SALT LAKE CITY ORDINANCE
No. 7 of 2000
(Amending Salt Lake City Ordinance No. 63 of 1999
which adopted the Final Budget of Salt Lake City,
including the employment staffing document,
for Fiscal Year 1999-2000)
AN ORDINANCE AMENDING SALT LAKE CITY ORDINANCE NO. 63 OF
1999 WHICH APPROVED, RATIFIED AND FINALIZED THE BUDGET OF SALT
LAKE CITY, UTAH, INCLUDING THE EMPLOYMENT STAFFING DOCUMENT,
FOR THE FISCAL YEAR BEGINNING JULY 1, 1999 AND ENDING JUNE 30,
2000.
PREAMBLE
On June 17, 1999, the Salt Lake City Council approved, ratified and
finalized the budget of Salt Lake City, Utah, including the employment staffing
document, for the fiscal year beginning July 1, 1999 and ending June 30, 2000,
in accordance with the requirements of Section 118, Chapter 6, Title 10 of the
Utah Code Annotated. Said budget, including the employment staffing
document, was not approved nor vetoed by the Mayor, but became effective by
operation of law under Section 10-3-1214 Utah Code Ann., 1953.
The City's Policy and Budget Director, acting as the City's Budget Officer,
prepared and filed with the City Recorder proposed amendments to said duly
adopted budget, including the amendments to the employment staffing
document, copies of which are attached hereto, for consideration by the City
Council and inspection by the public.
The City Council fixed a time and place for a public hearing to be held on
February 15, 2000 to consider the attached proposed amendments to the
budget, including the employment staffing document, and ordered notice thereof
be published as required by law.
Notice of said public hearing to consider the amendments to said budget,
including the employment staffing document, was duly published and a public
hearing to consider the attached amendments to said budget, including the
employment staffing document, was held on February 15, 2000, in accordance
with said notice at which hearing all interested parties for and against the budget
amendment proposals were heard and all comments were duly considered by
the City Council.
All conditions precedent to amend said budget, including the employment
staffing document, have been accomplished.
Be it ordained by the City Council of Salt Lake City, Utah:
SECTION 1. Purpose. The purpose of this Ordinance is to amend the
budget of Salt Lake City, including the employment staffing document, as
approved, ratified and finalized by Salt Lake City Ordinance No. 63 of 1999.
SECTION 2. Adoption of Amendments. The budget amendments,
including amendments to the employment staffing document, attached hereto
and made a part of this Ordinance shall be, and the same hereby are adopted
and incorporated into the budget of Salt Lake City, Utah, including the
employment staffing document, for the fiscal year beginning July 1, 1999 and
2
ending June 30, 2000, in accordance with the requirements of Section 128,
Chapter 6, Title 10, of the Utah Code Annotated.
SECTION 3. Certification to Utah State Auditor. The City's Policy and
Budget Director, acting as the City's Budget Officer, is authorized and directed to
certify and file a copy of said budget amendments, including amendments to the
employment staffing document, with the Utah State Auditor.
SECTION 4. Filing of copies of the Budget Amendments. The said
Budget Officer is authorized and directed to certify and file a copy of said budget
amendments, including amendments to the employment staffing document, in
the office of said Budget Officer and in the office of the City Recorder which
amendments shall be available for public inspection.
SECTION 5. Effective Date. This Ordinance shall take effect on its first
publication.
Passed by the City Council of Salt Lake City, Utah, this 15th day of
February , 2000.
CHAIRPER N
ATTEST:
CHIEF DEPUTY I E RDER
3
Transmitted to the Mayor on February 15, 2000
Mayor's Action: Approved Vetoed
MAYOR
ATTEST:
.„ M 1
Qia yF • 'AI
IEF D UTY CITY R C RDER \..'
(SEAL)
Bill No. 7 of 2000. /"a" ZO
Published: February 22, 2000 . 377. 6,^^--
G:\Ordina00\Amending budget 2-B.doc
4
Issue Request #1 — Police Asset Forfeiture Fund
Asset Forfeiture Fund — Fund Balance
The city should utilize available department Asset Forfeiture Funds to provide
additional equipment and training not included in the adopted budget for use by the department
in the following areas:
1) Supplies and equipment for Narcotic and Vice investigative
Units - $ 64,000
2) Training for Narcotic and Vice investigative units - $ 6,400.
