Proposed Resolution - 8/26/2021Approved As To Form
Salt Lake City Attorney’s Office
Date ______________________________
Sign ______________________________
Jaysen Oldroyd
SALT LAKE CITY RESOLUTION
NO._________OF 2021
(Adopting Capital Improvement Program Allocations for fiscal year 2021-2022.)
A resolution adopting the attached Capital Improvement Program Allocations for the
fiscal year 2021-2022.
WHEREAS, in June the City Council adopted a final budget for the City fiscal year
2021-2022; and
WHEREAS, the budget adopted by the City included a budget for the capital
improvement program; and
WHEREAS, the City Council now wishes to formalize the appropriations for the capital
improvement program.
NOW THEREFORE, be it resolved by the City Council of Salt Lake City, Utah:
SECTION 1. Purpose. The purpose of this resolution is to adopt the capital
improvement allocations for the City for fiscal year 2021-2022.
SECTION 2. Adoption of Capital Improvement Allocations. The capital improvement
allocations for fiscal year 2021-2022, which were included within the 2021-2022 budget, shall be
and hereby are adopted according to the specific terms and conditions set forth on Exhibit A
attached hereto.
SECTION 3. Public Inspection. The City budget officer is hereby authorized and
directed to certify and file copies of these capital improvement program allocations in the office
of said budget officer and in the office of the City Recorder, which allocations shall be available
for public inspection during regular business hours.
SECTION 4. Effective Date. This resolution shall take effect upon adoption.
Passed by the City Council of Salt Lake City, Utah, this ______ day of _____________, 2021.
SALT LAKE CITY COUNCIL
_______________________
CHAIRPERSON
ATTEST AND COUNTERSIGN:
_______________________________
CITY RECORDER
-$ -$ -$ -$ -$ -$
#Application Title Scope of Work General
Funds
Class C
(gas tax)
Impact
Fees
1/4 ¢
Transportation
FOF
Streets
FOF
Transit
General
Funds
Class C
(gas tax)
Impact
Fees
1/4 ¢
Transportation
FOF
Streets
FOF
Transit
1 1.5% for Art
Required by City ordinance and calculated as 1.5% of the General Fund available to spend revenues in the Mayor's
Recommended Budget. Overseen by the Arts Council. Ordinance allows the Administration to use some of the
funding for maintenance of existing artworks and the rest goes to new artworks. The new Art Maintenance Fund
has an available to spend balance of $20,266 and the % for Art Fund has $114,841 available.
$85,586 $34,500 $100,607 $34,500
2 Cost Overrun
Account
Required and governed by the CIP Resolution 29 of 2017. Provides additional funding for projects with expenses
that come in slightly higher than estimated. The available to spend balance of the Cost Overrun Account is
$750,606.
$114,114 $46,000 $114,114 $46,000
3
Odyssey House
Annex Facility
Renovation
100% ARPA
ELIGIBLE
Requested $500,000 from General Fund; Constituent Engineering Project
Will be fully funded using ARPA dollars in the next budget amendment
Odyssey House is seeking funding from Salt Lake City to complete a significant renovation of the Annex building
rented by the agency located at 623 South 200 East, Salt Lake City, Utah 84102. Currently, the Annex has a
multitude of structural problems that pose life and safety risks for the residential clients who inhabit the facility at
this time. The roof is deteriorating, and the gutters are becoming unstable. This damage is causing a multitude of
different leaks within the building, harming interior and exterior walls. To fully replace the roof and gutters, it will
cost about $28,000. The building's foundation, primarily in the rear, is beginning to crumble and needs to be
repaired, treated, and braced, which will ultimately cost about $250,000. The roof and foundation must be
restored to complete all other necessary renovations before other workers can be deployed inside the building.
Following the roof and foundation's replacement and repairs, the interior beams, walls, and overall structural
skeleton need to be reinforced and stabilized due to extensive water damage, costing about $33,000. All exterior
walls need to be cleaned, repaired, and repainted, costing about $41,500. Windows and doors within the facility
have to be wholly replaced. Due to structural and foundational problems, all interior doors and windows cannot
shut or lock because their frames are warped and/rotting. To complete an overhaul of the windows and doors, it
will cost about $19,500. Additionally, the electrical and mechanical systems in the building, such as wiring,
hardware, plumbing, etc., will need to be evaluated and repaired or replaced, which will cost about $35,500.
Lastly, exterior site work, such as sidewalk repairs, drainage slope, ADA access, and miscellaneous fees, such as
permits, additional insurance, and project management, will add $42,500 to the total project cost. In total, the
renovation of the Annex will cost about $450,000. However, Odyssey House is looking to build in a contingency of
$50,000 to prepare for any additional work that may appear after beginning construction resulting in an overall
cost of $500,000.
$300,000
4
Street
Improvements
2021/2022
15% ARPA
ELIGIBLE UP TO
$450,000
Requested $3.5 million from Class C; Engineering Project
Deteriorated city streets will be reconstructed or rehabilitated using funding from this program. This will provide
replacement of street pavement, curb and gutter, sidewalk, drainage improvements as necessary. Where
appropriate, the program will include appropriate bike way and pedestrian access route improvements as
determined by the Transportation Division per the Complete Streets ordinance.
$2,046,329 $2,046,329
5 Pavement
Conditions Survey
Requested $175,000 from General Fund; Engineering Project
Approximately every five years the entire pavement network is surveyed. This condition survey is accomplished by
a third party with state of the art equipment and results in a report summarizing possible options and costs. The
data collected is used by Engineering’s Pavement Management Team to determine the overall street network
condition, provide street rehabilitation and reconstruction recommendations, and prioritize proposed
maintenance activities.
$3,571 $171,429 $3,571 $171,429
6
Public Way
Concrete
2021/2022
Requested $750,000 from General Fund; Engineering Project
This project will address displacements in public way concrete through saw-cutting, slab jacking, and removal and
replacement of deteriorated or defective concrete sidewalks, accessibility ramps, curb and gutter, retaining walls,
etc.
$75,000 $675,000 $75,000 $675,000
AVAILABLE FUNDING
Mayoral Funding Recommendations COUNCIL Funding Decisions
Last Updated August 17, 2021 Page 1
Exhibit A: Fiscal Year 2021-2022 Capital Improvement Program (CIP) Project AllocationsFINAL
-$ -$ -$ -$ -$ -$
#Application Title Scope of Work General
Funds
Class C
(gas tax)
Impact
Fees
1/4 ¢
Transportation
FOF
Streets
FOF
Transit
General
Funds
Class C
(gas tax)
Impact
Fees
1/4 ¢
Transportation
FOF
Streets
FOF
Transit
AVAILABLE FUNDING
Mayoral Funding Recommendations COUNCIL Funding Decisions
7
Bridge
Preservation
2021/2022
Requested $300,000 from General Fund; Engineering Project
There are 23 bridges in Salt Lake City, most crossing either the Jordan River or the Surplus Canal. UDOT inspects
these bridges every two years and provides the city with a basic condition report. The city is responsible for
performing appropriate maintenance activities based on statements in the UDOT report. City Engineering has
prepared an ongoing bridge maintenance strategy with the objective of extending the functional life of these
structures, and extending the time between major repairs. The requested funds will be used to address needed
repairs and routine maintenance.
$21,429 $278,571 $21,429 $278,571
8
Rail Adjacent
Pavement
Improvements
2021/2022
Requested $70,000 from General Fund; Engineering Project
This program addresses uneven pavement adjacent to railway crossings. Engineering designs pavement
improvements and contracts the construction.$70,000 $70,000
9
Capital Asset
Replacement
Program
$19.2 MILLION IN
MAYOR'S
PROPOSED BOND
FOR SIX FACILITIES
PROJECTS
Requested $5,860,449 from General Fund; Facilities Project
The Facilities Division’s Facility Condition Index database categorizes asset renewal projects based on the criticality
of projects starting with Priority 1, Life Safety. Projects in Priority 2 address Structural Integrity, Property Loss, and
Contractual Obligations. To eliminate the $47,733,403 in total deferred capital renewal, Facilities proposes an
annual investment through CIP of $7,000,000. For FY22 CIP funding, Facilities is requesting funding for Projects of
Priority1 and 2 for $5,860,449. (The amount requested is derived from an initial 2017 facility assessment to which
a 3% annual inflationary rate has been applied. It should be noted that the current construction environment is
very heated; with the 10% contingency and 21% Design/Engineering costs Facilities request is $5,860,449.)
$1,252,230 $1,252,230
10 Training Tower
Fire Prop Upgrade
Requested $318,279 from General Fund; Fire Project
The Fire Training Tower Fire Prop Upgrade consist of modernizing the existing natural gas fire props within the
Tower. The scope includes upgrading the fuel control station, PLC5 to the new ControlLogix PLC operating system,
and the bedroom, storage, desk, and car fire props.
Fuel control station: Replace existing assembly whose components are currently obsolete. The upgrade will
replace the existing FCS (fuel control station) to “auto” open style FCS which will have the automatically controlled
main gas safety shut off valve and the latest version of the low- and high-pressure switches.
PLC Upgrade – PLC5 to Logix includes upgrade the existing PLC 5 to new ControlLogix PLC:
*New Allen Bradley PLC ControlLogix, input modules, output modules, analog modules, and Ethernet adapter
modules
* Replacement of control room PC’s with the latest PC hardware available at time of delivery
* Microsoft operating system (currently Windows 10)
* KFT Fire Trainer software
* Ethernet to Data Highway Interface for both systems
* Upgrade Outdoor PLC to New Logics PLC.
Fire prop upgrade: KFT's advanced burner design, AquaMesh, produces increased levels of radiant heat, a more
realistic flame signature, lower levels of unburned gases during fire suppression, and more challenging flames that
cannot be swept off the fire mock-up with hose stream application. Water, used to disperse the propane or
natural gas, is not visible through the fireplace mock-up. AquaMesh fires are capable of withstanding repeated
direct hose line stream attacks, without having any significant amount of water dispelled from the burner
assembly within the fire mock-up.
