HomeMy WebLinkAbout10/27/2022 - Meeting Materials Publ i c Managing Assets, Capital Planning
utiliti s . and Budget
Make It Pure
October 27, 2022
Asset Capital Asset CI P Project
Management Program Delivery
Public
Utilities SLC Public Utilities Assets By the Numbers
................................................................ ...........................................................................
• Water
>135 square mile service areaJI
> 90,000 water service connections
> 1,300 miles of water supply lines
• 3 drinking water treatment plants .
• 30 pumping plants
• 36 groundwater wells
• 6 dams
0 30 tanks and reservoirs �-
Public
Utilities SLC Public Utilities Assets — By the Numbers
............................................................................... ............................................................
• i mr
Sewerj.
•
600 miles of collection lines
I
!' 1{
i9l ^
I
1 wastewater treatment plant WaterReclamahonFacil'I'; r�
— R
't
` p ry
Beck Street Sewer Interceptor
•
35 lift stations __ SahLakeCkintemabnalAirort ,
• Storm Drain --
Orange Street Sewer Interceptor 6
> 300 miles of (ollertion lines '
• I
• > 14,000 stormwater inlets
��Imerstate.7 80 ta
UnNersity,atUtah
• > 36 miles of canals, ditches,and creeks
m,
• 112 detention basins '
1000 W sewer Inb=*
• Street Lighting
Public
f � ram Utilities SLCDPU Asset Management Pro
g Program
• Inventory/Inspect Assets.
• Assign Criticality.
• Assign Condition.
• Create a plan for each asset and schedule next inspection.
Public
f � Utilities► Inventor Ins
Y/ ection p
...............................................................................................................................................
A A
\ A ,
r-
0.2ft-General Observation-Corrosion to 5.4" 02111-General ob,erection-Corrosion to 5.e 1241ft-Max Corrosion-A.2'
M r 3.6in
2.4in
1.2in
12
O.Din
-12in
-2.4in
„Id7 .3.Bin
0 2 15.4 32.0 46.5 65.1 81.7' 9 114.
Public
Utilities Example Asset Performance Criteria
p
...............................................................................................................................................
REGULATORY CUSTOMER SATISFACTION
WATER QUALITY SAFETY
STRUCTURAL CAPACITY
SUSTAINABILITY SEISMIC
CARBON FREE BY 2032 OTHER
Public
Utilities► Criticality
...............................................................................................................................................
DescriptionCriticality Rating L
Low or minimal impact if the asset is lost or fails
2 Moderate or minimal impact if asset is lost or fails
AService restored with repair or system redundancy in 8 to 24 hours after failure of the asset
4 Some critical customers are affected by failure of the asset
5 Significant number of customers or critical facilities are affected by failure of the asset
""Consequence of Failure ""
Public
Utilities Condition
...............................................................................................................................................
Condition Rating Descr . .
0 Asset does not exist.
1 Asset is in very good or new condition.
2 Asset is in good shape without significant defects.
3 Asset has some defects or is deteriorating, and it should be monitored again within five years.
4 Asset has defects that may cause failure within five years and repair should be included in the five
year CIP Budget.
5 Asset has defects that may cause failure and repair should be included in the upcoming year's CIP
Budget.
""Probability of Failure "
i. Public
Utilities
Criticalityand Condition
n w
are considered individually
� iu■:iiii'
There is NO combined
�y� • I!It�;�i ■■yci,�ur .:von
■I�Ii`�... �ur�•
�. /IIIAnn•� �',..' .7Y:i EFI� ;h=,;_ �i:a-value.
��r .:.i �^ ,7 � � a a,-'���•:� 1,
Maps 1 to aide 1
� -a•�.. R�`i:.����.�r'v mil; i),
Public
Ut� lit�' c�► Plan for the Asset
' '
...............................................................................................................................................
eContinued Asset Management
Work Order
eCap • • - - Proje
"Every Asset Has a Plan "'
inh►'ii
It 1, WPM
-
71
Asset CI P Project
Management Delivery
•
Public
Utilities Identified Issues/Concerns
cr�4
...............................................................................................................................................
• Lack of organization for documenting capital project p�CP } L �
needs. L
• Difficulty communicating project status between
4.- t".r•—,I —
Operations/Maintenance and Engineering. r �k
JAv�n ott_�a�.S arar,...�w.a- b .lS
#ik'WC 6 4 -
.. - Swsi��; 41Lv ;g.;�,eSl.,t.�-�rtiA..✓e4.
