Project Overview
The proposed project involves the renovation of approximately 5,500 square feet
located on the north end of the fifth floor of the Salt Lake City and County Building. The
fifth-floor space is a unique opportunity for useful open office space in a historic
building. The design intent emphasizes a balance between preserving historic character
and accommodating new office needs of the City's Law Offices.
Design Precedents
Several precedents inform the design approach for this project:
• GSBS Architects Offices / Henderson Building: This project highlights the
integration of open office planning with exposed structural and mechanical
systems, combining functionality with an expression of materiality and
craftsmanship.
• Puck Building: Known for its exposed brick and steel structural elements, the
Puck Building demonstrates how historic spaces can be adapted for modern
office use while preserving original architectural features.
�fV,
= a —
711
1t�
• Salt Lake City and County Building - Accounting Offices: A historic precedent
within the same building, the accounting offices demonstrate how spaces in the
building can be furnished for office use while respecting original finishes,
375 WEST 200 SOUTH 901 WEST VICKERY BLVD.
SUITE No 100 SUITE No 100
SALT LAKE CITY,UT 84101 FORT WORTH,TX 76104
www.gsb...chitects.
P 801.521.8600 P 817.589.1722
moldings, and architectural detailing. These offices serve as a model for
integrating new furniture with historic finishes and fixtures.
Interior Finishes
Interior finishes will include adding drywall to all open rafter cavities, furring out
exposed concrete, and constructing wood millwork to conceal mechanical piping, with
species, finish, and style chosen in keeping with historic elements. Two design options
are proposed: a historic exposed brick and structure, with the wood columns and
beams, painted steel structure and ducts, and simple wood base elements; or a more
historic approach that matches the building's original finishes, covering the brick, wood
structure, adding plaster crown molding details and decorative pendant light fixtures.
Code Compliance
Code compliance IEBC 2021 and IBC 2021. The space will be fully sprinkled, incorporate
a fire-rated horizontal exit, and maintain a single-level floor. Due to the relocation of
mechanical equipment, a mezzanine extension will be required to house existing and
new HVAC components. Code analysis identifies the project as an alteration (IEBC 2021
Section 202), involving a change of occupancy from S to B in a historic building.
Increased live loads necessitate the use of IBC 2021 Section 1607 for structural design,
while Section 306 ensures accessibility compliance under ICC A117.1. Section 503
requires adherence to IBC provisions for alterations, with Section 506 confirming that
the new occupancy is approved as less hazardous. Section 1200 recognizes the
building's historic status, and horizontal exit requirements are dictated by maximum
exit access travel distances per IBC 2021.
Structural Design
Structurally, new floor framing will support the fifth-floor office use, with both wood
and cold-formed steel options analyzed. Framing requirements vary across five
designated areas, using CFS sections such as 140OS350-97 and 160OS350-97 at
specified spacings, or equivalent wood joists 3/4" x 14" @ 8" o.c. New framing supports
both the office floor and existing ceiling, addressing inadequate deflection capacity in
existing joists to mitigate plaster cracking. Analysis of roof truss braces indicates non-
critical support in most areas, allowing selective removal and redistribution of forces.
Mechanical, Electrical, Plumbing, and Fire Sprinkler Systems
Mechanical, electrical, plumbing, and fire sprinkler systems will be added to serve the
new office spaces. Existing air handling units will be relocated to an upper mezzanine,
with ductwork and chilled/heating water extended to serve new fan coil units.
Plumbing modifications will accommodate condensate piping for both existing and new
HVAC units. Fire sprinkler piping will be redesigned to serve the remodeled space while
maintaining coverage of the fourth floor.
Electrical work includes new power panels, emergency power panels, and motor
controls to support relocated and new air handlers. Fire alarm and detection systems
will integrate new NAC panels, annunciation devices, and signal line extensions. Data
systems will include a new rack and conduit connection to existing fiber cores, with
dedicated grounding and emergency power. Lighting will be installed with energy
code-compliant controls, emergency egress lighting, and power provisions, while
security and card access systems will be provided as directed by the owner.