$318,279 $318,279
Last Updated August 17, 2021 Page 2
-$ -$ -$ -$ -$ -$
#Application Title Scope of Work General
Funds
Class C
(gas tax)
Impact
Fees
1/4 ¢
Transportation
FOF
Streets
FOF
Transit
General
Funds
Class C
(gas tax)
Impact
Fees
1/4 ¢
Transportation
FOF
Streets
FOF
Transit
AVAILABLE FUNDING
Mayoral Funding Recommendations COUNCIL Funding Decisions
11 Single Family/Fire
Behavior Prop
Requested $374,864 from General Fund; Fire Project
Drager Phase V Rambler/Fire-Behavior Prop to include:
One (1) story unit comprised of Five (5) 40’ fire training modules
NFPA 1402 $ OSHA-compliant system
Two (2) high-temperature thermal-insulated burn chamber with emergency exits as required
Burn baffles
High-heat thermal-insulated wall with door(s), standard windows and doors, one (1) sliding door
Hallway
Vents with pull cable
Cleanout cargo doors
Freight to customer site
On-site installation & set up to include:
Full Project management support from Drager staff
Pre-installation site surveys and in-process review of the build site
Drager contracted and project-managed installation to ensure that the fire prop system is installed properly,
safely, and with minimal disruption
Insured and bonded installation and crane service
Train-the Trainer Program
Two-day on-site training for up to ten (10) fire department instructors
Complete documentation package on operation and maintenance
$374,864 $374,864
12
Tracy Aviary
Historic Structure
Renovations
Requested $156,078 from General Fund; Constituent Public Lands Project
Two historical elements at Tracy Aviary in Liberty Park are in need of repair and are the subject of this CIP request.
The Bath House (a.k.a.Custodial Storage Building (CSB)) and the East Gate. The CSB needs a new roof. This will
require removing the solar panels, replacing asphalt shingles and re-installing the solar panels. The East Gate was
identified during our 2019 AZA accreditation inspection as an area of concern due to being an insufficient
perimeter barrier. The solution is to re-align the existing fence and add additional fencing to block a gap. Brick
work to repair damaged areas, signage, and landscaping surrounding the space is also included.
$156,078 $156,078
13
Three Creeks West
Bank Trailway
$3.4 MILLION IN
MAYOR'S
PROPOSED BOND
FOR WESTSIDE
PARKS
100% ARPA
ELIGIBLE
Requested $490,074 from General Fund; Constituent Public Lands Project
Reconstruct a half-block of the Jordan River Parkway Trail where it’s eroding into the river at 1300 South and 1000
West.
$484,146 $484,146
14
Three Creeks West
Bank New Park
$3.4 MILLION IN
MAYOR'S
PROPOSED BOND
FOR WESTSIDE
PARKS
100% ARPA
ELIGIBLE
Requested $150,736 from parks impact fees; Constituent Public Lands Project
This project will create a new multiuse park on 1.4 acres owned by the city at 1050 W 1300 South, along the
Jordan River. Grading and landscaping would need to take place. Park amenities can be determined as the project
moves forward. Pickleball courts have been suggested by the Glendale Community Council.
Note that the Three Creeks Confluence Park on the east side of the Jordan River completed construction and
opened to the public in July 2021.
$150,736 $150,736
15
Sugar House Park
Fabian Lake
Pavilion Remove
and Replace
Requested $183,834 from General Fund; Constituent Public Lands Project
Scope of work is to remove and replace existing Fabian Lakeside Pavilion. SHPA hired Arch Nexus to review,
analyze and recommend solutions for the deteriorating pavilions, and completed the attached report in December
of 2015. Arch Nexus factored in escalation costs through 2020.
$183,834 $183,834
Last Updated August 17, 2021 Page 3
-$ -$ -$ -$ -$ -$
#Application Title Scope of Work General
Funds
Class C
(gas tax)
Impact
Fees
1/4 ¢
Transportation
FOF
Streets
FOF
Transit
General
Funds
Class C
(gas tax)
Impact
Fees
1/4 ¢
Transportation
FOF
Streets
FOF
Transit
AVAILABLE FUNDING
Mayoral Funding Recommendations COUNCIL Funding Decisions
16 Liberty Park
Basketball Court
Requested $99,680 from General Fund; Constituent Public Lands Project
This project is for resurfacing the existing basketball court in the center of the park and the replacement of two
new basketball hoops.$99,680 $99,680
17
Glendale
Waterpark Master
Plan & Landscape
Rehabilitation &
Active Recreation
Component
$10 MILLION IN
MAYOR'S
PROPOSED BOND
FOR THIS PROJECT
AND
$3.4 MILLION IN
MAYOR'S
PROPOSED BOND
FOR WESTSIDE
PARKS
Requested $3.2 million from parks impact fees; Public Lands Project
This project is Public Lands' highest priority impact fee request. The goal of this project is to provide a new active
recreation amenity at the former Glendale Water Park. This project will build on the results of a City sponsored
community visioning process, planned for 2021, that will determine the program and character for development.
Funds from this request will be allocated for technical drawings and site improvements. Forty years ago, the
Glendale water park was built using Federal Land and Water Conservation Funds (LWCF). LWCF protects funded
sites in perpetuity, to remain active recreation facilities open to the public. Removal of the obsolete water slides
and pools has triggered a three-year clock in which SLC must replace the amenity with another public outdoor,
active recreation facility. It does not have to be water based, but it cannot solely be open fields of grass or natural
area. In the first phase, $3,200,000 will construct a community directed, active recreation amenity on site within
the three-year time limit. The scope of this project will reflect the communities’ priorities and character, resources
allocated and alignment with LWCF requirements. SLC Council and/or designees will be briefed on phase one
project selection prior to design and construction. Full development of the 17-acre site will likely require several
phases and funding cycles.
$3,200,000 $3,200,000
18
A Place for
Everyone: Emerald
Ribbon Master
Plan
$3.4 MILLION IN
MAYOR'S
PROPOSED BOND
FOR WESTSIDE
PARKS
AND
$440,000 FOR
JORDAN RIVER
PADDLE SHARE
Requested $420,000 from General Fund; Public Lands Project
The Jordan River Emerald Ribbon Master Plan is, fundamentally, a placemaking initiative for the Jordan River
corridor, built on creative, diverse and deep community engagement through four Salt Lake City neighborhoods.
Engagement will seek to identify features, improvements, stories, artwork and institutional connections that are
important to individual neighborhoods and communities along the river.
The planning effort will be led by the SLC Public Lands Division with support from an experienced consulting firm,
and extensive involvement of community partner organizations imbedded in the neighborhoods. This approach
will build on the connections made with University Neighborhood Partners to further this collaborative
relationship in the west side communities, and will ensure that creative and diverse engagement tactics produce
public feedback that captures the voices and opinions of groups and community members that have been
traditionally underrepresented.
Placemaking engagement activities will be broken into four distinct but complimentary neighborhood efforts:
Glendale (Hwy 201 to 900 South), Poplar Grove (900 South to North Temple), Fairpark/Jordan Meadows (North
Temple to 700 North), and Rose Park/Westpointe (700 North to I-215). Each engagement effort will draw on
existing Public Land assets along and nearby the river corridor, as well as the direction established by the Blueprint
Jordan River 2.0, the Westside Master Plan, 9Line Master Plan, Northwest Master Plan, North Temple Boulevard
Plan, Rose Park Small Area Plan, Northpointe Small Area Plan, Jordan River Flood Control, Habitat and Green
Infrastructure Plan, the Reimagine Nature SLC Public Lands Master Plan, and other relevant documents. The final
Master Plan will include block-by-block improvement components along with recommended phasing and high-
level cost estimates for implementation that will guide subsequent allocation of CIP and Impact Fee resources,
investments in programming, and strategic partnerships.
$416,667 $416,667
Last Updated August 17, 2021 Page 4
-$ -$ -$ -$ -$ -$
#Application Title Scope of Work General
Funds
Class C
(gas tax)
Impact
Fees
1/4 ¢
Transportation
FOF
Streets
FOF
Transit
General
Funds
Class C
(gas tax)
Impact
Fees
1/4 ¢
Transportation
FOF
Streets
FOF
Transit
AVAILABLE FUNDING
Mayoral Funding Recommendations COUNCIL Funding Decisions
19
Downtown Green
Loop
Implementation:
Design for 200 East
linear Park
PARTIALLY ARPA
ELIGIBLE
Requested $610,000 from parks impact fees; Public Lands Project
Several streets along the Downtown Plan's visionary Green Loop Regional Park project are already under
consideration by the Transportation Division for corridor-wide changes, including improvements for active
transportation. This request from the Public Lands Division would fund the collaborative visioning, public
engagement, and conceptual design of the nontransportation elements of the Green Loop. The design of public
green space, park elements, and stormwater rain gardens / bio-swales will be proposed within the 132' public
way, facilitated by a significant reallocation of space from pavement to park.
Based on the Transportation Division's current and pending work on 200 East, it is anticipated that this funding will
go primarily to 200 East, with some lesser attention to other corridors along the loop. The result of this phase of
the project will be public awareness, interest and excitement about this regionally-significant project; a conceptual
and preliminary design; a construction cost estimate suitable for seeking construction funds; and strategies for
short and long term maintenance approaches and costs. Specific tasks associated with this scope of work include:
• Public engagement for conceptual design and design development of the 200 East leg Green Loop corridor
• Conceptual design for the green space component of the 200 East Corridor/ Segment of the Green Loop.
• Analysis of site opportunities and constraints with special attention to underground utilities and infrastructure
that may impact above ground improvements.
• Design development of the 200 East green space development and amenities. To include full construction cost
estimates with short and long term maintenance cost estimates.
$610,000 $610,000
20
Liberty Park
Cultural Landscape
Report and Master
Plan
Requested $475,000 from General Fund; Public Lands Project
Liberty Park is Salt Lake City’s most iconic – and most popular – park space, with well over one million visitors each
year. The features that draw visitors to Liberty Park – this historic features and mature trees that give Liberty Park
its unique atmosphere – are in a state of accelerating deterioration. The formal tree plantings framing the central
walkway and perimeter of the park are suffering tree loss due to old age and a planting plan to maintain historic
character is desperately needed. The project has three integral components:
1. A Cultural Landscape Report (CLR) is the principal document based on standards established by the National
Park Services. The report documents the history and physical changes of the site, determines periods of historic
significance and develops treatment recommendations for historic features and plantings. The report will build on
previous studies such as the 19XX Historic American Landscape Survey and look to including information on
underrepresented communities for this site. A CLR will include guidance for capital improvements, deferred
maintence projects and maintence.