3) Overtime for tactics training and additional investigative work
for Narcotic and Vice investigative units - $ 8,600
Asset forfeiture funds are received from property seized during enforcement of certain
illegal activities. Funds from this account may only be used for anti-drug efforts.
Fund Department/Category Decrease Increase
Asset Fund Balance (FB) $79,000
Forfeiture Personal Services(E) $8,600
Fund Supplies/Equipment(E) $64,000
Training (E) $6,400
Issue Request #2 — Olympics-Police Planning
General Fund - $72,500
One of the greatest challenges during the Olympics is providing adequate and efficient
public safety services for residents and visitors. The Utah Olympic Public Safety Command is
planning on a theater-wide basis. The City Police Department must translate that general
information into a detailed, computerized plan for each activity area in the city. The plan will
outline placement of staff (where, when, how many), allocate needed resources, identify
contingency plans, etc.
The police department is requesting $ 72,500 for four months funding of dedicated staff
for this planning.
The city should appropriate funds to provide salary and equipment costs of one
dedicated Captain and two dedicated Sergeants. These positions will be filled through
promotions within the Department. Funding is necessary to pay for the difference in salary as
a result of promotion and overtime to maintain current levels of "on-street" service at the
Police Officer level.
This funding is for the current year only, and continued support and costs will
be addressed in the FY 2000-01 budget.
3
Fund Department/Category Decrease Increase
General Fund Contingency (E) $72,500
Police personal services (E) $64,000
Police supplies & equipment(E) $8,500
Issue Request #3 — East-West Light Rail Coordinator
General Fund - $ 25,000
The City's interlocal agreement with UTA regarding the University Light Rail project
stipulates that UTA will reimburse the City for the costs associated with two positions identified
as an integration team who shall serve as the principal contacts for the City with UTA regarding
design and construction matters.
One of the positions is assigned to the Community and Economic Development
Department. They will increase their staffing by 1.00 and hire the person to serve as the
coordinator. They have received formal approval for their specific budget amount from UTA and
will reimburse the City irrespective of them receiving a full funding grant agreement.
The annual cost of the position is estimated at$58,100 and $25,000 for the remainder of
this fiscal year.
Fund Department/Category Decrease Increase
General Fund UTA Grant (R) $25,000
Personal Services (E) $25,000
Issue Request #4 — Airport
Airport Fund - $-43,474,400
Each year the Airport prepares a budget amendment to address upcoming capital
projects and incorporate those projects that will require expenditures or contract award prior to
June 30, 2000.
The attached exhibits provide detail of the requested budget decrease of$43,474,400.
Exhibit 1 lists all currently approved projects with revised cost estimates, which has resulted
in a requested increase of$452,400. Exhibit 2 shows revised expenditure estimates for the
New Development Program resulting in a reduction of$55,231,800, due to changes in
program phasing. Exhibit 3 provides a list with cost estimates and detailed descriptions and
justifications for the new project (FY 2000/2001) totaling $11,305,000 that will require
expenditures or contract award prior to June 30, 2000.
The Board Finance Committee met on January 13, 2000 and reviewed the budget
amendment in detail.
4
Fund Department/Category Decrease Increase
Airport Capital Improvements Projects(E) $452,400
Fund Development Program $55,231,800
Capital Improvement Projects FY00-01 $11,305,000
Issue Request #5 - Completed CIP Projects
-0- Net Budget Impact
CIP Fund
The City is requesting to close numerous cost centers and reallocate funds into the
current year CIP contingency fund cost center. The funds to be transferred are from CIP
projects that were completed under budget. It is proposed that these funds be reallocated and
be made available for use as contingency.
The source of reallocation funding is noted below. The completed CIP projects are
listed by their cost center, funding source, description and current remaining cash. The total
combined reallocation to CIP contingency would be $326,776.