• Challenges linking prioritized projects generated fromS
Asset Management to the final budget.
•
Rt
ruw IYATNW 4e• 'C¢_ nF
Incomplete sco ing of proposed projects before F'4 f �-
1,1� vo.�61Aja-%a-ftVA4 tax,
acceptance into the budget. - a. -
Asset Capital Asset CI P Project
Management Program Delivery
Asset
Management
Progra m
Capital Asset Maintenance Inspection
Program Work Order Schedule
Budget How • • projects generatedfrom
Asset Management get into the
Budg- • • the Capital
Improvement Program?
Capital
Improvement
Progra m
Asset Management
Legend
Maintenance/Operations and Asset Mana em�eF��t Project
Inventory/Criticality/Condition(GIS Database) Other Processes Engineering Program Managers Project Manager Coordinato F I Coordinator
External Coordination(UDOT,SLCO,Cities,CED) -
(Malntenanceand Englneering Program Managers,nmq All Hands(AMC,Maintenance/Operations and Finance Administration
(Engineering Program Managers,Finance,Administration)
7tomprlete Create Project Capital
Iniect Map,Project Needs
No Determine Vey copng Document set, Database B
.IS Project Object
Capital Project is
Needed �
z
Develop Submit Request a
Inspection and for Capital Project A Complete Final c pproved Sloping
Preventative aecuest uumerrnrar,�d (AMC Moves to Initial Scoping, c
Maintenance Plan — Project Manager and EWO Assigned) E
8 a
E
0 Y
Meeting to LeB
g to a
Program Prioritized Budget Work Plan
Manager Approval Capital Needs .Review Capital Proposal udget proposal
Needs al
Z;
z
S
Denied Submit
(AMC Notifies Originator) Capital-Asset ti
Project Number Project Number plan Annual
Assigned Request Form i
— y upcoming Fy Only Submittal
Upcoming FY Only \�./ I -�
Project Delivery Approved SubmittoCity Submit to Submit to Administration
Project Management software Budget Council Mayor PUAC Review
(Project Manager,0e,rr,li ,,,,,,r.r,,n.,rC,r,.t,
- Projects with Additional Phases Remain in Capital Needs Database
Public
Utllltie�l Capital Asset Program Components
...............................................................................................................................................
PubllC CAP Nomination
• Request for Capital Projed P,.j�c- CAP StaeD" �°`e.eeig°� U ® I
Prtryect Central Stage: ominadon
,,to
Develop project Nomination
DevNPp YPurnominatipn.Fieltlz in
red are requirM.Click the
• Submitted by Maintenance/Operations � . . "°"- P.
Develop sziEn «ummcess Guitlf
Pr°jec P Sc°pina validate � Statu to Project c
Naminaha � �• Protect$[°P $[°P D eM Open for lull
or Engineering a"Npn
• Unique request number °rPJe'ttTi`le water PrPJeN Funtl:
• Shop,Project Basic project information, including Ad--: Sturenout. and Other e leings
tmentrt Pla
Ci Trea Plant
Nominated b on Inadon De 1hh.ht: Parleys Teatment plant
Y: Er°w^,aasnn. 9 Pa elg cottonwood-ig Treatment plant
criticality/(ondition and estimated cost Water Storage Reservois(Canyon Reservd s)
nitial Cdticafty: initlal Condlb.n: )ortlan antl Salt lake Canal
OraJea List Tags: ❑City Driven Proj.. ❑City/county/state Funded ❑Master Plan ❑frat-Relatetl ProJMs
Wxer ExNange Area-Wchards Ditch
Water Exchange.rea-Green Difch
• Reviewed and approved or denied by DESCRIPTION wrtef Mai ange Area-Upper Ellison
project Description: r N E n-County
wxer vumv Plant
Water Diatrlbutl°n—oh,
counterpart Program Manager W Watexerr—a anal°°-DNy
y
Water Htu Valve1.
na
-j—Re—,
IST
. .
�thhatad
Cost: Source of Eebmate: ❑Vee Workaheef
Public
f � Utilities Request for Capital Project
............................................................. ...................................................
