Transmittal - 4/11/2022ERIN MENDENHALL DEPARTMENT of INFORMATION
Mayor MANAGEMENT SERVICES
AARON BENTLEY
Director
SALT LAKE CITY CORPORATION
451 SOUTH STATE STREET, ROOM 445 WWW.SLC.GOV
P.O. BOX 145487, SALT LAKE CITY, UTAH 84114-5487 TEL 801.535.7712 FAX 801.535.6269
CITY COUNCIL TRANSMITTAL
_____________________________ Date Received: _________________
Lisa Shaffer, Chief Administrative Officer Date sent to Council: _____
______________________________________________________________________________
TO: Salt Lake City Council DATE:
Dan Dugan, Chair
FROM: Aaron Bentley, Director of Information Management Services
__________________________
SUBJECT: Funding Our Future Quarter 1 & 2 Update
STAFF CONTACT: Christianna Johnson, Civic Engagement Specialist,
christianna.johnson@slcgov.com, 801-599-3323
DOCUMENT TYPE: Information Only
RECOMMENDATION: Per Council request, the Administration is providing an update on
Funding Our Future staff, programs, and projects. Staff welcomes any questions and comments
that this information may raise for Council Members.
BUDGET IMPACT: None
BACKGROUND/DISCUSSION: Funding Our Future Quarters 1 and 2, from July 1st to
December 31st 2021, continued to present challenges for Salt Lake City government, residents,
and visitors. However, City leadership and staff are funding programs and working with partner
organizations to help the most vulnerable in our community. For example, housing assistance (at
the City level, augmented by federal American Rescue Plan dollars) is supporting people in
weathering the continued financial impacts of COVID. Another case is how Salt Lake City, in
collaboration with the Utah Transit Authority (UTA) launched the UTA On Demand ride service
in the City’s Westside neighborhoods. Funding Our Future—including the many ongoing street
reconstruction bond projects—is a crucial piece of how Salt Lake City is focused on our growth,
our environment, our community, and our City family.
Funding Our Future sales tax revenue continues to support programs and staff in the areas of
housing, transit, streets, and neighborhood safety:
1
Lisa Shaffer (Apr 11, 2022 14:59 MDT)04/11/2022
04/11/2022
ERIN MENDENHALL DEPARTMENT of INFORMATION
Mayor MANAGEMENT SERVICES
AARON BENTLEY
Director
SALT LAKE CITY CORPORATION
451 SOUTH STATE STREET, ROOM 445 WWW.SLC.GOV
P.O. BOX 145487, SALT LAKE CITY, UTAH 84114-5487 TEL 801.535.7712 FAX 801.535.6269
Housing
•Staff
o The Census concluded in October 2020. Therefore, the The Mayor Office’s
Census Coordinator position changed focus to do more general community
outreach work for the Mayor’s Office. The person who has been in this
Coordinator position since it was created has recently moved to another position
in the City, so this Mayor’s Office position currently needs to be filled.
o The Housing and Neighborhood Development’s (HAND) Community
Development Grant Coordination Administrator has continued to oversee
administration of Funding Our Future housing programs.
o The Planning Division’s Additional Planner has focused on housing-related
zoning issues (such as the affordable housing overlay and ADUs).
•Programs
o The Housing Stability Division (formerly known as HAND) continues to work
closely with community partner orgnaizations to assist with deployment of all
housing programs. They continue to work to deploy all available funds into the
community with programs like House 20, Rent Assistance, Mortgage
Assistance, Down Payment Assistance, and more.
o A newer program is the Fair Tenant Program administered by People’s Legal
Aid. This nonprofit is dedicated to defending and advancing the rights of low-
income debtors and tenants within the state of Utah unable to afford an attorney.
Salt Lake City is the number one filer for eviction actions in the state, and in 95%
of eviction cases the landlord is represented; less than 10% of tenants are
represented. The Fair Tenant Program provides attorneys for each eviction action
filed in Salt Lake City.
o The Redevelopment Agency (RDA) closed on a previous loan and disbursed
$1,590,000 of Funding Our Future dollars to the Colony B affordable housing
development located at 228 West 1300 South in October of 2021. This is a key
part of Developing Affordable Housing. The development will have 140 units,
with 106 units ranging from 25% AMI – 50% AMI and 34 market rate units. The
project broke ground in October of 2021 and is expected to be completed in 2023.
o Community Land Trust funds have been recaptured for other housing programs
that align with Funding Our Future.
Transit
•Staff
o The Transportation Division’s Transit Planner continues to update an online
transit dashboard featured on the Funding Our Future website. The Planning
Division’s Planner has worked on transit-related zoning issues (Fleet Block
zoning, updated parking regulations, and creation of a new form-based zoning
district—intended to replace auto-oriented commercial zoning districts, such as
CG, and M-1 zoning in relative close proximity to downtown).
o The Transportation Division’s Transportation Engineer and Engineering
Division’s Project Engineer have managed projects related to Funding Our
Future, particularly complete street transformations that combine bond
2
ERIN MENDENHALL DEPARTMENT of INFORMATION
Mayor MANAGEMENT SERVICES
AARON BENTLEY
Director
SALT LAKE CITY CORPORATION
451 SOUTH STATE STREET, ROOM 445 WWW.SLC.GOV
P.O. BOX 145487, SALT LAKE CITY, UTAH 84114-5487 TEL 801.535.7712 FAX 801.535.6269
o reconstructions with Frequent Transit Network (FTN) corridor infrastructure,
such as 200 South and 600/700 North.
o The Civic Engagement Team’s Civic Engagement Specialist, within IMS, has
managed updates and supported engagement for Funding Our Future projects.
The person in the Civic Engagement (CE) Specialist position since 2019 has
recently moved to another position within the City; this CE position has been
filled internally.
•Programs
o The Transportation Division continues to work on implementing Bus Stop
Improvements. On 500 East, 2100 South and 200 South, bus pads were poured.
