Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
09/04/2025 - Meeting Materials
PARKS,NATURAL LANDS,URBAN FORESTRY AND TRAILS ADVISORY BOARD Of SALT LAKE CITY Formal Meeting Thursday, September 4, 2025 5:00 p.m. -7:25 p.m. Or Join at the Public Lands Administrative Building:1965 W.500 S.Salt Lake City,UT 84104,2nd Floor,Parks Training Room Join Zoom Meeting hops://us02web.zoom.us/j/3703674458?pwd=xigAA5545gKVf bj uBUj QhpOPQtUb20.1 Meeting ID:370 367 4458 Passcode:133477 AGENDA 1. Convening the Meeting 5:00 PM A. Call to order B. Chair Comments 5 mins We commemorate Board Members Brianna Binnebose, Meredith Benally,and Talula Pontuti for completing their service on the Parks, Natural Lands, Urban Forestry,and Trails Advisory Board of Salt Lake City. 2. Approval of Minutes 5:05 PM — Approve August 7, 2025, meeting minutes 5 mins 3. Public Comment 5:10 PM — Verbal comments are limited to no more than 3 minutes; 15 minutes total. Written comments are welcome. 4. Director's Report 5:15 PM — Summary of current high-priority department items. — Kim Shelley, Public Lands Director 20 mins S. Board Action Item 5:35 PM — Board Members will discuss the proposed SLC Indigenous Commission document 20 mins and vote on the proposal — Meredith Benally, Board Member 6. Urban Trails Committee Nominations 5:55 PM — Nominations for Urban Trails Committee: Brianna Binnebose— Kerri Nakamura, Board Chair 5 mins 7. Staff Presentations, Updates & Discussions 6:00 PM A. Public Lands Capital Improvement Projects—Kat Andra, Senior Planning Strategist 30 mins D. Staff Updates.—Maria Romero, Board Manager 5 mins 8. Board Discussion 6:35 PM A. Committee Reporting 10 mins B. Board comments and question period, & request for future agenda items 10 mins C. Board Engagement Opportunities/Requests 5 mins D. Written Updates Packet Overview: • Allen Park Update • Parks Fire Safety • Korean Pavilion Update • Planning &Design Update; Glendale Park, Jefferson Park • Park Ranger Program Schedule Change • Urban Forestry Sycamore Anthracnose Study Progress • Golf Division Updates • Community&Volunteer Event E. Next meeting: October 2,2025 3 mins 9. Adjourn 7:03 PM PARKS,NATURAL LANDS,URBAN FORESTRY AND TRAILS ADVISORY BOARD of SALT LAKE CITY Formal Meeting Thursday,August 7, 2025 5:00 p.m. -7:25 p.m. Or Join at the Public Lands Administrative Building:1965 W.500 S.Salt Lake City,UT 84104, Upstairs Parks Training Room Join Zoom Meeting https://us02web.zoom.us/j/3703674458?pwd=xigAA5545gKVfbiuBUj QhpOPQtUb2O.1 Meeting ID:370 367 4458 Passcode:133477 Unapproved Minutes 1. Convening the Meeting 5:00 PM A. Call to order 5:05 PM Clayton Scrivner Ginger Cannon Aaron Wiley Kerri Nakamura Meridith Benally Sarah Foran Eric McGill Steve Bloch Melanie Pehrson Brianna Binnebose B. Chair Comments 5 mins 2. Approval of Minutes 5:05 PM — Approve June 5, 2025, meeting minutes 5 mins A motion to approve and adopt the June 5th meeting minutes for the Parks, Natural Lands, Urban Forestry, and Trails Advisory Board was made by Board Member Steve Bloch. The motion was seconded by Board Vice Chair Ginger Cannon. The vote passed unanimously from the Board Members present to approve and adopt minutes from the June 2024 Advisory Board meeting 3. Public Comment 5:10 PM — Verbal comments are limited to no more than 3 minutes; 15 minutes total. Written comments are welcome. No members of the Public were present, and no public comments were made. 4. Director's Report 5:15 PM — Summary of current high-priority department items. — Kim Shelley 10 mins Kim Shelley, Public Lands Director, reported that the City-Wide Wildfire Mitigation Audit for Public Lands properties covering over 6,000 acres is due to the Mayor's Office on August 14. Initiated after a fire on City property in Millcreek, the audit has identified 100 priority parcels for maintenance. Kim will meet with the mayor's team to review initial findings and assess the readiness of Public Lands managed properties near businesses and homes, and report to the board at the September meeting. Kim Shelley encouraged City residents and businesses that are along natural lands to utilize the Citizen Wildfire Mitigation Program. Board Member Eric McGill directed a question at Kim Shelley on whether the Public Utilities Millcreek property contracts with Public Lands to provide service. Kim Shelley clarified that Public Utilities has their own staff for maintenance. Board Member Brianna Binnebose asked Kim Shelley whether the new risk assessment will be incorporated into the City's Community Wildfire Preparedness Plan. She noted that other agencies take this approach to strengthen eligibility for future grants. Kim Shelley responded that legislation is in place to support this, and both the department and the City will be prioritizing it. Kim Shelley also reported that all 12 pickleball courts in Glendale are now open to the public and shared details about the grand opening celebration. In addition, a new futsal court will open on August 9. Kim Shelley highlighted that the Public Lands Employee Summer Party was a meaningful opportunity to celebrate and recognize staff. Board Members further discussed amongst each other the Pickleball Court reopening. - Introduce New Communications Staff- Jana Cunningham, Communications& Engagement 5 mins Manager Jana Cunningham briefly briefed the Advisory Board on the new Communication Employees, Kim Davidson, Communications Coordinator, and Finola McDonald, and their current role in the Communication team. Jana Cunningham also discussed the interview efforts for the second graphic designer. Board Member Melanie Pehrson and Board Chair Kerri Nakamura directed questions at Jana Cuningham. 5. SLC Indigenous Commission 5:30 PM - Board Members will discuss the proposed SLC Indigenous Commission document- 10 mins Board Member Meredith Benally Board Chair Kerri Nakamura commended Board Members for prioritizing the SLC Indigenous Commission Proposal Document. Board Member Meredith Benally introduced the document and briefed the Board on the significance of the proposal. Kim Shelley, Public Lands Director and Board Member McGill directed a question to Board Member Meredith Benally. Board Member Eric McGill made a motion to move forward with the proposal. Board Chair Kerri Nakamura advised the board to further review the document and vote on a subsequent meeting. Board Member Meredith Benally emphasized that the future Indigenous Board would Disseminate information for the indigenous community. Board Member Kerri Nakamura Provided feedback on the document. Kerri Nakamura and Clayton Scrivner provided feedback on the application Requirements for future board members. Board Member Brianna Binnebose and Board Member Meredith Benally agreed to Working on the details of the document. 6. Urban Trails Committee Nominations 5:40 PM - Nominations for Urban Trails Committee - Kerri Nakamura 2 mins Board Chair Kerri Nakamura provided background to the Board Members on why she recommended including Tom Merrill on the Urban Trails Committee. Board Member Melanie Pehrson moved to approve his participation, and the motion carried unanimously with all members present voting in favor. 7. Staff Presentations, Updates & Discussions 5:40 PM A. Rocky Mountain Power Wildfire Mitigation Project Phase 3 & Phase 4—Rocky Mountain 20 mins Power by Brad Knoles, Regional Business Manager& Brant Swander Brad Knoles provided the Board with a brief introduction and introduced his team: Brant Swander, John Whitesman, and Robert Hamilton. The presentation included details on the importance of the mitigation work, which includes enhanced vegetation clearing practices, more line inspections, along with capital investment for transmission and distribution, line upgrades, all occurring in the Wasatch Front and throughout Utah. Additionally, included a map of the completed and future phases. Board Member Kerri Nakamura, Board Member Steve Bloch, Board Member Steve Bloch, Board Member Melanie Pehrson directed questions at the Rocky Mountain Power team. The questions were further discussed. Board Member Sarah Foran provided feedback to the Rocky Mountain Power team on the communication regarding the closures of trail closures that have been occurring and the lack of awareness to the larger community. Board Member Kerri Nakamura provided a comment. Tyler Fonarow, Trains & Natural Lands Division Director, provided comments on Rocky Mountain Power signs and more information on the public feedback, and the role of Public Lands in keeping trail users informed and safe. Board Member Ginger Cannon asked the Rocky Mountain team a question on whether they have contracted a Public Relations Firm. The Rocky Mountain team further discussed their current communication tools and efforts. Board Member Brianna Binnebose provided further feedback on the Rocky Mountain Power Communication Strategy and the City's Strategy on the project. Board Member Steve Bloch directed a question at Rocky Mountain Power regarding the timing of the start of Phase 4, and contractor bidding process, and construction details. The Rocky Mountain team responded. Board Member Melanie Pehrson directed a question at Rocky Mountain Power on when the restoration of the impacted trails will happen. B. City Civic Engagement Update— Mia McCain, Communication & Engagement Manager 20 mins Mia McCain began her presentation by providing a brief introduction and also invited Public Lands to share any public updates with the City's Engagement team. Board Member Sarah Foran has asked if there is a barrier to collaborating with Rocky Mountain Power on communication. Kim Shelley, Public Lands Director, responded. Mia McCain provided an overview of the communication channels the city utilizes: SLC.com, mySLC, and shapeSLC. Mia McCain provided the benefits of the feedback website shapeSLC for residents to utilize as a public comment for projects, and the notification system for engagement. Details included the different software capabilities within the website for different methods of engagement for City projects. Board Member Kerri Nakamura asked for details on login information on the different platforms. Board Member Eric McGill commended the new software, and he also directed a question at Kim Shelley, Public Lands Director, on whether shapeSLC with lessen the need for consultants for engagement in future projects? Kim Shelley responded. Board Member Clayton Scrivner provided the board with the history of the Civic Engagement Office and commented that it is highly unlikely that the current efforts to minimize the need for consultants. Board Member Kerri Nakamura requested that the next time Mia McCain presents for she provide information on the mySLC app, she provided history on how the Mayor's Office took complaints 40 years ago. Board Member Melanie Pehrson commended the project progress bar in the shape SLC projects. She also asked about the maintenance of the projects posted. Mia McCain provided a response. C. Staff Updates.