053 of 1986 - Electrical Permit Fees 0 86-1
0 86-16
SALT LAKE CITY ORDINANCE
No . 53 of 1986
(Electrical Permit Fees )
AN ORDINANCE AMENDING SECTIONS 5-9-14, 5-9-15, 5-9-16,
5-9-17, AND 5-9-18 OF THE REVISED ORDINANCES OF SALT LAKE CITY,
UTAH, 1965, AS AMENDED, RELATING TO DIVISION OF BUILDING AND
HOUSING CODES.
Be it ordained by the City Council of Salt Lake City , Utah:
SECTION 1. That Sections 5-9-14, 5-9-15, 5-9-16, 5-9-17,
and 5-9-18 of the Revised Ordinances of Salt Lake City , Utah,
1965, as amended , relating to Division of Building and Housing
Codes be, and the same hereby are, amended as follows :
Sec . 5-9-14. Residential electrical fees. The following
fees for a permit for the installation of electrical materials in
residences , including multi-apartment buildings, shall be paid to
the City Treasurer before any permit is valid :
(1 ) The minimum fee for :
(a) Minor remodel and additional circuits; or
( b) Service change with 1 or 2 new circuits ; or
( c) Service change or alteration $20. 00
( d ) Home owner electrical remodel
permit 25. 00
( e ) New residents for homeowner permits see single
family schedule.
( 2 ) The square foot area of new single family dwelling , as
determined from the building permit , shall establish an
electrical permit fee as follows :
( a) Up to 1500 square feet, per square
foot 0. 03
( b) Per square foot above 1500 square
feet 0. 02
(3 ) Permit for total renovation of electrical
systems in existing single family dwellings 20. 00
(4 ) Permit for total renovation of electrical systems in
multi-unit apartment buildings shall be as follows :
( a) One or two units 20. 00
( b) Third and fourth units, each 8. 00
( c ) Additional units, including house
meter, each 4. 00
(5 ) Inspection to advise on and appraise electrical
systems in existing residences ( consulting) 4 . 00
(6 ) Permits for multi-unit apartments (excluding
transient occupancies, such as hotel or motel , which are
classified as commercial) shall be established as follows :
( a) First three units, per square
foot 0. 03
( b) Units four through ten, each 8. 00
( c) Units eleven and above, each 4. 00
( 7 ) Projects including multiple buildings and/or row-houses
shall be computed for each building or house separately .
( 8 ) A power to panel with no issue fee for single occupancy
buildings $7. 50
-2-
For individual apartments in an apartment building , or
condominium units nor for occupancy an additional 3. 00 fee for
each additional meter.
Sec . 5-9-1 5. Fee for temporary metering . The fee for
permit for temporary metering and service facilities shall be :
( 1 ) Up to 100 amp load capacity $13. 00
(2 ) Each additional , or part thereof, 100 amp
capacity 3. 00
Sec . 5-9-16. Commercial and industrial fees. The fee to be
paid to the City Treasurer for electrical permit covering work in
industrial or commercial properties shall be computed as follows :
( 1 ) Minimum fee shall be: 20. 00
(2 ) For new service , change of service , alterations or
repairs of 600 volt or less, capacity service entrance equipment,
fee shall be computed in accordance with the following:
( a) Up to 100 amp 20. 00
( b) 101 amp to 200 amp 20. 00
( c) Each additional 100 amp or fraction 3. 00
(3 ) Fee for installation , alteration or repair of sub-
feeders, including supply taps from sub-feeders shall be computed
in accordance with the following table :
( a) Up to 30 amp capacity , each 0. 05
( b) 31 amp to 60 amp capacity, each 1. 50
( c) 61 amp to 100 amp capacity , each 3. 00
-3-
(d) Each 100 amp, or fraction, capacity above
100 amp capacity 3.00
(6 ) The installation of transformers shall be subject to
inspection fee when such transformers are an integral part of the
consumer' s distribution system . Such fee shall be in addition to
the regular system inspection fee and shall be computed as
follows :
( a) Transformers up to 50 volt secondary NO CHARGE
( b) 51 volt to 240 volt secondary 15. 00
( c) 241 volt to 600 volt secondary 25. 00
( d) 601 volt to 2300 volt secondary 65. 00
( e) Greater than 2300 volt secondary 95. 00
(5 ) Installation of a motor generator for emergency or
standby:
( a) Power up to 500 KVA 75. 00
( b ) Above 500 KVA 12 5. 00
( 6 ) Alternate fee schedule. Electrical permit fees shall
be computed on the schedules set forth in this chapter and shall
be paid prior to work being started . When a fee cannot be
computed on the foregoing schedules, it shall be computed as
follows up to , but not exceeding $100, 000. 00:
( a) Where such work is more than $25.00 but less than
$1 0, 000. 000: 1-1/4% of the total valuation.
( b) Where such work is more than $9, 999.99 but does
not exceed $1 00, 000. 00 - $100. 00 + 2/3 of 10 of
valuation over $9, 999. 99.