Cost Estimates
Rough order of magnitude (ROM) costs, based on the architectural, structural, and MEP
narratives, are as follows:
• Exposed Brick and Structure Option: $510-$545 per square foot
o Total: $2.8M-$3M
• Historic Aesthetic and Finishes Option: $600-$655 per square foot
o Total: $3.3M-$3.6M
The design preserves the historic character of the Salt Lake City and County Building
while delivering a fully functional, code-compliant, and visually engaging office
environment, informed by notable adaptive reuse precedents.
Erin J. Mendenhall, Mayor
Office of the Mayor
City&County Building
451 South State Street
Salt Lake City, UT 84111
Subject: Recommendation for Comprehensive Lighting Study — Salt Lake City &
County Building
Dear Mayor Mendenhall,
On behalf of the Use and Conservancy Committee, we write to recommend that the City
commission a comprehensive lighting study for the Salt Lake City & County Building.
During our most recent review of the building's interior environments, we identified a number
of concerns with the current lighting. Many of the existing fixtures appear not to conform to
the prescribed design guidelines for Priority A spaces (Section 6.2.2.6), which call for light
fixtures to be unobtrusive yet compatible with the historic character of each space. Moreover,
the lighting in many areas appear to fall short of contemporary industry standards and may
not meet minimum code requirements for egress and safety.
To fully assess these conditions and to establish a direction, we recommend a formal lighting
study with the following scope:
1. Existing Conditions Assessment
• Inventory of all fixtures: types, quantities, locations, mounting heights, lamp types, and
control systems.
• Photometric survey: measurement of existing lighting levels (foot-candles) in all spaces.
• Condition and maintenance review: age and serviceability of fixtures, damaged or
degraded equipment.
• Evaluation of control systems: dimmers, occupancy sensors, daylighting controls, timers,
or smart-lighting systems.
2. Code and Standard Compliance
• Review for compliance with relevant local and international codes and standards (e.g.,
IBC, IECC, ASHRAE 90.1, ADA, and applicable local energy or safety codes).
• Assessment of compliance with the City and County Building Design Guidelines.
• Verification that egress and safety lighting (emergency lighting, exit signage, stair and
corridor illumination) meet current code minimums.
3. Lighting Performance Analysis
• Compare measured illuminance levels to recommended lighting levels for different room
types (offices, meeting rooms, lobbies, corridors, etc.).
• Determine uniformity ratios to ensure even illumination without excessive glare, hot
spots, or deep shadows.
• Evaluate color quality: color temperature (CCT), color rendering index (CRI), and
consistency across fixtures.
• Assess visual comfort: whether lighting produces glare, flicker, or other conditions that
may impair occupant comfort or perception.
4. Energy and Sustainability Evaluation
• Quantify current lighting energy consumption (e.g., kWh/year).
• Evaluate the efficacy and efficiency of existing fixtures (lumens per watt) and identify
potential savings through LED retrofits or modern fixtures.
• Estimate life-cycle costs including replacement frequency, maintenance costs, and
projected energy savings.
S. Recommendations & Next Steps
Based on the study findings, the Committee requests the consultant to propose:
• Fixture upgrades or retrofits — including replacement with code-compliant,
energy-efficient fixtures.
• Improvements to control systems — such as occupancy sensors, daylight harvesting, or
centralized lighting management.
• Design adjustments — repositioning, aiming, or re-spacing of fixtures for improved
illuminance and comfort.
• Historic/aesthetic-sensitive solutions — ensuring any changes remain compatible with
the building's architectural character and design guidelines.
• A rough order-of-magnitude cost estimate for proposed improvements, and a
recommended phasing plan for when different measures should be implemented.
We believe that undertaking this lighting study is essential to ensure that the City & County
Building continues to meet both the historic preservation standards and the functional, safety,
and sustainability needs of a modern public building. The findings will provide a sound,
data-driven basis for prioritizing upgrades, budgeting, and scheduling future improvements.