—Maria Romero, Board Manager 5 mins Maria Romero provided an update on the City PNUT Advisory Board website and the future creation of a slc.gov email for the board. Board Member Brianna Binnebose provided feedback. Board Chair Kerri Nakamura asked about the location of the presentation request form. 8. Board Discussion 6:25 PM A. Committee Reporting 10 mins The Communication Committee did not have an update. Board Member Sarah Foran mentioned she is a member and requested to be included in future communication. Board Member Steve Bloch directed a question at Maria Romero, Board Manager, on whether a distribution list can be created for board members. Board Member Brianna Binnebose commented that there is a distribution list on the PNUT Gmail account. Board Chair Kerry Nakamura provided an update on the Urban Trails Committee. She reports the committee has been working on a GIS Map to provide the public with conditions of the trail. Tyler Fonarow provided background on past trial reporting methods. Board Member Kerry Nakamura added that she attended the Transportation Advisory Board to request a Board Member be part of the Urban Trails Committee as well as the Bicycle Advisory Board. Board Member Brianna Binnebose commented on her excitement for the City to prioritize data and digitization of the Public Lands trail inventory. Board Chair Ginger Cannon provided an update on SCAAMP Recently, the community engagement summary was shared with preliminary analysis. She reports that she has provided the consultants with feedback, and all documents are available to Board Members in the Google Drive. Board Member Steve Bloch provided an update on behalf of the Foothills Committee. Board Member Steve Bloch highlighted the EDR Environmental Dispute Resolution with regard to the memorandum of understanding with the five landowners. Tyler Fonarow provided an update memorandum of understanding. Board Member Melanie Pehrson provided the update that the Jordan River Committee is looking to have a meeting with Public Lands Leadership. B. Board comments and question period, & Request for future agenda items 10 mins Board Member Sarah Foran suggested a future agenda item to be Trail Condition Communication. Board Member Melanie Pehrson requested more information on the Glendale Park Construction Progress. The Board Member also asked for the agenda timing to be more accurate. Board Member Aaron Wiley asked for more information about Baseball Reservations and how he can provide feedback to streamline the process. Board Member Sarah Foran provided the board with opportunities for feedback and a water symposium for more information on watershed issues. Board Member Eric McGill requested the Board to consider hosting a meeting at a Park. Board Members further discussed the issue. Board Member Steve Bloch requested an overview of the September Agenda and details on the Capital Improvement Project Applications presentation. Maria Romero provided more information on the future presentation. Board Member Meredith Benally asked the process to reappoint another term as her 1st term ends in the month of September. Board Chair Kerri Nakamura requested that Maria Romero communicate with Board Member Dave Bloch on his attendance at future meetings. C. Board Engagement Opportunities/Requests 5 mins D. Next meeting: September 4,2025 3 mins 9. Adjourn 7:30 PM Board Member Steve Bloch made a motion to adjourn the meeting. Board Member Sarah Foran seconded the motion to adjourn at 7:39 PM 0 DEPARTMENT of PUBLIC LANDS Public Lands Updates Parks, Natural Lands, Urban Forestry&Trails Advisory Board Thursday, September 4th Parks Update: Fire Safety: The team is focusing on improving the fire-safety of operations, especially related to weed control-both weed overgrowth prevention and overgrowth response.Through internal field crew information sharing, City safety programs, and trainings from SLCFD, Parks is improving operational safety, awareness, and if needed,immediate on-site response.We are assessing fire danger in islands/park strips, City parks, and urban trail locations as well as defensibility around the Public Lands building, cemetery, and Regional Athletic Complex. In-Ground Trash Cans:Two months after installation,it is finally time to empty the first of the in-ground trash cans being piloted along the western end of the 9Line trail.Two months of weekly trash removal is a large amount of work removed from the plate of our Parks teams, and the pilot program has gone so well,we will be adding another half-dozen high-capacity, in- ground trash cans in trash hotspots. Cottonwood Park and Fairground locations along the JRT are prime candidate locations. Korean Pavilion Donation In 2019, Utah's sister province Kyonggi (Gyeonggi)in Korea reached out to the Governor's Office of Economic Opportunity(GOEO)with a request to build a new pavilion in the Korean Garden at the International Peace Gardens, aiming to further strengthen our partnership.The proposal was approved, designs were completed, and funding was secured. However,the project was paused due to the COVID-19 pandemic. In 2024,the Korean Delegation reinitiated the conversation. GOEO transitioned the project to the Mayor's Office of Economic Development, which then coordinated with Engineering, Public Lands Planning&Design, and Parks staff to resume planning. Since the project received original approval from then Governor Herbert and support from the International Peace Garden Committee in 2019, Public Lands is moving forward with the request.The project includes a new pavilion and a complete redesign of the Korean Garden,with construction anticipated to begin in spring 2026. • Supporting documents are attached within the packet. Planning&Design Update: Jefferson Park—The Reimagine Jefferson Park project kickoff meeting was held on 7/29/2025. Design has started and will continue through 2025.The public will be given an opportunity to provide feedback on two proposed concepts in the fall of 2025. Construction is anticipated to begin in 2026. Public Lands will be coordinating closely with Public Utilities,the owner of the site,throughout the project's duration. In addition, Public Lands is collaborating with Transportation,given the park's proximity to MeadUP, Ballpark NEXT,the Ballpark Trax Station, and the 9-Line Trail. Glendale Park-Glendale Park Phase I construction is well underway. The entire Phase I area has been graded, and all underground utility work has been completed.Much of the concrete work is complete, including several sidewalks,playground curbing, curb and gutter for the parking lot,light pole bases, and the post tension basketball court.The main line for the irrigation system is complete and the landscape contractor is continuing to install the lateral lines.Topsoil is also being spread in preparation for planting.The dry creek bed/bio-swale is currently being installed as well as placing other landscape boulders throughout the site. Various structures have been installed,including the large pavilion frame,other smaller shade structures, and the playground equipment,including a large and very cool Sandhill Crane climbing feature. Installation of the playground surfacing began during the week of August 111h and will be ongoing for several weeks after that. The grand opening of the new pickleball courts was held on Saturday,August end and was extremely well attended(100+).The project included converting four existing tennis courts to twelve pickleball courts.The community has expressed excitement and appreciation for these new courts.We were also able to replace all the dead sod on the north side of the courts in preparation for the grand opening. Glendale Phase I is scheduled to open this fall. Phase II's design is underway, and we will be kicking of the next phase of design, design development through construction documents,later this August. Allen Park • We are currently out to bid for the water/fire line and are still working toward construction commencing this fall.We anticipate a park closure of three to four months to accommodate construction. However, Public Lands will look for opportunities to periodically open parts of the park if we can do so safely and without impacting the construction schedule. • Due to poor condition,the aviary structure at Allen Park was earmarked for demolition during Phase 1 in the Adaptive Reuse and Management Plan. It was successfully demolished the week of August 25th.Trails and Natural Lands will work to restore the degraded creekbank. • The Phase 1 Design consultant team led an all-day project kickoff meeting and design charrette at Public Lands on August loth and spent all day at Allen Park on the 21st doing field work. Design will last several months as the ARMP final concept is refined. When complete,the concept will be shared with the public. Miller Park • A 40% Design Review was held for the Miller Park CIP project, addressing accessibility, trail stability, and historic wall preservation and protection in mid-August. Construction is still anticipated for late 2025 or early 2026. Public Lands will attend the October 9th 0DEPARTMENT of . PUBLIC LANDS Yale crest Neighborhood Council meeting with the project consultants to share the scope of work with the public and answer project-related questions. Park Ranger Program: Park Rangers completed Fire Assessment Surveys for the nearly ioo Priority 1 properties.The initial assessments will be used by Trails&Natural Lands, Parks, and the Salt Lake City Fire Department to do further assessments and suppression. Additionally, Park Rangers will be contributing to the SLCPD operation in the Fairpark area from 8/22 to 9/5. Rangers will patrol the area of the JRT