Cost Description Decrease Increase
Center
83-00099 FY 2000 CIP Contingency G/F $326,776
83-87027 NW Quad Master Plan G/F $10,493
83-87041 Sport Complex/85 G/F $78,900
83-89005 Sidewalk, C & G: Emer. Repair G/F $1,789
83-89010 Traffic Safety Management G/F $30
83-91068 Boiler Room Automation G/F $1,672
83-93089 CBD Beautification G/F $1,245
83-94001 Sidewalk SID G/F $78,924
83-94006 Jordan River Parkway(Bike Path) G/F $2
83-94020 Local Streets(Emergency Light) G/F $6,772
83-94054 Fencing Old Landfill Site G/F $564
83-94077 Jordan River Trails PVT $14
83-95002 Jordan River Bridge G/F $752
83-95015 SBD Storage Shed G/F $406
83-95024 Dinwoody Park Fence G/F $3,200
83-95045 Raging Waters Repair G/F $10,153
83-96007 California Avenue Bridge G/F $1,129
83-96008 1300 South Bridge Rehabilitation G/F $19,324
83-96009 Irrigation Backflow Study G/F $1,000
83-96011 Pioneer Park Locomotive Study G/F $5,125
83-96018 N. Warm Springs, Demo &Grading G/F $3
5
83-96027 University Street Design G/F $13,364
83-96034 Odyssey House Property G/F $2,375
83-96037 Asbestos Removal Animal Control G/F $12,336
83-96046 Citizen Unloading Facility G/F $131
83-96114 Virginia Street G/F $1,931
83-97016 Local Streets Reconstruction Phase IV-A G/F $28
83-97031 Sunnyside Park Soccer PVT $114
83-97079 Facility Study—Downtown Depts. PROP.SALE $75,000
Issue Request#6-Class "C" CIP Projects for FY 2000-01
$3,595,000 Budget Impact
CI?Fund
The City is requesting that budgets be created for CIP projects to be funded from the
City's anticipated Utah State Highway User Funds(Class"C"revenues)for fiscal year 2000-
2001. As in the past,creating budgets for these projects early in the calendar year allows the
City to proceed with projects to obtain better construction bids and cost savings. Particularly
with the projects proposed for construction,an early start date allows the work to be
completed during the 2000 construction season instead of going through a winter season with
little or no construction effort. Experience has shown that construction projects bid during the
early part of the calendar year are generally bid at least 5% less than projects bid in the
summer months. A timesaving of up to one year can be realized by getting projects designed
early and ready for construction bidding.
CIP applications have been submitted to the CIP administrator for these projects,and a
brief description of each project is listed. These CIP projects are the top priority Class"C"
projects for fiscal year 2000-2001. They are contained in the CIP 5-Year Plan and 20-Year
Inventory of Capital Needs. These projects have been chosen based on City Engineering
Division criteria. Class"C"proposed projects are not included in the General Fund CIP
ranking process.
The source of funding is Class"C"revenue as noted below.No other funding sources
are required.
Streets Overlay/Street Micro-Surfacing
This budget request is to proceed with construction funding for street overlay and
micro-surface seal treatments to street pavements. This work will increase pavement life,
provide smoother street surfaces for improved rideablilty and improve the streetscape
appearance. ADA ramps will be constructed and some curb and gutter will be repaired. This
request also includes funding to design the fiscal year 2001-2002 overlay and micro-surfacing
project.
The following is a priority listing of streets to be overlaid and to receive the micro-
surfacing treatment. The streets were selected based on pavement condition and need by the
City's pavement management section in consultation with the Streets Division.
