Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
21 of 2024 - Vision & Implementation Plan - Rio Grande District
REDEVELOPMENT AGENCY OF SALT LAKE CITY RESOLUTION NO__________ Endorsement of the Redevelopment Agency’s Utilization of the Rio Grande District Vision and Implementation Plan RESOLUTION OF THE BOARD OF DIRECTORS OF THE REDEVELOPMENT AGENCY OF SALT LAKE CITY ENDORSING THE REDEVELOPMENT AGENCY’S UTILIZATION OF THE RIO GRANDE DISTRICT VISION AND IMPLEMENTATION PLAN. WHEREAS, the Redevelopment Agency (RDA) owns approximately 15 acres of real property in the RDA’s Depot District Project Area, with 11 of these acres located between 500- 600 West and 200-400 South and 4 of the acres located near 600 West and 100 South Properties). WHEREAS, in preparation for the redevelopment of these Properties, the RDA engaged a consultant team to recommend a design and development strategy such that the redevelopment of these properties is thoughtful and cohesive. A copy of the recommended Rio Grande District Vision and Implementation Plan is attached to this resolution as Exhibit A (Recommended Plan). WHEREAS, the Redevelopment Agency Board of Directors (Board) is committed to the redevelopment of these properties. WHEREAS, as part of the development process, the Recommended Plan is a proposal for how the Properties may be developed, but in no way will it replace or override the existing authority and discretion of the Administration or Board. WHEREAS, at this stage in the redevelopment process, the Board wishes to take formal action to signal its support for the Recommended Plan. NOW, THEREFORE, BE IT RESOLVED by the Board of Directors of the Redevelopment Agency of Salt Lake City as follows: 1. The Board hereby formally supports the Recommended Plan and the RDA’s ongoing participation in developing the properties in alignment with the Recommended Plan. 2. The RDA acknowledges that the Recommended Plan will not replace or override the existing authority and discretion of the Administration or Board. 21 Passed by the Board of Directors of the Redevelopment Agency of Salt Lake City, Utah, this ____ day of _____ , 2024, to be effective upon adoption. Alejandro Puy, Chair The Executive Director: __ does not request reconsideration __ requests reconsideration at the next regular Agency meeting Erin Mendenhall, Executive Director Attest: City Recorder 2 Allison Parks, Salt Lake City Attorney's Office 10 December 12/12/2024 Alejandro Puy (Dec 12, 2024 16:03 MST) r$n Menden#all (Dec 1ш, 2024 13:2ц MST) 4 $ndy Tr$.#(an (Dec 23, 2024 11:10 MST) E�,4PMENl Rio Grande District Vision and Implementation Plan Prepared by Perkins&Will Prepared for Acknowledgments Mayor Erin Mendenhall Redevelopment Agency of Salt Lake City (RDA) Board of Directors Victoria Petro, District 1 Alejandro Puy, District 2 Chris Wharton, District 3 Eva Lopez -Chavez, District 4 Darin Mano, District 5 Dan Dugan, District 6 Sarah Young, District 7 Salt Lake City Core Team Danny Walz, Director Cara Lindsley, Deputy Director Ashley Ogden, Senior Project Manager Allison Parks, Senior City Attorney Marcus Lee, Project Coordinator Clark Cahoon, Technology and Innovation Strategic Advisor Consultant Team Perkins&Will HR&A Advisors Kimley-Horn & Associates Phil Myrick Placemaking Contents CHAPTER 1 CHAPTER 3 Introduction The Public Realm 1.1 Project Vision 12 3.1 Development Blocks 1.2 Transit -Oriented Development 14 3.2 Open Spaces 1.3 Community Wellness District 16 3.2.1 The Green Loop 1.4 The Design Moves 18 3.2.2 The Festival Street 1.5 Stakeholder Engagement 24 3.2.3 The Arts Campus 1.6 Plan Document Structure 26 3.2.4 The Underpass Park 3.3 Planting, Ecology, Habitat 3.4 Stormwater Management CHAPTER 2 3.5 Paving The Site 3.6 Site Furnishing 2.1 Downtown Context 30 2.2 Transportation Context 32 2.3 Site History 36 2.4 Site Ownership 38 2.5 Site Today 40 2.6 Site Zoning 42 This is an interactive document. When viewed in PDF supported viewers, click on the table of contents above and underlined sections and figures throughout the document to navigate to relevant pages. 