072 of 2008 - modifying certain permit fees in the Salt Lake City Code •
0 08-1
0 08-26
SALT LAKE CITY ORDINANCE
No. 72 of 2008
(Modifying Certain Permit Fees)
AN ORDINANCE MODIFYING CERTAIN PERMIT FEES IN THE SALT LAKE
CITY CODE.
WHEREAS, the Salt Lake City Code sets forth certain fees for various permits issued by
the City; and
WHEREAS, the Salt Lake City Council adopted Ordinance No. 42 of 2008 increasing all
planning, zoning,building permit and related fees; and
WHEREAS, after further review the City administration has recommended further
modifications of certain of those fees; and
WHEREAS, the City Council finds that this proposal is in the best interests of the City;
Now, Therefore,be it ordained by the City Council of Salt Lake City, Utah, as follows:
SECTION 1: Section 14.32.405 of the Salt Lake City Code shall be and hereby is
amended to read as follows:
14.32.405 Public Way Improvement Fees:
The city engineer shall charge, and the city treasurer shall collect, upon issuing a permit,
the following fees for review of the application and site inspection of public way improvements:
A. Curb and gutter $1.70 per linear foot
B. Sidewalk, driveway approach $0.30 per square foot
Minimum charge:
April 1 -November 15 $138.00
November 16 - March 31 $205.00
C. Permit extension $55.00
D. For in kind replacement of existing sidewalk, curb and gutter, or driveway
approach, a no charge permit will be issued.
E. Where any of the foregoing subsections specify a higher fee rate for any period,
such higher fee shall be applicable if any portion of the work is completed during the higher fee
period.
SECTION 2: Section 21A.46.160(4)(c) of the Salt Lake City Code shall be and hereby is
amended to read as follows:
c. Fee: The fee for demolishing a nonconforming billboard shall be $111.00.
SECTION 3: Section 14.40.030 of the Salt Lake City Code shall be and hereby is
amended to read as follows:
14.40.030 Permit-Application And Fee:
All applications for permits to erect poles must be in writing addressed to the director of
public services, must be signed by the person desiring to erect the poles therein specified, must
state the place or places where it is desired to erect poles, and must be accompanied by a fee of
$1.70 for each pole,permission to erect which is applied for. Such application must be left with
the director of public services and be filed in his/her office.
SECTION 4: Section 14.32.400 of the Salt Lake City Code shall be and hereby is
amended to read as follows:
14.32.400 Excavation Permit Fees:
2
A. The city engineer shall charge, and the city treasurer shall collect, upon issuing a
permit, the following fees for review of the application and site inspection of:
1. Excavation:
a. Hard-surfaced $0.30 per square foot
b. Other $0.20 per square foot
Minimum Charge:
April 1 -November 15
Hard-surfaced $138.00
Other $90.00
November 16 - March 31
Hard-surfaced $205.00
Other $133.00
2. Multiple Utility Excavation: Minimum fees shall be in accordance with the following
schedule, if the distance between excavations does not exceed one block (660 feet) along the
same street:
Minimum Charge:
April 1 - November 15
Hard-surfaced $89.00
Other $50.00
November 16 -March 31
Hard-surfaced $138.00
Other $80.00
3
3. Portions Of The Public Way To Which Excavation Restrictions Apply: Excavation
permits for portions of the public way to which excavation restrictions apply, when permitted
pursuant to the provisions of this chapter, shall be issued only upon written authorization of the
city engineer and the permit fees shall be two (2) times the normal rates published in this section.
The city engineer may also require persons working in such portions of the public way to employ
extraordinary measures in restoring said street such as applying seal coat or other surface
treatment to maintain the overall integrity of the surface. The value of such extraordinary
measures may, in the discretion of the city engineer,be used to offset the additional fees.
4. Poles And Anchors: Poles and anchors, $42.00 each pole or concrete pedestal or
anchor.
B. Where any of the foregoing subsections specify a higher fee rate for any period,
such higher fee shall be applicable if any portion of the work is completed during the higher fee
period.
C. Permit extension: $55.00. The city engineer may deny this extension when work
is not proceeding on the project in a satisfactory manner.
SECTION 5: EFFECTIVE DATE This ordinance shall become effective upon the date
of its first publication.
Passed by the City Council of Salt Lake City, Utah this !- day of
Alevitzt— , 2008.
kwL
CHAIRPERSON
ATTEST:
ett/i)verroAceke„
' CITY RECORDER
Transmitted to Mayor on 8-26-08
PP
Mayor's Action: 7 Approved. Vetoed.
Vit 1 0
e,-,r
MAYOR •
ATTEST:
ITV C ERA'` r`'0'R�"""`%. APPROVED AS TO FORM
'_.tECIn. S,� - t Lake City Attorney's Office
� e —( —O/ A
(SEAL) ,-
Bill No. 72 of 2008. ,,'�i, '"' `T.!' +'
Published: 9-6-08 . '��o,�� P"
HB_ATTY-#4908-v I-Modifying_Certain_Permits_and_Fees.DOCy
5