-4-
Sec . 5-9-17. Electrical work exceeding $100, 000. 00. When
the cost of electrical work exceeds $100, 000. 00, electrical
permit fees shall be as follows :
( 1 ) Where such work is more than $1 00, 000. 00 but less than
$250, 000. 00: $300 + 3/10 of 1% over $100, 000. 00.
(2 ) Where such work is more than $250, 000. 00: $700 + 1/10
of 1% of all over $250, 000. 00.
Sec . 5-9-18. Power to panel permit for construction
purposes only. A power to panel permit shall authorize power for
construction purposes on a temporary basis only; permanent power
must be authorized separately.
( 1 ) At the time power to panel is required to complete
construction, the owner or contractor shall apply for and obtain
a separate power to panel construction permit. Said permit shall
be valid for a 60 day period .
( 2 ) Thirty day extensions for said permit may be issued
upon the approval of Building and Housing Services and upon
payment of one-half of the oriqinal permit fee for each
extension .
( 3 ) Final electrical approval for permanent power shall be
withheld until a certificate of occupancy is issued. Occupancy
occurring prior to the issuance of a certificate of occupancy
shall result in a discontinuance of all power until occupancy is
approved or until occupancy ceases.
(4 ) Upon expiration of a power to panel construction permit
all power to said electrical panel shall be discontinued .
(5) Fees :
60 day , no issue fee $20. 00
30 day extension 7. 00
SECTION 2. This ordinance shall take effect thirty ( 30 )
days after its first publication .
Passed by the City Council of Salt Lake city, Utah, this
'10th day of June , 1986.
-5-
CHAIRMAU 1� c
ATTEST:
CITY kECO DEA
Transmitted to Mayor on June 20, 1986
Mayor's Action - July 1, 1986
ATTEST:
011y
Fat,
GRH:rcl 2
86
July 9, 1986
-6-
Affidavit of Publication AI)M�5A
STATE OF UTAH,
ss.
County of Salt Lake
Sharon Payne
.............................................................................................
i 1eg81 Notices " legal Notices
ccII Being first duly sworn, deposes and says that he/she is
f SALT}AKIJITof 1 ORDINANCE legal advertising clerk of the DESERET NEWS, a daily
pp �E!•�h1ca1°•'m"Fees) newspaper printed in the English language with general
16,S-9-J7RAIND A-9 18 OF THE SECTIONS
OF ; , circultin n Utah, and published in Salt Lae City,
SALT'LAKE CITY,UTAH 1965,AS AMENDED,REL TING TO ,
DI)fl (>F OF BUILDING
'ND-,HOUSING CODES. Salt Lake County, in the State of Utah.
ordained b the City Council of Salt lako CI Utahr
SECTION 1.ThatYSecfion 5.9•14 5.9.15$-9.16,S-9.17antl 5-
9-10 of the Reylsed Ordinances of i6it Lake City,Utah f965,as
amended,ree her to Division ended Building bndHousinp�odesbe, That the legal notice of which a copy is attached hereto
gnq_�he,sdme herebyV are amended as follows;
Sec:5.9.14.Resident�ol electrical fees.The following fees
for a permit for the Installation of electrical materials In rest-
denCes,pricludingmultl•opertmentbulldlnes,shall bepoldtothe OrCllnariCe NO 53 Of 1986
CN1!fireosgrer before any,permit Is valid: .........................................................................................
io The minjmUm Tee tor;, •'
r. a hlllhor remodel end additional circuits M
fb Service ch0nde lvtlf+t*2 new clrcul�s;or
(c Service change br'alteration $20.00 .............................................................................................
,�d Homeowner Ole ,al remodel permit 25.00
e)New reSidenhi for,homeowner permits see single
family schedule;._ii
(2)The squWlao area of new single family dwelling,as .............................................................................................
determfiferf from the bulldino permit,shall establish an electri-
cal permit fee as follows:
1a)Up to 1500 square feet,per square foot 0.03•
b)Per square foot above 1500 square feet 0.02
(3)Permit for total renovation of electrical systems In exist- ••••••••••••••••••"""•'•--""""'•""""••"""""""""""""""""'""""'
Ing single family dwellings 20.00
(4)Permit for total renovation of elecrlcol systems in multi-
unit apartment buildings shall be as follows: 20.00
a)One or two units .............................................................................................
b))Third antl fourth units,each 8:00
c)Additional units,Including house meter,each 4.00
(5)Inspection to advise on and appraise electrical systems
Inexlsting residences(consuping) was published in said newspaper on..................................
(6)Permits for mul l-unit apartments(excluding transient
ocruponcies such as hotel or motel which are classified as
commercial shall be established as rollows:
(a)First three units,per square foot 0.03 July 9, 1986
(b)Urift Pour throw h ten,each 8.00 .........