Engineering Project Central /EDRLINI6
l. SharePoint form is completed My CAP Workspace
requesting a capital project. Nomination-Under Development
J Hu CAPID III nuI Rdj fund Proj Type Nominated by Date Nominated Ndmira Approver SM Assigner Sloping Manager Protest step
2. Notification email is sent to the There are no items to show in this view of the"CAP Nominations'list.
Nomination-Awaiting Approval
opposite program manager for review • Edo CAP ID Proj-Title PI fund Proj Type ..-in—by Date N—inatM Nomination Approver SM Assigner Sipping Manager Rotes Step
There are no items to show in this view of the*CAP Nominations'list.
and approval. Validation-Need Scoping Manager Assigned
Edo CAP ID 111 Title Raj rand Proj Type Nominated by Date Nom 11 141—11 Approver SM Asaignx -pin,Manager Proresa Step
3. If "Denied", reviewer must document There are no items to show in this view of the'CAP Nominations'list.
Validation-Need Scoping
why the request was denied. IEtlB CAP ID PI-TXIe Rpj rend PIType N°mi° by Date Npmin Nomination Apo. SM Assignor Sipping Manager Protess Step
There are no items to show in this view of the"CAP Nominations'list.
ed
4. If "Approved", a Scoping Manager is I 1du tI IDY Me III Tale Proj fund Proj Typa N—na by Dale N.....
lip 2D22-1030 Fv 22123 W RF Capital p ject Support .. Sewer Water Reclamation Facility ❑Brown, in 2022 6/1/ 10:58 AM
assigneda n d t h e request moves onto ,J 2019-1114 Program Management Support-Storm .. Storm Storm Dram Study ❑Brown,Jaon 9/10/20199:52 AM
2019-1113 Program Management Support-Sewer ... Sewer Sewer Study ❑Brown,Jason 9/10/20199:51 AM
theInitial S c o p i n g phase. 4 2019-1112 Program Management Support-Water Water Water Main Wension-City ❑Brown,Jason 9/10/2019 9A8 AM
} 2019-1076 Watershed Master Plan update ... Water Watershed Projects ❑Brown,Jason 6/6/2019 7:21 AM
2019-1067 7DO SWh waterline replacement ... Water Water Main Extension-City ❑Brown,Jason 5/3112019998 AM
3 2017-2024 Advance Meter Infrastructure Program(Annual) ... Water Water Smice Connection 0 Brown,Jason 9/29/20171:DO AM
Public
Utilities Capital Asset Program Components
...............................................................................................................................................
""� " " a-
nitial S(oping CAPRALIMPROVEMENT PROJECTS-WATER . ..�°�..
MAIN REPLACEMENT PROJECT
State Stnlet-Kelsey Avenue(1161 South)to 1300 South
REQUEST NO.2073-02"
• Completed by Scoping E
Manager (Engineering)
�•.Ta ,. gt:;.:� II Ili ...,
• Provides closer look at
project needs - consultant, M
0
coordination, study, permits,
EWO s etc.
• Scoping Map created
S (y
wa.i�nm.is FM
Public
Utilities Initial Scoping
...............................................................................................................................................
l. Notification email is sent to Scoping ... °f�.....°V....�a �..• ° °•
CAPITAL IMPROVEMENT PROJECTS-WATER MAIN REPLACEMENT PROJECT
Manager to complete the Initial Scoping State$`��-N.IS.yAv.°u.,,,61 1h„°,JUUS001h
REQUEST NO.20 13-0246
2. Scoping Manager completes the Initial E
Scoping form on SharePoint.
3. Email notification is sent to the Project
C
Coordinator when Initial Scoping is m
+I o
complete. ( f
4. Project Coordinator adds the project to -� —,
the GIS database, creates a map
S (y
11 .� 0 W 100 200
wa.i�nm.is FM
Public
Utllltle�l Capital Asset Program Components
...............................................................................................................................................