46 48 50 56 60 66 68 69 70 71 4 Rio Grande District Vision and Implementation Plan CHAPTER 4 The Mobility Network 4.1 Mobility Overview 74 4.2 Active Transportation 76 4.3 Vehicles 78 4.4 Street Sections 80 4.4.1 500 West 76 4.4.2 300 South 78 4.4.3 Market Street 80 4.4.4 Woodbine Court 82 4.4.5 Pierpont Avenue 84 4.4.6 600 West 86 4.4.7 400 South Frontage 88 4.4.8 Alleyways 89 4.5 Shared Parking 96 CHAPTER 5 Land Use and Building Design 5.1 Urban Form Overview 102 5.2 Land Use 106 5.3 Ground Floor Uses 108 5.4 Building Heights 112 5.5 Podiums 114 5.6 Building Orientation and Massing 116 5.7 Sustainable Design 120 CHAPTER 6 Implementation 6.1 Phasing Plan 6.1..1 Phase 1 6.1.2 Phase 2 6.1.3 Phase 3 6.1.4 Phase 4 6.2 RDA Role in Rio Grande District APPENDIX Al Transportation, Parking, and Circulation Analysis A2 100 South Design Workshop Summary 126 128 129 130 131 132 5 List of Figures Figure 1.1 Rendering of the Green Loop 13 Figure 1.2 Project Vision Design Parti 15 Figure 1.3 Community wellness programming in the Arts Campus Plaza 17 Figure 1.4 Human Centered Public Realm Diagram 20 Figure 1.5 Mixed Use Transit -Oriented Downtown District Diagram 22 Figure 1.6 Photographs from the Stakeholder Engagement Worksessions 25 Figure 1.7 Design Standards and Guidelines User Guide 27 Figure 2.1 Downtown Context Map 30 Figure 2.2 Transportation Context Map 32 Figure 2.3 Relevant Transportation Capital Projects 35 Figure 2.4 Historic Photographs of Rio Grande Depot and Salt Lake Mattress 37 Figure 2.5 Historic Site Map from 1911 37 Figure 2.6 Site Ownership Diagram 38 Figure 2.7 Key Map for Site Existing Condition Photographs 40 Figure 2.8 Site Zoning and Historic Properties Map 42 Figure 3.1 Development Blocks Diagrams 47 Figure 3.2 Rio Grande District Open Spaces Diagram 49 Figure 3.3 Green Loop Standards Diagram 51 Figure 3.4 Green Loop Guidelines Diagram 52 Figure 3.5 Photograph of the Ferry Building 53 Figure 3.6 Photograph of a community playground in Philadelphia 53 Figure 3.7 Illustrative rendering of the future Green Loop on 500 West 54 Figure 3.8 Festival Street Standards Diagram 56 Figure 3.9 Festival Street Guidelines Diagram 58 Figure 3.10 Photograph of the neighborhood street converted into a farmers market 59 Figure 3.11 Photograph of the Pitt Street Pedestrian Mall 59 Figure 3.12 The Arts Campus Standards Diagram 60 Figure 3.13 The Arts Campus Guidelines Diagram 62 Figure 3.14 Photograph of temporal public art installations 63 Figure 3.15 Photograph of urban plaza space that can accommodate larger community festivals 63 Figure 3.16 Illustrative rendering of the future Arts Campus plaza 64 Figure 3.17 The Underpass Park Guidelines Diagram 66 Figure 3.18 Photograph of a revitalized underpass park 67 6 Rio Grande District Vision and Implementation Plan Figure 3.19 Photograph of an urban skatepark 67 Figure 3.20 Photograph of Dense tree canopy 68 Figure 3.21 Photograph of landscape that provides habitat for insects and other fauna 68 Figure 3.22 Photograph of rain gardens and bioswales help to manage stormwater on site 69 Figure 3.23 Photograph of landscapes with low -drought plantings 69 Figure 3.24 Photograph of paving design and material 70 Figure 3.25 Photograph of permeable pavers 70 Figure 3.26 Photograph of site furnishings 71 Figure 3.27 Photograph of exterior street lights that adhere to dark sky standards 71 Figure 4.1 Mobility Network Map 74 Figure 4.2 Active Transportation Network Map 76 Figure 4.3 Vehicle Network Map 78 Figure 4.4 Street Standards Guide 80 Figure 4.5 500 West Typical Street Section 83 Figure 4.6 300 South Street Section 1 85 Figure 4.7 300 South Street Section 2 85 Figure 4.8 Market Typical Street Section 87 Figure 4.9 Woodbine Court Street Section 1 89 Figure 4.10 Woodbine Court Street Section 2 89 Figure 4.11 Pierpont Avenue Section 91 Figure 4.12 600 West Street Section 1 93 Figure 4.13 600 West Street Section 2 93 Figure 4.14 400 South Frontage Street Section 94 Figure 4.15 Alleyway Section 95 Figure 4.16 Shared Parking District Diagram 96 Figure 4.17 Parking Garage Facade P22a designed by Wulf Architekten 98 Figure 4.18 The Central Parking Garage at the University of Utah 98 Figure 5.1 Urban Form and Land Use Overview Diagram 102 Figure 5.2 Illustrative rendering of the Rio Grande District at full buildout 104 Figure 