and adjacent parks twice daily, informing the community about the operation, and relaying any public safety information to police. Urban Forestry: Sycamore Anthracnose Study Progress-Contractors working on behalf of the Urban Forestry Division will begin fungicide treatments(intended to mitigate the effects of anthracnose and powdery mildew in the City's largest Sycamore trees) next week.Approximately 1/3 of the study group trees will receive the trunk-injected fungicide treatment this year.Treatment of the remaining study group trees will be split between 2026 and 2027. Residents living adjacent to trees that will be treated will be mailed a notice.Additionally,the Urban Forestry Division has leveraged in-house resources to provide anthracnose treatments for approximately 50 to 75 additional sycamore trees that are not in the study group.This service is being provided as a means to evaluate alternative treatment options and to cultivate the support and satisfaction of Salt Lake City's residents.The Anthracnose Study funding provides for the treatment of approximately 500 of the City's largest sycamore trees.As a result,this has enabled the Urban Forestry Division to satisfy public requests to treat trees that are not in the study group. Washington Square Tree Pruning: Over the next couple of weeks, Urban Forestry Division Arborists will be meticulously pruning the crabapple trees that line both sides of the primary walkway from State Street to the west entrance of the City and County Building.These trees have numerous dead and low-hanging branches that impact grounds maintenance and tree health.As some of these trees are in various stages of decline,mostly due to being outcompeted by neighboring trees,the pruning should improve their overall health.This work will occur in the morning hours (prior to 9:0o am)to minimize any disturbance to those working and visiting the City and County Building. Golf Division: Golf Division staff completed a fire-risk assessment of all six golf courses during the week of August 4th.Areas that could be addressed immediately were prioritized and tasks completed, and problematic areas that could not be met with current staff and equipment were identified for future attention. Courses with higher-level risk areas were Bonneville and Nibley Park.The division is looking for possible general fund assistance to address these out-of-play areas that pose potential fire hazard threats to adjacent private property. The Bonneville Golf Course hosted the 2025 Salt Lake City Open on August 9th and loth. This is the crown event for the Golf Division,with staff working extra hours in July and August to prepare the course for the event. Despite hot and dry conditions,the course playing conditions were excellent, and staff received many compliments from players, Utah Golf Association staff, and spectators. Martin Leon, a former University of Utah golfer from Chile,scored a 7-under 65 on Sunday to post a 17-under 127 and beat 2023 champion Mitchell Schow's tournament record by two shots.The 2023 Utah State Amateur champion repeated the title he won last year,when he posted a 9-under 135. Skyline High senior Austin Shelley placed second with an 8-under 136 (70-66) and was the low-scoring amateur,while Schow placed third at 7-under 137(67-70). The planning process for the Nibley Park Golf Course irrigation system has begun with the development of an RFP for system design and construction specifications.The project to projected to be completed sometime during 2027. With record dry conditions in July, courses have needed to apply a greater volume of water than normal in order to keep essential turf features of the courses healthy.To try and offset the increased volume of water,courses reduced irrigation to turf areas on driving range areas and out of play areas. Revenues have remained strong and will cover the additional usage with a budget amendment planned for December. Community&Volunteer Event Update: September is shaping up to be a vibrant month filled with community and volunteer opportunities. Highlights include the launch of our weekly Pilates in the Park,the Rosewood Community Celebration, and the ever-popular Fisher Mansion Beer Garden. On the volunteer side,it's one of our busiest months of the year,with two projects along the Jordan River Trail, four dedicated Foothills events, a Beautification Day on the Folsom Trail, and a hands-on work session at Allen Park. In 2019, Utah's sister province Kyonggi (Gyeonggi) in Korea reached out to the Governor's Office of Economic Development (ED)with a request to build a new pavilion in the Korean Garden at the International Peace Gardens, aiming to further strengthen our partnership. The proposal was approved, designs were completed, and funding was secured. However, the project was paused due to the COVID-19 pandemic. In 2024, the Korean Delegation reinitiated the conversation. The Governor's Office of ED passed the project off to the Mayor's Office of ED, which then coordinated with Engineering, Public Lands Planning& Design, and Parks staff to resume planning. Since the project received original approval from the Utah Governor and support from the International Peace Garden Committee in 2019, Public Lands is moving forward with the request. The project includes a new pavilion and a complete redesign of the Korean Garden, with construction anticipated to begin in spring 2026. on — - spud laued ,iauur� aney J�UOP� C 4 90. 0.G JOWS 1 z � _ asjoaaxa of juem sn jo jsoy ; Monoo 3H13J0 w geln;o alels aql of uoljlned aqI paleu -91 a`u'rA'XI law all Iugl aaD!;;o jauua -op IuawMuano2 jumulnoad!$2uosm ag j, -lad a se�ulnaas SUM uaMog ajlgm seM lI ti�sPIR M`ums nd 'ISOM 006'S ft6`suapiu0 aauad jeuoll gulp 3o d1E7 � s �lr)a��S.ig PUB aH"3!30 -uuialuj aqI lu uoquud alf4s-ueaaom u palua aql pue papua;ap aq uolleu all uaa:�la a� t�sw WIN`uolunal -!pap`eaao}I glnoS;o aautnoad 02UO X xujj pljos mou a puallod pue—sanaso;: a4m I � � siols agl ajrgM `alels saws s,geln woa;uolle2ajap u`�Sepsn a�uuga osje Inq a3l1 s!q anus Bjuo IOU pjnow uaMog -les u0•saolliodoad jeuolluuaalul pagasaa luawu2lsse Mau s!q Imp uagl Mo"uai&q suq l!legl os g n� q� axa uotlonjlsuoa aw n os—spuau;pool ptp aill!'I'sSus mou ag,,`u!paddals awa.. III¢; ue mou�Sq`un- seM l! jjlls aau uaMog pue u m`aalej saeas Slao,� junln ms so;aausq F 'Z86T d sI ssaa�ns InogllM Inq`unx «330 l!jrq,Sjjuai a� �Sauow a se saul1 luoa;.IL ueaso}j agI palgaq saTa " aleaQ o3 spe=ile juaanas spew uaMog ujlxa ajlllj a uilq anl�pj Puu`wlZl�03 s�joog anl;Isod antlejlslulwpe we of luauH8 aimovEgj c:pa_aw uaMog pue Saellj!w uuaa so;awoq Iuas I os`gslj�ug ujuaj of paluem -seas s!q pagsrjai uaMog 0 I Iagog 1'I p i a uoa aH„-saagwawaa uaMog ,`,fljjeuosaad pjo-aeOx-£Z`a�plg 3jeajgljeaH pajjea alUl -0g aw�paveip sum wlg aal3e I ul enba ue a ut a suoluedwoa s, o sow gl!U �q sreaS ma;a io3 w!}j ql!m Iueseajd u gans peg aH„-Slli P ql P li!}i P4 I papa�s�peq al'ZS61 IS"nV w awoq laadsaz iillm uil}j Wall oI pats;sSuMju al ,aluµ llels srnaN 13% omog Jal3v-05e slugs Ssus uaMog`suuaaom juaoj uo umop xooj of Ae16uedg AUjep R nolunai aauega papal;saalpjos ueauawV laglo a jlgm Ing a0uieotd l uoSg 's.IaTPioS 18 86ed uo tio;s:aoualoln ul payouaJp)1aar od ials!s s,gui_Z S' l w�3 Panlaaai Sagl luauuuajl 2ulueaw pue of Aem oluoil jaylej Inq aolu a sl�(uowam Wwo -000,00E$luads -ap Sq asio.a uana apew XIoes juluaw sem H seg pue laafoid ali 000'009$palaNPnq 1I'slatplos;o salpoq peap all ianoaa t uana gu01�1)21 pZ117 uauL 7, uaa.-_?= PCM aaulnold aqs-dlgsaogeW alels-aals!S aT. pue saols galls s�uai ueajD of lIIawujano2 sail�uunpua s ouoy uo :.:.� 'Vsi ;o.+Jma,nluue gIoI ammo uolluaowawwo: uealo- all aq paaojduza eogasnoq pjo-MS �f d� s uai GwIm em W04 su,osso�q uo�i a��C .0 P .� .� Lnoommoo IsaM 006-S 9L6'suapieE)aoead leuotleusalul atl le uo4,tuuec saleoipap ewo)j y1noS ul alels jalsls smel0 woal uc :vsm s —� f ;; i � iamt I;M151am O anpan ' . �► e j MM � � a ram_ eel As ano t 5 J Uej < (D O pw O oq C.n01 w=;Gol ro A°� ro 'v rocD w o (D 0 -9 w 't7 = ¢ �"'L7 (roD G �0Q c`.yD Cs`C v, n R �'� (/��y O�C OOa �'� 0 n ero+:L �_ O O �'*(D A C: ^1 C' ro O `p O O a A s-,+ .•y .'O.a d ro O i ro - =_ � r ¢ �� i � y %bCoR (D> , nD (D � . O- .,=O (D - a �' � p m G �O O a�' wy o" ro . �w `"v.CQ aI Ow•n O roa uw.c Iroc .�ww m CAKc`wroCii`.�y i.�r roc ms "w _O ( r Y a -. o C Nw v(n In EL O(o � a ' ° o sm.-% oa � wa -'ID X'M D ro y � ° , ro OCD no �ro waq w m � � o w . o 01Q, yG' ��� � yOn'�. (n p - y y l N p On`2 w go, "p O ro ss a',?�7�`2O�2(Dww g 0 E O t w - OQ lD C G ' °O O4•a ic Z o � Do OOO( O ( 5 cn aw a °Op 3_Ea cl PI�.� 0 (yo ro c R 0'w< 00Q < o o w y ^' C�C.a CD w a't�O X,-1 � � y`11 ID %° ro C 0 � < (RD CCC `J a ro �•ro to p -O•o(pD w. iG•1 C.0.O �a•z (D (D w Cam,• �- G• c a O O a p : moq 0.a' �(D� a' a ti m ro row ro n w p p w p a `+ O'cw "y (nroro ro wCl.�ICD (�D pO `�a...i-,C'y'wa'nL'a Oa �O m A C) Ol ? = - .�.. ',,...p w (n ro •! ti O.ro ro ."! r�r� a y �-.:s' n A ° ro .�-.n '� c A = O r+oQ pOQwt7 M mnO.�y a+ A'F.ayOwro �_pI� y .n (D (n a a ? p C o x'b ro Crop O W xo o yoq �N O n �' p w C �sA m a m ma QO A O a i procowcro r. n p ti O w �s Ows=. a• cow m A _ 5' (�DN GlroD 'C rofpD p' a.. -aA �.w .y'U -tiroeo ;°,tiC- aims y O C • = -C C/] w p �.•-• (D w ti w O 0'Q a O ro Cl]a O w pq (D " n .y cn o 7 Q O (1 O G p yO ro .°+•'-OQQ w Es o 0 C.�-i•O �' 'L7 p w n •'-•r ro tr w 0 Oq n (D C C a !f • p C p ro (D (n C m O O ((D a cCD rs � ro O .ro yC �� w a� '� IID� _r fnD (-'. w ro O n .�.. .�+.ro E R ro -Z ro wO O'y O ,roy 0'Q � � f3..�..�FO•n V W w v C C S C w [�, a �� ��c o °.� —0 'o g O o ti aO p O "' ny E2. � a •. � ro 3. v, _»,ro °�' w vro ' ro � rood �yw � 3ro (D O(<D �r+ (D n (n y es �" "n +�.p w �. ro p b O ado m p r+,y y�(va 3 � m y U'(so p o ro o ro s p�'w a M - ro ro a �n'n (n �y w C . .Jp (D w � �s x c ���� n •� ua ro r:O wC� ro+ w x n wm CDGn OnQ CD 7C w ow O ,-.wcawybo �?ro+gi° w�5roa m 0roIft qEw �a a C oC . � , m �C <w-0x 'a � 1.0 ID rna pro Co Aro O s ro ro � '7 M Cr � CD ro � CD � O < m (D �ro w ro eD op n (D (o y y .r (D ro (DroCrosbd�vro (DOwo �. w �.n'roR ID0w wO o (Do o R asp y ro a c<o C.-.S a'(o wb a a n o p b o < (p Orox� ..