Amenities are then installed by Utah Transit Authority (UTA). On 2100 East, half
of the pads were completed in summer of 2021. South Temple bus improvements
will be built once 2100 East is complete. Other transit capital improvements are
still in planning stages as part of larger studies and street reconstructions, such as
300 West, 600/700 North, 200 South, and the Local Link Study.
o Frequent bus service is available on UTA Routes 2, 9 and 21. Service on these
routes operates from 4 am to midnight. Ridership on transit continues to recover
from COVID. UTA even implemented a new late-night service pilot in Salt Lake
City through their on-demand provider, Via; this Salt Lake City-specific service
was available during the summer of 2021 and complemented the Frequent Transit
Network (FTN) well. Another transit service addition was UTA On Demand rides
in Salt Lake City’s Westside neighborhoods. This service launched on December
13, 2021.
o FTN Brand Development was restarted, with staff developing finalized versions
of potential names, logos, colors, and more. They anticipate one more round of
public engagement. Transportation continued coordinating development with
transit along FTN corridors after gaining developer input about how to promote
the value of an “adopt-a-stop” program.
o COVID led to increased work in Westside neighborhoods, with businesses such
as Amazon, Netflix and UPS experiencing steep growth in demand for their
services. TMA Development continues as the need for convenient, affordable
transportation options is greater than ever. Salt Lake City staff and partners
developed Westside Equity Study lessons learned, and used it as basis for a Utah
Department of Transportation equity program. The Research Park TMA process
is ongoing.
Neighborhood Safety
•Staff
o Salt Lake City Police Department (SLCPD) funding and programs are ongoing,
and there are continuing efforts to maintain staffing levels as employees have
separated employment from the Department. As of December 2021, 49 of 50
Funding Our Future-funded Police Officer positions were filled.
o The Additional Police Personnel positions—needed civilian personnel related to
the increased police officers—continue to be filled. These positions have provided
support in records, crime lab, social work, data analysis, etc.
3
ERIN MENDENHALL DEPARTMENT of INFORMATION
Mayor MANAGEMENT SERVICES
AARON BENTLEY
Director
SALT LAKE CITY CORPORATION
451 SOUTH STATE STREET, ROOM 445 WWW.SLC.GOV
P.O. BOX 145487, SALT LAKE CITY, UTAH 84114-5487 TEL 801.535.7712 FAX 801.535.6269
•Programs
o All SLCPD equipment has been purchased.
o The Salt Lake City Fire Department (SLCFD) also received Funding Our Future
funds for 3 new fire vehicles in 2020. These funds will be leveraged with VW
grant funds, which likely will not be available until 2022.
Streets
•Staff
o Coordination between each Streets Division’s Streets Crew is continuing to
improve. The hard-working Streets crews resurfaced more roads than ever during
the 2021 construction season.
o Indeed, the Streets crews hit their stride during the 2021 calendar year. They
finished over 62 lane miles of chip seal, 9 lane miles of inlay, and 82 lane miles of
slurry seal, totaling over 153 lane miles of surface treatments during summer of
2021.
Progress also continues with Capital Improvement Program (CIP) projects using Funding Our
Future funds and street reconstruction projects funded by the 2018 voter-approved General
Obligation Funding Our Future bond:
•Capital Improvement Program (CIP)
o Funding Our Future sales tax dollars continue to fund ongoing CIP Projects in
Salt Lake City. The specific CIP projects funded are primarily improvements to
the public way, enhancing other Funding Our Future transportation and street
projects. Multiple projects started construction in 2021 or are scheduled for later.
•Street Reconstruction
o Salt Lake City is currently planning on four bond issuances. The first $20 million
installment of the $87 million street reconstruction general obligation bond was
sold in October 2019. The second installment of $20.5 million was sold in
September of 2020. Transportation and Engineering staff tailored engagement and
planning for each project based on the community affected and the impact of
reconstruction. 300 West, the largest bond project, started construction in 2021.
900 South also started construction in 2021.
o All upcoming Street Reconstruction Projects can be found on the bond map and
larger project map on the Funding Our Future website. Capital City News, Salt
Lake City’s regular news update by SLCtv, also completed a construction update
in every episode. Staff also posted a weekly social media update (and responded
to all comments and questions) about the extensive construction throughout 2021.
PUBLIC PROCESS: None
EXHIBITS:
1) Funding Our Future Quarter 1 and 2 Update
4
Funding Our Future
Years 1, 2, 3 & 4
Quarters 1 & 2
July 1 - December 31 | 2021 5
Overview
Funding Our Future Quarters 1 and 2, from July 1st to December 31st 2021, continued to present
challenges for Salt Lake City government, residents, and visitors. However, City leadership and
staff are funding programs and working with partner organizations to help the most vulnerable in
our community. For example, housing assistance (at the City level, augmented by federal American
Rescue Plan dollars) is supporting people in weathering the continued financial impacts of COVID.
Another case is how Salt Lake City, in collaboration with the Utah Transit Authority (UTA) launched
the UTA On Demand ride service in the City’s Westside neighborhoods. Funding Our Future—
including the many ongoing street reconstruction bond projects—is a crucial piece of how Salt Lake
City is focused on our growth, our environment, our community, and our City family.
6
Housing Critical Need Area
Overview: As Salt Lake City residents continue to work to recover from the ongoing
effects of the COVID pandemic, funding for housing programs like rental assistance
and mortgage assistance is always critical in assisting some of our community’s most
vulnerable community members.
Staff, like the Community Development Grant Administrator and the Planner, manage
housing programs and address staff capacity on zoning issues related to housing,
such as the affordable housing overlay. Other staff, like the Census Coordinator, had
their work shift. As the last update noted, the Census concluded in October 2020.
Therefore, the Census Coordinator changed focus to do more general community
outreach work for the Mayor’s Office. The person who has been in this Coordinator
position since it was created has recently moved to another position in the City, so
this Mayor’s Office position currently needs to be filled.
The Redevelopment Agency (RDA) closed on a previous loan and disbursed
$1,590,000 of Funding Our Future dollars to the Colony B affordable housing
development located at 228 West 1300 South in October of 2021. The development
will have 140 units, with 106 units ranging from 25% AMI – 50% AMI and 34 market
rate units. The project broke ground in October of 2021 and is expected to be
completed in 2023. Meanwhile, through the 2021-2022 budget process, $2,590,000
in sales tax funding was transferred to the RDA for the Housing Development Trust
Fund (HDTF). These funds were included as a part of a competitive Notice of Funding
Availability (NOFA) for affordable housing projects totaling $5.3 million released in
September of 2022. In December of 2022, the Board awarded the funding to four
projects, as follows:
- Silos on 5th at 425 West 500 South – 106 Units
- 144 South Apartments at 144 South 500 East – 110 Units
- The Nest at 382 Rio Grande – 220 units
- Schmidt Apartments at 1265 South 300 West – 159 Units
Funding Our Future supports several housing assistance programs
administered by local nonprofits and partner organizations.