5.3 Land Use Diagram 106 Figure 5.4 Ground Floor Uses Diagram 108 Figure 5.5 Photograph of elevated residential stoops 110 Figure 5.6 Photograph of ground floor conference/assembly spaces 110 7 List of Figures Figure 5.7 Photograph of sliding doors on the ground floor 111 Figure 5.8 Photograph of well-defined lobby entries 111 Figure 5.9 Maximum Height Diagram 112 Figure 5.10 Building Podium Diagram 114 Figure 5.11 Building Orientation and Massing Diagram 1 116 Figure 5.12 Building Orientation and Massing Diagram 2 118 Figure 5.13 Sustainable Design Diagram 120 Figure 5.14 Rendering of the proposed mass timber Earth Tower 123 Figure 6.1 Phasing Plan Diagram 126 Figure 6.2 Phase 1 Proposed Infrastructure and Development 128 Figure 6.3 Phase 2 Proposed Infrastructure and Development 129 Figure 6.4 Phase 3 Proposed Infrastructure and Development 130 Figure 6.5 Phase 4 Proposed Infrastructure and Development 131 Figure 6.6 Close up of the Arts Campus plaza 133 Figure 6.7 Illustrative rendering of the Rio Grande District at full buildout 134 8 Rio Grande District Vision and Implementation Plan List of Tables Table 1 Relevant Transportation Capital Projects 34 Table 2 Site Ownership Matrix 38 Table 3 Development Block Matrix 46 Table 4 Green Loop Programming Table 52 Table 5 Festival Street Programming Table 54 58 Table 6 The Arts Campus Programming Table 62 Table 7 The Underpass Park Programming Table 66 Table 8 500 West Street Standards 82 Table 9 300 South Street Standards 84 Table 10 Market Street Standards 86 Table 11 Woodbine Court Standards 88 Table 12 Pierpont Court Standards 90 Table 13 600 West Standards 92 Table 14 400 South Frontage Standards 94 Table 15 Alleyway Standards 95 Table 16 Parking and Transportation Demand Management (TDM) Strategies Menu 99 Table 17 Maximum Heights Table 112 Table 18 Maximum Tower Floorplate Table 116 Table 19 Phasing Plan Infrastructure and Development 126 9 1.1 Introduction Project Vision 1.4 12 The Design Moves 18 1.2 Transit -Oriented Development 1.5 Stakeholder Engagement 14 24 1.3 Community Wellness District 1.6 Plan Document Structure 16 26 Introduction 1.1 Project Vision The Rio Grande District places community wellness at the heart of its design framework. The neon glow of the Rio Grande sign shining atop the historic depot is a beacon, welcoming all Utahns to be a part of a robust new Downtown neighborhood located at Utah's most transit rich gateway. The Rio Grande District Vision and Implementation Plan presents a long-term development road map that encapsulates the vision statement above and the values memorialized in Salt Lake City's Downtown Plan to deliver `an internationally recognized destination and a vibrant neighborhood defined by mountain beauty and the best quality of life in the country.' The design framework outlined here serves the two guiding ambitions established at the onset of the planning process: OThe Rio Grande District is the best transit - oriented development site in Utah. © The Rio Grande District is an urban neighborhood committed to advancing community wellness and delivering equitable outcomes. 12 Rio Grande District Vision and Implementation Plan Introduction 1.2 Transit -Oriented Development The Rio Grande District is the best transit -oriented development (TOD) site in Utah. A magnetic hub that maximizes its downtown location. The Rio Grande District is uniquely positioned to receive a wide range of public and private investments. Most notable is the site's adjacency to Utah Transit Authority (UTA) Salt Lake Central Station, the City's premier transit hub. Currently, this station provides service for Frontrunner commuter rail, TRAX light rail, local bus, Amtrak, and Greyhound. Furthermore, UTA is proposing to enhance transit service at this station via the Tech Link TRAX Study. This wealth of existing and future transit service complements parallel projects such as the City's Green Loop linear park and urban trail, the renovation of the Rio Grande Depot, and the potential future home of a National Governing Body of Sport. A public realm that serves as an armature for future growth. The site's design framework is founded on a network of walkable, fine grain public spaces that are anchored by notable buildings such as the Rio Grande Depot, the Salt Lake Mattress Building, and Artspace's Macaroni Flats. 