Loading...
054 of 2023 - Text Amendment Related to Maximum Height in the M-1 District1 SALT LAKE CITY ORDINANCE No. _____ of 2023 Amending the text of Section 21A.28.020 of the Salt Lake City Code pertaining to maximum height in the M-1 Light Manufacturing District) An ordinance amending the text of Section 21A.28.020 of the Salt Lake City Code pertaining to maximum height in the M-1 Light Manufacturing District pursuant to Petition No. PLNPCM2023-00282. WHEREAS, the Salt Lake City Planning Commission (“Planning Commission”) held a public hearing on August 9, 2023 to consider a petition initiated by the Salt Lake Garfield and Western Railway Company (Petition No. PLNPCM2023-00282) to amend Section 21A.28.020 Zoning: Manufacturing Districts: M-1 Light Manufacturing District) of the Salt Lake City Code to allow bulk material storage structures up to 150’ in height to be built west of 5600 West and between 100’ and 1000’ south of I-80; and WHEREAS, at its August 9, 2023 meeting, the Planning Commission voted in favor of transmitting a positive recommendation to the Salt Lake City Council (“City Council”) on said petition; and WHEREAS, after a public hearing on this matter, the City Council has determined that adopting this ordinance is in the city’s best interests. NOW, THEREFORE, be it ordained by the City Council of Salt Lake City, Utah: SECTION 1. Amending the text of Salt Lake City Code Subection 21A.28.020.F. That Subsection 21A.28.020.F of the Salt Lake City Code (Zoning: Manufacturing Districts: M-1 Light Manufacturing District: Maximum Height) shall be, and hereby is amended as follows: F. Maximum Height: 1. Distillation Column Structures; Development In AFPP Overlay District: No building shall exceed sixty five feet (65') except that emission free distillation column 54 2 structures, necessary for manufacture processing purposes, shall be permitted up to the most restrictive Federal Aviation Administration imposed minimal approach surface elevations, or one hundred twenty feet (120') maximum, whichever is less. Said approach surface elevation will be determined by the Salt Lake City Department of Airports at the proposed locations of the distillation column structure. Any proposed development in the Airport Flight Path Protection (AFPP) Overlay District, as outlined in section 21A.34.040 of this title, will require approval of the Department of Airports prior to issuance of a building permit. All proposed development within the AFPP Overlay District which exceeds fifty feet (50') may also require site specific approval from the Federal Aviation Administration. 2. Location exceptions: a. West of the Salt Lake City International Airport and north of Interstate 80 (I-80): Buildings may exceed sixty-five feet (65') in height subject to the design review standards and procedures of chapter 21A.59 of this title. In no case shall any building exceed eighty-five feet (85'). b. West of 5600 West Street and between 100' and 1,000' south of the Interstate 80 (I-80) right of way: Bulk material storage structures associated with a railroad freight terminal may be allowed up to one hundred fifty feet (150’) in height. When the structure is located between 5600 West Street and John Glenn Road, the height of the structure shall not exceed 4,378.8 Mean Sea Level (MSL). 1) Size and spacing: Structures exceeding 85’ in height are limited to 100’ in diameter. A group of such structures may be permitted if the combined width, including the space in between the structures, does not exceed 200’. Such structures or groups of structures shall be separated by a distance equal to or greater than 2 times its height. 3 3. Railroad Offloading Structures: Cranes, lifts, and other similar offloading structures related to the operation of a railroad freight terminal are allowed up to eighty five feet (85’) in height and are also subject to the Airport Flight Path Protection (AFPP) Overlay District and Federal Aviation Administration (FAA) requirements. SECTION 2. Effective Date. This Ordinance shall become effective on the date of its first publication. Passed by the City Council of Salt Lake City, Utah, this ___ day of ____________, 2023. CHAIRPERSON ATTEST AND COUNTERSIGN: CITY RECORDER Transmitted to Mayor on _______________________. Mayor’s Action: _______Approved. _______Vetoed. MAYOR CITY RECORDER 17th October Darin Mano (Oct 27, 2023 13:26 MDT) Oct 27, 2023 Erin Mendenhall (Nov 3, 2023 13:51 MDT) 4 4 SEAL) Bill No. ________ of 2023. Published: ______________. Ordinance amending maximum height in the M-1 Light Manufacturing District (final) APPROVED AS TO FORM Salt Lake City Attorney’s Office Date:___________________________ By: ____________________________ Katherine D. Pasker, Senior City Attorney54 Oct 19, 2023 Nov 7, 2023 Ordinance 54 of 2023 Text Amendment Related to Maximum Height in the M-1 Light Manufacturing District Final Audit Report 2023-11-06 Created:2023-10-19 By:Thais Stewart (thais.stewart@slcgov.com) Status:Signed Transaction ID:CBJCHBCAABAAZrOU8pynK2fiYaQPrpgT4SqJ0ZxAXFAk Ordinance 54 of 2023 Text Amendment Related to Maximum H eight in the M-1 Light Manufacturing District" History Document created by Thais Stewart (thais.stewart@slcgov.com) 2023-10-19 - 4:12:15 PM GMT Document emailed to katherine.pasker@slcgov.com for signature 2023-10-19 - 4:15:09 PM GMT Email viewed by katherine.pasker@slcgov.com 2023-10-19 - 5:06:24 PM GMT Signer katherine.pasker@slcgov.com entered name at signing as Katherine Pasker 2023-10-19 - 6:18:23 PM GMT Document e-signed by Katherine Pasker (katherine.pasker@slcgov.com) Signature Date: 2023-10-19 - 6:18:25 PM GMT - Time Source: server Document emailed to Darin Mano (darin.mano@slcgov.com) for signature 2023-10-19 - 6:18:28 PM GMT Email viewed by Darin Mano (darin.mano@slcgov.com) 2023-10-20 - 1:52:56 AM GMT New document URL requested by Darin Mano (Darin.Mano@slcgov.com) 2023-10-27 - 7:22:25 PM GMT Email viewed by Darin Mano (darin.mano@slcgov.com) 2023-10-27 - 7:26:12 PM GMT Document e-signed by Darin Mano (darin.mano@slcgov.com) Signature Date: 2023-10-27 - 7:26:21 PM GMT - Time Source: server Document emailed to Erin Mendenhall (erin.mendenhall@slcgov.com) for signature 2023-10-27 - 7:26:23 PM GMT Email viewed by Erin Mendenhall (erin.mendenhall@slcgov.com) 2023-10-28 - 4:34:24 AM GMT New document URL requested by Erin Mendenhall (erin.mendenhall@slcgov.com) 2023-11-03 - 7:45:56 PM GMT Email viewed by Erin Mendenhall (erin.mendenhall@slcgov.com) 2023-11-03 - 7:47:03 PM GMT Document e-signed by Erin Mendenhall (erin.mendenhall@slcgov.com) Signature Date: 2023-11-03 - 7:51:33 PM GMT - Time Source: server Document emailed to Cindy Trishman (cindy.trishman@slcgov.com) for signature 2023-11-03 - 7:51:35 PM GMT Document e-signed by Cindy Trishman (cindy.trishman@slcgov.com) Signature Date: 2023-11-06 - 6:19:17 PM GMT - Time Source: server Agreement completed. 2023-11-06 - 6:19:17 PM GMT