Outcomes: See program tables below for details.
FY 18/19 FY 19/20 FY 20/21 FY 21/22
Dept/Division Position Description Budget FTE Budget FTE Budget FTE Budget FTE
STAFF
Mayor’s Office Coordinator Support general community outreach. $80,000 1 $80,000 1 $83,310 1 $83,310 1
CAN/Planning Planner Help staff capacity on zoning issues. $101,161 1 $107,333 1 $118,794 1 $118,794 1
CAN/Housing
Stability
Community
Development
Grant
Administrator
Oversee the administration of Funding
Our Future housing programs, including
application, contracting, reporting, and
processing payments.
$99,408 1 $98,963 1 $98,963 1
^ In September of 2021, the Salt Lake City
Housing Stability Division team toured
Wasatch Community Gardens’ Sprouts
Studios, which are affordable and net-zero
micro units. They also helped clean up the
garden.
The Salt Lake City Housing
Stability Division has worked to
support the larger community
during the ongoing economic
impacts of the COVID pandemic
- helping provide rent assistance,
mortgage assistance, utility
assistance, and more.
7
FY 19/20
Organization Program Outcomes Budget Spent
FY 19/20 PROGRAMS
Alliance House Rent Assistance Total number of individuals placed in housing: 6
Total number of individuals who received rent, deposit, rental application fee
assistance: 27
Total number of individuals who received case management services: 27
$40,000 $32,291.54
CDCU Down Payment Assistance Total down payment assistance granted: $27,000
Total households granted down payment assistance: 2
$133,000 $117,200
First Step House Housing Case Management Number of households granted short-term rental assistance: 17
Number of households granted deposit assistance: 64
Number of households granted rental application fee assistance: 116
Number of clients granted case management services: 80
Other services provided by this grant: 95
$385,000 $384,575.36
Housing Authority Landlord Assurance Increased # of new landlords agreeing to participate: 100
Number of households maintaining housing: 57
Amount of property damage paid to landlords: $32,232.66
Amount of attorney and court costs paid: $2,074
Amount of rent paid to landlords as eviction prevention: $66,222.85
$350,000 $348,300.01
International Rescue
Committee (IRC)
Emergency Rental Assistance Total rental assistance granted: $15,000 $15,000 $15,000
Down Payment Assistance Number of individuals granted down payment assistance: 1
Number of individuals completed Home Purchase Workshop: 10
Total down payment assistance granted: $37,602.34
$122,000 $60,385.43
Utah Community Action
(UCA)
Landlord/Tenant Mediation Total number of individuals assisted into housing: 39
Number of households that received direct mediation: 25
Total number of households that avoided eviction orders: 25
$300,000 $236,284.59
NeighborWorks Down Payment Assistance Total down payment assistance granted: $45,000
Number of individuals granted down payment assistance: 3
$45,000 $45,000
The Road Home House 20 Total unduplicated participants: 7
Total participants: 23
$250,000 $250,000
Shared Housing Total number of individuals placed in shared housing: 24
Total number of landlords agreeing to participate in Shared Housing: 53
$100,000 $97,243.02
Volunteers of America Intensive Case Management Total number of individuals housed: 2
Total number of individuals receiving case management services: 30
$100,000 $99,648.30
YWCA Rent Assistance for Children
in Transitional Housing
Number of households housed: 2
Number of children receiving services from
The Children’s Advocacy and Intervention Program: 10
$60,000 $60,000
Salt Lake City - Housing
Stability
Community Land Trust Funds recaptured for other housing programs that align with FoF.$500,000 $0
NOTE: Due to the extremely competitive housing market, IRC’s contract was amended to extend the contract term to June 30, 2022. Housing
Stability also amended the Down Payment Assistance amount to range from $5,000 to $50,000 to provide more of an opportunity for diverse low
income buyers to close on a home in the city. UCA will continue to deploy funds into the community. With the increased funding sources, due to the
pandemic, UCA requested a contract extension to assist with spend down. The contract expiration date has been extended to June 30, 2022.
All other program contracts expired in 2021.
FY 18/19
Organization Program Outcomes Budget Spent
FY 18/19 PROGRAMS
Utah Community Action Incentivized Rent Total number of households given rental assistance during
entire grant period by UCA: 117
$458,078 $440,510
NOTE: All contracts from FY 18/19 have now expired.