300 South becomes a vibrant festival street that serves as a civic scaled and experience -rich Downtown entrance for Salt Lake Central Station transit patrons, seamlessly connecting to the magnificent Rio Grande Depot. As part of the Green Loop, 500 West becomes a lush urban forest, providing biophilic respite within a downtown setting, while also promoting alternative modes of transportation for a climate positive future. Building on the wealth of artists, cultural organizations, and non- profits located in the Rio Grande District's Artspace facilities, the Arts Campus becomes an ever -evolving canvas for SLC's thriving arts, music, and community scene. A new iconic social heart where the past and future converge. At the intersection of the Green Loop and the Festival Street forms the Rio Grande District's epicenter for public life. From this social heart rise three distinct buildings that represent the district's past, present and future. To the east is the revitalized Rio Grande Depot, one of Utah's grandest buildings, to the south is the proposed headquarters and training center for a National Governing Body of Sport; and to the north is a future iconic tower, which will enhance SLC's evolving skyline while providing expansive views out to SLC's magnificent natural environs. 14 Rio Grande District Vision and Implementation Plan IArtspace Macaroni Flats 'LAKE ell What is Transit -Oriented Development (TOD)? IRio Grande Depot WASATCH RANGE Salt Lake Mattress Building TOD means integrated urban places designed to bring people, activities, buildings and public space together with easy walking and cycling connection between them and near -excellent transit service to the rest of the city. It means inclusive access for all to local and citywide opportunities and resources by the most efficient and healthful combination of mobility. Inclusive TOD is a necessary foundation for long- term sustainability, equity, shared prosperity, and civil peace in cities.' Figure 1.2: Project Vision Design Parti * Institute for Transportation & Development Policy (ITDP) https://www.itdp.org/library/standards-and- g uides/tod3-0/what-is-tod/ 15 Introduction 1.3 Community Wellness District The Rio Grande District is an urban neighborhood committed to advancing community wellness and delivering equitable outcomes. An emerging district that reflects the mission of the RDA. The RDA's mission is to strengthen neighborhoods and business districts by improving livability, creating economic opportunity, and fostering authentic, equitable communities. The RDA is committed to enhancing the City's housing opportunities, commercial vitality, public spaces, and environmental sustainability. As such, the Rio Grande District's future built and natural environment upholds this commitment to community wellness by championing inclusive growth and taking a holistic approach to sustainability and resilience. A district committed to delivering social infrastructure that enables all people to thrive. Adopted City and RDA policies will influence the future built form of the Rio Grande District. The adopted Plan Salt Lake (2015) identifies Equity as one of its guiding principles, specifically highlighting access to public amenities and events, to healthy food, housing, employment, education, and recreation. To actualize this principle, the Rio Grande District Vision and Implementation Plan promotes the construction of affordable housing units and commercial spaces, fosters access to active recreation opportunities and healthy food options within new public spaces, expands access to apprenticeship and upward mobility, and invests in physical and programmatic connections to Westside neighborhoods. A national model for climate positive development. Salt Lake City Climate Plan (2017) defines'climate positive' as protecting the health and safety of its residents by ensuring access to clean air, clean water, and a livable environment. Salt Lake City is already experiencing significant impacts of global climate change leading to record heat, drought, and increasingly harmful air pollution. The design framework takes a holistic approach to addressing these pressing environmental issues via building standards for high - performing, biophilic buildings, reducing embodied carbon through preserving and revitalizing existing buildings, on -site stormwater management and re -use for outdoor irrigation, an all -electric district through renewable energy sources, low -carbon transportation options, and an inclusive public realm. 