CONSTRUCTION
PHASING
BY GSBS ARCHITECTS
Salt Lake County Building Earthquake Repairs 2022 15