Thank you for your consideration of this recommendation on behalf of the Committee. We are
ready to assist in defining the scope, selecting appropriate consultants, and participating in
planning discussions as needed.
Respectfully,
Travis Shepp—aacr
Chairperson
Salt Lake City&County Building Use and Conservancy Committee
i
G S B S `M
'
OPTION 1 (Cubicles only) ARCHITECTS 21
COUNTS
375 WEST 200 SOUTH
i SALT LAKE CITY,UT 84101
36 Cubicles
P 801.521.8600
www.gsbsarchitects.com
— — — — —
L — — —
Fr -
I I
I I
I I I I
I I13
F-- -
- -� - -
--1 F-- J L
TYP.CUBICLE SIZE < b
8'-0"X T-6" REVISIONS:
p ❑I
TYP.
I I I I I I
TOTAL QU ARE FEET:
I
I
L — — SLC-CITY COUNTY BUILDING: BUDGET ESTIMATE SUMMARY
Construction Pricing Furniture Pricing Total Cost per Square Foot
- Cubicles 58 Exposed Brick
Option 1 $2,956,003 $324,324.00 $3,280,327 $660
L Option 2 $3,368,389 $301,917.00 $3,670,306 $738
Option 3 $3,452,439 $308,154.00 $3,760,593 $756.51
= Private Offices Historic Finishes
Option 1 $3,649,948 $324,324.00 $3,974,272 $799.49
Option 2 $4,511,371 $301,917.00 $4,813,288 $968
Option $4,838,200 $308,154.00 $5,146,354 $1,035.28
Note: Costs listed above include construction and furnishings, but do not cover soft costs such as design fees,
permitting fees, or other related expenses.
I
I
Feasibility Study
L - Salt Lake City and
L--- County Building -
L 5th Floor Feasibility
Structural Study
Enter Address Here-->
Salt Lake City Corporation
I
451 State St.
L Salt Lake City,UT 84111
OWNER PROJECT NO.: FAC24084
GSBS PROJECT NO.: 2024.056.03
ISSUED DATE: 12/04/2025
FURNITURE PLAN
G012 REV
I
I
I
. G S B S `M
+ ■1
OPTION 2 (Cubicles Private Offices) � ARCHITECTS
I
COUNTS
I
I 375 WEST 200 SOUTH
I SALT LAKE CITY,UT 84101
- 13Cubicles
10'-4" 10'-4" 10'-4" 10'-4" P 801.521.8600
- 16 Private Offices
www.gsbsarchitects.com
LI Ll
� � E0 N,
N N
OFFICE OFFICE OFFICE OFFICE
81 SF 81 SF ❑ ❑ 81 SF 81 SF
A A
cn cis
OFFICE OFFICE �� ❑ ❑ ❑ ❑
❑ ❑ 141 SF 80 SF o ❑ ❑
— — � — —
OFFICE
- 82 SF N
OFFICE
OFFICE �i �i
JL0 94 SF
❑ 94 SF LOFFICE
F- 82 SF
16'-8" 8'-6" --1 C2
TYP.CUBICLE SIZE b ❑
8'-0"X 7'-6" OFFICE _ _ REVISIONS:
146 SF
A ❑ LL— —i—,
❑ A
❑ d,
I
7'-6"
TYP.
OFFICE OFFICE OFFICE OFFICE ❑
00
81 SF 81 SF 99 SF 99 SF TOTAL SQUARE FEET: ❑ 02
N � ❑� ❑ �. ❑ 4,9 71 SF N
❑ ❑ OFFICE 1U
D Ll �. U1 4„ 3,0„ 6" - - - - - - 115SF
10'-4" 10'-4" 12'-7" 12'-7" 10'-6" 4'-11" 9'9" 14'-71/2"
L
58"
= Cubicles SLC-CITYCOUNTYBUILDING: BUDGETESTIMATESUMMARY
L Construction Pricing Furniture Pricing Total Cost per Square Foot
❑ Exposed Brick
Option 1 $2,956,003 $324,324.00 $3,280,327 $660
= Private Offices Option�- $3,368,389 $301,917.00 $3,670,306 $738
Option 3 $3,452,439 $308,154.00 $3,760,593 $756.51
Historic Finishes
Option 1 $3,649,948 $324,324.00 $3,974,272 $799.49
❑( Option $4,511,371 $301,917.00 $4,813,288 $968
I ❑J
L Option 3 $4,838,200 $308,154.00 $5,146,354 $1,035.28
Note: Costs listed above include construction and furnishings, but do not cover soft costs such as design fees,
permitting fees, or other related expenses.