16 Rio Grande District Vision and Implementation Plan .. J 1 ALT LAKE Nk:rTHE SS+RfG.G4 _IAA Ali ��I+:P �r rQ w • �a 1 ~ y _S Figure 1.3: Community wellness programming in the Arts Campus Plaza 17 Introduction 1.4 The Design Moves The Project Vision is distilled into 11 design moves informing the Vision and Implementation Plan. r. u Establish Compact, Walkable Blocks Strategically break up the typical SLC block with new streets to ensure a walkable environment while promoting compact urban development. 0 Champion the Green Loop A critical part of the neighborhood's mobility network is the Green Loop on 500 West. The Green Loop is more than just an urban trail, it's envisioned as an inclusive community open space that activates the neighborhood at different times of the day and year. Restore the Site for All Living Things Streets, parks, plazas, and the spaces between buildings will be designed to heal the site, restoring the land back for all living things with native plants, fostering biodiversity, cleaning air, and water conservation. Ensure Functional Roadways While the Plan leads with people - first streets, it is critical that streets also serve as functional roadways with two way vehicle travel lanes, on street parking, pick up/drop off points, and ingress and egress for parking and loading. Enable Low Carbon Mobility With new streets comes an opportunity to champion low carbon modes of transportation via low -stress pedestrian and bicycle facilities that are seamlessly connected to the Salt Lake Central Station. 0 Lead with Shared Parking The shared parking strategy includes progressive parking ratios for new development, a shared, unbundled garage for all neighborhood uses, and opportunities to broker agreements to utilize existing but underutilized parking supply within the Depot District. 18 Rio Grande District Vision and Implementation Plan a 0 0 Curate Public Places with Arts, Culture, and Performance Building on existing Artspace facilities, the Plan includes an Arts Campus plaza, a place for temporal art, cultural events, performances and maker spaces for emerging artisans. Maximize the TOD Potential The Rio Grande District is the best transit -oriented development (TOD) site in the state of Utah, and therefore development has downtown height allowances to capitalize on this optimal location. Strengthen Social Fabric The Rio Grande District's horizontal and vertical development should deliver significant community benefits to support a more equitable, resilient urban fabric and ensure that historically marginalized and underrepresented communities are the recipients of this new district. Design Sustainable Buildings The design standards promote occupant connections to nature, preservation of key buildings to preserve embodied carbon; conserving water through outdoor irrigation and greywater systems, and harnessing the power of sun through high performing buildings, and renewable energy. Catalyze Street Life and Mixed -Use Development A calibrated mix of uses fosters vibrant street life with spaces for shops and restaurants along 300 South and the Green Loop. New development consists of an array of different land uses ranging from residential, to tech office, to civic and cultural. 