��a'� Ra�; ., �.aap � ' Soti � ro rd� 9 � ° 0.: ro n (D a l� O O soW n C�yn -.ro Op n Ow ° Ej .D.; (D.wp W Ocp Z O -01 �ro < D (D � O dR CD y n (D ro �OQ OO O Oro�i 5�(CD'(pO� I °O° pU roR ti�a ya D IQA 'ro QdroO O O O mw co W x omaa c (noyw 0 o cn w = _ - �, ro yID Gro ro O n O O w O �'Sd I to C ro EL C O. O Q,y , ro � a de N S Si S • t E; ,� ro u ro p w C M O C'� 7-. N 'C'+ D ? :r. O r. lroD �0•t w ID w aq M Atl (� .Sj m :.► 'p ,-►(p O O _ - _ _ - _ - _ ID (°qo o `< m o m o p ro O rx0 Oon roro ,., o �maCs.A.. _ - i co � 'S'�croa`�c ° M -y 0 C(aow 'tiw (<D w.W-°v � � � Fr"2, ` :: __ ._____ --a v O. 7P7Cro aCl -• t�j7, w Z $ '�ww `t. 0�W n0n " ( 1-e -oiM vo(D aM:: cOH �C.'� (n I�� Inod`aCcn ." ; ""-.(ODD-•.mOQ -I(ron � C`�.^-- y p,y iy �.W 0-K (w�D n a•ate.(moo w ° (%' 'O pop r. W x r �m o �oar :m Mc. „, n C CDO -Ows ZZ "-M w + yw !m ID oG oro f�o•D 0ow wo- xa w y oroo�'- fiM w (n O ° o � ro �O �w � (D 0..3 o 9 m/A , � Dm % ¢ `D n yam, ovaO ° a D ' R ti- 'est�y w cCpa_";'- Pw Cdq[n"`"a.dp��c"'O(''.'ipamxroL�r..1*j.•+,.O'radw 0w�CtiOro'Q•'D.pB'4.aw"s sw--.''.Ca"'O'.•y.1 ..,nro",O-.wE��, nro w..ODas" .v0•a3roy•w� 11 roro O . p-0 VW �row w C . (D (i Wy V� C � .d8al �f O9(n r .n �m Oa',Y w - (D 0 Cm ( ro (D 9`L (D O C.OQ 7i y O 'OmO + nC a' (w ]" (D m .s ro IDw w O OL .1 (D w =V= m w - p o -C, o (n O cn o = O'Q'° roymp' x `' � wM , ° �s� �t' ro ^ ""D4 ID so zv w p bro o o C� D ' Cpm ( 0 CDCL MS w o �o v o E ,ron m � o OVy ( oo M CM o G..0 D� o ,'° -M PC a s a = 0 o ro w- ' m M (D -NO ro a -R � (D ZC " roropC w o M. C (D 0. O ^ �' O DO, C aOq w .G O •a*=:- cn pIDOOro 0ro ro eD °' O roroO'ti lz CO O.n O w a'.+ n w w ro O .� O G.(OJ1M� � w (ID �'p �'OPI�C a -w-'o�C� Ntr w C p -C 7'A(��D C A C.�. .�A`< j �: y C. p• om s CD e•O -t y �'ro ro m C � O -two.. -1 O 5'ro 0 0 �,`/� wfl,ro C �p�jcyDCCrJ °. 'Z0 (n� o.oii� -9n= o 0 :,%e� pm9 y,..-B ..3 a'(�D a, �t< � � wro �gwwcDoaA �r.�n .cn Aaio �s�ws -sa3w� .+X,,,mwv, � ,sA eD i3 ti (� O.� n O, ro s m Er g4OE ESS/O c,94i z This drawing is in conformance 1 ry v�, 22 with relevant engineering codes. Project Plan ofGyeonggi Garden in SLC , ( Renov . of Korean Garden in International Peace Gardens) 2020 , 05 , Gyeonggi - do QQOF c SS/o Z This drawing is in conformance Drawings List with relevant engineering codes. g H Category No. Drawing Name Al Scale A3 Remarks Category No. Drawing Name Al Scale A3 Remarks Plans L—001 Drawings List NONE NONE Detailed L— 201 Taegeukjeong(1 ) 1/20 1/40 Drawings L—002 Measurements 1/100 1/200 (Traditional L— 202 Taegeukjeong(2) 1/20 1/40 Installation) L—003 General Plan 1/100 1/200 L— 203 Taegeukjeong(3) 1/20 1/40 L—004 Removal and Relocation Plans 1/100 1/200 L— 204 Taegeukjeong(4) 1/20 1/40 L—005 Planting,Paving and Facility Plans 1/100 1/200 L— 205 Taegeukjeong(5) 1/20 1/40 L—006 Stage and Slope Installation Plans 1/20,40 1/40,80 L— 206 Taegeukjeong(6) 1/20 1/40 L— 207 Taegeukjeong(7) 1/20 1/40 L— 208 Taegeukjeong(8) 1/20 1/40 L— 209 Taegeukjeong(9) 1/30 1/60 L— 210 Taegeukjeong(10) 1/20 1/40 L— 211 Taegeukjeong(11 ) 1/20 1/40 L— 212 Taegeukjeong(12) 1/20 1/40 Detailed L— 101 Planting and Paving Details NONE NONE L— 213 Taegeukjeong(13) 1/20 1/40 Drawings L— 102 Signboard Detail 1 1/5 1/10 L— 214 Taegeukjeong(14) 1/5 1/10 L— 103 Signboard Detail 2 NONE NONE L— 215 Taegeukjeong(15) 1/60 1/120 L— 104 Traditional Handrail Detail 1/10 1/20 L— 216 Taegeukjeong(16) 1/60 1/120 L— 105 Rock Bench,Sitting Wall Details 1/10,100 1/20,200 L— 217 Soseuldaemoon(Loft Gate)(1 ) 1/30 1/60 L— 218 Soseuldaemoon(Loft Gate)(2) 1/30 1/60 L— 219 Soseuldaemoon(Loft Gate)(3) 1/30 1/60 L— 220 Soseuldaemoon(Loft Gate)(4) 1/10 1/20 L— 221 Bullomoon(Gate) 1/120 1/240 L— 222 Traditional Fence(1 ) 1/100 1/200 L— 223 Traditional Fence(2) 1/100 1/200 L— 224 Amisan Chimney 1/20 1/40 L— 225 Jangdokdae 1/100 1/200 L— 226 Folk Swing 1/100 1/200 Project Name Developer Constructor Scale Design Date Project Re,°s°"f°,;,,° "°"M curt D°5; "° Drawing Name No. Gyeonggi Garden Renov. in SLC G eonggi-do Al :NONE (Korean Garden in International Peace Gardens) y __ Geon Yeong ENC A3:NONE 2020. 05. S.J. Yan J. Seo� G.G. L Drawings List L-ool Q�OFESgj� �9Z This drawing is in conformance SCALE = 1/100 y �GGF `'gyp L� with relevant engineering codes. Russian Garde � z FI a� o 0 O ° ❑ 9508 0�n 18700 16900 4300 4300 3300 ❑ O ❑ ° O ❑ O O E I� nument ❑ M O orb � 0 o 0 0 M O O N N O N a O O Q O M M O 0 N 0 0 17500 19100 0 0� VIEW 1 0 Philippines Garde o a O ° " Project Name Developer Constructor Scale Design Date M—eme"t Drawing Name No. 1 P 9 Pro ect Re resents ive M- er Designer 9 Gyeonggi Garden Renov. in SLC Al : lnoo (Korean Garden in International Peace Gardens) Gyeonggi—do Geon Yeong ENC A3 : 1'200 2020. 05. S.J. Yan .J. Seo r� .G. L Measurements L-002 _ _ •1 1 - 1 1 1 1 1 1 1 1 WIFE ON mom •. - ■■■■■■■n ■■■■■■■n --- 00002 ------------ ---. - ■■■■■■■■■■■I . .- ■■i■■!__=i I;=- !■■■■■■■■■■■■■MIL ■G■■■■■■■■■I ■���■� iilil!:7I'iilllrl■■■����1' ... ■■■►'f�i7Ta■■■I 'i■■■■ i �i■i■n■iili■mow■■� EGG■■i■■■■■I ■■■■■� ■■■■�l[1YItI�Il� ir� ■■■■■■■■■■■I MEN t III I II�;I;I�IIIIIIIIIIIIII%j I f.1■wSl�l■■■■wnai■11TNS7"!■Al IM _ • � �I_-�%III IIIIIIII�li\\� � � • �IIIIIIIIIIIIIIIIIIIIIIIIIIIIIII�� � •11 1 • ence Remo �3 �:, Rya i " .. y a 1 7.1 OfES 09�?� z This drawing is in conformance °pi with relevant engineering codes. UIgH 18700 N&P16900 4300 4300 3300 ❑ O a ❑ °° ❑ ° °p 3 -3 Roof Tiles Removal(L 22,11 ®English Monumen ,©Sig at c E i* nume°t Shrub Reloca e I "' 8 EA - H1.5 ® Stone Mem ri o al(l EA) 0 i� 3 -1 Roof Tiles Removal OO Plants Rel ca o 0 3EA - H2.0* 1.5 Cl) 0 O Flowers Relocate(375 EA) 1 -1 Stone Fence Removal(L=2,230) o o 0 10cm , A=15 N ©Flag Pole Re o ale Li -2 Stone Fence Removal(L=5 ) N o � 4zaa 2 -1 Bench Removal(3E ) FFr_Flowers Rel cafe(37 EV 'IS0 (f:Pavilion.Monument Relo 10cm , A= 5m° OTot m (M) 3 -4 Roof Tiles emoval L=19 4 20) 0 ©Tot m (F) Relocdt LO 2 -2❑3 Bench Remov-2 Roof Tiles Removal(L=9;10 ) V-� 3 Bench Removal(2EA) 17500 19100 ■ Units Division Si Name Unit Quantity Remarks Removal 1 Stone Fence Remov IH=1000-1500 m 2.77 Li"'LJ Relocate 'J) Relocate 0—Oh Relocate LZ Bench Removal W400*LI500 EA 8.0 Roof Tiles Remova W600 m 64.64 ® Stone Monu.Rernovc 11300x1300xT150 EA 1.0 Relocation p Monument Reloc. W400*H1000 EA 1.0 (� Signboard Reloc. W400*H400 EA 1.0 Totems Reloc. H=3500 EA 2.0 Flag Pole Reloc. H=5000 EA 1.0 0 Pavilion Monu.Reloc 600*1000*1200 EA 1.0 nStoe M mortal Re Small Plant Reloc. H2.0*W7.5 EA 3.0 Shrub Reloc. H1.5 EA 8.0 Flowers Reloc. 110cm I EA 1 375 6EA/m.A=15m Project Name Developer Constructor Scale Design Date Pro'ec,Representaiive Ma Mana er Designer Drawing Name No. Gyeonggi Garden Renov. in SLC Gyeon Al : 1/100 (Korean Garden in International Peace Gardens) ggi-do Geon Yeong ENC A3: 1/200 2020. 05. S.J. Yan J. Se G. L Removal and Relocation L-ooa SCALE = 1/100 QPpFESS/0,�, 9Z This drawing is in conformance ❑ z N with relevant engineering codes. o ° ° Russian Garde hi7oo°o°o BAH ❑ 18900 16700 4400 04300 ❑ 3400 ❑ O ❑ ° O a Sitting Wall/8.Om ° o V� Shr bs Reloc. u o Stone Fence Rebuild Section B/35.2m enee (h800) _ Stone Fence Rebuild S D/ <4 Ryyose[[11 off Sharons/6EA e(F 'r5xCe2'0) Rock Bench/3EA a (1000*400*400) c �f Stone Fence Rebuild See E " Stone Fence Construction Section/4.4m Garden > (Mix Fence-Brick/Cube) Size 72.8m2 J Stone Fence Removal 0.5m o 0 II un (Stone Fence Removal 5m) e Stone Fence Construction Section/0.9m Signboard(1900x7OO) (Natural Stone) Pavilion Monument(400 x Wall R of Tile en /Stone Fence Rebuild Section A/5.6 Stone Fence Rebuild ection C/9.1 m St ge lope o O1e � ignboarN 9 d Rock Bench/3EA +0.0 p - nee o (1000-400.400) �otem(M) Pavilion rume W. Q Oratem(F) gnboard(1900x7OO 250 Amisan Chi ne q of Tiles g Jangd Taegeukjeong ,+0.60 0 500x2500) C Folk Swing a ® .+0.80 a 34.70m°-Granite Tiles D a (T40) 0 e O 1 +o.o a +0.6 a ■ Plant/Pave/Facility Units Q Div. Sign Name Size Unit Quantity Remarks 8900 177so Facility Taegeukjeong 6,020.6,020 EA 1 Soseuldoemun W8,050xH3,930 EA 1 Bullomun W2,25OxH2,550 EA 1 Amisan Chimney 137,400xH3,222 EA 1 Philippines Gard n Jangdokdae 1500x2500 SET 1 Folk Swing W800A2400-2600 EA 1 Stone Fence Cons Mixed Fence M 4.4 ❑ Stone Fence Cons H=1800 M 0.9 O ❑ Root Tile Install W600 M 81.4 ° Signboard 1900x7OO EA 5 Stone Bench 1000x400x400 EA 6.0 Sifting Wall H=450 M 8.0 Stage/Slope SET 1.0 Monument l400x5OOxT30 EA 1.0 Paving lGranite Tile Pave 10=40 M2 34.70 Plants I Rose of Sharons I H2.OxW2.0 EA 6.0 US Unit 7GAL Grass lSod M2 500.0 Existing Plants Project Name Developer Constructor Scale Design Date ProjectRepresentotive Ma aae— Manager oesi ne Drawing Name No. Gyeonggi Garden Renov. in SLC �1 Gyeonggi-do Al :1/100 L-005 (Korean Garden in International Peace Gardens) Geon Yeong ENC A3:1/200 2020. 05. S.J. Yan J. Se G. L Planting, Paving and Faci ity PpFES Q g —— — z S Granite Tile Paving(500*500 T40) Fence Q�9 '9� cut stone(white Tone) Existing v, cY ',? z This drawing is in conformance 300.250*1000) Mortar(1:3),T40 Concrete Foundation Concrete Foundation(T150) with relevant engineering codes. Rubble Foundation(T100) Wire Mesh(#10.9150) Patterned Wall(H2100) Rubble Fountlation(T150) •/�H Water Slope within 2% o .... ......,.. ...:_. 15.3M-Cut Stone 250*300) Rebar(Epoxy x@l000) Existing Pavement(Boulder) 1 OEA-Rebar(Dl6 aso I sso 2 Cross Section "A" I L A3:1/ 40 _ Gra ite TheCovering ove,Existing ving oulder)-. j Granite Tile 11civirl +0. 3 I Granite Tile Paving(500.500 T40) Granite Tile Paving(500+500 T40) Mortar(1:3) Mortar(1:3) Concrete Fountlation(T150) Concrete Foundation(T150) Wire Mesh(#10.9150) Wire Mesh(#10.@150) Rubble Foundation(T150) Granite Tile Paving(T30,Bush-Hamm r) Rubble Foundation(T150) I Existing Stone Fence(H60 ) H cA ( =28 15m`1 Granite Tile Paving(T30,Bush - N GL� — — — — — — — O ° -Dirt Fill- , III—III III III III III a O O I # I—III III-1 II o 0 o GL III—III=III-III=III—III .a ...,.. Water Pipe(@2000) oo .. o m60.5xL2100,STS PIPE 500 11Granite(W400x8OT) Granite(W400x80T) 600 Spherical Concrete(25-240-12) Spherical Concrete(25-240-12) Deformed Rebar(D13mm.9200) Deformed Rebar(D13mm.0200) Existing Stone Fence(H600) Rubble Foundation(T150) Rubble Foundation(T150) 3 Cro s Section "B" q Cross Section "C" 6.5M-Install Fence A n L Al:1/ 20 L Al:1/ 20 W40oxH950 0 A3 1/ 40 A3:1/ 40 1 O.OM-Handrail y 4.OM-Install Fence B H1000 �+0.6o yyg00xH400 ■ Stage and Slope Quantity �\' rA 1.7 -Cut Stone(250*300) +o.o cD Div. Sign Name Size Unit uantity Remarks Paving ® Granite Tile Pave A=40 m2 22.36 3 I® Granite Tile Pave Er=40 m2 28.15 95 LE L n SL PE 1/2 ® Granite Tile Pave ¢=40 m2 17.83 +0.80 Rebar D16,L800 Locat 10.0 (A=17.83 °) — Cut Stone 250*300 m 18.0 N .OM-Cut Stone(250*300) Facility Stone Fence Install-A W400*H1000 m 17.0 0 Stone Fence Install-B W400*H400 m 4.0 +0.0 lO.OM-Handrail H1000 +0.6 , age an Slope Trad.Handrail L1500*H1100 m 20.0 10.51VI-Install Fence A L Al:l/ 40 =__= Water Pipe 060.5,STS PIPE m 6.3 L2100x3 Location W400xH950 3EA Water Pipe(@2000) W 060.5xL2100,STS PIPE A3 1/ 80 Project Name Developer Constructor Scale Design Date P,O,cjRePresentafn,e Ma Mana erI Designer Drawing Name No. Gyeonggi Garden Renov. in SLC '�'� Gyeon Al : 1/20,40 (Korean Garden in International Peace Gardens) ggi—do Geon Yeong ENC A3: 1/40,80 2020. 