8
FY 20/21
Organization Program Outcomes Budget Spent
FY 20/21 PROGRAMS
Alliance House Clubhouse Model Assistance Number of individuals who received rent/utility and or deposit assistance: 2
Number of individuals who received case management services: 2
Number of individuals moved to a permanent housing voucher: 2
$43,147 $0
Asian Association of Utah Mortgage Assistance Amount of assistance provided: $0 $50,000 $0
Rent Assistance Households received rent/arrears assistance: 1
Households received case management : 1
Number of months rent assistance received: 2
Amount of assistance received: $1,251
$125,000 $0
CDCU Mortgage Assistance Amount of assistance provided: $0 $500,000 $0
International Rescue
Committee
Emergency Rental Assistance Number of clients who received rental assistance: 0 $39,797 $0
Down Payment Assistance Amount of assistance provided: $0 $147,239 $0
Odyssey House Rent Assistance Number of households granted rent assistance: 25
Number of households granted utility assistance: 1
Number of households receiving case management services: 19
Amount of assistance: $1002.00
$100,000 $58,146.41
People’s Legal Aid Fair Tenant Program Number of households receiving consultation (eviction): 50
Number of households receiving consultation (housing related debt collection):
6
Number of households receiving legal representation: 99
Number of households that avoided eviction orders: 61
$88,000 $15,822.92
UCA Landlord Tenant Mediation Number of households/individuals assisted into housing: 0
Number of households received case management: 0
300,000 $0
McKinney-Vento Program Number of McKinney-Vento eligible households: 0 $187,079 $0
Rapid Rehousing Amount of assistance provided: $0 $225,386 $0
NeighborWorks Down Payment Assistance Number of individuals granted down payment assistance: 0 $152,761 $0
The Road Home House 20 Expansion Number of individuals assisted: 23
Number of new individuals enrolled: 7
Number of individuals currently housed: 17
Number of individuals received case management services: 23
Number of individuals to permanent supportive housing subsidy: 2
Number of months of assistance provided: 13
Amount of rental assistance: $8,793.60
$250,000 $63,410.74
Landlord Assurance Program Number of landlords agreeing to participate: 3
Number of landlords provided with assistance: 3
Number of households maintaining housing: 3
Amount of property damage paid to landlords: $1,625.71
Amount of additional deposits paid to landlords: $876
$53,000 $2,501.71
Palmer Court Case Management Number received case management services: 268 individuals/179 households
Number of households received supportive services: 179
Number of individuals/households remained housed: 175
Number of households who increased income/benefits: 9
$227,812 $57,532.92
Progressive Rental Assistance Number of individuals/households who received rental assistance: 82
Number of individuals/households who received utility assistance: 48
Number of individuals/households who received case management: 82
Total number of months rental assistance received: 140
Number of individuals/households who increased their income/benefits: 3
$476,858 $73,881.93
Shared Housing Number of individuals matched with roommates: 12
Number of individuals successfully housed: 12
Number of individuals who received financial assistance: 35
Number of individuals who received case management: 42
Number of individuals that received landlord/tenant support: 1
$162,000 $0
9
FY 20/21
Organization Program Outcomes Budget Spent
FY 20/21 PROGRAMS (CONTINUED)
VBH Rental Assistance Number of households received rental assistance: 11
Number of households received case management services: 11
Number of months rental assistance received: 1-3
Amount of assistance provided: $10,056.00
$17,500 $0
VOA Case Management for Women Number of individuals housed: 1
Number of individuals receiving long-term physical and behavioral health
treatment: 14
Number of individuals receiving case management: 14
Percent of case managed individuals that are housed: 6.7%
$199,773 $1,600
YWCA Rent Assistance for Women and
Children in Transitional Housing
Number of households/individuals assisted into housing: 4
Number of households received case management: 4
$54,648 $5,595
Salt Lake City - RDA Developing Affordable Housing Colony B - 106 units will be deed-restricted at 50% AMI or below $2,590,000 $1,340,000
FY 21/22
Organization Program Outcomes Budget Spent
FY 21/22 PROGRAMS
Alliance House Clubhouse Model Assistance Number of individuals assisted into housing: 1
Number of individuals who received rent/utility and or arrears, deposit
assistance: 11
Number of individuals who received case management services: 20
Number of individuals moved to a permanent housing voucher: 2
$43,147 $16,837.86
Asian Association of Utah Mortgage Assistance Amount of assistance: $1,350.92
Households received mortgage assistance: 1
$50,000 $991.71
Rent Assistance Households received rent/arrears assistance: 17
Households received case management : 11
Total Amount of Rental Assistance: $6112
$125,000 $21,117.61
CDCU Mortgage Assistance Amount of assistance: $5000
Households received mortgage assistance: 1
Mortgage assistance provided as a grant: 1
$500,000 $7,053.65
International Rescue
Committee
Emergency Rental Assistance Number of clients who received rental assistance: 0
Number of clients who received case management: 11
$39,797 $0
Down Payment Assistance Number of individuals granted down payment assistance: 0
Number of individuals that completed Homebuyer Education Course: 0
Amount of assistance provided: $0
Number of families enrolled in Home Purchase Program: 11
$147,239 $0
Odyssey House Rent Assistance Number of households granted rent assistance: 33
Number of households granted utility assistance: 0
Number of households receiving case management services: 23
Amount of assistance Q3: $988.00
Amount of assistance Q4: $455.00
$100,000 $100,000
People’s Legal Aid Fair Tenant Program Number of households receiving consultation (eviction): 51
Number of households receiving consultation (housing related debt collection):
7
Number of households receiving legal representation: 116
Number of households that avoided eviction orders: 64
$88,000 $58,715.75
UCA Landlord Tenant Mediation Number of households/individuals assisted into housing: 0
Number of households/individuals still housed after 3 months: 0
Number of households that avoided eviction: 0
Number of households that received direct mediation: 0
Number of households received case management: 0
$300,000 $0
McKinney-Vento Program Number of McKinney-Vento eligible households: 0
Number of households/individuals assisted into housing: 0
Number of households/individuals still housed after 3 months: 0
Number of households/individuals still housed at the end of the school year: 0
Attendant performance of students at the end of the school year
$187,079 $0
Rapid Rehousing Amount of assistance provided: $0 $225,386 $4,398.67
10
FY 21/22
Organization Program Outcomes Budget Spent
FY 21/22 PROGRAMS (CONTINUED)
The Road Home House 20 Expansion Number of individuals assisted: 26
Number of new individuals enrolled: 3
Number of individuals currently housed: 12
Number of individuals received case management services: 26
Number of individuals transitioned into a permanent supportive housing
subsidy: 13
Number of months of assistance provided: 30
Amount of rental assistance: $28,258.73
$250,000 $157,940.91
Landlord Assurance Program Number of landlords agreeing to participate: 38
Number of landlords provided with assistance: 38
Number of households maintaining housing: 46
Amount of property damage paid to landlords: $18,554.06
Amount of additional deposits paid to landlords: $8,585
Amount of signing bonuses paid to landlords: $0
$53,000 $25,483.96
Palmer Court Case Management Number of individuals/households that received case management services:
269 individuals/186 households
Number of individuals/households received supportive services: 186
Number of individuals/households remained housed: 182
Number of individuals/households who increased their income/benefits: 3
$227,812 $57,532.92
Progressive Rental Assistance Number of individuals/households who received rental assistance: 118
Number of individuals/households who received utility assistance: 54
Number of individuals/households who received case management: 119
Total number of months rental assistance received: 223
Number of individuals/households who increased their income/benefits: 17
$476,858 $349,759.68
Shared Housing Number of individuals matched with roommates: 24
Number of individuals successfully housed: 24
Number of individuals who received financial assistance: 53
Number of individuals who received case management: 81
Number of individuals that received landlord/tenant support: 3
$162,000 $83,510.89
VBH Rental Assistance Number of households received rental assistance: 2
Number of households received case management services: 2
Number of months rental assistance received: 2
Amount of assistance provided: $2,112.00
$17,500 $12,168.30
VOA Case Management for Women Number of individuals housed: 13
Number of individuals receiving long-term physical and behavioral health
treatment: 10
Number of individuals receiving case management: 10
Percent of case managed individuals that are housed: 56%
$199,773 $99,366.41
YWCA Rent Assistance for Women and
Children in Transitional Housing
Number of households/individuals assisted into housing: 5
Number of households received case management: 5
$54,648 $32,121.64
NeighborWorks Down Payment Assistance Number of individuals granted down payment assistance: 5
Number of individuals that completed Homebuyer Education Course: 5
Amount of assistance provided: $95,000
$152,761 $97,785
“Today I was happy to announce
the Empowered Living Design
Competition. We’ve heard from
many designers and architects
who want to collaborate with
us to create new, innovative
housing solutions.”