2. The Liberty Park Master Plan will establish a vision and actionable plan that builds on the CLR recommendations
and provide an orderly framework for consistent planning, development and administration of the park for the
next twenty years. The plan deliverable will include concept level designs and renderings; a prioritized list of
capital improvements with high-level cost estimates; and policy direction for decision makers. The plan will go
though a formal adoption process.
3. This project will also include a study of the Liberty Park Greenhouse adaptive reuse for plant production, visitor
access, sustainability and potential revenue generation. The study will look at significantly expanding capacity for
growth of the City’s rare and native plant propagation program, allowing biodiversity enhancements at more parks
and natural areas citywide.
$354,167 $354,167
Last Updated August 17, 2021 Page 5
-$ -$ -$ -$ -$ -$
#Application Title Scope of Work General
Funds
Class C
(gas tax)
Impact
Fees
1/4 ¢
Transportation
FOF
Streets
FOF
Transit
General
Funds
Class C
(gas tax)
Impact
Fees
1/4 ¢
Transportation
FOF
Streets
FOF
Transit
AVAILABLE FUNDING
Mayoral Funding Recommendations COUNCIL Funding Decisions
21
Historic Structure
Renovation &
Activation at Allen
Park
$1.3 MILLION IN
MAYOR'S
PROPOSED BOND
FOR THIS PROJECT
Requested $420,000 from parks impact fees; Public Lands Project
• Structural and occupancy analysis of the historic structures
• Development of architectural drawings and bid-ready cost estimates for baseline structural, safety and
functional improvements for eleven (11) structures, sufficient to utilize them as twenty-three (23) separate art
studio spaces without plumbing, and the historically-sensitive adaptation of one (1) structure to serve as a
restroom/supplies washroom.
• Development of preliminary architectural plans, renderings and high-level cost analysis for the historic
reconstruction of the George Allen Home to serve as a community education space for art classes and workshops,
and historic reconstruction of the adjoining “Rooster House” duplex to serve as a small café space with outdoor
dining.
• Development of construction documents and cost estimates for demolition of all aging/leaking septic systems
buried on property, and construction of a sewer connection from the adapted restroom structure to the sewer
connection on 1300 East.
• Development of construction documents and cost estimates for replacement of the two broken water meters
that serve the property, water connections to service the adapted restroom structure, fire suppression systems in
the art studios, a fire hydrant on the east side of the property, underground drip irrigation to support trees
throughout the property, and spray irrigation to support select flowerbeds and turf areas, and a replumbed
connection to the decorative fountains.
• Construction documents and cost estimates for repair and stabilization of exterior art pieces on the Allen
Property at risk of collapse or severe deterioration, reconstruction of the lighting along Allen Park Drive,
adaptation of the north and south driveways to include public and ADA accessible parking for Allen Park, resurface
the degraded Allen Park Drive into an ADA-accessible, permeable surface pathway.
• High-level plan drawings and preliminary cost estimates for pedestrian stairway connections to 1400 East and
1500 East.
$420,000 $420,000
22
Replace Poplar
Grove Tennis with
new Sportcourt
$3.4 MILLION IN
MAYOR'S
PROPOSED BOND
FOR WESTSIDE
PARKS
100% ARPA
ELIGIBLE
Requested $440,000 from General Fund; Public Lands Project
Poplar Grove Park is currently underutilized and does not have recreation amenities in demand by the community.
This project will remove two failing tennis courts, constructed over forty years ago, and construct either two new
tennis courts or six new pickleball courts in the existing footprint. A brief community survey will be conducted to
determine neighborhood priority. Should pickleball courts be selected, six courts would make the site ideal for
tournament play. There is an existing restroom that was recently updated, and a recently constructed concessions
stand, currently underutilized, that would provide desired support amenities for tournaments. The project
includes:
• Engagement with the community on project preference
• Full demolition of the existing tennis courts and associated pavement
• Development of site design and technical drawings for bidding and construction
• Construction of post-tension court facility
• Installation of associated perimeter fences, gates, nets, and benches
• Replacement of related perimeter sidewalks
• Installation of waterwise use plantings and irrigation in associated landscape areas
$433,333 $433,333
Last Updated August 17, 2021 Page 6
-$ -$ -$ -$ -$ -$
#Application Title Scope of Work General
Funds
Class C
(gas tax)
Impact
Fees
1/4 ¢
Transportation
FOF
Streets
FOF
Transit
General
Funds
Class C
(gas tax)
Impact
Fees
1/4 ¢
Transportation
FOF
Streets
FOF
Transit
AVAILABLE FUNDING
Mayoral Funding Recommendations COUNCIL Funding Decisions
23
SLC Foothills
Trailhead
Development
$5 MILLION IN
MAYOR'S
PROPOSED BOND
Requested $1,304,682 from parks impact fees; Public Lands Project
This project is part of a phased development of trailheads within Salt Lake City Foothills. The Foothill Trails Master
Plan adopted by Council in early 2020 identified key trailhead locations and recommended improvements to
better accommodate the growing trail network.
Phase 1, Conceptual Design: This phase was funded during FY19 and is currently underway. The SLC Public Lands
team has been working with Alta Planning Consulting to develop concept designs for five key trailhead locations
including: Emigration Canyon, Popperton Park, Bonneville Boulevard, Morris Mountain (I-Street) and Victory Road.
Concepts are attached.
Following completion of the conceptual design process and cost estimates, SLC Public Lands is now requesting
funding to implement two of the five trailhead improvement projects. Due to substantial costs associated with all
five locations the remaining locations will be included in FY23
Phase II, construction will implement trailhead improvements at both Bonneville Boulevard and Emigration
Canyon.
Implementation of key trailhead improvements is a fundamental component for sustainability, accessibility, and
functionality of the 100+ mile recreational trail system recommended by the SLC Foothills Trail System Plan and
these two locations will provide a good start to implementation of the master plan recommendations.
If the Council approves this funding, then it would be subject to the FY22 annual budget adoption ordinance
contingency on all foothill trails funding.
$1,304,682 $1,304,682
24
SLC Foothills Land
Acquisitions
$5 MILLION IN
MAYOR'S
PROPOSED BOND
Requested $425,000 from parks impact fees; Public Lands Project
The project scope is limited to the acquisition of property rights for six parcels of undeveloped natural open space
in the north and central Foothills Natural Area, totaling approximately 275 acres, which will allow SLC to
consolidate ownership interest in the subject parcels, putting the City in a position to protect the parcels from
future development, and to guide property management for habitat protection, restoration, and recreational
access.
For three parcels, the proposed acquisitions would give SLC 100% property ownership; for two parcels, the
proposed acquisitions would move SLC from a minority ownership interest to a majority property ownership
interest; an in one case, would move SLC from a slight majority interest to a 90% interest. Increasing the fractional
ownership interest in these parcels substantially improves the City's ability to protect and manage them for
foothill protection, habitat restoration and nonmotorized recreational use.
If the Council approves this funding, then it would be subject to the FY22 annual budget adoption ordinance
contingency on all foothill trails funding. The Council could request a closed session briefing from the
Administration about the proposed property purchases.
$425,000 $425,000
25
Jordan Park
Pedestrian
Pathways
$3.4 MILLION IN
MAYOR'S
PROPOSED BOND
FOR WESTSIDE
PARKS
AND
$1.2 MILLION FOR
PUBLIC LANDS
SIGNAGE
100% ARPA
ELIGIBLE
Requested $510,000 from parks impact fees; Public Lands Project
This project will design and construct more than 3000 linear feet of new looped pathways in Jordan Park. New trail
segments will connect to existing sidewalks in order to create new desired pedestrian connections and a looped
network around the multi-use fields. This project builds on a previous request, approved in 2019 for new multi-
use trails in Jordan Park. This funding will be used to develop construction drawings for the pathways and
construction of the new pathways. Site furnishings, wayfinding and orientation signage will also be installed.
$510,000 $510,000
Last Updated August 17, 2021 Page 7
-$ -$ -$ -$ -$ -$
#Application Title Scope of Work General
Funds
Class C
(gas tax)
Impact
Fees
1/4 ¢
Transportation
FOF
Streets
FOF
Transit
General
Funds
Class C
(gas tax)
Impact
Fees
1/4 ¢
Transportation
FOF
Streets
FOF
Transit
AVAILABLE FUNDING
Mayoral Funding Recommendations COUNCIL Funding Decisions
26
RAC Playground
with Shade Sails
$3.4 MILLION IN
MAYOR'S
PROPOSED BOND
FOR WESTSIDE
PARKS
Requested $450,000 from parks impact fees; Public Lands Project
Cost Estimates
$300,000- Playground materials and construction
$150,000- Design, engineering and contingency
This project will add a new playground at the Regional Athletic Complex. The RAC has been open for 5 years and
currently doesn’t have any amenities for children to use while visiting the complex.
The full scope of this project includes:
• Design for a new playground for ages 5-12
• Development of technical drawings
• Grading and surfacing preparations
• Playground Construction
• Walkway and fencing
Note that since FY17, the Council approved $2,421,518 for six RAC capital improvement projects
$180,032 $180,032
27
700 South
Westside Road
Configuration
Requested $514,450 from General Fund; Constituent Transportation Project
A particular area of concern is the intersection of 700 S and 1000 W. 10th west (a massively wide road) intersects
with 700 S (another, even more massively wide road). I propose that 700 S be reconfigured to include a traffic
circle with a pocket park in the center, and include at least two, perhaps 3 medians along 700 South. I picture
these medians planted with large, native trees and plants. I picture clearly defined traffic lanes for pedestrians,
bicyclists, and cars, including clearly marked, perhaps even raised cross walks. I picture a quality, speed controlling
traffic circle with some low maintenance vegetation, benches, maybe even a simple playground. This vision
benefits the community in more ways than we could count. Improving roads, reducing the heat island effect by
the massive asphalt slabs, beautifying our surroundings, creating community gathering places, mitigating crime,
reducing vehicle speeds, and so much more. I have discussed this concern with neighbors, the poplar grove
community council, and had a brief conversation with Councilman Andrew Johnston about my concerns and our
ideas for reconfiguration, and he suggested I submit a CIP grant, which brings me here today. I hope the city will
consider the benefit that this kind of project will offer to our community.