05. S.J. Yan .J. Sell G. L Stage and Slope Instal n L-006 QPOFESS/��L 9Z This drawing is in conformance y GGGF `d0� Cut Stone(White Tone) 2� = with relevant engineering codes. (300-250.1000) O� A� T40 Granite Tile Pavi ng(Fi ne Finish) THK40 Mortar Concrete Foundation •AH THK150 Mix.d Concrete(25-180-8) Rubble Fo.dnation(T100) #8 Wire Mesh(150X150) TKK150 Rubble Foundation 0 d G.L o- O O z O C o d 0 450 550 01 Granite He Paving-D(T40 S=1/10 02 Cut Stone Boundary(250x300 S=1/10 Pavement Cross Section Detail Scale A1(1/10),A3(1/20) ./,.. ,t:. .................................................. Cut this art /.... ... ..:: '::. .':.' '::..:..:.....'..'..'..'::.' P:. ............. .............. .............. .......... ............... ............... Root Soil .�: ������ �� � � and stick to the tree as the other stake .... ......... :........r.._.__�_: ......... .......... ........... .... ................................................................................................. W150 Tree Bandage 5 Wraps �iocaticn : 1 Em 06mm Manila Rope 6 Wraps Stake m� yoo 050 Round Antiseptic Wooden Stake L-1800 o #8 Zinc Plated Wire 2 Wraps 2 .t-yrJ8 o 0 r t4 F j fj-"f oo W150 Tree BendeBe a6mm 06mm 5 Wraps Manila Rope Manila Rope x 6 Wraps 6 Wraps r. f' 'F 050-60 Round Antiseptic Wooden Stake s k .ram`` I f1 f i1"4�}^�'�' 2D 6D 2D _,t„�` Stage 1 Stage 2 Stage 3 1,300-1,600 Power Relocation : 25EA/m' Tree-Small Tripod Wooden Stake Planting Detail 3 Staking Detail _ Scale Al(NONE),A3(NONE) - Scale:A1(NONE),A3(NONE) Project Name Developer Constructor Scale Design Date Pro'ec,Representafive I Man gnVI Desianer Drawing Name No. Gyeonggi Garden Renov. in SLC Al: NONE (Korean Garden in International Peace Gardens) Gyeonggi—do AV Geon Yeong ENC A3: NONE 2020. 05. S.J. Yan .J. Seo�r G. L lanting and Paving Detai L-101 450 Anodized Signboard 1. Material : Duralumin POFESgj� 2. Instruction Etch( the design on an anodized Duralumin plate. ss6?92 9� This drawing is in conformance do`'o a�o� a -4 of'�i, z? Z g NOTE tO The final design adjusted with the manufacturer 'A" �� Glk6 Pp= with relevant engineering codes. and reviewed by the project Supervisor (9)Size may vary on demand BAH O Foundations may vary at the project site Floor Plan (A)texts, fonts and other variables must be chosen Scale :A,(v5>.A3(,/,0) after consulting with the supervisor 450 T=12 ��`z� '�IIg�IN,1eYolfiran 2�J"I$ol5Cfu 3.2'&-12'b'c4wM V_=Wi ;ioll 04-PI°r5ol�U. 636 'i14RMU. Sand-Blasted(Engraved) EH It isasperm a eg,,en in re Painted (Color TBA) beautiful palace tlen in ung, antl is made to enjoy the natural Scenery and to Play or _ _ relax.,Taegeukleong is a Sperm located in the - - north of the Soyoleong of Chanetleokgung - _ _ Palace.If was built in 163604 Years of King Into) -- - - -- Bending with hydralic bender _ IB�g e71 vest bl., 12T Duralumin (Anodize Color-TBA) 12T Duralumin (Anodize Color-TBA) M12 Stud Bolt GL M12xL125 STS Set Anchor 0 0 Ul a 8T STL PLATE Q d (200x450) a a ° a Concrete Foundation a (450x300x300) a a � 3 Side Section 4 Rendering (Example) C) Scale Front Section A1(1/5),A3(1/10) Scale:A1(1/5),A3(1/10) Pale: NONE _ - - Project Name Developer Constructor Scale Design Date ProjectRepresentati,e I Aan g in erI Designer Drawing Name No. Gyeonggi Garden Renov. in SLC r Gyeon Al :1/5 (Korean Garden in International Peace Gardens) ggi—do Geon Yeong ENC A3:1/10 2020. 05. S.J. Yan J. Seo�r G. L Signboard Detail -102 Anodized Signboard 1. Material : Duralumin 2. Instruction Etch( the design on an anodized Duralumin plate. NOTE : ;T The final design adjusted with the manufacturer and reviewed by the project supervisor T2 Size may vary on demand OO o W OO ChangdeftungYa 1eulkiwng BooOmun Gate s Foundations may vary at the project site V texts, fonts and other variables must be chosen 21�!�l :71W°ho144- :&� 'S9.a°I pFG:30II °'` 'Sxf ar �F� � II+Aio� ot� oo� tr �� ���z .�� �— � — 'S�i after consulting with the supervisor :?a'Lr 110101, xjEl o�+z oa'ajatAi or7F�ol �°�afM7, of o& -Wluo � °FTT o�h W�o'b z�41-4 4"fi NOr71 �0rw �FzOJEIE4. t `10 x1 dlga� 1R o � �I M� oxj� �� a��r. 1636kl °j-14L44a11 This gate was made of one large stone is It is a sperm in Changdeokgung, the most implemented in Changdeokgung Palace, and beautiful palace garden in Korea, and is made if it passes through this door, and it is said that to enjoy the natural scenery and to play or it is long and healthy. relax., Taegeukjeong is a sperm located in the north of the Soyojeong of Changdeokgung Palace. It was built in 1636(14 Years of King Injo) pFESs/ GyeongGi-D ���� aei GyeongGi-D � * ae0 QP SQ�D y< This drawing is in conformance with relevant engineering codes. oc�gH FL4 Fak sAng M, Qysongbokgung Amusan Chimney QD 0 �1Jangdol dad �Ihz�fxl]L�rF(yT �la°loll LFTz��Jf�(ryyz21=TL �ZI L � (Jy a 7fo°ho�F °�, 0��12EHLI °o'Ofzl az z2Q1 -111°F� x� �iG zanfQi, (y _H T, a oj211o11 aHz zX1-a-U 3f�1-II &2 01.P4L -q—joil M` 0I•DI�F oTia ��01OV2' 20QoI AiM-Crl TT�I•T� OIU0I'` nIZ� Ta.'II/li �F��h` �.'II A1A1 oz l li $�w Ea �t- Wxrz� �$,�I o,� oFo�F�J o of o �Ai� �I$z tom, zAlafM2, 'S'�z z21 � �S gal -7I a It is the most beautiful chimney of the palace, It A typical folk play facility for women who cross and it implements the Amisan chimney in the is a low shaft that makes jar stand, etc., a a tree on a large branch or two pillars, and then back garden of the Gyeongbok Palace and it is installed near the kitchen as a facility stand on a footstool under a row and sit on it or gyotaejeon . The shape is sophisticated and mainly used by housewives. It is also used as stand and move their bodies back and forth the decoration is beautiful, so it functions as a facility mainly used by housewives. It is also used garden ornament. as a place of origin for housewives in addition to the purpose of putting the jar. GyeongGi-D 4�aHA GyeongGi-D �Q�r1UrA GyeongGi-D �Fa� adi Project Name Developer Constructor scale Design Date ProectRepresentative "°M°e°ee Designer Drawing Name No. Gyeonggi Garden Renov. in SLC G eonggi—do Al : none L-1o3 (Korean Garden in International Peace Gardens) y Geon Yeong ENC A3 : none 2020. 05. S.J. Yan .J. Seo� G.G. L Signboard Detail QPOFESS/��L 9Z This drawing is in conformance GF o r with relevant engineering codes. � �I �-�� Ir i� 011 I, , +i -�� r -- - r iaso laso so -----------•____- _73 Si5 Plate(Dark Gray Powder Coat) AI-Caating(Dark Gray Powder Coal) ----- Floor Plan tl5 Perspective View _ Scale A1(1/10),A3(1/20) - Scale NONE i3 SIS Plate(Dark Gray Powder Coat) i3 US Plate(Dark Gray Powder Coat) e0x20 Nara wood(0il-Stoinetl) D O O D O 0 0 AI-Extiudec-BOi(DOik Gray PO'�/tler Coat O o AI-Casling(Dark Gray Powder Coat) AI-Extr—a-Bark Groy Powtler Caotl 0 0 0 O O 0 0 0 0 0 0 O AI-CaslinglDark Groy Powtler Coal) i6 STL Plate(Dark Gray Powder Coat) 16 SIL PIOIeIDark Gray Powtler Caat) 2 Standing View 3 Side View Scale A1(1/10),A3(1/20) _ Scale A1(1/10),A3(1/20) 50 Al-B3�tl�-kar Ii I I F �I AI-&hutle Bm(Dark Gray Powtler Coal) �"� IDak WwPowderCwl) At-Extruded-Bm(Llghl Gray Powder Coat) i6 STL Plate(Dark Gray Powder Coat) o p AI II I I III - de E-kar N _III_Inn'Il1_C Ii II, I I CI r gm G.1—coal I EII11 5 0SR P 4 Section Detail Scale NONE Project Name Developer Constructor Scale Design Date Pro'ectRepreSentative I Ma Mana er I Designer Drawing Name No. Gyeonggi Garden Renov. in SLC r Gyeon Al : 1/10 (Korean Garden in International Peace Gardens) ggi—do Geon Yeong ENC A3 : 1/20 2020. 05. S.J. Yan .J. Seo�r G. L Trad. Handrail Detail -1oa 4'7700 0°o 16700 4400 ".00 3400 OF ESS�O� o ❑ SQ 9 ❑ � o 0 o Sitting Wall/8.Om ° a �9�G�''a z This drawing is in conformance p y tiG °�= with relevant engineering codes. 400 Granite(W400x8OT) ench/3EA Boulders Fixed(Mortarl:3) Stone B ° Concrete Bricks Stacked 0.56 (lone* ench/ Mortar Filled Garden > Area 72.8do 0 0 a a Concrete(25-18-8) . -- - T200 Rubble Foundation e Stone Bench/3EA +o.o (1000*400*400) 100 Ion 400 inn inn 0 +o.so +o.ao �� Sitting Wall Cross Section 'a _ Scale A1(1/10),A3(1/20) 9 +0.0 Layout Scale A1(1/100),A3(1/200) Granite(W400x8OT) Marble(Top-water Polished) -Boulder Fixed(Mortarl:3) Mortar Filled G.L a <e a., a a ', Concrete(25-18-8) T200 Rubble Foundation Length(L=1000) —Width(B=400) —Height(H=400) Stone Bench Detail 4 Sitting Wall Front View Scale A1(1/10),A3(1/20) _ Scale :A1(1/10),A3(1/20) Project Name Developer Constructor Scale Design Date Pro'eciRepresentafry Man gnWI Designer Drawing Name No. Gyeonggi Garden Renov. in SLC Gyeon Al :1/10,100 (Korean Garden in International Peace Gardens) ggi-do Geon Yeong ENC A3 :1/20,200 2020. 05. S.J. Yan .J. Seo�r G. L Stone Bench/Sitting Wall Detai -105 QPOFESS/��L This drawing is in conformance T a e g e u k j e o n g ( 1 ) X NOTE ❑The site must be thoroughly inspected before construction to make sure nothing has changed after the inspection during the project design stage. If any modification is 2� = with relevant engineering codes. required, it..at be approved by the supervisor. ❑ If-oded material is not specified in the drawing, use Douglas Fir. BAH Roof Ornament H1096(Granite) Korean Roof Tile(Small) 3 Stage Angle Rafter Roof Support Beam 75xl50 Support Beam Bracket 90xl50 Name Board 900x300x5OT Pillar Ornament 20X21OX950 Door Frame 12Ox75(ST'L Plate 6.01r) Pillar 0216.3x8.OT(ST'L Pipe) Stone Rail 050.8x2.OT(STS304 Pipe) Handrail Pillar 70x7Ox2T(STS304 Pipe) Fountlation Stone 25Ox300x (White, Flame Finish) Rail Ornament 15x25x1.5T(STS304 Pipe) Partition 4Ox6Ox2.OT(STS304 Pipe) LFountlation Stone 2 250x3OOxl000 (White,Flame Finish) L Floor Support Finish) (White,Flame Finish) Stair Stone 2 Finish) L Pillar Support 300x300x4 e) (White,Flame Finish) L Stairl 200x300xll50 (White,Flame Finish)Foundation Stone 1 150x260x1 GI L (White,Flame Finish) (White, Flame Finish)) L Slope Connecting Floor Tile 100T (White,Flame Finish) Foundation Stone 2 25Ox300x1000 (White,Flame Finish) I Taegeukjeong Front View L SCALE : 1120 Project Name Developer Constructor Scale Design Date Project Re Representative Mana er Designer Drawing Name NO. Gyeonggi Garden Renov. in SLC ' Gyeon Al : i/2o (Korean Garden in International Peace Gardens) ggi-do Geon Yeong ENC A3 : 1/40 2020. 