- Mayor Mendenhall, July 2021
11
FY 18/19 FY 19/20 FY 20/21 FY 21/22
Dept/Division Position Description Budget FTE Budget FTE Budget FTE Budget FTE
STAFF
IMS/Civic Engagement Engagement Specialist Support engagement on FoF projects.$66,166 1 $76,197 1 $76,197 1
Pub. Services/Engineering Project Engineer Manage FoF reconstruction projects.$109,398 1 $132,153 1 $132,153 1
CAN/Transportation Engineer Manage infrastructure projects.$100,342 1 $120,989 1 $120,989 1
CAN/Transportation Transit Planner Track transit programs. $50,000 1 $103,304 1 $88,974 1 $88,974 1
CAN/Planning Planner Help staff capacity on zoning issues. $101,161 1 $107,333 1 $90,382 1 $90,382 1
Transit Critical Need Area
^ On December 13, 2021, UTA On
Demand ride service launched in Westside
neighborhoods of Salt Lake City. Carlton
Christensen, Mayor Mendenhall, and City
Council Member Petro-Eschler attended
the ceremony to celebrate bringing this new
transportation option to City residents.
FY 19/20 & FY 20/21
Dept/Division Program Outcomes Budget Spent
FY 20/21 & FY 21/22 PROGRAMS
CAN/Transportation Bus Stop Improvements Transit capital improvements planned or implemented in every
district of the City, improving ADA access.
$1,100,000 $0
CAN/Transportation UTA Bus Routes 2, 9, and 21 (FY
20/21)
Improved transit service for the Salt Lake City community. $4,700,000 $4,472,276
CAN/Transportation UTA Bus Routes 2, 9, and 21 (FY
21/22)
Improved transit service for the Salt Lake City community.
$5,601,319 $1,821,779
CAN/Transportation FTN Branding Branding moving forward, collaborating with UTA.$100,000 $89,280
CAN/Transportation TMA Development Transportation continued to work on Westside Equity as well as
TMA development with Research Park.
$100,000 $0
FY 18/19
Dept/Division Program Outcomes Budget Encumbrance
FY 18/19 PROGRAMS
CAN/Transportation FTN Branding A short list of potential FTN names/colors/logos/etc is being
vetted for copyright and UTA compatibility - “Adopt-a-stop” in
the development process.
$250,000 $194,638
Overview: Frequent bus service is available on Utah Transit Authority (UTA) bus routes
2, 9 and 21. Service on these routes operates from 4 am to midnight. Ridership on transit
continues to recover from COVID. UTA even implemented a new late-night service pilot in
Salt Lake City through their on-demand provider, Via; this Salt Lake City-specific service
was available during the summer of 2021 and complemented the Frequent Transit Network
(FTN) well. Another transit service addition was UTA On Demand rides in Salt Lake City’s
Westside neighborhoods. This service launched on December 13, 2021.
The Transportation Division continues to work on implementing bus stop improvements.
On 500 East, 2100 South and 200 South, bus pads were poured. Amenities are then
installed by UTA. On 2100 East, half of the pads were completed in summer of 2021.
South Temple bus improvements will be built once 2100 East is complete. Other transit
capital improvements are still in planning stages as part of larger studies and street
reconstructions, such as 300 West, 600/700 North, 200 South, and the Local Link Study.
Staff, like the Engagement Specialist, provide outreach and communication support on
various projects.
Brand development for the FTN was restarted, with staff developing finalized versions
of potential names, logos, colors, and more. They anticipate one more round of public
engagement. Transportation continued coordinating development with transit along FTN
corridors after gaining developer input about how to promote the value of an “adopt-a-
stop” program. COVID led to increased work in Westside neighborhoods, with businesses
such as Amazon, Netflix and UPS experiencing steep growth in demand for their services.
TMA development continues as the need for convenient, affordable transportation options
is greater than ever. Salt Lake City staff and partners developed Westside Equity Study
lessons learned, and used it as basis for a Utah Department of Transportation equity
program. The Research Park TMA process is ongoing.
Outcomes: See program tables below for details.
12
Safety Critical Need Area
FY 18/19 FY 19/20 FY 20/21 FY 21/22
Department Position Description Budget FTE Budget FTE Budget FTE Budget FTE
STAFF
Police New Police Officers Serve Salt Lake City.$4,795,802 27 $3,469,496 27
$8,749,563
27
$8,749,563
27
Police New Police Officers Serve Salt Lake City.$3,225,659 23 23 23
Police Civilian Staff Provide support in records,
crime lab, etc.
$858,136 13 $858,136 13
13 13
Non-Departmental Social Workers Provide support in social
work.
$139,390 $962,109
^ Mayor Mendenhall attended a holiday
lunch in December 2021 with the Salt lake
City Fire Department. Salt Lake City is
grateful for everything the Fire Department
does to keep our City safe.
The Salt Lake City
Police Department
(SLCPD) has a team
of social worker staff
members.