6
1. Pavement Overlays
STREET NAME FROM-TO LIMITS LANE MILES
Amelia Earhart Dr. Wright Bros. Dr. to east Cul-de-sac end 0.5
Challenger Rd. Harold Gatty Dr. to north Cul-de-sac end 0.5
Harold Gatty Dr. 5600 W to Jimmy Doolittle Rd 1.4
Neil Armstrong Rd. Amelia Earhart Dr. to north Cul-de-sac end0.6
Wiley Post Way Admiral Byrd Rd to Charles Lindbergh Dr 1.9
1700 South Redwood Rd to Jordan River 5.1
2100 South 900 E to 1100 E 1.2
300 West 900 S to 400 S 5.8
200 South 400 W to 200 W 2.2
2nd Avenue State St to Canyon Rd 0.2
"A" Street South Temple St to 1S` Ave 0.2
Cheyenne Street Indiana Ave to Arapahoe Ave 0.7
Concord Street 400 S to 300 S 0.4
9th Avenue "E" St to "G" St 0.6
2. Micro-surfacing
STREET NAME FROM-TO LIMITS LANE MILES
200 South 200 W to State St 2.8
200 West 500 S to 100 S 3.9
Pioneer Road - 1700 South to 2100 South
This phase is a continuation of work in progress from 1300 South to 1700 South. It
will reconstruct an existing west side collector road by replacing deteriorated pavement,
installing curb and gutter, and necessary storm drainage facilities. The existing street will be
widened. It will also be realigned between 1900 South and 2100 South.
This project will improve the rideability of a heavily traveled collector road in an
expanding west side industrial area and reduce current maintenance costs associated with
patching a deteriorated street.
2100 South - 900 West to Redwood Road
This project was recently approved for Federal Highway funding by Wasatch Front
Regional Council with construction funding of$5.6 million to be available in 2003. This
request will provide funding to select a consultant and prepare a design study report (DSR) and
environmental assessment to meet the requirements for Federal Highway funding. The DSR
must be funded by local funds. Also included in this request will be money for the City's
local match to complete the design of the project. The design phase of the project is eligible
for Federal funding.
This project consists of removing and replacing deteriorated pavement, curb, gutter,
sidewalk, and storm drainage, and includes traffic control features. The existing substandard
bridge over the Jordan River will also be replaced. A reconstructed 2100 South Street will
improve the traffic mobility to a new interchange to the I-15 freeway.
It is important to begin the consultant selection process as soon as possible so a
contract can be prepared allowing a consultant to prepare the DSR. The DSR and
environmental assessment must be approved before final design can proceed.
1300 South-1700 East to Foothill Blvd.
The purpose of this project that is currently being designed is to rebuild a deteriorated
street by removing and replacing pavement,curb,gutter,and sidewalk, and replacing storm
drainage,water and sewer facilities. The neighborhood appearance will be improved through
streetscape upgrades. This funding is necessary to provide the local match for Federal
Construction funding in the amount of$1,585,000,which will be available in October 2000.
Concrete Street Rehabilitation
The funding requested is part of an on-going project to extend the life of existing
concrete streets by doing slab replacement and joint repair and replacement. The funding
included,as part of this request will also provide additional left turn lanes on California
Avenue west of Pioneer Road.
700 South at Jordan River Bridge Replacement
This project will replace a structurally deficient bridge and therefore improve traffic
safety and access in the west side of the City. This funding is needed to prepare a design
study report and environmental assessment and provide the local match for a Federal Bridge
Replacement Grant.
1100 South at Jordan River Bridge Replacement
This funding request is to provide City matching money for a Federal Highway Bridge
Replacement grant. The bridge is structurally deficient and cannot be repaired to meet
structural and seismic requirements. Traffic safety and mobility will be improved after
construction of the new bridge.
Fund Department/Category J Decrease Increase
CIP CIP/Streets Overlay/Street Micro-Surfacing(R) $1,450,000
Fund CIP/Streets Overlay/Street Micro-Surfacing(E) $1,450,000
CIP/Pioneer Road-1700 South to 2100 South(R) $1,130,000
CIP/Pioneer Road-1700 South to 2100 South(E) $1,130,000.