05. S.J. Yan J. Se G. L Taegeukjeong(1) L-2oi QPOFESS/��L This drawing is in conformance Taegeukjeong ( 2 ) X NOTE ❑The site must be thoroughly inspected before construction to make sure nothing has changed after the inspection during the project design stage. If any modification is 2� = with relevant engineering codes. required, it..at be approved by the supervisor. ❑ If-oded material is not specified in the drawing, use Douglas Fir. BAH Roof Ornament H1096(Granite) Korean Roof Tile(Small) 3 Stage Angle Rafter Roof Support 75x150 Roof Support 90x265 Roof Support Bracket 9Ox150 Roof Support Bracket Seperator 6Ox65 IA6x35L Self Tapping Bolt Door Frame 120x75(ST'L Plate 6.OT) Pillar 0216.3x8.OT(ST'L Pipe) Pillar Ornament 20x2lOx950 Rail 50x7Ox2.0TC3TS304 Pipe) Stair Stone 1 200x300x Rail Support 031.8x1.5T(STS304 Pipe) (White,Flame Finish) Rail lb50.8x2.OT(STS304 Pipe) Stair Stone 1 200x3OOxI480 (White,Flame Finish) Rail Pillar 7Ox7Ox2T(STS304 Pipe) Rail Ornament 15x25xl.5T(ST5304 Pipe) Foundation Stone 3 200x200x1300 Rail Support 40x60x2.OT(ST5304 Pipe) (White, Flame Finish) Foundation Stone 2 250x3OOxl000 (White, Flame Finish) Stair Stone 2 300x3OOxI480 (White, Flame Finish) Fountlation Stone 1 150 1000 GL (White, Flame Finish) Foundation Stone 2 250x300x1000 (White, Flame Finish) Stair Stone 2 300x300x1480 (White,Flame Finish) Taegeukjeong Right View L SCALE : 1120 Project Name Developer Constructor Scale Design Date Project Re Representative Mana er Designer Drawing Name No. Gyeonggi Garden Renov. in SLC ' Gyeon Al : i/2o (Korean Garden in International Peace Gardens) ggi—do Geon Yeong ENC A3 : 1/40 2020. 05. S.J. Yan .J. Se G. L Taegeukjeong 2 L-2o2 QPOFESS/��L This drawing is in conformance Taegeukjeong ( 3 ) X NOTE ❑The site must be thoroughly inspected before construction to make sure nothing has changed after the inspection during the project design stage. If any modification is 2� = with relevant engineering codes. required, it..at be approved by the supervisor. ❑ If-oded material is not specified in the drawing, use Douglas Fir. BAH Roof Ornament H1096(Granite) Center Roof Support 0180 Roof Support 150x180 Roof Support 210x240 Roof Support 0220 Roof Support 75x150 Roof Support Bracket 9Ox135 Roof Support Bracket Separator 60x65 Door Frame 120x75(ST'L Plate 6.01r) Pillar 0216.3x8.OT(ST'L Pipe) Rail Pillar 7Ox7Ox2T(STS304 Pipe) STS304 Plate 5.OT 0 Rail 050.8x2.OT(STS304 Pipe) Rail 50x70x2.OT(STS304 Pipe) Plank 70x 195(STS304 Plate 4.OT) ULL Foundation Stone 2 250x3OOxl000 (White, Flame Finish) Floor Support 200x100x6.OT(ST'L Pipe) Stair Stone 2 300x300x1480 Floor Support l50xlOOx6.OT(ST'L Pipe) (Nhite, Flame Finish) Fountlation Stone 1 1501000GL (White,Flame Finish) I Taegeukjeong Cross Section (1) L SCALE : 1120 Project Name Developer Constructor Scale DeMamma sign Date Project Re Representative Mana er Designer Drawing Name No. Gyeonggi Garden Renov. in SLC ' Gyeon Al : i/2o (Korean Garden in International Peace Gardens) ggi—do Geon Yeong ENC A3 : 1/40 2020. 05. S.J. Yan .J. Seo'�V G. L Taegeukjeong 3 L-203 QPOFESS/��L This drawing is in conformance Taegeukjeong ( 4 ) X NOTE ❑The site must be thoroughly inspected before construction to make sure nothing has changed after the inspection during the project design stage. If any modification is 2� = with relevant engineering codes. required, it..at be approved by the supervisor. ❑ If-oded material is not specified in the drawing, use Douglas Fir. BAH Roof Ornament H1096(Granite) Center Root Support 0180 Roof Support 150x180 Roof Support 210x240 Roof Support 0220 Roof Support 75x150 Roof Support Bracket 9Ox135 Roof Support Bracket Separator 6Ox65 Door Frame 120x75(ST'L Plate 6.OT) Pillar 14216.3x8.0T(ST'L Pipe) Rail Pillar 70x70x2T(STS304 Pipe) STS304 Plate 5.OT Rail 050.8x2.OT(STS304 Pipe) Rail 50x70x2.01(STS304 Pipe) Plank 70xl95(STS304 Plate 4.OT) Foundation Stone 2 25Ox300x1000 (White,Flame Finish) Floor Edge 200x100x6.0T(ST'L Pipe) Stair Stone 2 300x300x1480 (White,Flame Finish) GL Floor Edge 15OxlOOx6.OT(ST'L Pipe) Taegeukjeong Cross Section (2) L SCALE : 1120 Project Name Developer Constructor Scale DeMamma I sign Date Project Re Representative Mana er Designer Drawing Name No. Gyeonggi Garden Renov. in SLC ' Gyeon Al : i/2o (Korean Garden in International Peace Gardens) ggi—do Geon Yeong ENC A3 : 1/40 2020. 05. S.J. Yan .J. Seo,�V G. L Taegeukjeong 4 L-2oa QPOFESS/��L 120 500 120 Z This drawing is in conformance T a e g e u k j e o n g ( 5 ) with relevant engineering codes. STS304 Plate 5.OT Rubber Plate 5T BAH Floor Tile 530x253x50T 3,990 (Dark Gray,Flame Finish) Floor Support 2OOx100x6.OT(ST'L Pipe) 1,127 1,737 1,127 2 Cross Section A L SCALE : NONE 90 515 105 I Floor Tile 2 530x33OX50T (Oark Gray,Flame Finish) STS304 Plate 5.OT F l aor Tile 1 530x253x5OT (Dark Gray,Flame Finish) M Pillar 0216.3x8.OT(ST'L Pipe) A B Door Frame 110x75(ST'L Plate 6.OT) Floor Tile 2 530x330x50T (Dark Gray,Flame Finish) Floor Tile 1 530x253x50T Flop Support 200xlOOx6.OT(ST'L Pipe) (lark Gray, Flame Finish) Floor Tile 2 530x33OX50T o) M (lark Gray, Flame Finish) 3 Cross Section B a) Cl FI r Support 15ox100x6.0T(ST'L Pipe) L SCALE : NONE STS304 Plate 5.OT Ft r Support 200x100x6.0T(ST'L Pipe) STS304 Plate 5.OT Plank 70x145(Slope Gonneo (STS304 Plate 4.OT) Floor Tile 3 530x260X50T Slope Connecting Floor Tile 80T STS304 Plate 5.OT IL (Dark Gray, Flame Finish) (White, Flame Finish) f� Rubber Plate 5T t— Floor Tile 2 5ame Finish M (Dark Gray, Flame Finish) Floor Tile 4 530x230x50T (Dark Gray, Flame Finish) Rail Pillar 7Ox7Ox2T(STS304 Pipe) Floor Tile 1 53Ox253x5OT (Dark Gray, Flame Finish) Rail 050.81 Pipe) Floor Support 15Ox100x6.OT(ST'L Pipe) Foundation Stone 2 2 (White,Flame Finish) Foundation Stone 1 150x260x1000 (White,Flame Finish) Floor Plan a Cross Section C L SCALE : 1/20 L SCALE NONE Project Name Developer Constructor scale Design Date Project Representative I Mana erI Designer Drawing Name No. Gyeonggi Garden Renov. in SLC r Gyeon Al : i"' (Korean Garden in International Peace Gardens) ggi-do Geon Yeong ENC A3 : 1140 2020. 05. S.J. Yan J. Se ,r G. L Taegeukjeong 5 L-205 QPOFESS/��L This drawing is in conformance Taegeukjeong ( 6 ) X NOTE ❑The site must be thoroughly inspected before construction to make sure nothing has changed after the inspection during the project design stage. If any modification is 2� = with relevant engineering codes. required, it..at be approved by the supervisor. ❑ If-oded material is not specified in the drawing, use Douglas Fir. BAH 170 370 900 900 370 170 Roof Frame 180x240 \ Angle Rafter 180x300 Roof Frame 75x105 Roof Support Bracket 90x135 Roof Frame 0120 Ceiling Frame 75x75 Ceiling Plate 30T Roof Support 75x150 Ceiling Frame 75x75 Roof Support 0220 \ \ 1 1 Roof Persepective (1) SCALE : 1/20 Margagarnen Project Name Developer Constructor Scale Design Date Project Representative I Man.er I Desi ner Drawing Name No. Gyeonggi Garden Renov. in SLC r Gyeon Al : 1/20 (Korean Garden in International Peace Gardens) ggi-do Geon Yeong ENC A3 : 1140 2020. 05. S.J. Yan .J. Sec, G. L Taegeukjeong 6 L-206 QPpFESell S/0,�, c,%;'o M This drawing is in conformance T a e g e u k j e o n g ( 7 ) X NOTE �j I2 ❑The site must be thoroughly inspected before construction to make surenothing has changed after the inspection during the project design stage. If any modificationis with relevant engineering codes. required, it must be approved by the supervisor. ❑ If wooded material is not specified in the drawing, use Douglas Fir. BAH 5,360 170 370 900 2,480 900 370 170 r Root Frame MUM Angle Ratter 180000 Root Frame 75x105 Roof Support Bracket 90x135 Root Frame 0120 Root Support 150x180 Roof Support 210x240 Roof Support 75x150 Roof Support 120x150 Root Support 0220 1 Roof Persepective (1) SCALE : 1/20 Project Name Developer Constructor Scale Design Date Pro'ectRe resentative a er Man oeaeoer Drawing Name No. Gyeonggi Garden Renov. in SLC Gyeon Al : 1/20 (Korean Garden in International Peace Gardens) ggi—do Geon Yeong ENC A3 : 1/40 2020. 05. S.J. Yan J. Seo,�V .G. L Taegeukjeong 7 L-207 QPpFESS/0,�, 9Z This drawing is in conformance T a e g e u k j e o n g ( 8 ) i with relevant engineering codes. v H 5,550 1,535 2,480 1,535 Korean Roof Tile(Small) Roof Ornament H1096(Granite) End Roof Tile n 1 Roof Floor Plan SCALE 1/20 Project Name Developer Constructor Scale Design Date Project Re resentafive Mona er oe:eoer Drawing Name No. Gyeonggi Garden Renov. in SLC Gyeon Al : 1/20 (Korean Garden in International Peace Gardens) ggi—do Geon Yeong ENC A3 : 1/40 2020. 05. S.J. Yan .J. Sea G. L Taegeukjeong 8 L-208 QPOFESS/��L 9Z This drawing is in conformance with relevant engineering codes. T p@ g e U IC J e O n g 9 BAH 1,737 7,920 #Slope Connection 'Lowered Level' 1,900 6,020 300 1,300 30p 9Do 4,220 900 300 Plank 70xl95(3TS304 Plate 4.OT) Slope Connecting Floor Til 100 g (White, Flame Finish) " S Foundation Stone 1 150x260x1000 Stair Stone 1 2OOx300x1150 (White,Flame Finish) (White, Flame Finish) Stair Stone 1 200x300x1480 Foundation Stone 1 150x260x1000 (White,Flame Finish)i (White, Flame Finish) Foundation Stone 3 200x2DDx,30D 3 Cross Section Detail B (White,Flame Finish) Fountlation Stone 2 25Ox300x1000 (White, Flame Finish) SCALE NONE Floor Tile 210x210x50T Stair Stone 2 300000x1480 (White, Flame Finish) Corner Stone 300x300x450(Stone) o (Yrhito, Flame Finish) St it to 1 20 300 148CIII—1 ish) Floor Frame Support 175xl75x185(Stone) (White, Flame Finish) 920 1,900 6,020 Pavilion Monument (Relocation) 300 1,300 30p 900 4,220 900 300 Concrete(W/0 Behar) Memorial Stone 400x500x30T (Dark Gray,Water Polished Rebar (D13mm T/B @200) Engraved Letter (TBD) Concrete Foundation(T250) Rubble Foundation(T400) FIT F� FIT S � Concrete Foundatio Bountlary GL m Rubble Foundation Boundary o Excavation Boundary �m 1 Floor Plan SCALE 1/30 2 Cross Section Detail A SCALE : NONE Project Name Developer Constructor Scale Design Date Representative I Mana erI Designer Drawing Name No. Gyeonggi Garden Renov. in SLC Gyeonggi—do Al : 1/30 L-209 (Korean Garden in International Peace Gardens) Geon Yeong ENC A3 : 1/60 2020. 