Overview: Salt Lake City Police Department (SLCPD) funding and programs are
ongoing, and there are continuing efforts to maintain staffing levels as employees have
separated employment from the Department. As of December 2021, 49 of 50 Funding
Our Future-funded Police Officer positions were filled.
There are also ongoing efforts to hire support personnel:
- Social Service Worker – 1 of 4 filled
- LCSW/Mental Health Counselor – 1 of 3 filled
- Office Technician – 1 of 2 filled
- Quality Assurance Manager – 1 of 1 filled
- Crime Scene Technician – 2 of 3 filled
- Police Intelligence Specialist – 2 of 2 filled
- Police Information Specialist – 2 of 2 filled
- Victim Advocate – 1 of 1 filled
The Department will continue its hiring process to fill these vacant positions.
The Salt Lake City Fire Department (SLCFD) also received Funding Our Future funds
for 3 new fire vehicles in 2020. These funds will be leveraged with VW grant funds,
which likely will not be available until 2022.
Outcomes: The long-term outcome of the SLCPD funding is an increase to the number
of authorized sworn and civilian Police Department staff to serve the Salt Lake City
community. SLCFD also serves the Salt Lake City community. Both of these aspects are
part of the originally identified Funding Our Future critical need of neighborhood safety.
13
Streets Critical Need Area
Overview: Coordination between each crew at the Streets Division is continuing to
improve. With the help of Cartegraph, an asset management system, each supervisor
can delegate and track tasks easily, which eliminates guesswork and allows for more
efficient use of time and resources. With new equipment and better coordination,
the hard-working Streets crews resurfaced more roads than ever during the 2021
construction season.
The Streets crews finished the surface treatment season in late September of 2021.
They were able to complete more lane miles than ever now that they have a few
years of experience working with higher production goals. Better planning, improved
coordination with the asphalt district crews, the continued use of Cartegraph, and a dry
summer all contributed to a successful season of surface treatments. Streets obtained
new equipment that helped complete the 2021 surface treatment projects and will be
used to prepare the roads for surface treatments in 2022. The equipment includes a
trailer for hauling planers, pavers, and rollers, a tack wagon for inlay projects, and a
third slurry seal truck.
Outcomes: Weeks of extreme heat in July and August forced the crews to shift to
shadier areas of the city where cooler road temperatures helped the materials used in
surface treatments to set properly. However, the warm temperatures stayed late into
the year which allowed the slurry seal crews to continue working through September.
The Streets crews hit their stride during the 2021 calendar year, finishing over 62 lane
miles of chip seal, 9 lane miles of inlay, and 82 lane miles of slurry seal, totaling over
153 lane miles of surface treatments during the summer. New equipment allows the
Streets crews to use their time more efficiently and increase production capacity. Both
of the surface treatment teams now have their own trailers for hauling equipment and
tack wagons for inlay projects. This saves time and fuel by removing the need to drive
around to multiple job sites to share equipment.
FY 18/19 FY 19/20 FY 20/21 FY 21/22
Dept/Division Position Description Budget FTE Budget FTE Budget FTE Budget FTE
STAFF
Public Services/Streets Streets Crew Double number of surface
treatment lane miles.
$2,900,000 19 $1,667,890 19 $2,353,031 19 $2,353,031 19
^ The Streets Crew is busiest during the
spring through fall seasons, completing
short-term surface treatment projects which
prolong the life of the entire street network.
Though the objective of the Streets Crew is to improve the lifespan of city roads, the crew works year-round to support other operations at the
Streets Division, such as plowing and salting the roads during snow events. There are a total of 45 plows available during major storms. During
the winter of 2021, Salt Lake City conducted a public poll to name some of the City’s snowplows. More than 4,000 people participated.
14
2020 Construction Year Bond Projects
Pre-Construction Cost Estimated (After Bid) Cost Final Cost
(Does Not Include PU)
Project Original
Budget
Cost Center
Budget
Bond Funds
Earmarked
Contingency Bond
Funds Earmarked
Final Cost
Construction
Bond Funds
Used
2000
East:
Parley’s
Way to
Salt
Lake
City
Limits
$1,300,000 $1,170,000 $1,170,000 $393,655 $2,932,039 $1,170,000
500
East:
1700
South
to 2100
South
$1,500,000 $1,350,000 $1,350,000 $1,606,345 $2,577,899 $1,350,000
700
West:
1600
South
to 2100
South
$2,000,000 $1,800,000 $1,283,777 $0 $969,989 $882,146
Local
Streets:
Districts
1, 7
$3,000,000 $2,700,000 $2,973,502 $27,421 $2,393,864 $2,550,756
NOTE: There are additional earmarked funds from other sources to supplement the above bond reconstruction projects (like Class C and Impact
Fees).
200 South will begin
the first phase (200
East to 900 East) of
full reconstruction in
2022.
15
Pre-Construction Cost Estimated (After Bid) Cost Final Cost
(Does Not Include PU)
Project Original
Budget
Cost Center
Budget
Bond Funds
Earmarked
Contingency
Bond Funds
Earmarked
Final Cost
Construction
Bond
Funds
Used
100 South:
North
Campus to
900 East $3,000,000 $2,700,000 $2,111,928 $0 $0 $0
900 East:
Hollywood
Drive to
2700 South $2,600,000 $2,340,000 $2,215,008 $0 $0 $0
900 South:
900 West to
300 West;
West Temple
to Lincoln
Street
$2,000,000 $1,800,000 $0 $1,240,428 $0 $0
300 West:
Design
$600,000 $540,000 $540,000 $50,000 $2,332,164 $879,547
300 West:
900 South to
2100 South $17,300,000 $15,570,000 $13,800,731 $0 $0 $0
200 South:
Design $1,000,000 $900,000 $160,000 $0 $0 $160,000
Local
Streets:
Districts 3, 6 $3,000,000 $2,700,000 $2,723,849 $2,393,864 $2,550,756
2019
Contingency $2,000,000
2021 Construction Year Bond Projects
NOTE: There are additional earmarked funds from other sources to supplement the above bond reconstruction projects (like Class C and Impact
Fees).