L
I
I
❑ Feasibility Study
I
L Salt Lake City and
County Building -
F 5th Floor Feasibility
Structural Study
LjI Enter Address Here-->
Salt Lake City Corporation
451 State St.
L — — — Salt Lake City,UT 84111
OWNER PROJECT NO.: FAC24084
GSBS PROJECT NO.: 2024.056.03
ISSUED DATE: 12/04/2025
FURNITURE PLAN
G012 REV
i
G S B S `M
OPTION 3 (Cubicles + Private Offices ARCHITECTS ■/
COUNTS
375 WEST 200 SOUTH
SALT LAKE CITY,UT 84101
- 6 Cubicles
10'-4" 10'-4" i 10'-4" 10'-4" P 801.521.8600
- 22 Private Offices
www.gsbsarchitects.com
-F
H -H H
or
N_ N
OFFICE OFFICE OFFICE OFFICE
81 SF 81 SF ❑ ❑ 81 SF 81 SF
{ -
A A
cn cis
r ❑ — —
L OFFICE OFFICE ❑ ❑ ❑ ❑ ❑
❑ ❑ 141 SF 80 SF o ❑ ❑
OFFICE
- 82 SF N
OFFICE
❑ �❑ n o 94 S F
OFFICE -a / �i L
❑ 94 SF OFFICE
82 SF
16'-8" 8'-6" �
TYP.CUBICLE SIZE b ❑
8'-0"X 7'-6" OFFICE _ _ REVISIONS:
146 SF
❑ d,
TYP.
OFFICE OFFICE OFFICE OFFICE ❑
81 SF 81 SF 99 SF 99 SF TOTAL SQUARE FEET: �❑ 02
00 (❑� ( �❑
N U1 1 I�I� 4,9 71 SF I I ❑ N
` ❑ ❑ r ❑ ❑ 4 OFFICE I -
U1 �. ❑ 3 0 1 6 ❑ n _ 115SF
- - - - -- - - - --- - -----�-- - - II -
I I I
10'-4" 10 4' 12'-7" 12'-7" ❑ ❑ 10'-6" 4'-11" 9'9" 14'-71/2"
58' SLC-CITY COUNTY BUILDING: BUDGET ESTIMATE SUMMARY
= Cubicles ❑ ❑ Construction Pricing I Furniture Pricing Total I Cost per Square Foot
Exposed Brick
Option 1 $2,956,003 $324,324.00 $3,280,327 $660
❑ Option 2 $3,368,389 $301,917.00 $3,670,306 $738
= Private Offices Option 3 $3,452,439 $308,154.00 $3,760,593 $756.51
Historic Finishes
Option 1 $3,649,948 $324,324.00 $3,974,272 $799.49
Option $4,511,371 $301,917.00 $4,813,288 $968
J❑ Option 3 $4,838,200 $308,154.00 $5,146,354 $1,035.28
Note: Costs listed above include construction and furnishings, but do not cover soft costs such as design fees,
permitting fees, or other related expenses.
Feasibility Study
Salt Lake City and
County Building -
5th Floor Feasibility
❑ ❑ Structural Study
Enter Address Here-->
❑ ❑ Salt Lake City Corporation
451 State St.
Salt Lake City,UT 84111
OWNER PROJECT NO.: FAC24084
GSBS PROJECT NO.: 2024.056.03
ISSUED DATE: 12/04/2025
FURNITURE PLAN
G012 REV