"'j- awe: E3
, j Public CAP Nomination :.,ou'"°t'°"w't"°M1 °""°a
• Final Scoping J ���°m°n"eQ°w
Utl�l}IC$ CAP ID a:2022-1097
PlOfec[CMfAI Stage: PrioAtlEatlon BPerml[s
Step: PN',[d a Project Sco °
❑Doer
• Completed by Scoping Manager IudwlN°nalAmad : UDDT
ProjeM rtle: stae street-90o s a.oa s sewer a °aa•nole.rs: ❑non.
p�mcounal
(Engineering) sewer IC"-vrojeEx one: ❑cd"w care Eacnidn
plmrrtiae
Addr
• Review of Initial Scoping NrP,a eee: a.Dg S And 5=tits�weet mch,
s Departments
° gulatoryparrnRa
°Ch—h-
ommatw by: IDmQIe..MA991: °Wa o—d
informationInitial Cdd,iility: e-Soma Significant ERe[
Design Type: External
Primary Rantlng: Developer lnitlatWIGrowM PROIECT SCHEDULE REQUESTED FISCAL YEAR
pre-Dez�gn Ev, 2021/3032 . Dez�gn Ev: 2021/2022 v ConrtrvrElon FY: 202a/3025
• I n c u e s s p e c i i c projectdetails - ".J..u.Ags °City Driven Proj.. °Diry/
COST
stakeholders, public involvement °d DESCRIPTION D—pt'°". CIPP''ni 225f°etef°x'etl eofEtlmae: nwnan/-P.m °Uae was hem
5 does not Currently exi
ee labeled as MM 2005n
.large n
design but o-bons/new utilities mmentz. eslgn co npletw[o Me 90%level under project 525003026.Project was id,—d pewing mmpletlan of UDOT m°rerodums along
plan, implementation issues, Inhalation of hod Copp In[he lnt state 9[r. ane,gg s wniEn will canElaee in 2025.
Design completed to the 90%lev
State Street and e00 S.Moratori
from 9o%to final,bidding And
detailedcost breakdown, work vrojeM Reason: Rebabllltate e,I,dng sewers on S D"a°d—urn.
®5
plan, and requested budget years
Project Obj-i— Rebab existing sewers after UDO ®Oik1e°ro�mert•Ty.I�nE 1 \J ��J ��J
cements. � ICI ICI
ImpkmenUtlon Issues: UDOT mom[orlUm,Tafflc Control A B Click h—t0 attach a file �••/•e..w .... ...✓ee.. p.a.a.•
w.i•awem.w�e..w=I•o..e.p I.Is.N•1
Public
Utilities Final Scoping
...............................................................................................................................................
1. Notification email is sent to Public CAP Nomination °'�"B0� pcoo.elh...wlm DMer AgenEiee
JpConeunaM rveeeea
UtiliUtl�l}IC$ CAP ID a:2022-10.1 ❑Easeme-
ities Stage: prioAtlEatlon up.—It.
Scoping Manager to complete the °^•2B°r°j•°=°° or
lurize ..I AUMod[y: IID-
Fina coping.
.nole.re: ❑non.
ProjeM Ytle: state street-aoo s a Boa s sewer R tak paty council
pCa unhy Counele
2. Scoping Manager completes the P`J—A El°`It1-1. ""'l"�
B Utlli"
vrP)ert Adereea: srate street a aoo s ane 30o s ❑sm0me
parr Departments
Final Scoping form on SharePoint rv°m, O Rog ulamry Pe°Ra
oCh—I io
, natea br: mmGle..efaggi; ❑ware°nm
including cost and time estimates Dooigl Ty,: y: e-Soma 5lgnlflcaM ERe[
esign Type: External 1 PROIECT SCHEDULE-REQUESTED FISCAL YEAR
Primary Ranking: Developer lnitlated/GrorrtM1
e5,gn Ev, 2021/3032 . Dez�gn Ev: 021/2022 v ConrtmrElon fy: 024/2025
specific tote project. ".Jea ust ngs: O City Driven Project ❑Citr/ re D z z
• •
N ESTIMATED COST
°,ert°e�d�i° CIPtooP lint,,,225 feet Estlmao:of existing R 0,000 Source of C.—Ito t/3rd party v ❑Uu Workshert
3. The Final S eo p i n g Form is MM 200' d...notCurrently exiCOMMENTS,LINKS&ATTACHMENTS
Inne'.t as MH 2005n
.large n
design bu[b-bons/new utilities mmen z. eslgn co npleted[o Me 90%level uneer proj-525003026.Proje°was shelved P—Ing..Motion of UDOT mootorlums along
ztallation of to'CIPP In the Int sots— ane 400 s which will conclude in 2025.