16
Pre-Construction Cost Estimated (After Bid) Cost Final Cost
(Does Not Include PU)
Project Original
Budget
Cost Center
Budget
Bond Funds
Earmarked
Contingency
Bond Funds
Earmarked
Final Cost
Construction
Bond
Funds
Used
Local
Streets -
Districts 2
and 5 $3,000,000 $2,700,000 $2,111,928 $0 $0 $0
2020
Contingency $2,030,000
NOTE: The above numbers are accurate as of March 2022. There is also $281,866 for bond interest (fall 2020). Additionally, there are other
funds to augment the bond funds, such as Class C funding.
2022 Construction Year Bond Projects
17
FY 18/19 & FY 19/20 CIP Projects
Project Overview Update Original
Budget
Budget
Spent
McClelland
Trail and
Neighborhood
Street
Livability
Improvements
This project, which is highly-supported by the community,
desires to increase the livability of streets near homes and
businesses and improve the comfort of the at grade McClelland
Trail crossings at six east-west streets (from Harrison to Bryan
Avenues, inclusive) between 1100 East and 1300 East.
The project is in the final design stages
and construction is expected in 2022.
$349,500 $1,000
McClelland
Shared Street
Phase 2
The goal of this project is to identify the option that best meets
the vision and goals from the Sugar House Master Plan, and
which are supported by the Sugar House Circulation Plan, the
Pedestrian and Bicycle Master Plan, and the Jordan and Salt
Lake City Canal Trail Implementation Plan.
Final design has concluded and the City
selecting a contractor. Construction is
expected in 2022.$500,000 $50,000
Transportation Safety Improvements
This project provides funding for high priority multi-modal safety
improvements. This better empowers Transportation to work
quickly to address identified safety needs in the City.
This funding is being spent on traffic safety
projects, such as installing new warning
flashers at intersections around the City.$202,000 $0
Traffic Signal Upgrades This project removes the existing traffic signal equipment that
has reached the end of its useful life, including steel poles, span
wire, signal heads, and traffic signal loops and will upgrade the
intersections with mast arm poles, new signal heads, pedestrian
signal heads with countdown timers, improved detection, and left
turn phasing, as needed.
The FY 19/20 funding has now been fully
encumbered to a contractor that is working
on construction projects aimed to maintain
and upgrade traffic signals.
$118,310 $0
Bridge Preservation
There are 23 bridges in Salt Lake City, most crossing either the
Jordan River or the Surplus Canal. Engineering has prepared an
ongoing bridge maintenance strategy.
This project was bid out two separate
times and both sets of bids came in way
over the Engineer’s Estimate. Procurement
rules allow Engineering to now reach out
to other contractors to solicit quotations
for work that meets the scope and need of
the project. This will cover items such as
routine bridge deck cleaning, resealing of
joints and crack sealing. The project will
run through the end of June 2024.
$150,000 $0
Public Way
Concrete
Program
This program addresses deteriorated curb and gutter, retaining
walls, crosswalks ADA ramps, and other concrete structures
in the public way and in coordination with Public Utilities. The
contract was executed and the selected contractor started work.
Due to the September 2020 windstorm, the contractor shifted
their efforts to concrete damage caused by downed trees and
tree stumps.
The contract with the concrete contractor,
ZPSCO, was terminated by “termination for
convenience.”
$402,443 $180,715
18
NOTE: There are additional CIP projects (constituent requests) from FY 18/19 and FY 19/20. These include the following: 1100 East Curb and Gutter,
Whitlock Avenue Curb and Gutter, 1900 East Street Reconstruction, and 1400 East Sunnyside Avenue Intersection Reconstruction. 1900 East
construction is complete.
Project Overview Update Original
Budget
Budget
Spent
Rail Adjacent
Pavement
Improvements
This project addresses uneven pavement adjacent to railway
crossings. There are currently three known locations to be
addressed. This initial request allowed Engineering to improve
one to two of the locations and perform a survey for future years.
Initial four locations completed by Geneva
Rock. Additional locations completed
with additional $70,000 in FY 20/21. The
budget is spent.
$53,000 $53,000
Sugar House
Traffic
Calming and
600 East
Neighborhood
Byway
Improvements
The funding will be used to develop and implement two projects:
1) a neighborhood-wide traffic calming plan to address vehicle
speeding and excessive cut-through issues in the west Sugar
House neighborhood, and 2) improvements to the successful
600 East Neighborhood Byway. Salt Lake City, South Salt Lake,
Millcreek and Holladay partnered on the Local Link study.
The project is in design and construction is
expected in 2022.
$150,000 $0
Complete
Streets
Enhancements
This project complements bond and other roadway projects that
have been funded or for which funds are being requested, but
which do not include incorporation of Salt Lake City’s Complete
Streets Ordinance and/or recommendations of City master
plans.
This funding has now been spent on
enhanced crosswalks around the City,
including flashing beacons, bulb-outs, and
median islands.
$100,000 $100,000
Total $2,025,253 $384,715
FY 18/19 & FY 19/20 CIP Projects (Continued)
19
FY 20/21 and FY 21/22 CIP Projects
Project Overview Update Original
Budget
Budget
Spent
Bridge Rehabilitation: 400 South and 650 North
This project rehabilitates the 400 South and 650 North vehicle
bridges over the Jordan River. A bridge inspection performed by
UDOT gave these bridges a Health Index score of 48.55 and 46.58,
respectively, out of 100. Combining the two bridges into one project
will result in economies of scale since the rehabilitation work for both
bridges will be similar. The existing asphalt surface will be removed
and the underlying deck will be treated for cracking and delaminated
concrete. The deck will receive a waterproofing membrane, a new
asphalt overlay, and deck drains to remove storm water from the
deck. The under surface of the bridge will be treated for cracking and
delaminated concrete on the deck, girders, pier caps, and abutments.
The steel piles supporting the piers exhibit heavier than typical
corrosion. The piles will be dewatered and treated for corrosion.
The existing damaged parapet wall will be removed and rebuilt
which will widen the sidewalk and improve the pedestrian access
route. Additionally, aesthetic enhancements will be incorporated like
replacing the chain link fence and including decorative railings. A
consulting firm with specialized experience will be used for this project.
SLC Engineering is preparing
to put out RFPs for the design
of the 650 N and 400 S bridge
replacements. No additional
funding is available at this time
however additional funding will
be requested to cover the full
replacement of these bridges.