Cost – provided by SLC Engineering
Traffic Circle Construction
Crosswalk Construction
2-3 Planted Medians
Clearly defined traffic lines.
Useful Life – >10 years
Salt Lake City Owned Asset – Roads and sidewalks are all public Salt Lake City Owned Assets
$223,450 $291,000 $223,450 $291,000
28
Highland High
Crosswalk
Enhancements
Requested $85,000 from General Fund; Constituent Transportation Project
The scope of work will include upgrading the crossing to include Rapid Rectangular Flashing Beacons (RRFB) as well
as enhancements to shorten the crosswalk and make it safer (bulbouts on the east and west side of the
intersection and a raised median)
$85,000 $85,000
Last Updated August 17, 2021 Page 8
-$ -$ -$ -$ -$ -$
#Application Title Scope of Work General
Funds
Class C
(gas tax)
Impact
Fees
1/4 ¢
Transportation
FOF
Streets
FOF
Transit
General
Funds
Class C
(gas tax)
Impact
Fees
1/4 ¢
Transportation
FOF
Streets
FOF
Transit
AVAILABLE FUNDING
Mayoral Funding Recommendations COUNCIL Funding Decisions
29
200 South Transit
Complete Street
Supplement
15% ARPA
ELIGIBLE UP TO
$1.8 MILLION OF
TOTAL PROJECT
COST
Requested $284,691 from transportation impact fees, $415,800 from Quartercent for transportation and
$2,561,409 from Funding Our Future; Transportation Project
As part of the Funding Our Future program, Salt Lake City will reconstruct 200 South from 400 West to 900 East
beginning in 2022. The current budget allocated to this project is $12,000,000 inclusive of construction and
professional design fees. The Transportation Division is requesting $3,261,900 to supplement the reconstruction
funds that reflects the recommendations from the 200 South Transit Corridor, Complete Street, and Downtown
Transit Hub Study. The preliminary design includes:
• Side-running Business Access and Transit (BAT) priority lanes, which operate as dedicated bus lanes but still
provide access to curbside uses and can be used in mixed traffic conditions.
• In-street bus stop islands will allow buses to stay in the driving lane, which reduces bus travel time and
minimizes conflicts that occur when weaving to curbside bus stops.
• Additional transit access and walkability elements, including mid-block crosswalk upgrades, landscaping,
sidewalk repair, human-scale lighting, traffic signal replacements (3), and bicycle lanes.
The low-end cost estimate for the preliminary design is approximately $15,500,000; the majority of the expense is
going to pavement robust enough handle the amount of bus activity expected on the corridor. Without
supplementary funds the budget shortfall will require removing many of the elements that make this a
transformative multi-modal project. It is expected that the project will need to be implemented in phases,
specifically the East Downtown Transit Hub envisioned in the Salt Lake City Transit Master Plan and WFRC Regional
Transportation Plan. However, there are many elements that are important to build in the initial construction
phase that are structural to the road reconstruction project (e.g. curb extensions that affect flow lines and
drainage inlets); these are the priority elements the supplemental funds will be directed towards.
$37,422 $415,800 $37,422 $415,800
30 900 South 9Line RR
Crossing
Requested $28,000 from transportation impact fees and $172,000 from Quartercent for transportation;
Transportation Project
The 2018 9-Line Trail Extension Study is the basis for recent 9-Line Trail projects’ design and budgeting
approaches. It recommends two very different design options near Interstate 15 and Union Pacific’s (UPRR) and
the Utah Transit Authority’s (UTA) rails. The more expensive, longer-term option is to grade-separate either just
the trail or both the trail and the roadway. The easier, less expensive, and shorter-term option is an improved at-
grade (or ground-level) crossing of the rails and routing the trail under the interstate. The latter is the focus of this
application. More information about the overall project’s timeline (2021-2023), approach, benefits, and robust
past engagement can be found at www.900SouthSLC.com. This funding request seeks additional monies that
would be used to:
• Fund an increase in the coordination and design budgets for the City’s contracted design and engineering
consultants (including multiple field and coordination meetings with UPRR, UTA, and the Utah Department of
Transportation (UDOT); research; and, more in-depth design), around $10,000
• Fund the UPRR consultant’s (RailPros) design review fees, typically up to $20,000.
• Construct three new railroad panels south of the existing panels, which are necessary to accommodate a 9-Line
Trail crossing capable of serving people walking and bicycling perpendicular to the rail corridor, typically around
$30,000 for all three.
• Construct additional improvements and/or new support infrastructure at the at-grade crossing per recent
experience with standard UPRR and UDOT guidance (e.g., back flashers, blankout signs, signage, pavement
markings, detectable warning surfaces and trail delineation, audible devices, fencing, swing arms, gates), typically
around $120,000.
• Fund UPRR and UTA-required training, traffic control, permitting, and miscellaneous other costs related to
construction, typically around $10,000.
• Engineering Division fees, typically about 10% (estimated at $10,000)
$28,000 $172,000 $28,000 $172,000
Last Updated August 17, 2021 Page 9
-$ -$ -$ -$ -$ -$
#Application Title Scope of Work General
Funds
Class C
(gas tax)
Impact
Fees
1/4 ¢
Transportation
FOF
Streets
FOF
Transit
General
Funds
Class C
(gas tax)
Impact
Fees
1/4 ¢
Transportation
FOF
Streets
FOF
Transit
AVAILABLE FUNDING
Mayoral Funding Recommendations COUNCIL Funding Decisions
31 Trails Maintenance
Requested $200,000 from Quartercent for Transportation; Transportation Project
This funding request from 4th Quarter of a Cent Sales Tax for Transportation is requested to be moved from the
capital list into the annual operating budget for the Public Lands Division. Maintenance is an eligible expense of
the state-authorizing legislation for this fund. These funds will be used to fund city staff, equipment and material
to maintain new and recently constructed trails including portions of the 9-Line, McClelland Trail, and the Jordan
River Trail, and other urban trail segments that potentially come online during the course of the fiscal year. The
maintenance of these trails are necessary to keep them safe for all that use them and also so they can be used
year round.
$200,000 $200,000
32 Local Link
Construction
Requested $50,000 from transportation impact fees and $450,000 from Quartercent for transportation;
Transportation Project
The Local Link Circulation Study (adoption pending, summer/fall 2021), prepared as an update to the 2013 Sugar
House Circulation Plan, continues the 2013 plan’s focus on improving conditions for walking, bicycling, and transit
in Sugar House.
This funding request is supplemental construction dollars to implement some of the recommendations of the
Local Link circulation study in the Sugar House area. Many Sugar House streets are planned to be reconstructed as
part of the Funding our Future Streets Bond, which included some Complete Streets funding. However, these
budgets had only limited funding for more extensive Complete Streets elements such as would reconfigure curbs
or intersections. This funding will allow the City to build higher-quality, higher-comfort facilities for walking and
biking in this key area, above and beyond what could be constructed with currently allocated funding. These
roadways include Highland Drive, 1100 East and 2100 South; 1300 East will be reconstructed with a federal grant
allocated through the Wasatch Front Regional Council.
These recommendations of the Local Link study include: providing better walking and biking connections between
Sugar House and Millcreek on Highland Drive and 1300 East, construction of bike facilities around Sugar House
Park, intersection enhancements at various locations around Sugar House (modifying turn movements, shortening
crossing distances).
$50,000 $450,000 $50,000 $450,000
33 Corridor
Transformations
Requested $75,604 from transportation impact fees and $780,438 from Quartercent for transportation;
Transportation Project
This programmatic request will fund the design and construction of significant infrastructure additions to corridors
NOT currently planned for reconstruction -- to include corridor-based complete streets changes to signing, striping
and wayfinding. corridor-long consideration and placement of bus stops with shelters, benches, trash cans, and
other amenities; improved bikeways; reconfigured intersections for improved pedestrian and bicycle safety in the
context of a corridor study; and consideration of business access / on-street parking. Possible corridors include
600/700 North, 2100 South, and corridors on the Downtown Green Loop.
$25,398 $282,200 $25,398 $282,200
Last Updated August 17, 2021 Page 10
-$ -$ -$ -$ -$ -$
#Application Title Scope of Work General
Funds
Class C
(gas tax)
Impact
Fees
1/4 ¢
Transportation
FOF
Streets
FOF
Transit
General
Funds
Class C
(gas tax)
Impact
Fees
1/4 ¢
Transportation
FOF
Streets
FOF
Transit
AVAILABLE FUNDING
Mayoral Funding Recommendations COUNCIL Funding Decisions
34 Area Studies
Requested $14,000 from transportation impact fees and $201,000 from Quartercent for transportation;
Transportation Project
These funds will be used to study and provide recommendations for streets and circulation in the rapidly-
developing Granary area, including the incorporation of bike, pedestrian and rail transit in the area, as well as an
understanding of how the existing streets should be improved. The cost of this study is estimated at $120,000, and
the City has applied for $111,000 in Transportation and Land Use Connection funding. The study will be
complemented by a study work being conducted by UTA in the area.
These funds will also be used to develop design recommendations for selected streets in the Sugar House area,
following on the more general guidance provided by the Local Link Circulation Study. This study (adoption process
anticipated, summer/fall 2021), prepared as an update to the 2013 Sugar House Circulation Plan, continues the
2013 plan’s focus on improving conditions for walking, bicycling, and transit in Sugar House. The purpose of this
funding would be to allow us to design higher-quality, higher-comfort facilities for walking and biking in this key
area, above and beyond what could be constructed with currently allocated funding. These roadways include
Highland Drive, 1100 East and 2100 South; 1300 East will be reconstructed with a federal grant allocated through
the Wasatch Front Regional Council. These recommendations of the Local Link study include: providing better
walking and biking connections between Sugar House and Millcreek on Highland Drive and 1300 East, construction
of bike facilities around Sugar House Park, intersection enhancements at various locations around Sugar House
(modifying turn movements, shortening crossing distances).