generated from SharePoint °°sIg°°pmpleted°°Me90%ICI°
State Street and e00 S.Montori
from 90%to final,bltltling And to
documentationof the projects vroj..Reason: Rehabll o[e exlstlng sewers on 5l ❑nked DPCP—
®°®5
scoping efforts. °h °`
vro)eR ObJeRive: Rehab existing sewers after UDO IN nrcrt•Tynlink 1�\J ��J ��J
cements. U ICI ICI
ImpkmenUtlon Issues: UDOT mom[orlum,Ta(flc Control A d Click I—to attach a file �••/.e..w .... ...✓ee.. °...a.•
w.i•awem.we..w=I•o••dP i.ls.N•1
Public
f � Uti lit ic�► Project Prioritization
.................................... ..........................................................................................
1. Projects are initially prioritized within cost 5
centers based on the Criticality and
Condition indicated during Final Scoping. \�
2. An "All Hands" meeting is held to review
the prioritized projects. 6 •
~ 3 •
3. Final Scoping is updated based on the o lateP"
U
discussions in this meeting.
4. A Budget Proposal is prepared based on the 2 •
final prioritized project needs and financial
constraints. , _ 3 4 5
CRITICALITY
Public
utilitie�► Annual Timeline
...............................................................................................................................................
OctJul Aug Sep
Submit Budget Proposal to O Submit Budget Proposal to Public
Public Utilities Administration Utilities Advisory Committee
Public
Utilities Administrative Review Budet Finalization
............................................................................................ ...................................
PUBLIC UTILITIES
l. Budget Proposal and supporting 2023 BUDGET PROPOSAL
documentation (Final Scoping Forms) are
submitted to SLCDPU Administration.
r `_ Public
2. Upon approval, Budget Proposal is �tl I I#' S
presented to PUK
3. Final Budget Proposal is sent to the City
p :'C
Council and Mayor's Office for review and
final approval. ►
WATER-SEWER-STORM W ATER-STREET LIGHTING
MafCh'17, ENTERPRISE FUNDS
ZQZ2 SERVING OUR COMMUNITY,PROTECTING OUR(NVIRONMCNT
--- ---- -- -
Budget Approved JulyReview Final
Budget
April
Submit Proposed August/September
Budget to City Generate List of
Council Projects for Next
Fiscal Year
March y 'L9 October
Submit Proposed �� _� Prioritize List
Budget to the
of Projects
Mayor
IT
February November
Submit Proposed Review Project
Budget to PUAC Priorities with
Program Managers
January
Submit Capital December
Improvement Plan Finalize Asset
and Budget to -- Management
SLCDPU Database
Public
Utilities SharePoint Integration
...............................................................................................................................................
tin-iu-J. I., ,2DITUNK3
• All CAP information stored in My CAP Workspace
Nomination-Under Development
SharePoint• Th are w items to M1pw in this w-ew of the'CAP No Im--rMatipre lirt m1ro x.mimu..n m sM ssw w w .r vm
Nomination-Awaiting Approval
SharePoint list features include: sear• ch T„Nedfemlrems[osM1owin[M1iswewoftM1e'CAP Nomoa[io list
N.—I.-.— ,M p — `�i9ro
filters, views, attachments. �an'°�.INeed—S "111. 9ef" '9n�°� �M ro,� xe.roeeA.— —M P-1—ne,�.]ee �r�.a �,rypa a�p.paw.9er
There are rw irems[o show in[his New of the'CAP Nominations'list.
• Workflows notify users of new VaIItlMa^loUPlpNe-11I.l°� ro I]ape w �n�m,ro xemroee..romw sM1,p u� per ——
hem �w
There are rio irems to show in this New of ttie'CAP Nominations'lirt.
requests, required scoping, and other Nominated ByMep M]n (�_ D M`ppg=�300f�WMr,gfip gPMm°,n IwT —II
m, . Ma+r.ga eeae�r
hp 2azz-,n3n I2 11UPaaiPrgerttxPP T to ai isn.e
action items. •2m¢,,,. program Ma g m Supp rt om X -} "L53i T 4h re as
l 2at91113 program Ma�Mgemenl support-Sewn ra ail r r Pn • c
112 P.
raPPna opl o.� rma
• �2a1?lo]a w,Pram Mana9emem Support-water Fe�w cou Yetpm>n(cv)(sysanl6i.earMrye..m.1 - s+.m wea99aots,0.35 c
Single location - My CAP workspace •2 � rs �M""a U."
