Loading...
11/14/2022 - Meeting Materials N t - - - - - - - _ - - -- ` CityCounty Building _ FAC20044 - EARTHQUAKE - DAMAGE REPAIRS - � a I!� Agenda Insurance and Funding • Testing of Structural Isolators x • Construction Mock-ups • Construction Documents Coordination �3 • Tentative Schedule WIN MR _ R _ �'AIAl11Ai' _ - Ili �16 „ r y- r • C ••�. 2022 2 Insurance and Funding FM GLOBAL HAS DISBURSED 2M TO CONTINUE TO COMPLETE THE CONSTRUCTION DOCUMENTATION PROCESS. INSURANCE COMPANY HAS AGREED TO REIMBURSE THE CITY FOR ALL EXPENSES INCURRED UP TO DATE TO COMPLETE THE INVESTIGATION AND DOCUMENTATION PROCESS. THE CITY IS LOOKING TO BE REIMBURSED FOR THE FULL VALUE OF DAMAGES AT THE TIME OF THE EARTHQUAKE. IF THE FINAL CONSTRUCTION ESTIMATE EXCEEDS THE CONSTRUCTION BUDGET, WE MIGHT HAVE TO SPLIT THE PROJECT INTO TWO BIDDING PHASES. Salt Lake County Building Earthquake Repairs 2022 3 Testing of Building Bearings Isolators were shipped to the University of California on August 18th, 2022 Received on August 29t", 2022 Testing was conducted at the end of October. The city is waiting for the test results and instructions to ship the isolators back to Salt Lake City i- Salt Lake County Building Earthquake Repairs 2022 4 `•11III �` /� • Construction Mock-ups The interior Construction mock-ups are finalized. The architect selected the Council Chambers and the 5t" Floor Lobby to conduct those. Testing has been done, and we have issued final process approval. Contractor will put together a report with instructions on material and methods to achieve nr the desired results. Architect is waiting for this information to be included in the Construction Documents for Bidding. t Salt Lake County Building Earthquake Repairs ` -- r Roof Inspection 2022 NOVEMBER MONDAY .. .. -. "FAR 11 ON IF FIRST DAY OF WEEK Monday Tuesday Wednesday Thursday Friday Saturday Sunday - 31 01 02 03 04 05 06 07 OB 09 10 11 12 13 14 15 16 17 19 19 20 ` STAGE CRANE.EARLY ~ ROOF INSPECTION TO START AT 9:OD AM. CONSTRUCT A SAFETY ZONE WITH SAFETY _ FENCING CONDUCT INSPECTIONS WITH CRANE AND BASKET REMOVE SAFETY FENCING AND CRANE , r'tt.:: w East Council East I � j —vey Parking Accessible NO CAFE OU I DOOR SEA I ING :r ij r S^ ALL PEDESTRIAN ENTRANCES WILL BE ACCESSIBLE _ �� ',' � ! iuiii4 I 21 22 23 24 21 24 27 Ei;_ faP n Non 3 Salt Lake County Building Earthquake Repairs _ T Roof Inspection Safety Fence Untitled Ma Lipind Write a desmpaon fo, yaw rnap. Sak Lake Crty and County Building ; Y. t l `1 4. f��a - s: � \\ . _r..t. sal'`. � a '� .• � -- Salt Lake County Building Earthquake Repairs 2022 7 Construction Documents Coordination Artwork Moving Services Salt Lake City Arts Council has reviewed Don Harward will be conducting the the Art inventory and updated artwork coordination and contracting of all locations. furniture moving services. The Art Council has found a suitable Some of the furniture will be slid away moving company to remove the artwork in from repairs, and others will have to be phases and put it back in place after moved outside the room, possibly to a construction. About $40K estimate. secured area outside the department, Public Services has offered one of their until the phase is finalized. rooms to store the art during construction. The rooms will be habilitated before construction to receive the art and keep it safe. There is no particular repair on the exterior art. Salt Lake County Building Earthquake Repairs 2022 8 LEVEL 1 LEGEND m� .E 7 _ X X 4 , r m o LEVEL 1 Salt Lake County Building Earthquake Repairs 2022 9 LEVEL 2 LEGEND r�-ti r J ,I„ r { LEVEL 2 Salt Lake County Building Earthquake Repairs 2022 10 LEVEL 3 LEGEND A L 0 J Al Irw i ] oo - — LEVEL 3 Salt Lake County Building Earthquake Repairs 2022 11 LEVEL 4 LEGEND FzTF O C - LEVEL 4 Salt Lake County Building Earthquake Repairs 2022 12 LEVEL 5 LEGEND m� o, .nF v� o LEVEL 5 Salt Lake County Building Earthquake Repairs 2022 13 Timeline 151h -191h Roof 161h - Final 71h to 25th - Bidding, Value Start of Inspection Construction Project Bidding Engineering Construction: -Insurance Drawings and and March 2023 Funding Specifications Contracting 11 Phases of Discussion - Contractors -Departments 6 weeks each RFQ's Meetings and Estimated Phasing completion Coordination Date: July 2024 Salt Lake County Building Earthquake Repairs 2022 14 Phase 1 - Open stairs Phase 4- Level 4 North Phase 7 - Level 3 South Phase 9 - Level 2 South — west—start 3/1/2023 —start 7/15/2023 —start 12/1/2023 start 3/1/2024 (Mayor's office prefers Phase 2 - Open stairs Phase 5 - Level 4 South to be completed in Phase 10- Level 1 North east—start 4/15/2023 —start 9/1/2023 November) —start 4/15/2024 Phase 3 - Level 5 —start Phase 6 - Level 3 North Phase 8 - Level 2 North Phase 11 - Level 1 South 6/1/2023 —start 10/15/2023 —start 1/15/2023 —start 6/1/2024 TENTATIVE CONSTRUCTION PHASING BY GSBS ARCHITECTS Salt Lake County Building Earthquake Repairs 2022 15 1�,Ott, 'i Thank you KARILYN ANDERSON , AIA Salt Lake County Building Earthquake Repairs 2022 16