( ) p
c Units eleven antl above,each 4.00
(7)Projects Including multiple buildings and/or row-houses
shalt be computed for each bulIdirig or house separately.
(8)A power to panel with no Issue fee for single occupancy .......... iV�Adver
..................
bu050
Fogs $7.n- tising Clerk
For Indlvldugt gpgrfineMs In an apartmerN building,or con-
dominium units nor for occupancy an additional 3.00 fee for
each additional meter.
Sec.5.9.15.Fee for temporary meteringy.The fee for permit
for temporary metering and service facllltias shall be:
((1))Up to 100 amp load capacity $13.00
(2)Each additional,or part thereof,100 amp capacity 3.00
Sec.5.9-16.Commercial and Industrial fees.The fee to be
rld to the City Treasurer for electrical permit covering work In
Industrial or commercial properties shall be computed as fol-
lows:
(1)Minimum fee shall be: 20.00
(2)For new service,change of service,alterations or re-
pairs of 600 volt or less,capacity service entrance equipment,
fee shall be computed In accordance with the following:
((q))uP to 100 ampp 20.00 a me this ..........22n. .................................................. day of
(b3 101 amp to 200 amp 20.00
(c Each addtional 100 amp or fraction 3.00
(3�Fee for installation,alteration or repair of subfeeders,
includ ng supply taps from sub-feeders shall be computed in A.D. 19.86
accordance with the following table:
(a)Up to 30 am capacity,each 0.05
(b)31 amp to 60 amp capacittyy,�each 1.50
e 61 am to 100 amp capacity,each 3.00
d Each%0 amp,or haefIon,capacNY above 3.00 /
100 amp capacity
(6 "`""""" "
)The installation of transformers shall be subject to In• / 2
speetionfeewhensuchtransformersareanIntegralpartofthe r """"""""""""" """""""""""""
consumer's distribution system.Such fee shall be In addition to Notary Public
the regular system Inspection fee and shall be computed as
follows:
ITransformers up to 50 volt secondary NO CHARGE
51 volt to 240 volt secondary 1500
241 volt to 600 volt secondary 25:00
601 volt to 2300 volt secondary 65.00
Greater than 2300 volt secondary 95.00
(5)Ins llatlon of a motor generator for emergency or stands
by (a)Power up to 500 K VA 75.00 ��A� p y
b Above$00 KVA 125.00
(6)Alternate fee schedule.Electrical permit fees shall be
computed on the schedules set forth in this chapter and shall be
paid prior to work being started.When a fee cannot be comput• Kw
ad on the foregoing schedules It shall be computed as follows
up to,but not exceeding$100,900.00:
(a)$10,000.000 work
1 4%of tthhe total valuatation less than a •�a
(b)Where such work Is more than$9 999.99 but does
not exceed$100,000.00•$100.00+2/3 of 1%of volu-
atlon over 59,999.99.
�aF ul��
/11e Wxstad e11ecl Eleem work K'eCaeElefIW,000.00,eH 01" pZ"
MR fees shall be as tallow::
It thsre such work Is mare pion t00,000.OD buf IOM Mwn
fa30 00:f300+,7/0MI1s6ovar sl 110.
lal Vlnare auto work Is more Man s 50,000.00:f100+1/10
m 1%at all over faS0;11%00.
Sec SA•le.POwer ro panel permit far conskumlon put•
Oases only.A power ro ppnel pMm"shall OUMorlie Power for
construNlon purpoSH on a tempNary bosls only:permanent
Power must oe au"arlse.s9ParafelV.
P1 At me time pOvror ro panel Is reaulre.ro complete con-
Shumlon,me owner w a0mroctor shall apply tar an.a0taI.o
sePwma power ta ponel construction perm".Sala permit shal l
he van.fw a 60.ay perlo0.
la)ThIM.aV ekhmlons fw saI Pnerrm"maY be Isspuee.
puaayymeM of ooe-holf 6flllle-formal p— femme fat.and
s On. opp
wltntMlE uMli o rertlkflcale m cpc-"=is Iff-d.0..all be
accwrina molar ro the Issuance m a ceriNi'aro at ocoupan Y
situ resu"In 0 discontlnuonae of all power unto occupancy Is
apwoved or uMll accuponcy ceases.
all owe°o s.Wall 10 of power to panel construction parmlt
(sl Fees: panel anal ne.ieconflnue..
60.OY,no Issue fee f20.00
SECTION ae:This take effect thirty(30)
Passe ft.by first
C"V C-11 of Sa"Lake CRY,Utah,this 101h
.aY of June,1966.
Earl F.Hor"Ick
CHAIRMAN
ATTEST:
/s/Kathryn Marshall
CITY RECORDER
T,amm"te.ro MUVOr an J.q.20,19M.
Mavv's Action:
s/Polmer A.De
MAYOR
ATTEST:
/e/Kathryn M.rshpll
CITY RECORDER
VEAL)
II S3 at1966
OSs.ls
Puh'bheC.JNv 9,1996
S.. _.