CIP/2100 South-900 West to Redwood Road(R) $300,000
CIP/2100 South-900 West to Redwood Road(E) $300,000
CIP/1300 South-1700 East to Foothill Blvd.(R) $200,000
CIP/1300 South-1700 East to Foothill Blvd.(E) $200,000
CIP/Concrete Street Rehabilitation(R) $290,000,
CIP/Concrete Street Rehabilitation(E) $290,000
CIP/700 South Jordan River Bridge Replacement(R) $75,000
CIP/700 South Jordan River Bridge Replacement(E) $75,000
CIP/1100 South Jordan River Bridge Replcmt(R) $150,000
CIP/1100 South Jordan River Bridge Replcmt(E) $150,000
8
Issue Request #7 - Salt Lake Valley Solid Waste Facilities Survey
$100,000 Budget Impact
CIP Fund
The City should create a new cost center with a budget of$100,000 to continue the
required services currently being provided by the City's survey consultant at the Salt Lake
Valley Solid Waste Facility (Landfill).
The creation of this new cost center would satisfy the prepayment agreement with the
County. Per agreement with Salt Lake County, the City provides engineering services such as
survey, design, construction administration, etc. for projects at the Salt Lake Valley Solid
Waste facilities. In order to operate, the Environmental Protection Agency (EPA) has issued a
permit to the landfill. One of the permit requirements is the implementation of an operations
record plan. This requires that the location of refuse be documented on a weekly basis. This
budget is to continue the required services currently being provided by the City's survey
consultant. The City will pay the consultant, and the County will reimburse the City.
The source of funding is reimbursement by the County for services performed by the
City's survey consultant. No other funding sources are required.
Fund Department/Category Decrease Increase
CIP Survey at Salt Lake Valley Solid Waster Facilities (R) $100,000
Fund Survey at Salt Lake Valley Solid Waster Facilities (E) $100,000
Issue Request #9 - Memory Grove Restoration
-0- Net Budget Impact
CIP Fund
The City should create a new cost center with a budget of$16,668 to design restoration
elements at Memory Grove. This design is needed as a result of the tornado damage incurred
at Memory Grove last summer. The name of this new Cost Center will be "Memory Grove
Restoration Design".
The source of funding is the reallocation of the CIP project cost centers noted below.
There are no outstanding needs in the projects to be decreased, and this reallocation will result
in the closure of these funds. No other funding sources are required.
The current approved CIP projects are listed below by their cost center, current budget
and name. The total combined budget for the design project would be $16,668.
9
Cost Description Decrease Increase
Center
CIP Fund
Memory Grove Restoration Design $16,668!
83-00004 Park Facilities Fund-Rent G/F $9,822
83-91039 Memory Grove Memorial(Renter)G/F $368
83-95027 Memory Grove Curb&Gutter G/F $6,478
10
Grant Budget Amendment Items
Issue #1 - Adjustments
I. The following is an adjustment/correction to budget amendment#4 and pertains to a Police
Department carryover budget. A journal entry posting expenses of$16,957.00, from cost center
73-73001 to the general fund was not reflected on IFAS at the time information was prepared for
the carry over budgets in amendment#4. This action will increase the 73 cost center by
$16,957.00, which is the amount of expenses posted to the general fund.
^?,r, r�.- .:,r+ -,.,A`°>« ;,.,�a;Ez,i .,.iae �,:x.;e;,+z°;-.'., ��'...�.�,,�.<,�,.E.a�:.�i:,'.;�;'?�'+-�� e.�^'� 't'�''' +�''"'�,Nw
f�f„ , r f: ro .St",, 5 a , G�;iPt s ii ;`'-itA2s.,. 5„' ,s; 0,% g `' ,V;e `i';s "�6 t:s
f y'?��`gt� a z^�i v+h a�" �4«"''�s�r � „�.'�S,°N�'✓>',="a;I':� ya++. w y�°:.._ ,: ,� w,�r ,n;
41 C9git::4116,f,,A:4
t 7j��s Y YE« $, z' y 5 }w fE `'.F?1'Y'l ,v1`o-1 .A.:� ] r" ,e'�'""+:,-. n'lu+q' naEa k?t. -3` k `,1`yn �, ;xw w , e•,', . ",,,,,¢°*:•,'—. -1. .'- .zr � �� �.: 5t,,�?i� r1,5,,,'`�Z€„�,�°"«„� " �a'�),�, <� r,+ M ..4rt°'r r- �T""'."''�.i,-� F �+��"�'4�3 �°:�'�si;.,y�!�� �r„,.'�4. +,10�,�� ..ra.'' r,, *n.r.-;ti r '4 S7.�t,ast.b Ya ;,w,,z..., �n .'�i'iau sE�+'�'�a°'`i?,, 5�,''�� ii y,;T, Erb, M } }ffir. ti g-Ka 't "fat j �� t:.N,:f=. <-,,a,�4c r.,.? ,. ',�, . R .,n;.u.S'b<;^`1x�r"„4;W���i7"^'-F:a �4'�,'h.t"��?;'Za �?z�"���i'� '; ;�,ui�«rs`��*��?i�%�,t}'��'y�x�''i'� :,'v�TT.`.s�'�"r,���f: -. .� :c;,.�.xx':,,a.,��f;y,,.v+, �S
73-73001 Narcotics Evidence Trust Fund $16,957.00(E)
$16,957.00(R)
2. The following action decreases the budget of the Salt Lake Area Gang Project by
$215,079.00.