$0 $201,000 $0 $201,000
35 400 South Viaduct
Trail
Requested $310,000 from General Fund, $90,000 from transportation impact fees and $500,000 from Quartercent
for transportation; Transportation Project
This project will add a low-profile, concrete barricade along with striping changes to create a multi-use trail on the
south side of the 400 South Viaduct, connecting the Poplar Grove Neighborhood with Downtown Salt Lake City for
those walking or bicycling. Construction includes changes to sidewalks and bike / pedestrian ramps, striping
removal and replacement, and minor construction to relocate medians. The multi-use trail will tie into existing
sidewalks on the east and west, and connect to existing and planned bike lanes.
$310,000 $90,000 $500,000 $310,000 $90,000 $500,000
36 Neighborhood
Byways
Requested $104,500 from transportation impact fees and $940,500 from Quartercent for transportation;
Transportation Project
These funds will be used for design and construction of four neighborhood byways, as well as to create a
neighborhood byway conceptual design and guidance document to be used as reference material in the
development of future neighborhood byways. This will make future neighborhood byway development more
streamlined and efficient, and is anticipated to cost $100,000.
Two neighborhood byways -- 800 East Phase 1 ($275,000) and Poplar Grove Phase 2 ($600,000) -- will receive
construction dollars, while the additional two byways -- Sugar House to the U and Rose Park West -- will enter
community collaboration leading to conceptual designs ($35,000 per byway).
$104,500 $940,500 $104,500 $940,500
Last Updated August 17, 2021 Page 11
-$ -$ -$ -$ -$ -$
#Application Title Scope of Work General
Funds
Class C
(gas tax)
Impact
Fees
1/4 ¢
Transportation
FOF
Streets
FOF
Transit
General
Funds
Class C
(gas tax)
Impact
Fees
1/4 ¢
Transportation
FOF
Streets
FOF
Transit
AVAILABLE FUNDING
Mayoral Funding Recommendations COUNCIL Funding Decisions
37
900 South Signal
Improvements
15% ARPA
ELIGIBLE UP TO
$375,000 OF
TOTAL PROJECT
COST
Requested $430,000 from General Fund and $70,000 from transportation impact fees; Transportation Project
The 2021-2023 900 South Reconstruction project runs from 900 West to Lincoln Street (945 East). From 700 East
to 200 West, the proposed design includes reducing the roadway width and cross section from four lanes to three,
improving safety and reducing speeds. The reduction in width also provides space for a separated path (the 9-Line
Trail), from 700 West to Lincoln Street (945 East) on the south side of 900 South. The narrowing and other project
elements will largely be achieved by moving the southern curb line to the north. These improvements are fully
funded and are currently in design, and construction will begin in 2021. For more about timeline, benefits, and the
robust past engagement for this project, visit www.900SouthSLC.com.
The new street design requires updated signal design and some additional infrastructure at most intersections
along the corridor. The layout of the proposed improvements has been designed to reduce the number of signal
poles required to be moved to keep project costs as low as possible.
1. West-facing signal mast arms on the south side of the corridor would generally be lengthened, or the entire
pole and mast arm would be relocated farther north.
2. East-facing signal mast arms on the north side may be shortened.
3. All signal heads would be adjusted to line up with the new lane configuration.
4. The new street design and the introduction of the trail on the south side require relocating or adding new or
relocated pedestrian push buttons to coincide with the new curb ramp locations.
5. The existing signal detection on cross streets (for northbound and southbound traffic) would also be upgraded
with radar or camera sensors at the 200 East, 300 East, 400 East, and 500 East intersections, the only four
intersections where such state-of-the-practice detection technology does not currently exist.
$96,500 $70,000 $100,000 $233,500 $96,500 $70,000 $100,000 $233,500
38 Urban Trails
Requested $6,500 from transportation impact fees and $1,038,500 from Quartercent for transportation;
Transportation Project
This programmatic funding application is for a suite of projects that represent collaborations between
Transportation Division and the Trails & Natural Lands Division of Public Lands. These funds will enable conceptual
development, design, and construction of selected urban trails, including:
• design of the Folsom Trail west of 1000 West
• design of the Grit & Gravel Trail (Beck St.) providing a key connection to Davis County
• design of the Parley's Trail in Sugar House following on the Local Link Circulation Plan
• design and initial quick-build implementation of portions of 200 East and/or other streets
included in the Green Loop linear park recommended in the Downtown Master Plan. Quick-build designs will be
linked to the project’s public engagement process and may be temporary, seasonal, or semi-permanent.
• initial conceptual design of potential west side trails such as Stegner Trail along CWA drain
• neighborhood connections to the Jordan River Trail
• rehabilitation of badly deteriorated sections of the Jordan River Trail
$6,500 $1,038,500 $6,500 $1,038,500
39 Multimodal Street
Maintenance
Requested $200,000 from Quartercent for transportation; Transportation Project
This project provides funding to hire contractors for specialized maintenance of infrastructure for which current in-
house staff doesn’t have the equipment or staff to accomplish. Examples include enhanced crosswalks, bike lanes,
bike racks, colored pavement including downtown green bike lanes, bus shelters, enhanced medians: Snow
plowing, striping, signals, signage, delineators, etc.
$200,000 $200,000
Last Updated August 17, 2021 Page 12
-$ -$ -$ -$ -$ -$
#Application Title Scope of Work General
Funds
Class C
(gas tax)
Impact
Fees
1/4 ¢
Transportation
FOF
Streets
FOF
Transit
General
Funds
Class C
(gas tax)
Impact
Fees
1/4 ¢
Transportation
FOF
Streets
FOF
Transit
AVAILABLE FUNDING
Mayoral Funding Recommendations COUNCIL Funding Decisions
40
Transportation
Safety
Improvements
Requested $450,000 from General Fund and $50,000 from transportation impact fees; Transportation Project
Traffic safety projects include the installation of warranted crossing beacons, traffic signals, or other traffic control
devices and minor reconfiguration of an intersection or roadway to address safety issues. Salt Lake City's program
places a strong emphasis on pedestrian and bicyclist safety, particularly in support of access to and from transit.
This funding will further the City’s on-going effort to reduce injuries to pedestrians and bicyclists citywide and to
improve community health and livability by promoting walking and bicycling. This funding will be used for the
installation of safety improvements throughout the city as described in the Pedestrian & Bicycle Master Plan, and
also to address ongoing needs as safety studies are completed.
Crossing improvements such as HAWKs or TOUCANs, flashing warning lights at crosswalks or intersections, refuge
islands, bulb-outs, improved signalized crossings and new or improved pavement markings are examples of the
safety devices that are installed with this funding. Projects are identified by using data to analyze crash history,
roadway configuration and characteristics, and with citizen input. Identified projects to improve traffic safety
involve conditions that pose a higher relative risk of injury to those traveling within SLC and are therefore deemed
a high priority for implementation.
$44,400 $400,000 $44,400 $400,000
41
1700 South
Corridor
Transformation
Requested $326,835 from General Fund and $36,315 transportation impact fees; Transportation Project
Transformation of 1700 South to provide improved neighborhood connections to Glendale Park, 1700 River Park,
support a possible new regional park replacing the defunct water park, and to create an improved east-west
walking and bicycling corridor at the approximate north-south midpoint between the 9-Line Trail and the Parley’s
Trail. Improvements will also include street crossings to connect the parks on the north (1700 South River Park)
and south (Glendale Water Park and Glendale Park) sides of the street. Funds to be used for design, public
engagement, and construction of curb changes to improve ped/bike safety and street tree planting sites, semi-
permanent quick build linear elements, striping changes, and signage.
$317,792 $35,300 $317,792 $35,300
42 Kensington Byway
Ballpark
Requested $500,000 from General Fund; Constituent Transportation Project
The CDCIP Advisory Board did not recommend funding this project.
The Ballpark Community Council and Liberty Wells Community Council are requesting CIP funds for development
of a neighborhood byway on Kensington Avenue as suggested in the Utah Bicycle & Pedestrian Master Plan
(December 2015).
“Improvements that make a street a neighborhood byway include bicycle and pedestrian crossing improvements
(for example, signals, crosswalks, curb extensions (aka bulb-outs), curb ramps, signage, street markings, and other
traffic calming techniques), wayfinding signage, and connectivity enhancements to existing bicycle and pedestrian
routes.” (source: https://www.slc.gov/transportation/neighborhood-byways/ )
Note the CDCIP Board did not recommend funding this project.
$500,000 $500,000
43 3000 South
Sidewalk and Curb
Requested $449,315 from General Fund; Constituent Engineering Project
Install curb and gutter and adjacent sidewalk and asphalt tie in on the north side of 3000 South
from Highland Drive to 1500 East and an asphalt overlay over the entire street. Installation will
require the removal of trees and landscaping and adjustment of drive approaches and retaining walls.
44 Logan Ave
Reconstruction
Requested $1,405,000 from General Fund; Engineering Project
This project will reconstruct the deteriorated streets affected following the Public Utilities storm drain project. This
will provide replacement of street pavement, curb and gutter, sidewalk, drainage improvements as necessary.
Where appropriate, the program will include appropriate bike way and pedestrian access route improvements as
determined by the Transportation Division per the Complete Streets ordinance.
Last Updated August 17, 2021 Page 13
-$ -$ -$ -$ -$ -$
#Application Title Scope of Work General
Funds
Class C
(gas tax)
Impact
Fees
1/4 ¢
Transportation
FOF
Streets
FOF
Transit
General
Funds
Class C
(gas tax)
Impact
Fees
1/4 ¢
Transportation
FOF
Streets
FOF
Transit
AVAILABLE FUNDING
Mayoral Funding Recommendations COUNCIL Funding Decisions
45
Bridge
Replacement (200
South over Jordan
River)
Requested $3.5 million from General Fund; Engineering Project
This project will include the complete removal and replacement of the existing vehicle bridge for 200 South over
the Jordan River. Design will consider complete streets features, accommodations for the adjacent Jordan River
Trail, and the historic nature of the adjacent Fisher Mansion, and potential art components incorporated into or
around the new bridge.