Ell 2g South waterline replacement SaanisOie,n'a3rmv cape.
Ell 2o1. AM_Math inkaa.—program pn—I) -- -- -- - - — ilea
Q 201-3 aoo[art 2100 t]p3 Jenni,sown
A SharePoint Document Set has been heated(or)our proecl-900 East HHltiew(4060 South)-Replsoe DIP ht
Under Sewer,Request Number sots-56.You can access the Document Set has.It Mill be named sol$-os$6.
Please complete the Flual SeoplOR for this pmjeR has.Please contact Kristeen with am.questions. �I
Public
Utilities The CAP Solution
...............................................................................................................................................
A ' Solution
Poor tracking of CIP project requests. Single database for all project requests
tracked with unique request number. Easy
to use!
Inconsistent prioritization for budgeted Rating system to classify importance of
projects. needs.
Incomplete project assessment prior to Detailed scoping to analyze project specific
acceptance into budget. coordination, cost, and staffing.
Lack of organization for documenting SharePoint database for all CIP needs.
capital project needs.
Public Capital Asset Program: FY 2018 - FY2023
T~ Utilities
. ...........
Project Requests 1745
Completed Projects (Total) 333
Completed Projects (4 or 5 Criticality and 4 or 5 Condition) 223
Projects in Progress (Total) 364
Projects in Progress (4 or 5 Criticality and 4 or 5 Condition) 224
Pending Scoped Projects (Total) 562
Pending Scoped Projects (4 or 5 Criticality and 4 or 5 Condition) 161
Projects Budgeted for FY 2022-2023 87
Projects Included in 5-Year Plan 257
■ ■ ■ ■
Public
SLC PUBLIC UTILITIES
Financial Review :
Financial Dashboard(June 30, 2022 - unaudited, July 31, 2022)
September 22, 2022
'., Public
utilities Financial Dashboard
As of June 30, 2022 — unaudited
Water Fund FY 22 Expense Detail
■ Personal Services
180,000,000 15.71
175,000,000 ■ O&M
170,000,000 �2.71% ■ Charges & Services
165,000,000
Debt Services
160,000,000
155,000,000 ■ Capital
150,000,000 26.59% Expenditures
145,000,000
140,000,000 52.29
135,000,000 2 70%
Revenues Expenses
June 30, 2022 Change from FY21 Percent of Budget
■ FY 20-21 ■ FY 21-22 FY 22 Bud YTD FY 22 Bud Operating Revenues $79,161,815 ($9,560,105) 86.99%
Operating Expenses 68,109,138 3,457,431 84.46%
Capital Expenditures 79,120,067 (10,482,683) 92.14%
Amount Percent Time Total Expenses 147,229,205 (7,025,252) 88.42%
Remaining Remaining Remaining June 30, 2022 Change from FY21 Percent Change
2020 Bond Funds $39,638,333 51.30% 37.30%
2022 Bond Funds $68,141,714 100.00/ 100.00/ Available Cash $116,187,837 $31,191,386 36.70%
(Included in Cash) Accounts Receivable 4,964,957 (892,625) -15.24%
'., Public
utilities Financial Dashboard
As of June 30, 2022 - unaudited
Sewer Fund FY22 Expense Detail
3.52% 0.73% 2.46%
500,000,000 I 4.42% ■ personal Services
450,000,000 -
400,000,000 ■ O&M
350,000,000 ■ Charges & Services
300,000,000
■ Debt Service
250,000,000 ■ Capital Expenditures
200,000,000
150,000,000 ■
il
100,000,000
50,000,000 88.86%
0
Revenues Expenses June 30, 2022 Change from FY21 Percent of Budget
Operating Revenues $58,410,888 $4,317,178 99.66%
■ FY20-21 ■ FY21-22 ■ FY22 Bud YTD ■ FY 22 Bud Operating Expenses 19,903,555 1,317,132 80.32%
,Capital Expenditures 263,372,825 65,538,851 78.53%
Amount Percent Time Total Expenses 283,276,380 66,855,983 78.65%