This grant is a multi-jurisdictional gang identification project for which the City has been the
lead agency. The grant administration, implementation, and remainder of funds have been
transferred by the projects Board of Directors to the Salt Lake County Sheriff's Office. This
was the agreement when the grant was applied for. All reimbursements and personnel costs
are now processed through the county system. The City's level of police service in the area of
gang enforcement remains unchanged, and will not be affected by the transfer of grant
administration to the County. The original Grant award was $265,000. Grant Number 97
Drug 37.
1 ^ein�'ti,t.e7;��,«,.'ai-": ";i.:'l5°r;�Eo�a x ..,r`s,•.r^.�r2;t�r'ar,.-` +�,.;,�,�.,,'-.v`�=;a:sf�'!r°;-;"•i-'�-`';-`�£1a.�-� ',:.,'.w x', ''�`y>��F,lay`��"���°R''°� '#a .?;?'.;�u.,�y., „Sxy�ra'-;tt'e";P�.rV'�"�^p'%H;t✓r�St:tai ,:f,..^aX�.�.4cy,e�,.t'�.rfi*.-.,•° -s°�`pr�.�'';s;'�.s'v*�,`:'.res�','��'*.;�:'� :_�;.;^i:, ;d�", }'+"'.,t r,..�g.�".., s�.as•.
y1F,.H F •�`a 1" .,n h v„3. Y'.2°'�?, „t.�1E .y, Yd, ! «? _
*,M;.,� 3� 4«'� �1,*,.`,''.�i {; n d �4'� ,�'v,f ,,� .,� �„a":;s:;(;ts,,a„Fk, `,,ry�'y:`S�r;..- :_,-`,e� .,,4d o x+a �;", -ri
l�{ 1«" "Q T ,* 6h{ �a 4V `y',Z4. .^�{` tiite$£Si"7c, q.0 VIM i 5
i s t .?t'''A i'• A_ '` 4 4'' n'es. '. "rt ;s, ,� , ; mix s1`'s�w`v,1,,.„-„,i- ti .a ^.'4w5. . ..ziitit
State of Utah(CCJJ) SL Area Gang Project-99-2000 $215,079.00(E)
(72-20003) $215,079.00(R)
3. The following action decreases the budgets of grants that have been terminated due to grant
completion, extension expirations, and/or project termination. All grant expenses have been
reimbursed and will not affect the general fund.
11
c0 G,17 II`(D$ kROJ CTS DECREASE
72-29805 Victims of Crime Act(VOCA) $409.00(E)
93-V OCA-17 $409.00(R)
72-299802 Victims of Crime Act(VOCA) $8,003.00(E)
97-VOCA-27 $8,003.00(R)
72-29809 Crime Scene Equipment $5,506.45(E)
96 DRUG-38 $5,506.45(R)
72-29903 Organized Crime Drug $850.00(E)
Enforcement WC-1JT078 $850.00(R)
72-29913 COPS in SHOPS $300.00(E)
410-99-18 $300.00(R)
72-29914 Internet Child Abuse $2,774.15(E)
8J51 $2,774.15(R)
4. The following action increases the budget for the Indian Walk-in Center by$16,000.00. This
is a 24'h Year CDBG,CIP project,with improvements to include renovations to the
entrance/vestibule,and to replace the existing windows with energy efficient windows. This
project was originally awarded funding in the amount of$29,783.00. The low bid received for
project was$35,606.00. The additional funding will allow construction contingency,permits,
testing,and engineering fees.