46
Bridge
Rehabilitation (400
South and 650
North over Jordan
River)
PARTIALLY ARPA
ELIGIBLE
Requested $3 million from General Fund; Engineering Project
The purpose of this project is to rehabilitate the 400 South and 650 North vehicle bridges over the Jordan River. A
bridge inspection performed by UDOT gave these bridges a Health Index score of 48.55 and 46.58, respectively,
out of 100.
Combining the two bridges into one project will result in economies of scale since the rehabilitation work for both
bridges will be similar. The existing asphalt surface will be removed and the underlying deck will be treated for
cracking and delaminated concrete. The deck will receive a waterproofing membrane, a new asphalt overlay, and
deck drains to remove storm water from the deck. The under surface of the bridge will be treated for cracking and
delaminated concrete on the deck, girders, pier caps, and abutments. The steel piles supporting the piers exhibit
heavier than typical corrosion. The piles will be dewatered and treated for corrosion. The existing damaged
parapet wall will be removed and rebuilt which will widen the sidewalk and improve the pedestrian access route.
Additionally, aesthetic enhancements will be incorporated including replacing the chain link fence and railings
mounted on the outside of the sidewalk with decorative railings. A consulting firm with specialized experience will
be used for this project.
47 Wingpointe Levee
Design
Requested $800,000 from General Fund; Engineering Project
The cost estimate includes conceptual design, final design, and geotechnical investigations performed by
Engineering consultants. Current levee conditions will be evaluated, required improvements identified, and
modifications recommended. Typical sections of levee reconstruction determined in order to develop
construction cost estimates and required plans and documents for permitting, then construction. This design
effort will inform future funding construction requests to bring the levee into compliance.
48 Three Creeks West
Bank Roadways
Requested $1,158,422 from General Fund; Constituent Engineering Project
This project calls for reconstructing a little over a block of 1300 South and 1/3 of a block of 1000 West and
installing storm sewers.
49 Delong Salt
Storage
Requested $1,504,427 from General Fund; Facilities Project
This salt storage building would cover 4000 tons of salt during winter months and seasonal remnants of salt the
rest of the year. The salt will be protected from the elements which reduces waste and allows for an overall, more
efficient snow removal process. See attached estimate.
50 Steam Bay
Requested $363,495 from General Fund; Facilities Project
When the new Streets and Fleet facility was built in 2010, one equipment steam bay was installed to clean asphalt
and other heavy equipment. The bay is designed to remove asphalt products, separate oil from water runoff, and
capture the runoff to meet storm water pollution prevention requirements. A single Streets crew could alternate
equipment cleaning and repair, but with the addition of the second crew, all equipment is running simultaneously,
and the steam bay’s capacity has been exceeded to that point of jeopardizing equipment cleaning and the creating
a storm water pollution risk. Additionally, the current pump system is at the end of its expected lifespan. Funds
will go toward a larger, more robust, and better designed system. This additional steam bay will be 22X45 with 4
foot pony walls and tie in to the upgraded pumping system.
Last Updated August 17, 2021 Page 14
-$ -$ -$ -$ -$ -$
#Application Title Scope of Work General
Funds
Class C
(gas tax)
Impact
Fees
1/4 ¢
Transportation
FOF
Streets
FOF
Transit
General
Funds
Class C
(gas tax)
Impact
Fees
1/4 ¢
Transportation
FOF
Streets
FOF
Transit
AVAILABLE FUNDING
Mayoral Funding Recommendations COUNCIL Funding Decisions
51 Mixed-Use Three
Story Prop
Requested $815,895 from General Fund; Fire Project
Drager Phase V Training Gallery (Mixed-use fire prop) to include:
Three (3) story unit with roof top deck/fourth floor comprised of seven (7) 40’ and one (1) 20’ training modules
Three (3) high-temperature thermal-insulated burn chambers with emergency exits (as required)
Two (2) clean out decks for burn chambers
Burn room baffles
Exterior scissor staircase from the ground level to the fourth story/roof with interior access on each floor
Exterior stairs to single container roof
Interior stairs connecting first to second and second to third stories
Fall protection railings around all roofs of containers
Rappelling anchor on top of fourth story/roof
Two bailout windows
Vent/enter/search windows
Eleven (11) exterior doors
Two (2) interior doors
Emergency fire escape stairs
Four (4) training deck containers
On-site installation & set up to include: Full project management support from Drager staff, Pre-installation site
surveys and in-process review of the build site, Drager contracted and project-managed installation to ensures
that the fire prop system is installed properly, safely, and with minimal disruption, Insured and bonded installation
and crane service, Train-the Trainer Program
Two-day on-site training for up to ten (10) fire department instructors Complete documentation package on
operation and maintenance
52 Training Ground
Site Improvements
Requested $694,785 from General Fund; Fire Project
The fire training ground site improvement includes the excavation and construction of paved areas surrounding
fire training props to allow access for firefighters and fire vehicles as they train. Ideally this training ground would
simulate a small cross section of the structures that are in Salt Lake City and the site improvement would resemble
streets and access points like what is in the city. Currently there is approximately 45,000 square feet of
underutilized training ground.
Key components of this project include:
Training ground site design
Site excavation
Drainage and retention system
Site back fill and compaction
Various paved access roads
Reinforced concrete pads for vehicle extrication training
Technical and confined rescue training props
Curb and gutter along Wallace St.
Perimeter landscaping and fencing
53 Sunnyside Park
Sidewalk
Requested $72,740 from General Fund; Constituent Public Lands Project
Construct sidewalk on south side of Valdez Dr. from east gate of Dept. of Veterans Affairs to intersecting sidewalk
inside Sunnyside Park. See map. Sidewalk is approximately 365-ft long by 4-ft wide. Federal funding was explored
but we are prohibited from applying those funds to non-federal property. Costs could include wider surface or
other improvements to meet the minimum spending requirement.
Last Updated August 17, 2021 Page 15
-$ -$ -$ -$ -$ -$
#Application Title Scope of Work General
Funds
Class C
(gas tax)
Impact
Fees
1/4 ¢
Transportation
FOF
Streets
FOF
Transit
General
Funds
Class C
(gas tax)
Impact
Fees
1/4 ¢
Transportation
FOF
Streets
FOF
Transit
AVAILABLE FUNDING
Mayoral Funding Recommendations COUNCIL Funding Decisions
54
Winner on
Wasatch Dee Glen
Tennis Court
Construction
Requested $500,000 from General Fund; Constituent Public Lands Project
A critically important construction project replacing four old asphalt tennis courts at Dee Glen (Wasatch Hills
Tennis Center/formerly Coach Mike's Tennis Academy) inside the current bubble. These new courts would be post-
tension concrete courts (long-lasting compared to asphalt) would be preparatory to a new privately funded year-
round tennis air dome by the Coach Mike's Friends of Public Tennis Foundation (a 501 c3 non-profit whose
mission is to assist the main funding source, Salt Lake City, in supporting Liberty Park & Wasatch Hills Tennis
Centers). Note that #s 54, 55 and 56 are in order of the constituent's preferences.
$400,000
55
Lighting Upgrade
at Liberty Park
Tennis Center
Requested $202,100 from General Fund; Constituent Public Lands Project
LED Energy Efficient Lighting Upgrade of 120 outdated metal halide light fixtures at Liberty Park Tennis Center.
Note that #s 54, 55 and 56 are in order of the constituent's preferences.
56
Liberty Park &
Wasatch Hills
Tennis Court
Resurfacing
Requested $300,000 from General Fund; Constituent Public Lands Project
26 Tennis Courts resurfacing at Liberty park tennis center and wasatch hills tennis center. Note that #s 54, 55 and
56 are in order of the constituent's preferences.
57
Harrison Ave and
700 E Community
Garden
Requested $103,500 from General Fund; Constituent Public Lands Project
This community garden would be developed through the Green City Growers Program, a partnership between
Wasatch Community Gardens (WCG) and Salt Lake City’s Parks and Public Lands Division to establish community
gardens on Cityowned and managed land with the primary goals to increase access to fresh, local produce and
reduce barriers to urban food production.
The scope of work to develop a new community garden includes working with community members for 12 to 18
months to develop the interest, support, and design of the project. WCG will work to build the community
support. Our organization will work with stakeholders to create a coalition of gardeners, garden leaders,
volunteers and donors to raise any remaining funds to complete the garden design process, provide the materials
for planting boxes (including ADA accessible raised beds), soil, amendments, and irrigation. WCG will enlist and
provide oversight of volunteer in-kind labor, and oversee services that are contracted out.
The cost estimate of $103,500 is based upon three recent community garden starts in this program; the 9-Line
Community Garden, the Gateway Community Garden, and the Richmond Park Community Garden. The scope of
work includes; soil testing for contaminants to help guide the bed design, landscape design, site demolition and
preparation, water main hook up, fencing, ADA beds and pathways, garden beds, a drip irrigation system, soil,
amendments, and mulch for pathways, tools and supplies, a shade and gathering structure, and signage, benches,
and common area plantings.
$103,500
58
1300 South
Camping Resisitant
Landscaping
Requested $100,000 from General Fund; Constituent Public Lands Project
The Ballpark Community Council is requesting CIP funds for landscaping improvements for the park strips on 1300
South and the areas immediately surrounding Horizonte. Rather than the lawns and grass that currently exist on
these park strips, we’re asking the City to invest in re-planting these areas with new low- to no-water options such
as combinations of trees with xeriscaping and/or rockscapes. These new park strip designs would have the dual
effect of assisting the City with its goal of reducing nonagricultural use of water and would also serve as a loiter
and camping-resistant landscapes.
Last Updated August 17, 2021 Page 16
-$ -$ -$ -$ -$ -$
#Application Title Scope of Work General
Funds
Class C
(gas tax)
Impact
Fees
1/4 ¢
Transportation
FOF
Streets
FOF
Transit
General
Funds
Class C
(gas tax)
Impact
Fees
1/4 ¢
Transportation
FOF
Streets
FOF
Transit
AVAILABLE FUNDING
Mayoral Funding Recommendations COUNCIL Funding Decisions
59 Wingate Walkway
Requested $286,750 from General Fund; Constituent Transportation Project
• This budget includes removal and transplanting of trees as requested by constituents. This is quite expensive at
estimated $5000 per tree, and would include using a crane, as well as contracted extra care for 2 years by a
landscaping company to get the trees reestablished. This is not something that can be done in-house. Tree
removal is much less expensive, at $500 per tree. This would mean the removal of 15 mature trees for this project,
but at a construction cost savings of $67,500.