Remaining Remaining Remaining
2020 Bond Funds $12,870,168 12.10% 37.30% June 30, 2022 Change from FY21 Percent Change
2022 Bond Funds $293,560,433 100.00% 100.00% Available Cash $299,320,615 $239,695,687 402.01%
(Included In Cash) I (Accounts Receivable 3,095,886 (1,977,026) -38.97%
'., Public
utilities Financial Dashboard
As of June 30, 2022 - unaudited
Stormwater FY22 Expense Detail
30,000,000
20.96%
25,000,000
20,000,000 0.84% Personal Services
■ O&M
15,000,000 52.64° ■ Charges & Services
I ■ Debt Services
10,000,000 L 17.16%■ Capital Expenditures
5,000,000 8.40%
0 June 30, 2022 Change from FY21 Percent of Budget
Revenues Expenses Operating Revenues $12,095,190 $1,229,443 110.99%
■ FY20-21 ■ FY21-22 ■ FY22 Bud YTD -A FY 22 Bud Operating Expenses 7,205,255 963,052 78.80%
Capital Expenditures 9,735,516 1,250,720 73.53%
Amount Percent Time Total Expenses 16,940,771 2,213,772 75.68%
Remaining Remaining Remaining June 30, 2022 Change from FY21 Percent Change
2020 Bond Funds $9,657,507 66.37% 37.30% Available Cash $21,163,666 $1,117,210 5.57%
(Included in Cash) Accounts Receivable 613,470 9,818 1.63%
Public
�= -X Utilities
Financial Dashboard
t ;T
As of June 30, 2022 - unaudited
Street Lighting FY22 Expense Detail
11.48% 5.95%
7,000,000 �0.02% , personal Services
4.56%
6,000,000 ■ O&M
■ Charges & Services
5,000,000
Debt Services
4,000,000 ■ Capital Expenditures
3,000,000
2,000,000 -----77.99%
1,000,000
0 June 30, 2022 Change from FY21 Percent of Budget
Revenues Expenses Operating Revenues $4,325,132 $49,722 103.90%
Operating Expenses 3,560,864 (890,384) 108.77%
■ FY20-21 ■ FY21-22 ■ FY22 Bud YTD FY 22 Bud Capital Expenditures 487,130 (104,265) 21.75%
Total Expenses 4,047,994 (994,649) 73.42%
June 30, 2022 Change from FY21 Percent Change
Available Cash $5,551,121 $725,666 15.04%
Accounts Receivable 139,557 (226,656) -61.89%
'., Public
utilities Financial Dashboard
As of June 30, 2022 - unaudited
Total Public Utilities
June 30, 2022 Change from FY21 Percent of Budget
Operating Revenues $153,993,025 ($3,963,762) 93.51%
Operating Expenses $98,778,812 $4,847,231 83.83%
Capital Expenditures $352,715,538 $56,202,623 80.76%
Total Expenses $451,494,350 $61,049,854 81.41%
June 30, 2022 Change from FY21 Percent Change
Available Cash $442,223,239 $272,729,949 160.91%
Accounts Receivable $8,813,870 ($3,086,489) -25.94%
Delinquent Billings 0.64%
Amount Percent Remaining Time Remaining
2020 Bond Funds $62,166,007 31.37% 37.30%
2022 Bond Funds $361,702,147 100.00% 100.00%
(Included in Cash)
Public
�= -X Utilities
Financial Dashboard
As of July 31, 2022
Water Fund FY 23 Expense Detail
140,000,000 5.21% 0.97% ■ Personal Services
I � 10.49
120,000,000 //- ■ O&M
100,000,000
0.70% ■ Charges &Services
/ Debt Services
80,000,000
60,000,000 — ■ Capital
Expenditures
40,000,000
20,000,000 —
0 — . � I
Revenues Expenses 82.63%
July 31, 2022 Change from FY22 Percent of Budget
■ FY 21-22 ■ FY 22-23 ■ FY 23 Bud YTD FY 23 Bud Operating Revenues $12,862,562 ($1,445,866) 12.32%
Operating Expenses 7,817,022 515,850 9.50%
Amount Percent Time Capital Expenditures 38,744,638 (9,705,089) 87.49%
Remaining Remaining Remaining Total Expenses 46,561,660 (9,189,239) 36.79%
2020 Bond Funds $37,528,348 48.57% 34.40% July 31, 2022 Change from FY22 Percent Change
2022 Bond Funds $68,141,714 100.00% 97.22% Available Cash $122,954,630 $29,817,358 32.01%