8 Pi
� 4
t•,{ .. u .<L.I.f.fi ,?a 3.x:.w..{.a.a�i,. '�s.nC2n'l�Lt L. '�� fi�C.��
24'h Year CDBG Indian Walk In Center $16,000.00(E)
(71-24048) $16,000.00(R)
24th Year CDBG CIP-Contingency $15,000.00(E)
(83-99098) $15,000.00(R)
24°i Year CDBG Operating-Contingency $1,000.00(E)
(71-24098) $1,000.00(R)
12
Issue #2 - Program Income
1. The following projects have received program income from repayment of loans. This action
will reallocate those funds back into the individual programs from which they were received.
4,ZiOrabOktilMV,4
iA*CRE,40?"
- •
,0 t•TaVi*M4,4'4: ;;.; •:;,,;
Loan Repayments Housing - CDBG $310,111.00(E)
(71-25010/78-25010) $310,111.00(R)
Loan Repayments Housing - Renter Rehab $115,218.00(E)
(72-00910/78-00201) $115,218.00(R)
Loan Repayments Housing - HOME $87,629.00(E)
(78-78325/72-72000) $87,629.00(R)
Loan Repayments I-lousing Trust Fund $192,000.63(E)
(72-17005) $192,000.63(R)
Loan Repayments Housing Trust Fund $68,139.91(E)
(72-17004) $68,139.91(R)
•
13
SALT LAKE CITY DEPARTMENT OF AIRPORTS
CAPITAL IMPROVEMENTS BUDGET AMENDMENT REVIEW SCHEDULE
FOR FISCAL YEAR ENDED JUNE 30,2000
- Estimated Revised f.,FY 1999: FAY 1999 FY,3000 ., -FY00 FY2000 >'.-
Completed Project Estimated Actual Budget .. Projected Budget Amend
Project Description - Project Cost Costs Request
Capital Improvement Program
Modify Elevated RGL and Install PAPI and REIL $1,287,700 $840,600 $832,900 $208,800 $454,800 $631,800 $177,000
Low Visibility Lights 1,097,900 926,200 195,600 21,000 902,300 905,200 2,900
Fire Alarm System Upgrade TU 1 325,400 350,000 302,600 258,400 47,400 91,600 44,200
Federal Express GSE Expansion 340,100 305,200 254,200 1,000 85,900 304,200 218,300
Un-interruptible Power Supply 1,001,500 1,001,500 701,000 630,500 281,800 371,000 89,200
Parking Lot Improvements 341,000 256,200 111,000 131,600 230,000 124,600 (105,400)
Shuttle Bus Shelters 605,000 307,100 307,800 267,900 297,200 39,200 (258,000)
Roof Replacement-North Support Bldg. 590,200 590,200 30,800 - 590,200 590,200 0
Executive Terminal HVAC Upgrade 260,000 237,200 2,000 10,000 258,000 227,200 (30,800)
Land Acquisition 212,000 212,000 - 212,000 212,000 0
Shuttle Facility Relocation 1,108,000 1,108,000 53,700 35,200 1,054,300 1,072,800 18,500
Economic Development Reserve 2,000,000 2,000,000 2,000,000 2,000,000 0
CIP Committee Reserve 1,500,000 1,183,400 1,500,000 1,192,900 (307,100)
South Gate Charters Baggage Remodel - 316,600 9,500 0 307,100 307,100
Security Fence Upgrade,Phase II 125,000 125,000 500 125,000 124,500 (500)
CCTV System Modifications and Upgrade 699,800 699,800 - 699,800 699,800 0
Widen 2200 North and 4000 West 3,880,000 3,045,000 2,186,300 424,000 1,693,700 2,621,000 927,300
Airfield Emergency Access Road Relocation 1,236,000 1,015,000 - 1,236,000 1,015,000 (221,000)
Extend Airport Roadway-TVA 372,000 262,000 1,500 1,300 370,500 260,700 (109,800)
TVA New Apron&Connecting Taxiway 237,000 319,100 147,000 1,900 90,000 317,200 227,200
Relocate Electric Vault-TVA 455,000 353,000 276,000 17,200 179,000 335,801 156,801
Realignment of Taxiway A-TVA 313,000 537,300 151,900 2,600 161,100 534,700 373,600
Taxiway S Reconstruction 3,215,000 1,593,200 139,000 220,300 3,076,000 1,372,900 (1,703,100)
CCR and Circuit Modifications 342,000 449,000 31,000 - 311,000 449,000 138,000
Runway Guard Light Upgrade-Phase II 1,838,000 2,346,000 - 1,838,000 2,346,000 508,000
Emergency Access Road Improvements Phase II 1,057,000 1,057,000 1,057,000 1,057,000 0
� rFaClMlx4ve rent gk , =.° , 24- , , ,21 435 . $,, .r'f2000. z{,"S 24- IQ „ , �1 5r#"itl0PA. W ,..
