Our Team
OPosition in Org Chart:
- Mayor's Office
- Department of Community and
Neighborhoods
- Engineering Division
Mission:
O To serve the City and its growth by
striving to exceed constituent
expectations during right-of-way design
and construction, with a focus on
providing sustainable infrastructure
In Short:
• We manage activities in the public right
of way (including private permited
construction)
ff
How Do We Serve Our Cit
Roadway CIP Group Public Way Permits GIS and Asset City Surveyor Group Public Outreach &
Group Management Group Information Group
- Design and - Monitor work - Preserve - Provide - Manage public
construct public way performed in the engineering professional land outreach and
projects approved public way records survey services communication on
through CIP - Ensure City - Manage public public way projects
standard are way assets
upheld inventory
FY2026 Initiatives
Accomplishments
Pavement Condition Survey
-A - Complete and assess the
Local Streets Projects new pavement condition
Virginia St Survey
West Temple - Update maintenance
r guidelines
„
°°°°° - Determine a timeline for
�;,HIN i
future repairs
Bike lane OCI assessed this
Spring
GIS Mapping tool
Work interdepartmentally to
Engineering - finalize a new GIS mapping
Accomplishments - to
ct future projects and
and Initiatives work zones efficiently
Overall Conditi Percent of Total Distance Percent of
2025 Pavement Condition Total Area
on Index(OCI) Total Area (Centerline Network
Range Description (yd2) (yd2) Miles) Miles
Condition Survey 86-100 Good 4,429,599 M= 177.51 _
71-85 Satisfactory 3,126,441 22.81% 138.62 23.1%
56-70 Fair 1,714,338 12.51% 77.92 13.0%
Roadway Asset Services, LLC (RAS) performed a 41-55 Poor 1,448,523 10.57% 60.61 10.1%
pavement condition assessment of our City's r
26-40 Very Poor 1,8 13.85/
97,947 � 88.92
streets in Fall 2025
L -11-25 Serious 1,008,759 7.36% 51.
RAS calculated an Overall Condition Index 0-1 Failed 79,075 0.58% 4.29 0.7%
(OCI) using their collected Pavement Condition
Index (PCI) and International Roughness Index Total of Rated Segments 13,704,682 100.0% 599.61 100.0%
(IRI) data:
OCI = (0.88 X PCI) + (0.11 X IRI)
511,
y.
10
Pavement Condition Results &
Health Metrics
Network Average PCI
The national average we see is a 65-75. Overall Condition •
Less than 5%score above an 80 Surface: All
Percent of Excellent Roads
20-30%is about the average we see across 200 30.8%
the nation 180
Ln .•
Ui
Percent of Backlog _
These are the Very Poor,Serious, &
Failed roads. Less than 10%is ideal zCO)
and 15%is a maximum recommended
mark. 209,6 and greater is difficult to UJ '' _
catch up from z .• -
I, 0
Shape of Curve '
There will always be streets in all •
condition categories, Excellent to Very ' ' ' ' ''Good
Poor. City has invested to maintain the Poor Satisf actory
overall network average and it is OCI CATEGORY
fiscally impossible to elevate all roads
to a"Good"condition