05. S.J. Yan .J. Seo ,r G. L Taegeukjeong (9) POFESS/O �9Z This drawing is in conformance Taegeukjeong ( 10 ) y� pf<' = with relevant engineering codes. H Rebar Details 1—H73—C.T.0 200,29EA L=6.520 L=6.520 N=29 a=5.3.320 b=600 CJ H13 L=6.520 N=29 J a=5.320 b=600 H13 L=5.720 N=6 a=5.320 b=200 o w G) H13 L=5.720 N=6 -5.320 b=200 0 0 U U U U 10 10 2 6 2 N I II I II V� Rebar List ) No. Diameter Length(M) Quantity Total Length(M) unit welom(I<c/M)—1—ennrom Remarks 1 H13 6.520 29 189.080 3 Extra Pri e 2 6.520 29 189.080 3—H73—C.T.0 200,6EA 1=5.320 3 5.720 6 34.320 4 5,720 6 34,320 Subtotal 446.800 0.995 0.445 0.458 Sum 0.445 0.458 Foundation Slab Floor Plan SCALE : 1120 Project Name Developer Constructor Scale Design Date Project Representative Munc er Designer Drawing Name No. Gyeonggi Garden Renov. in SLC r Gyeon Al : 1/20 (Korean Garden in International Peace Gardens) ggi-do Geon Yeong ENC A3 : 1/40 2020. 05. S.J. Yan J. Seo�r G. L Taegeukjeong (10) L-2io POFESS/O This drawing is in conformance T a e g e u k j e o n g ( 11 y� pf<' = with relevant engineering codes. H Rebar Details 1—H73—C.T.0 200,4FA L=5.320 H13 L=5.320 N=4 a=5.320 (J H13 L=5.320 N=4 J -5.320G) H13 L=5.320 N=4 a=5.320 w n 513 L=5.320 N=4 w v a 0 0 U U U U 10 10 I II I II V� Rebar List (SD400) No. Diameter Length(M) Quantity Total Length(M) Unitwelght(KG/M)— .1hMN)Remarks IL 1 H13 5.320 4 21.280 3 Extra Pri e 2—H13—C.T.0 200,4FA 1=5.320 2 " 5.320 4 21.280 3 5.320 4 21.280 4 5.320 4 21.280 Subtotal 85.120 0.995 0.085 0.088 Sum 0.085 0.088 Foundation Slab Slope Section L SCALE : 1120 Project Name Developer Constructor Scale Design Date Project Representative Munc er Designer Drawing Name No. Gyeonggi Garden Renov. in SLC r Gyeon Al : 1/20 (Korean Garden in International Peace Gardens) ggi-do Geon Yeong ENC A3 : 1/40 2020. 05. S.J. Yan J. Seo�r G. L Taegeukjeong(11) L-211 POFESS/O �9Z This drawing is in conformance Taegeukjeong ( 12 ) y� pf<' = with relevant engineering codes. H Rebar Details a MN H13 L=3.610 N=11 2—H13 C.T 200,11EA a=2.460 b=850 c=300 L=1.75 H13 L=1.750 N=44 L 11.750 C_T.0 00, lEA a=600 b=850 c=300 H13 L=2.050 N=11 a=900 b=850 c=300 G) H13 L=1.750 N=55 a=600 b=850 c=300 L=3.610C.T.0 200,11 FA __ +3H.1 50 C_T.0 00,lOEA �900 b=850 L ca300 50 N 11 Rebar List L 11.750C_T.0 00,AEA 2—H73 C.T C 200,11EA L=1.75 (SD400) No. Diameter Length(M) Quantity Total Length(M) unit W.inht(KG/M) o e-ehnroro Remarks 6 1 H13 3.610 11 39.710 3 Extra Pri e of WI N� 2 11 1. 50 44 22. 0 3 2.050 11 22.55550 cs 4 1.750 55 96.250 U U .in U ,� 5 Sub otal 2.050 11 22.550 ii Ci n Sum 258.060 0.995 0.257 0.265 io "o 0.257 0.265 xN i n N� Foundation Slab Floor Section L SCALE : 1120 Project Name Developer Constructor Scale Design Date Project Representative Munc er Designer Drawing Name No. Gyeonggi Garden Renov. in SLC ' Gyeon Al : 1/20 (Korean Garden in International Peace Gardens) ggi—do Geon Yeong ENC A3 : 1/40 2020. 05. S.J. Yan .J. Seo�r .G. L Taegeukjeong (12) L-212 POFESS/O �9Z This drawing is in conformance Taegeukjeong ( 13 ) y� pf<' = with relevant engineering codes. H 1-H13-C.T.0 200,4EA Rebar Details L=6.220 H13 L=6.220 N=8 a=6.220 0 H13 L=1.680 N=3 -1.680 H13 L=1.680 N=11 1.680 H13 H13 L=6.220 N=8 W W W -6.220 0 0 o 0 N N N N U U U U 5 H13 L=1.680 N=3 U U U U a=1.680 to to to to �d �d I II I II I II I II Rebar List (SD400) No. Diameter Length(M) Quantity Total Length(M) unit W.inht(KG/M) 1 1hnroro Remarks IL 1 H13 6.220 8 49.760 3 Extra Pri e 2 1.680 3 5.040 3 1.680 11 18.480 4 6.220 8 49.760 5 Sub otal 1.680 3 5.040 1-H73-C.T.0 200,4EA L=6.220 Sum 128.080 0.995 0.127 0.131 0.127 0.131 2-H13-C.T.0 200,3EA L=1.680 1 Foundation Slab Floor Section L SCALE : 1120 Project Name Developer Constructor Scale Design Date Project Representative Manager Designer Drawing Name No. Gyeonggi Garden Renov. in SLC ' Gyeon Al : 1/20 ggi—do Geon Yeong ENC A3 : 1140 2020. 05. S.J. Yan .J. Seo .G. L Taegeukjeong (13) L-213 (Korean Garden in International Peace Gardens) ePOsEss�°" Taegeukjeong ( 14 ) This drawing is in conformance with relevant engineering codes. H 300 300 580 P Pillar Supports 300x3OOx45O Pillar Supports 300x3OOx450 (White, Bush-lammered) (White, Bush-Hammered) G, 580 - Pillar Support - - Pillar Support - Hoof Top Ornament 58Ox58Ox1096 (White, Flame Finish) Hoof Top Ornament 58Ox58Ox1096 (White, Flame Finish) 175 175 0 m Floor e,Frame Support 175x175x1 Floor Frame Support 175x175x 185 (Whit (White, Bush-Hammered) Bush-Hammered) - Roof Top Ornament - - Floor Frame Support - - Roof Top Ornament - - Floor Frame Support - 1 Trimmed Stone Front View 2 Trimmed Stone Top View 14-1 SCALE : 1/5 14-1 SCALE : 1/5 Project Name Developer Constructor Scale Design Date Project Re resentative I Mono er I Desi ner Drawing Name No. Gyeonggi Garden Renov. in SLC r Gyeon Al : 1/5 (Korean Garden in International Peace Gardens) ggi-do 40 Geon Yeong ENC A3 : 1/10 2020. 05. S.J. Yan .J. Seo r G. L Taegeukjeong(14) L-21a QPOFESS/��L 9Z This drawing is in conformance with relevant engineering codes. T a e g e u k J e O n g 15 H A=52.21m2 H=0.8m AxH=41.77m3 O 02 �. .� residual Soil volume=7.57m3 Excavation volume=34.20m3 Excavation/residue formula L ((4.22*4.22)+(3.12*3.12))/2*0.55 =7.57m3 Leveled Surface 1, 3 Foundation Excavating Sloped Surface 2 Rubble Foundation O GL -r A=1.4m2 A=14.89m2 H=0.16m H=0.27m 2 Concrete Volume=0.22m3 Concrete Volume=4.02m3 Concrete Mold Concrete W/0 Rebar Manage Project Name Developer Constructor Scale Design Date pro'ec,Re reseniative I Mona erI Designer Drawing Name No. Gyeonggi Garden Renov. in SLC ' Gyeon Al : 1/60 (Korean Garden in International Peace Gardens) ggi—do Geon Yeong ENC A3 : 1/120 2020. 05. S.J. Yan J. Se G. L Taegeukjeong (15) -215 QPOFESS/��L 9Z This drawing is in conformance with relevant engineering codes. T a e g e U k J e o n g 16 H A=19.19m2 H=0.2m Concrete Volume=3.84m3 2 A=4.18m2 A=25.2m2 A=9.83m2 H=0.55m H=0.2m H=0.55m 1/2 Concrete Volume=2.3m3 Concrete Volume=5.04m3 Concrete Volume=2.70m3 Rebar Concrete Manage Project Name Developer Constructor Scale Design Date p,.j_,Re reseniative I Mona erI Designer Drawing Name No. Gyeonggi Garden Renov. in SLC ' Gyeon Al : 1/60 (Korean Garden in International Peace Gardens) ggi—do Geon Yeong ENC A3 : 1/120 2020. 05. S.J. Yan J. Se G. L Taegeukjeong (16) -216 Q�6FESS/OIL sQ?D y< X NOTE �9�G�'a z This drawing is in conformance ❑The site must be thoroughly inspected before construction to make sure ineerin nothing has v ti�tiF� �O? �' with relevant en codes. changed after the inspection during the project design stage. If anymodificatlon Sose u I d a e m u n ( 1 ) = g g required, it must be approved by the supervisor. 0� � ❑ If wooded material is not specified in the drawing, use Douglas Fir. (/TAH 300 250 Pillar Support (Foundation)300x250x1200(Grani ) } { (White,Bush-flamuneretl) ,90, Pillar Support 26 1000(Granite) Y-t (White,Bush�iammerral) retl) Plank 90x350(ST'L Plate 6.OT) Support Beam 50x3Ox2.3T(ST'L Pipe) Self Tapping Bolt M6x12OL(STS) Water Resistant Plywood THK12 STS PLATE 1755x960x2T (Etching) sow NL sslo 2750VN 2105 2400 2105 2210 Sill 150x100x6.0T(ST'L Pipe) Molding 100xwx4.51F(ST'L Pipe) Plllar 250x250x9.OT(ST'L Pipe) Korean Roof Tile Small) Korean Roof Tile(Small) 3 Detailed Section A SCALE : NONE 300 250 Pillar Support (Foundation)300x250x1200(Grani ) (White,Support Plaque 900x300x5OT T Pillar Support 260x240x1000(Granite) TT' (White,Bush-+iarmiered) Plank 9Ox350(ST'L Plate 6.OT) Pillar Head 320x320x 120 _ Pillar 250x25Ox9.OT(ST'L Pipe) Support Beam 5Ox3Ox2.3T(ST'L Pipe) _ II '" =� Lintel 150x100x6.OT(ST'L Pipe) Selt Tapping Bolt A16x120L(STS) I __ ue A Pillar Support 260x240x1000(Granite) Pillar Support 26OX21OX1300 _ / (White,Bush-Hammeretl) Water Resistant Plywo60x2T tl THK12 (Granite)(White,Bush�iainner Pillar Support(Fountlation)300x2wx1200(Gra ite Detail "A„ STS PLATE 1755x960x2r Pillar Support (Foundation) 0 x 50x1w0 a (White,Bush-Hammeretl) (Etching) GL (Granite)(White,Bush-Hammer N� Water Resistant Plywood THK12 STS PLATE 1755x96Ox2T Water Resistant PI load THK12 (Etching)-Written Texts STS PLATE 1755x96Ox2T (Etching) Sill 150x100x6.01(ST'L Pipe) 1 Front View 2 Side View Wall Frame 100x50x4.5T(ST'L Pipe) � SCALE 1/30 L SCALE 1/30 Pillar 250x250x9.OT(ST'L Pipe) a Detailed Section B SCALE : NONE Project Name Developer Constructor Scale Design Date pro'ectRe reseatative I Mona erI Designer Drawing Name No. Gyeonggi Garden Renov. in SLC ' Gyeon Al : 1/30 (Korean Garden in International Peace Gardens) ggi—do Geon Yeong ENC A3 : 1/60 2020. 05. S.J. Yan J. Se ,r G. L Soseuldaelnun(1) -21 X NOTE ❑The site must be thoroughly inspected before construction to make sure nothing has S os e u I d a e m u n ( 2 ) changed after the inspection during the project design stage. If any modification is required, it must be approved by the supervisor. ❑ If wooded material is not specified in the drawing, use Douglas Fir. Lotus Shape Engraved Q�pFESS/p2 O Z This drawing is in conformance with relevant engineering codes. H a� a Cross Section "A" 8050 L SCALE NONE 2 6610 750 2105 2400 2105 2210 Traditional Roof Tiling A Concrete Clay Filling Wood Filling Water Proof Sheet 3T Plank Covering THK30 Traditional Roof Tiling g Concrete Clay Filling Wood Filling Water Proof Sheet 3T ID Plank Covering THK30 Post Connector 120x150 Pillar Top Bracket 90x 0 Middle Post 150,180 Roof End 90x60 Support Post (Long)90 1 an Covering THK30 Pillar Top Bracket 90x180 Support Bracket 150x15 x Pillar Connector 150x210 Post Connector 120x150 Support Post(Short)90 1 _ Pillar 250x250x9.0T(3T'L Pipe) Middle Post 150x180 II =� Lintel 150x100x6.OT(ST'L Pipe) Plank Covering TIK30 I _ N s Pillar Support Z60x240x1000(Granite) Pillar Top Bracket 90x180 / (White,Bush-Hammered) Pillar Connector 150x210 Con act ng Fast ner lD 10 C nne ling Fastner Pillar Support(Foundation)300x250x1200(Granit ) Cross Section"A" (White,Bush-Hammered) GL 'n Concrete W/0 Bobar 400x1800x150 T-8 Concrete W/O Rebar 400x1800x150 ter Resistant Iyootl THK12ubble Foundation THK300 STS PLATE 1755x960x2T Water Resistant Plywood THK12 Rubble Foundation THC300 (Etching)-Written Texts STS PLATE 1755x960x2T (Etching) l 1,800 � I 1,500 1,900 1,600 1 Front View L —11 SCALE : 1/30 z Cross Section A 3 Cross Section B L SCALE : 1/30 L SCALE : 1/30 Mamaa Project Name Developer Constructor Scale Design Date I par_,Re resentative I Mana erI Designer Drawing Name No. Gyeonggi Garden Renov. in SLC ' Gyeon Al : 1/30 (Korean Garden in International Peace Gardens) ggi—do Geon Yeong ENC A3 : 1/60 2020. 