(Included In cash) Accounts Receivable 6,994,576 4,474,226 177.52%
'., Public
utilities Financial Dashboard
As of July 31, 2022
Sewer Fund FY23 Expense Detail
300,000,000 0.00% 0.19% i•2550.55%
■ Personal Services
250,000,000 ■ O&M
■ Charges & Services
200,000,000
Debt Service
150,000,000 ■ Capital Expenditures
100,000,000
50,000,000
99.01%
0
Revenues Expenses July 31, 2022 Change from FY22 Percent of Budget
Operating Revenues $5,410,495 $729,224 7.95%
■ FY 21-22 ■ FY22-23 ■ FY23 Bud YTD FY 23 Bud Operating Expenses 1,894,791 111,411 6.94%
Capital Expenditures 188,090,169 72,581,866 90.78%
Amount Percent Time Total Expenses 189,984,960 72,693,277 81.02%
Remaining Remaining Remaining
2020 Bond Funds $0 0.00% 34.40% July 31, 2022 Change from FY22 Percent Change
2022 Bond Funds $293,560,433 100.00% 97.22% Available Cash $301,481,741 $241,014,364 398.59%
(Included in cash) Accounts Receivable 3,114,783 (623,414) -16.68%
'., Public
utilities Financial Dashboard
As of July 31, 2022
Stormwater FY23 Expense Detail
20,000,000 4.89%�
0.14%
18,000,000
5.32% 1.84%
16,000,000
14,000,000 Personal Services
12,000,000 ■ O&M
10,000,000 ■ Charges & Services
8,000,000 ■ Debt Services
6,000,000 ■ Capital Expenditures
4,000,000
2,000,000 87.81%
o ■ ■ 1101
July 31, 2022 Change from FY22 Percent of Budget
Revenues Expenses Operating Revenues $1,066,596 $152,853 8.53%
■ FY21-22 ■ FY22-23 ■ FY23 Bud YTD ■ FY 23 Bud Operating Expenses 729,492 (91,641) 7.46%
Capital Expenditures 6,188,323 1,623,846 84.06%
Amount Percent Time Total Expenses 6,917,815 1,532,205 40.35%
Remaining Remaining Remaining July 31, 2022 Change from FY22 Percent Change
2020 Bond Funds $9,453,142 64.96% 34.40% Available Cash $22,459,562 $2,105,903 10.35%
((Included in cash) Accounts Receivable 729,699 480,388 192.69%
Public
�= -X Utilities
Financial Dashboard
t ;T
As of July 31, 2022
Street Lighting FY23 Expense Detail
5.36%
7,000,000 14.72% 0.00% , personal Services
6,000,000 3 73% ■ O&M
■ Charges & Services
5,000,000
Debt Services
4,000,000 ■ Capital Expenditures
3,000,000
2,000,000 -----76.19%
1,000,000
0 - ` July 31, 2022 Change from FY22 Percent of Budget
Operating Revenues $184,953 ($1,120) 4.32%
Revenues Expenses Operating Expenses 353,036 255,563 10.62%
■ FY21-22 ■ FY22-23 ■ FY23 Bud YTD FY 23 Bud Capital Expenditures 63,729 47,315 2.85%
Total Expenses 416,765 302,878 7.49%
July 31, 2022 Change from FY22 Percent Change
Available Cash $5,353,713 ($124,915) -2.28%
Accounts Receivable 233,467 7,306 3.23%
Public
Utilities Financial Dashboard
As of July 31, 2022
Total Public Utilities
July 31, 2022 Change from FY22 Percent of Budget
Operating Revenues $19,524,606 ($564,909) 10.31%
Operating Expenses $10,794,341 $791,183 8.80%
Capital Expenditures $233,086,859 $64,547,938 89.28%
Total Expenses $243,881,200 $65,339,121 63.55%
July 31, 2022 Change from FY22 Percent Change
Available Cash $452,249,646 $272,812,710 152.04%
Accounts Receivable $11,072,525 $4,338,506 64.43%
Delinquent Billings 0.55%
Amount Percent Remaining Time Remaining
2020 Bond Funds $46,981,490 23.70% 34.40%
2022 Bond Funds $361,702,147 100.00% 97.22%
(Included in Cash)
'., Public
,.e Utilities
Updates
Budget items
Rates — increases effective July 1, 2022
Water conservation
Audit is currently in progress
Additional funding opportunities