New Development Program
Program Manager $ 2,000,000 $ 2,000,000 $ 1,549,800 $ 5,090,000 $ 2,160,000 $ (2,930,000)
Master Architect 10,250,000 10,250,000 12,667,300 20,980,000 2,151,400 (18,828,600)
Temporary Commuter Facility 1,680,000 (1,680,0001
Site Prep for New Apron Paving 9,600,000 600,000 99,800 9,000,000 7,316,000 (1,684,000)
Apron Pavement and Drainage-Phase I 0 26,382,000 17,883,000 (8,499,000)
Aircraft Deicing Apron-West Side 6,698,000 16,698,000)
Hydrant Fueling System-Phase I 7,947,000 17,947,000)
Surface Parking Site Preparation-Phase I 1,500,000 200,000 1,000,000 80,000 1920,000)
Long Term Parking Lot Modification-Phase 1 6,288,000 (6,288,000)
Retail Consultant 275,000 275,000 128,200 100,000 100,000 0
Owner Controlled Insurance Program 2,460,000 2,460,000 1,887,500 2,370,000 3,492,800 1,122,800
Program Support 750,000 750,000 453,300 1,000,000 120,000 1880,000)
1$ub Total[Sevelopment Program` `: r _ $'26 835 000``$; 16,535 000. S 6,785;900, 3 .88;635 OOLT3,$".33,303 200 %S (55; 33 8003
New Projects FY2001
UDOT Ramp Reconstruction S 260,000 S 260,000 S 260,000
Computer Access Security System(CASS)Upgrade 500,000 500,000 500,000
Fixed Based Operator(FBO)Relocation-TVA 600,000 600,000 600,000
Fuel Tank Relocation&Containment-TVA 86,000 86,000 86,000
Water System-TVA 188,000 188,000 188,000
General Aviation Drainage Correction 178,000 178,000 178,000
Drainage Correction-Airport II 222,000 222,000 222,000
TU-1 Facility Upgrades 1,206,000 1,206,000 1,206,000
CASS Gate-North Boundary 76,000 76,000 76,000
Security Fence-TVA 185,000 185,000 185,000
PFC
Deicing Drainage Improvements 1,993,000 1,993,000 1,993,000
AIP Dependent
R/W 16L/34R Storm Drain Improvements Phase I&II 2,029,000 2,029,000 2,029,000
Taxiway P Extension 1,533,000 1,533,000 1,533,000
Land Acquisition(RPZ/RWY Construction)-TVA 2,249,000 2,249,000 2,249,000
Sub To41 Cip'°Y Z00Q/20b?. r-1> 11 305 000:::S - S ,, ;: § ..;$- :1:305 00Q $ 11 05,00p.'
Tote(Bt[dget Am*nt ,,,.,_e!gtiesff:-,v.:. $. `;35743,6O S A8,70,800 $&,.22,259;300 $ , 99027,5o(t $ ,A07g288y0A0 4„y`63$'! $00, $ {3,g7+fr'940J