05. S.J. Yan J. Seo�r G. L Soseuldaernun (z) L-2is of Q SjO ti sQ?D y� X NOTE �92,G�i2 z This drawing is in conformance ❑The site must be thoroughly inspected before construction to make surenothing has ���F ?O� �' codes. changed after the inspection during the project design stage. If any with relevant enineerinodification Sose u l d a e m u n ( 3 ) = g g required, it must be approved by the supervisor. � ❑ If wooded material is not specified in the drawing, use Douglas Fir. vlgH 2261 2750 1720 2210 Roof Foundation THK30 Root Beam 90x120 Gable Plank THK45 Windbreaker THK30 Pillar Head 320x32Ox120 Windbreaker THK30 900 v Korean Roof Tile(M) Rectangular Rafter (Short)9Ox120 Rectangular Rafter (Long)9Ox120 Korean Roof Tile(F) - Front V i ew - Ratter Bracket l50xl5Ox9O 50 Pillar Head 320x32Ox120 Spruce (Sand Blasted Finish) c Lintel 150x210 Lintel Bracket 9Ox180 LEN - Cross Section - 3 Plaque Detail SCALE NONE Roof Perspective 2 Roof Floor Plan SCALE : 1/30 SCALE : 1/30 Project Name Developer Constructor Scale Design Date Project Re Representative Mana er oe:eoer Drawing Name No. Gyeonggi Garden Renov. in SLC Gyeon Al : 1/30 (Korean Garden in International Peace Gardens) ggi—do Geon Yeong ENC A3 : 1/60 2020. 05. S.J. Yan .J. Sec, G. L Soseuldaemun (3) -219 IQ El X NOTE ❑The site must be thoroughly inspected before construction to make su no has is D? changed after the inspection during the project design stage. If an, is Sose u l d a e m u n 9�Goj? Z This drawing is in conformance required, it must be approved by the supervi ❑ If wooded material is not specified in the drawing,use Douglas Fir. /,GO2= with relevant engineering codes. H a� L L L L L Self Tapping Bolt M6x120L(STS) Plywood THK12 STS PLATE 1755x960x2T (Etched Finish) • o Rafter 50x30x2.3T(ST'L Pipe) o o-- owe o oaow o*VM Wall Frame 100x50x4.5T(ST'L Pipe) 0 AMR*0"a 0 ORYAW 0 a" 0In o+-a 1,855 � Front View 2 Assembly L SCALE : L SCALE : none 1/10 Project Name Developer Constructor Scale Design Date Pro'ectRepresentative Mona er oe:eoer Drawing Name No. Gyeonggi Garden Renov. in SLC ❑e Gyeon Al : 1/10 (Korean Garden in International Peace Gardens) ggi—do Geon Yeong ENC A3 : 1/20 2020. 05. S.J. Yan .J. Sea G. L Soseuldaemun (4) L-220 QPOFESS/��L 9Z This drawing is in conformance with relevant engineering codes. B U I I O m u n BAH #Engraved(Chinese Characters) ❑ ❑ ❑ ol�l�ool�ol�oo I�ol�000l�ol�o _1 _1 ❑ I�I�ol�ool�oo I�ool�ool�oo (D �D (DD �� o_o_o_o_o_o_o_o_oo o_o_o_o_o_o_o_o_o_o �� C C� C D Q K�❑❑❑❑❑❑❑❑❑❑❑❑ ❑❑❑❑❑❑❑❑❑❑❑❑ �� ❑ ❑ ❑oo❑❑o❑❑o❑❑oo 10LIEDELILILIELDILE-1 ❑ ❑ GL Front View L SCALE : 1/20 2,250 3pp Insert Depth 150M Foundation Boulder 600x600x600(Granite) Stone Lintel 300x150x2250(Granite) (White,BusfrHammered) / C (White,Bush-Hammered) T Connecting Rod 1316nm Engraved Letters (Image Reference) Stone Post 300x150x1050(Granite) (White,Bush-Hammered) G L 2,550 �7 fiW 1,350 600 c Concrete W/O Rebar 700x700x150 g Rubble Foundation TFK200 7 GL 00 800 2 Front View s Floor Plan a Foundation Detail L SCALE : 1/20 L SCALE : 1/20 L SCALE : NONE Project Name Developer Constructor Scale Design Date pro'ectRe Representative Mann er Desi ner Drawing Name No. Gyeonggi Garden Renov. in SLC '�, Gyeon Al : 1 /20 (Korean Garden in International Peace Gardens) ggi-do Geon Yeong ENC A3 : 1/40 2020. 05. S.J. Yan J. Seo�r G. L Bullomun L-22� QPOFESS/��L 9Z This drawing is in conformance with relevant engineering codes. H Traditional Stone Fence ( 1 ) (Stone Fence Construction Section 2200mm) (Stone Fence Construction Section 2200mm) 2,200 2,200 _,� ❑ ol�l�l�l�l�ol�oo l�ol�l�ol�l�ol�l� i i J -y(�`� 000000000 000000000 0000000000 0000000000 l�l�ol�ol�ool� l�ool�ol�l�ol� ❑❑❑❑❑❑❑❑❑❑❑o o❑❑❑❑❑❑❑❑❑❑❑ , K� K��❑❑❑❑❑❑❑❑❑❑❑❑ ❑❑❑❑❑❑❑❑❑❑❑❑o-� C c ❑❑❑❑❑❑o❑o❑❑o oo❑❑❑❑oa❑❑❑aGIL te ❑ J 1 Fence Construction Front View L SCALE : 1120 (Passage) Existing Stone Fence Removal 0.5m 1,800 Stone Fence Construction Section/0.9m (Natural Stone) 500 900 16 1 Fence Construction Floor Plan L SCALE : 1/20 Project Name Developer Constructor Scale Design Date Pro'ectRepresentative I Mona er Designer Drawing Name No. Gyeonggi Garden Renov. in SLC r Gyeon Al : 1/20 (Korean Garden in International Peace Gardens) ggi-do Geon Yeong ENC A3 : 1/40 2020. 05. S.J. Yan J. Seo�rG.G. LftgbTradifional Stone Fence(l) L-222 QPpFESS/O c9•yG�i2 �9z This drawing is in conformance with relevant en ineerin codes. g g Traditional Stone Fence ( 2 H r.� 800 800 soo soo )>Adhesive Apr)lication 3 Stage Roof Tile 3 Stage Roof Tile Korean Roof Tile Korean Roof Tile Cement Fill Cement Fill )>Connecting Roof Tiles (M+F) Baked Brick Stacking 0.58 Baked Brick Stacking 0.5B (190x90xT57) _ (190x90xT57) - F_ Cement Brick Stacking 0.58 090x90xT57) Mortar Grout Grout Offset t °a 0 Cube Stone 150x150x150 Natural Stones Attached >>Placing Adhesive Tile on Roof Tile (M), 3 Stage Tiling (F) � (White, Mushroom Finish on Exposed Surface) 0 i� Cut Stone 270x150x100o (White, Bush-Hammered) Mix Concrete Pouring(25-21-8) Mixed Concrete Pouring(25-21-8) GL GL 0 a HD13 Deformed Debar @200 g a HD13 Deformed Debar @200 ))Cement Application $ Rubble Foundation 200T Rubble Foundation 200T O O O O O O O O O O O O 1 900 1 l 900 1 1,100 1,100 >>Resu I t Construction Cross Section 1 Repair Section Cross Section 1 Roof Tile Application SCALE : 1/10 SCALE 1/10 SCALE : none Project Name Developer Constructor Scale Design Date Project Re resenfafive I Mona erI oe:1eoer Drawing Name No. Gyeonggi Garden Renov. in SLC Gyeon Al : 1/10 (Korean Garden in International Peace Gardens) ggi-do Geon Yeong ENC A3 : 1/20 2020. 05. S.J. Yan J. Seo'�V .G. L Traditional Stone Fence (2 1 L-223 Is ( of ES Korean Root Tiles sQ?D 9� 900 �92,G�,2 z This drawing is in conformance 1A°�= with relevant engineering codes. Reber D13@200 T/B PE Pipe(D500) N PE Pipe(D500) -•AH Dan.Cho Pattern Retl Brick 191 C7 Bu Jo Pattern(Crane,Goblin,Bat) So Gun Ja Pattern - - Spherical Concrete ^ Behar D13@200 t,6o -Level 1 - - Level 2 - Bur Jo Pattern(Crane,Goblin,BaU N Chimney Border Brick Stacking Application O• N� Foundation Stone 350x250(Mm ite,Flame nia SCALE NON( N - Concrete Foundation(T300) c Rebar D13@200 N G L BlInd ng Concrete 50T 600 S o � Rubble Foundation 300T Lang Cho Pattern - 0 Goblin Pheonix Crane 0 3,200 i0di Concrete Foundation Border 3,400 Rubble Foundation Border Excavation Border 4 Cross Section Detail L SCALE : 1120 � 1,150 11o0 1,1so r 3,200 Chi.In,- n l 1 r= o Korean Root Tiling s Floor Plan r� r= ^� H Legendary Creature Legendar�Cteature L SCALE : 1/zo - Side 1 - - Side 2 - - Side 3 - 42° Bat Crane Pheonix Deng Cho Pattem.. 4S0 ■ Red Brick 191- INK 4Sp �J 7Y k/x Pattern(Goblin,Crane,P Chimney Top 4?0 Pattern Korean Root Tile Pattern Foundation Stone 3501 (white,Flame Finish) Legendary Creature Legendary Creature Legendary Creature GL d ® d 1,600 - Side4 - - Side - - Side6 - Front View 2 Rear View 3 Roof Floor Plan SCALE : 1120 SCALE : 1120 SCALE : 1120 a Patterns Detail SCALE : NONE Project Name Developer Constructor Scale Design Date Pro'eatRe resentative Mona er pe:eoer Drawing Name No. Gyeonggi Garden Renov. in SLC Gyeon Al : 1/20 (Korean Garden in International Peace Gardens) ggi-do Geon Yeong ENC A3 : 1/40 2020. 05. S.J. Yan J. Se G. L Amisan Chimney -22a of ES IQ This drawing is in conformance Jangdokdae Drawings v� ��ti� °�= with relevant engineering codes. 2500 BAH 350 1800 350 Stone Pot H500 o (Dark Colored, Water Polished) CO Stone Pot H500 Stone Pot H400 (Dark Colored, Water Polished) (Dark Colored, Water Polished 0 o0/ Boulders Fixed(Mortar 1:3 Boulders Fixed(Mortar 1:3) o 0 coLo 0�o00�Do O �� Stone Pot H400 N (Dark Colored, Water Polished) 0 Front View L SCALE: ,/,o � Floor Plan L SCALE: 1/10 1500 1500 350 800 350 Stone Pot H500 (Dark Colored, Water Polished) Rubbles Filled Boulders Fixed(Mortar 1:3) tone Pot H400 Mixed Concrete(25-21-8) (Dark Colored, Water Polish oulders Fixed(Mortar 1: )o o�o�o�jo 0 v 0 \ivGL n o co o � o a l� OO D13 Deformed rebar@ N GL a o 0 0 0 0 0 0 0 0 o Rubble Foundation 2 s Side View a Cross Section Detail s Image L SCALE: 1/ID L SCALE: 1/10 L SCALE:none Project Name Developer Constructor Scale Design Date ProectRe resenfafive a er Mon oe 11 1 Drawing Name No. Gyeonggi Garden Renov. in SLC Gyeon Al : 1/10 ggi—do Geon Yeong ENC A3 : 1/20 2020. 05. S.J. Yan .J. Seo .G. L Jangdokdae L-225 (Korean Garden in International Peace Gardens) POFESS/O e c 9�yG�i? �9Z This drawing is in conformance Folk Swing Drawing with relevant engineering codes. H Rubber Plate 3T (Wrap more the 2 times to prevent the tree damage and ensure the tie does not get untied) t!-Bolt 3/8"x 8"L STS 800 0 N 1 Manila Rope 036 o OPine Board 800x230x50T Q Manila ROPe 036 Pine Board 800x230x50T o l!-Bolt 3/8"x 3"L STS z Cross Section Detail GL V SCALE: 1/5 Front View SCALE: 1/10 Mamaannen Project Name Developer Constructor Scale Design Date Project Re resentative I Man.er I Desi ner Drawing Name No. Gyeonggi Garden Renov. in SLC r Gyeon Al : 1/10 (Korean Garden in International Peace Gardens) ggi-do Geon Yeong ENC A3 : 1/20 2020. 05. S.J. Yan .J. Sea G. L Folk Swing —226 Brianna Binnebose Brianna Binnebose joined the Board in 2019, originally as an At-Large member, but was later appointed as the District 5 representative for the Liberty Wells, Central City, and Ballpark neighborhoods. After a spring break ski trip from Wisconsin to Little Cottonwood Canyon in 2005, the powder and the views convinced her to give Utah a try. She is a Communications Consultant and earned a Master's Degree in Public Policy from the University of Utah and has been involved in public involvement and planning for nearly a decade. She has previously worked for the Utah Division of Forestry, Fire, and State Lands, and led the development of the first wildfire prevention and preparedness plan developed for Salt Lake City. She is a frequent visitor to Liberty Park and you can often find her there running her dogs. Her interest in the PNUT Board stems from her previous experience in resource management and passion for making both our urban and open space public parks and lands accessible for all users of all abilities.