There is possible UDOT funding
available in addition to the
denied previous funding (this
application denied by UDOT for
additional funds through their
Local Government On-System
Bridge Replacement).
$2,648,507 $0
Bridge Preservation
There are 23 bridges in Salt Lake City, most crossing either the Jordan
River or the Surplus Canal. UDOT inspects these bridges every two
years and provides the city with a basic condition report. The City is
responsible for performing appropriate maintenance activities based
on statements in the UDOT report. Engineering has prepared an
ongoing bridge maintenance strategy with the objective of extending
the functional life of these structures, and extending the time between
major repairs. The funds will be used to address needed repairs and
routine maintenance.
The bridge maintenance plan,
as well as some initial projects
to start maintenance on, was
finalized fall 2021. Additionally,
the consulting firm is finalizing
pedestrian bridge inventory
and condition report similar to
the traffic bridges that will be
used to assess corresponding
maintenance.
$150,000 $0
Facilities Capital Asset Replacement Program
The Facilities Division’s Facility Condition Index database categorizes
asset renewal projects based on the criticality of projects starting with
Priority 1 (Life Safety). For the FY 20/21 abbreviated CIP funding,
Facilities requested funding for Projects in Priority 1 and a portion of
Priority 2 for $2,503,710 total. Projects in the Priority 1 category must
be replaced to meet OSHA, Federal, State, and local regulations and
codes; to maintain security; or ensure safe building occupancy. These
are not discretionary projects. FY 19/20 CIP investment funded many
of the Priority 1 projects. This request is to fund the remaining current
Priority 1 projects totaling $374,907. Priority 1 projects will never
be completely eliminated as different assets fall into the category
annually as they reach the end of their expected lifespan. Projects in
Priority 2 address Structural Integrity, Property Loss, and Contractual
Obligations. The latter is funding obligated through Interlocal
Agreements with Salt Lake County for 50% of capital renewal at the
Sorenson Campus and Salt Lake Sports Complex, and through a
contract with the Salt Lake Bees at the Smiths Ballpark to maintain the
facility. These are also non-discretionary projects. The funds requested
for Priority 1 (Life Safety) and Priority 2 (Contractual Obligations)
will address the most critical and contractually obligated needs for
Facilities. Typically, the County can fund 100% of projects upfront, and
the City reimburses its portion at project completion. The FY 20/21
County Interlocal Agreement obligations amount to $763,557.
The County and City have
identified the need to address
$10 million in deferred capital
renewal for both facilities. The
Bees contract obligations for FY
20/21 total $688,907; however,
the Bees contract partially funds
capital renewal from annual
naming rights revenue, so
$224,637 is available to offset
the requested amount for the
Ballpark for a total FY 20/21
CIP request of $464,270. The
total of deferred capital renewal
at the Ballpark is currently
$8,804,973. It should be
noted the current construction
environment is extremely
expensive. Facilities included
additional funds to cover
expected inflated costs.
$2,503,710 $168,135.63
20
Project Overview Update Original
Budget
Budget
Spent
Rail Adjacent Pavement Improvements
In this second year of the project, Engineering is designing
improvements and performing a survey of additional locations to
address in future years.
In 2021, only two rail adjacent
pavement sections were
completed. The remaining
balance of $32,723 is already
encumbered to Staker Parsons
to do more rail adjacent projects.
There was another CIP application
for another $70K for FY22-23
$70,000 $69,975
Parks Critical Asset Renewal
This project funds the repair or replacement of park amenities and
play features that are currently out-of-service or near closure. Many
of the facilities are still functional, however, their poor condition
discourages use. Features that may be replaced with this funding
may include:
- Basketball and tennis courts in deteriorated condition in parks
- Paving surfaces that are tripping hazards in high use parks
- Pavilions in disrepair
- Playgrounds that are deteriorated and at risk for closure in parks
- Inefficient and ineffective irrigation systems that increase operations
and staffing costs in locations
Specific information on priorities for these amenities are as follows:
1. Irrigation systems at 1200 East Islands and Warm Springs Park
2. Pavilions at Cottonwood Park and Poplar Park
3. Paving surface at Memory Grove Park
4. Basketball Court at Liberty Park and Poplar Grove Park
5. Tennis Courts at Poplar Grove Park
6. Playground at Pioneer Park and Taufer Park
The Parks Division has
encumbered $455,630.95 in
funds to upgrade a portion of
the outdated irrigation control
systems that are used to remotely
control Parks irrigation systems
throughout the City. These
updates will improve efficiency of
the overall irrigation systems and
allow improved central control
of the system. Parks and Public
Lands has allocated the remaining
Parks Critical Asset Renewal
funding to other critical asset
renewal projects happening in
2021.
$1,075,000 $0
Public Art This line item adds art features to other CIP projects, including
projects for Parks and Public Lands, Transportation, Facilities, and
Engineering, as required by City ordinance. Each department selects
1-4 projects to then present to the Art Design Board. The Art Design
Board reviews each project and considers many factors (City Council
District representation, opportunities for emerging artists, etc). The
life cycle of a public art project (18-24 months+) includes many steps
of research, development, public calls, and more.
During the time period of July 1 -
December 31, 2021, the following
was completed:
- Conducted further project
research and development
- Further meetings with City
departments about feasibility,
location of project, construction
timelines, and more
- Scope determined to be a Neon
based project
- Vendor for fabrication determined
- Public Art Program Manager
conducted outreach and
engagement with the local
Community Council
- Staff and Board development of
RFP
- Contract development with
Attorney’s Office
- Contract for services secured
with vendor for fabrication of
artists work
- Graphics and associated
marketing materials created for
RFP
- Release of RFP for artist
application Due March 11th
- Application review as
applications come in
$87,878 $0
FY 20/21 and FY 21/22 CIP Projects (Continued)
21
Project Overview Update Original
Budget
Budget
Spent
Cost Overrun This line item allows additional funding flexibility for small cost
increases over CIP project budget.
With the COVID pandemic,
and the timing changes that
occurred on many projects,
no requests for this funding
were made as of January
2022.
$175,756 $0
Total $6,710,851 $238,110.63
FY 20/21 and FY 21/22 CIP Projects (Continued)
22