• This budget assumes that the power pole at the eastern end of the corridor, and the power drop to the traffic
signal, will not be relocated. If those do need to be relocated, an additional approximate $30,000 would be added
to the project construction costs, along with associated design and engineering fees. There may also be ROW
acquisition costs to site the pole and its guy-wires.
• This budget does not include 36 parking headers that would need to be purchased by Wingate Condo
Association and placed on Wingate property at an estimated cost of $2,500-3,000 (for all 36). The parking headers
would be needed to protect the fence from regularly being hit and damaged by Wingate residents parking. It is
suggested that this be placed into legal agreement as part of the easement, and that the Condo Association be
responsible for any damage to the fence caused by not having the parking headers in place.
• A less expensive fence could be installed to save costs. This budget is for wrought iron fencing at $48 per linear
foot. Chain link would be half or less of that cost.
• This project has been budgeted as a 10' multi-use path, similar to the photos the constituents included. This also
recongizes the recommended use as both bicycle and pedestrian facility, as referenced in the City's Pedestrian &
Bicycle Master Plan. To save costs, the path could be constructed as a sidewalk, at 6' wide instead of 10'. The
thickness may be able to be reduced to sidewalk standard at 4" thick. However, further discussion should be had
with SLC Police Department about their preferred approach to emergency access.
$286,750
60 1200 East Median
Requested $500,000 from General Fund; Constituent Public Lands Project
The curbing and irrigation systems for these medians has fallen into serious disrepair. This project seeks to install
new curbing around each island to prevent cars from driving across the turf and will allow the soil to be raised to
match the grade of the top of the root ball of the existing trees, replace the irrigations system and a significant
amount of trees supplementing the urban forest that remains. The tree planting portion of the project is in
support of the “Trillion Tree Campaign” in an effort to aid in enhancing Salt Lake City’s air quality. The cost
estimate is $500,000 to include design, engineering fees, contingency and construction.
61
Parleys Historic
Nature Park
Structure
Preservation
Requested $765,325 from General Fund; Public Lands Project
The proposed CIP project will fund the following work in Parleys Historic Nature Park (PHNP):
1. identify key historic structures and artifacts, assess preservation needs, and create detailed
rehabilitation/protection recommendations for each;
2. develop fully-engineered designs and construction cost estimates for historic structural rehabilitation;
3. if feasible, develop and secure a conservation easement to protect irreplaceable historic and natural features,
per the recommendations of the 2011 PHNP Management Plan.
4. if feasible within project budget, develop a detailed signage & interpretive materials plan to improve public
awareness/appreciation of historic features & structures, and construct/install the recommended interpretive
signage.
Last Updated August 17, 2021 Page 17
-$ -$ -$ -$ -$ -$
#Application Title Scope of Work General
Funds
Class C
(gas tax)
Impact
Fees
1/4 ¢
Transportation
FOF
Streets
FOF
Transit
General
Funds
Class C
(gas tax)
Impact
Fees
1/4 ¢
Transportation
FOF
Streets
FOF
Transit
AVAILABLE FUNDING
Mayoral Funding Recommendations COUNCIL Funding Decisions
62
Enhancement of
the Cemetery for
Visitor Research
and Knowledge
$1.2 MILLION IN
MAYOR'S
PROPOSED BOND
FOR PUBLIC LANDS
SIGNAGE
Requested $790,000 from General Fund; Public Lands Project
Cemetery listed on National Register of Historic Places- $30,000
Website Enhancement, Cemetery GIS data and input- $250,000
Arboretum Accreditation and new planted tree protection- $65,000
Plat Markers- $100,000
Interpretive/Wayfinding Signage Design and 10 Sign placements-$75,000
Two years inflation adjustment - $52,000
Engineering Consultant fees - $208,000
Contingency - $10,000
Note that #s 62 and 63 are part of the Cemetery Master Plan implementation
63
Cemetery
Roadway
Improvements,
Phase 1
$1 MILLION IN
MAYOR'S
PROPOSED BOND
Requested $3,838,000 from General Fund; Public Lands Project
Phase 1a of a 6 phase road repair project identified in the Cemetery Master Plan. With 7.9 miles of roads and an
estimated $12.5 million dollars in repairs. Roadway Repair Priority Cemetery roadways were prioritized for repair
based on the following characteristics: Roads more frequently used for public and maintenance vehicular
circulation. Roads that also serve as main routes as outlined on the Pedestrian and Bicycle Improvements Plan.
Roads in poor condition were prioritized over those in fair or average condition (See Appendix E for detailed
Roadway Condition Analysis). Road width was given some consideration. Total roadway length within a priority
category was considered in an effort to separate roadways into projects that would be of a more manageable size.
Note that #s 62 and 63 are part of the Cemetery Master Plan implementation
-Costs include: full replacement including demo, reconstruction with asphalt, concrete edge/curb and gutter and
storm drainage improvements, 15% estimate contingency and 40% design/engineering fees. Other soft costs such
as project and construction contingencies, City project management, and permits and fees are not included and
should be added to budget requests as appropriate.
Cost Breakout - Full Repair of All Roads (Priority Street Name Length Width Total SF Repair Cost)
1a Main (N) 1,188 22 26,136 Full $701276
1a Main (N) 167 21 3,507 Full $94,099
1a Main (middle) 1,242 19 23,598 Full $ 633,176
1a Main (sexton) 367 17 6,239 Full $ 167,403
1a 240 N 1,090 16 17,440 Full $ 467,947
1a 330 N(Lindsey) 36 27 972 Full $ 26,080
1a 330 N 1,433 25 35,825 Full $ 961,250
1a Hillside 998 25 24,950 Full $ 669,453
Priority 1a Total 1.3 miles 139,000 sf $ 3,838,000
64
9Line and Rose
Park Asphalt Pump
Tracks
$3.4 MILLION IN
MAYOR'S
PROPOSED BOND
FOR WESTSIDE
PARKS
9Line $615,777
PORTION IS ARPA
ELIGIBLE
Requested $1,393,600 from General Fund; Public Lands Project
The proposed project incorporates the design and construction of two asphalt bike pump tracks, one at the
existing 9Line Bike Park located at 700 West 900 South and the second near the Day Riverside Library at 871 North
Cornell Avenue.
The proposed pump track at the 9Line Bike Park will reconstruct the small existing pump track at the 9Line Bike
Park. While the 9Line Bike Park will still retain its large signature dirt jumps under the freeway this amenity will
improve the pump track and provide a more accessible riding amenity for users of the bike park. Since the
construction of the 9Line Bike Park in 2016 it has become increasingly popular for families of all ages. This
improvement will provide a safe more durable riding surface for park users. The proposed pump track adjacent to
the Day Riverside Library will construct a new asphalt pump track adjacent to the Rosepark Community Garden. In
2020 SLC Public Utilities began a large storm water improvement project at this location. This project required the
removal of a small dirt pump track that was constructed by local users groups. Construction of the asphalt pump
track will replace this asset with a new community amenity for the Rosepark neighborhood.
Last Updated August 17, 2021 Page 18
-$ -$ -$ -$ -$ -$
#Application Title Scope of Work General
Funds
Class C
(gas tax)
Impact
Fees
1/4 ¢
Transportation
FOF
Streets
FOF
Transit
General
Funds
Class C
(gas tax)
Impact
Fees
1/4 ¢
Transportation
FOF
Streets
FOF
Transit
AVAILABLE FUNDING
Mayoral Funding Recommendations COUNCIL Funding Decisions
65
Richmond Park
Playground and
Park
improvements
Requested $690,000 from General Fund; Public Lands Project
This project will replace the existing playground and pavilion at Richmond Park. Both assets are more than twenty
years old. Redevelopment of these features is an opportunity to build on the recent success of the new
community garden. The project will evaluate the location of the new playground and pavilion so that it can
respond to the community garden to create synergies between the three uses and increase visibility into and out
of the site. The full scope of this project includes:
• Design for a new playground and pavilion
• Engagement with the community on project character and site development
• Development of technical drawings for bidding and negotiation
• Demolition of existing playground and pavilion
• Construction of a playground and pavilion
• Construction of new sidewalk connections
• Planting of new trees and waterwise plantings
• Installation of new site furnishings and park signage
66
Library Square
Feasibility, Civic
Engagement and
Design
Development
Requested $225,000 from General Fund; Public Lands Project
The 2002 Council adopted plan for block 37, Library Square, is to create an asset to the community, that is safe,
well used and attracts new development to the area. Library Square is an underutilized public space with wall and
paving system (uneven surfaces, paver movement and concrete settling), failures that are posing a safety hazard.
This project will fund a feasibility study to identify solutions for the failing paving and wall systems; facilitate
outreach to identify new amenities for positive activation; and develop comprehensive design solutions with
phasing strategies for implementation.
Summary of work:
1. Feasibility study: Library Square has multiple paving and wall system failures due to settling of the parking
structure. A compressive study is needed to determine appropriate solutions to ameliorate safety hazards. Existing
conditions analysis and feasibility studies will determine a critical path to correct site failures and propose
appropriate solutions.
2. Civic engagement: The Public spaces at Library Square are underutilized outside of the four major events that
occur during the summer. Salt Lake City’s rapidly growing and densifying population needs places to be outside. A
civic engagement study would identify desired community elements to be incorporated on the Square that would
increase positive activity throughout the day and week.
3. Design development and implementation strategy: The feasibility study will inform design solutions for the wall
and paving failures on the site. Civic engagement will inform new everyday uses to implement as well as design
moves to incorporate to make the site more functional and desirable for large events, this would include shade,
access and circulation improvements. The design will identify a phasing strategy with estimates of probable costs
and implementation strategies for a multi-year improvement plan.
Last Updated August 17, 2021 Page 19
-$ -$ -$ -$ -$ -$
#Application Title Scope of Work General
Funds
Class C
(gas tax)
Impact
Fees
1/4 ¢
Transportation
FOF
Streets
FOF
Transit
General
Funds
Class C
(gas tax)
Impact
Fees
1/4 ¢
Transportation
FOF
Streets
FOF
Transit
AVAILABLE FUNDING
Mayoral Funding Recommendations COUNCIL Funding Decisions
67
Donner & Rotary
Glen Park
Community Park
Irrigation &
Landscape Design
and Construction
Requested $650,000 from General Fund; Public Lands Project
2018 was the driest year on record for the state of Utah. Public Lands experienced budgetary restrictions on water
use, resulting in significant impacts to our properties. Protecting the trees and living landscape requires carefully
designed and managed landscapes and irrigation systems. Decreasing our water needs is a critical element of
climate adaption and a top priority for Public Lands. Significant water use reduction can be achieved by installing a
water efficient irrigation system and reducing passive use areas of manicured turf by installing regionally
appropriate water wise plant material. Areas of high use such as sport-fields can be isolated on an irrigation zone
while trees, shrubs and low water grasses can be on separate zones. Designed appropriately, these landscapes
require less than half the water to maintain conventional landscapes. In addition to creating a more climate
resilient landscape, Public Lands will work with the community to identify desired new amenities such as fitness
equipment, benches and interpretive signage. Planning and design will also focus on improving the parks
circulation network in order to offer a diversity of loops and difficulty ratings for park users. This project includes:
1) Community engagement to create a vision for Donner and Rotary Park;
2) Design development, best practices, and construction documents for Phase I of site implementation; and
3) Construction of new improvements for a portion of the site (approximately 25% or 3 acres) Two future funding
requests will ask for funding for the rest of the site. Design standards and best practices developed in this project
will be used as a tool for future site redevelopment.
68 Capitol Hill Traffic
Calming
Requested $595,194 from General Fund; Constituent Transportation Project
Mitigate commuter cut-through traffic, chronic speeding and industrial traffic: a) the installation of vertical speed-
reduction elements, (b) striping crosswalks, stop lines and bike lanes, (c) curb extensions, pedestrian refuge
islands, partial barriers and 'road diet' measures. This project is at the neighborhood scale and includes East
Capitol Hill BLVD.
$536,966 $58,228
69
Harvard Heights
Residential
Concrete Street
Reconstruction
Requested $1,311,920 from General Fund; Constituent Transportation Project
This project will rehabilitate the existing severely deteriorating street, including concrete pavement replacement,
drive approaches, curb and gutter and sidewalk repairs along Harvard Avenue. This street was initially constructed
in the mid-1920's and has not been replaced in the 90+ years since. Rather, temporary fixes have been employed
continuously by paving over the deteriorating concrete using asphalt. The key flaw with this approach--and the
main issue at play here--is that the asphalt doesn't adhere to the concrete surface below, resulting in severe, year-
round potholing. This is both a serious eye-sore and a real safety concern to residents.
Concurrent with the reconstruction of the street, this project will also install several speed humps, speed tables,
and/or any other traffic measures deemed appropriate by the Transportation Division to reduce traffic speed.
There is an understanding of the need to work with city on a final approved design
Last Updated August 17, 2021 Page 20
-$ -$ -$ -$ -$ -$
#Application Title Scope of Work General
Funds
Class C
(gas tax)
Impact
Fees
1/4 ¢
Transportation
FOF
Streets
FOF
Transit
General
Funds
Class C
(gas tax)
Impact
Fees
1/4 ¢
Transportation
FOF
Streets
FOF
Transit
AVAILABLE FUNDING
Mayoral Funding Recommendations COUNCIL Funding Decisions
70 Liberty Wells
Traffic Calming
Requested $400,000 from General Fund; Constituent Transportation Project
The “Liberty Wells Traffic Calming” project seeks to slow motor vehicles, improve safety near the school and near
homes, encourage more transportation choices, and implement recommendations from several Salt Lake City
master plans. These goals are based on feedback from residents of the sections of 600 East, and Kensington,
Bryan, and Milton Avenues, surrounding Hawthorne Elementary School. The project area was determined by the
project team and the applicants in order to avoid pushing negative traffic conditions “down the road” and to
benefit students, parents, and teachers at Hawthorne as much as the neighbors on adjacent streets.
The project will also enhance the existing 600 East Neighborhood Byway and extend the partially funded,
proposed Kensington Avenue Neighborhood Byway east of 600 East. The intersection of the two neighborhood
byways is a unique and cost-effective opportunity. (Neighborhood byways are traffic-calmed, bicycling and
walking-oriented streets with low traffic volumes and speeds.) To date, neighbors have offered their support for
physical street design elements that would accomplish these goals, including traffic circles, median islands,
signage, improved lighting, bulb-outs, and speed cushions. The exact elements to be constructed, however, will
depend on further community engagement, including discussions with neighbors, Hawthorne Elementary School
administrators and school community council, as well as the Salt Lake City School District.
The project scope will include the following elements:
1. Community engagement of neighbors that live and/or own property on and near the project’s streets
(Kensington, Bryan, and Milton Avenues, and 600 East) in order to determine the most popular, feasible, and
effective traffic calming interventions.
2. Design and construction of the recommended interventions.
71 Stratford Bike
Crossing
Requested $200,000 from General Fund; Constituent Transportation Project
This proposal has not gone through a public process or a formal review and approval process by the city. There is
an understanding of the need to work with the city on an approved final design. I'm requesting a modification to
the current 4 way stop at the intersection of 1700 E. and Stratford Ave. This would include removing the current
stop signs on both the east and west sections of road coming from Stratford Ave., and putting in place some form
of traffic reduction system that only allows bikes to go straight through east/west on Stratford. Then placing
something like what's on the crossing at 1300 E and Stratford, where bikers can press a button and the straight
through N/S traffic on 1700 E would yield to bikers as they cross.
72 Sugar House Safe
Side Streets
Requested $500,000 from General Fund; Constituent Transportation Project
This project is intended to improve the safety and comfort of local, neighborhood streets in Sugar House. It is
made up of two basic parts:
1. A study of (1) existing conditions, constraints, and opportunities; (2) the effectiveness of existing traffic calming
measures on Hollywood Avenue (1990s) and McClelland Street (2010s); and, (3) infrastructure and programmatic
recommendations, including the most effective, cost-efficient, and community-supported methods of improving
neighborhood street livability. This study may also include a series of tests of the recommendations.
2. Design and construction, or implementation, of the above recommendations on the project area’s six local
streets: Hollywood Avenue, Ramona Avenue, Garfield Avenue, Lincoln Street, 1000 East, and McClelland Street.
Initial ideas from the community include curb modifications, striping, stop signs, street narrowing, raised
crosswalks, increased and enforced truck restrictions, and gateway monuments. The project area was determined
by the project team and the applicants in order to avoid pushing negative traffic conditions “down the road”, so to
speak.
$153,221
Last Updated August 17, 2021 Page 21
-$ -$ -$ -$ -$ -$
#Application Title Scope of Work General
Funds
Class C
(gas tax)
Impact
Fees
1/4 ¢
Transportation
FOF
Streets
FOF
Transit
General
Funds
Class C
(gas tax)
Impact
Fees
1/4 ¢
Transportation
FOF
Streets
FOF
Transit
AVAILABLE FUNDING
Mayoral Funding Recommendations COUNCIL Funding Decisions
73 Sunnyside 9Line
Trail Missing Piece
Requested $350,000 from General Fund; Transportation Project
Just before the construction of the Sunnyside Trail between approximately 1400 East and Foothill Drive in 2016-
2017 (part of the soon-to-be-completed 9-Line Trail), the City determined that it was unable to acquire the
property necessary to complete the trail in front of the 1805-1851 East Sunnyside Avenue property owned by the
Church of Jesus Christ of Latter-day Saints.
There is now a roughly 600’ (or one-block) long missing piece of the trail where only a narrow, four-foot wide
sidewalk exists. CIP funding would construct a new section of the 10-12' concrete trail and fill this gap, connecting
to and replicating the look, feel, and impact of the existing segments of the trail to the east (University of Utah
property) and the west (City property).
The City estimates that $350,000 (in 2022 dollars) will be needed to reassess site conditions and constraints,
complete the design (currently at 40%), fund Engineering Division oversight, partially fund property acquisition or
easement, and construct this critical, missing piece of a citywide asset.
Included in the trail construction costs are additional adjustments to slopes, irrigation, fencing, trees and
landscaping, driveways, wet utility inlets and cleanouts, the central walkway leading to the front door of the
chapel, power pole guy wires, and signs that are necessary to ensure appropriate drainage, ADA compliance, and
trail user comfort.
74
Multimodal
Intersections &
Signals
Requested $945,000 from General Fund and $105,000 from transportation impact fees; Transportation Project
• Upgrade five aging traffic signals
• Combine with safety and operational improvements for all modes
• Possible transit-focused signal improvements on key Frequent Transit Network corridors
This project will remove the existing traffic signal equipment that has reached the end of its useful life, including
steel poles, span wire, signal heads, and traffic signal loops and will upgrade the intersections with mast arm poles,
new signal heads, pedestrian signal heads with countdown timers, improved detection, and left turn phasing, as
needed.
Fluctuations in construction pricing are particularly relevant to this project, with steel tariffs, labor costs, and
overall construction costs all affecting price.
75
600 North Corridor
Transformation
$4 MILLION IN
MAYOR'S
PROPOSED BOND
During the FY22 annual budget, the Council approved adding $1,879,654 into CIP for the upcoming 600 North
Corridor Transformation Complete Streets project. Two years in a row the frequent bus routes contract with UTA
was less than budgeted and the Council placed the excess funds into the Funding Our Future transit holding
account. The full amount from the holding account was appropriated for this project.
The Mayor’s Series 2021A and 2021B bond proposal (Attachment 4) includes $4 million for the 600 North
complete street transformation project. The description states the total project cost is $8.7 million but with recent
construction inflation costs may already be higher. It also mentions a phase 1 is already funded. In recent years the
Council funding safety improvements at the 600 North and 800 West intersection and funding for a safety study of
the 600 North corridor.
$1,879,654
$5,705,720 $2,046,329 $7,305,970 $4,900,000 $2,300,000 $0 $6,901,178 $2,104,557 $7,291,970 $4,900,000 $2,300,000 $1,879,654
Note: text in blue and red is information added by Council staff
Totals by Funding Source:
Last Updated August 17, 2021 Page 22