19 1 !I Introduction tampion tie a Green • � ��_ � � ��'"``i� acesi _ and ------ �,- �� 3nc - +� A 0 \ "'a f r Enable Low Carbon Mobility Catalyze Street Life and �` { -Use Development Figure 1.4: r` Human -Centered Public Realm Diagram 20 Rio Grande District Vision and Implementation Plan Ensure Functional Rodways Restore the Site i All Living Things' r 4 r \ /l 40 .01 ,r ,, r '--� ---- Establish Compact, Walkable Blocks M . rIL Z 21 1 !f Design Sustainable -_- �` Buildings Figure 1.5: Mixed -Use Transit -Oriented Downtown District Diagram Catalyze Street Life and -Use Development ri I q M.. 22 Rio Grande District Vision and Implementation Plan �f fr ! l P Lead with Shared Parking .01 /Jr� ' 23 Introduction 1.5 Stakeholder Engagement Stakeholders representing a diverse cross-section of the SLC community helped shape the Plan. The engagement process led by the Redevelopment Agency of Salt Lake City (RDA) included a variety of outreach touchpoints including stakeholder advisory meetings, one-on-one and small group work sessions, and an update to the RDA Board. These conversations revealed a series of common themes and observations that were critical to the users and neighbors of the Rio Grande District. This input ranging from streets, open space, programming, and urban form ideas, guided the development of the urban design framework and placemaking strategy. Stakeholder engagement included the following parties: Elected Officials Mayor Erin Mendenhall Salt Lake City Council Property Owners Artspace Stack Real Estate (lessee) University of Utah Educational Partners Utah System of Higher Education Utah State University Salt Lake Community College STEM Action Center Salt Lake Education Foundation Industry Anchors Recursion Pharmaceuticals Denali Therapeutics PIVOT Center Altitude Lab Intermountain Health University of Utah Health Stena Center for Financial Technology Industry Partners BioHive BioUtah Governor's Office of Economic Opportunity (GOEO) World Trade Center Utah EDCUtah Salt Lake City Planning Transportation Engineering Public Lands Arts Council Economic Development Police Fire Public Utilities Housing Stability Government Partners State of Utah Utah Transit Authority (UTA) Utah Department of Cultural and Community Engagement Non -Profits USA Climbing Downtown Alliance Urban Food Connections of Utah Utah Arts Alliance Make Salt Lake Slug Magazine / Craft Lake City NeighborWorks Salt Lake Community Development Finance Alliance of Utah Development / Real Estate W3 Partners BCG Holdings Gardner Batt Hamilton Partners dbUrban Neighborhood Councils Poplar Grove Fairpark Capitol Hill 24 Rio Grande District Vision and Implementation Plan Figure 1.6: Photographs from the Rio Grande District Stakeholder Engagement Worksessions 25 Introduction 1.6 Plan Document Structure This document contains six chapters, each containing descriptive text, figures, and precedent images to explain and visualize the proposed redevelopment of the Rio Grande District. Chapter 1: Introduction details the project vision for the Vision and Implementation Plan including the design framework big moves and community engagement. Chapter 2: The Site provides an overview of Downtown Salt Lake City context, the historical significance of existing buildings on the site, and existing site conditions including ownership and zoning. Chapters 3,4,5: Design Standards and Guidelines outlines requirements that govern the construction and modification of open spaces, streets, and buildings within the Rio Grande District. Standards are quantifiable or objective requirements whereas guidelines are qualitative or subjective requirements. Introductory Text Each new open space, street, and buildings within the Rio Grande District must meet the standards and guidelines prescribed in these chapters unless modifications to I Standards and Guidelines these standards and/or guidelines are approved by the RDA. An annotated example of a typical design standards spread is featured on the right in FIGURE 1.7. Chapter 6: Implementation describes a high level development phasing strategy and the RDA's role in administering the long-term success of the district. 26 Rio Grande District Vision and Implementation Plan Chapter Title I I Section Number and Section Title The Public Realm 3.1 Development Blocks The layout of development blocks at Station Center is critical to establishing a fine grain, human -scaled neighborhood. The development blocks contribute to a successful urban fabric with a functional network of connected public rights -of -way and urban open spaces that provide people with a variety of engaging routes to choose from and encourage pedestrian accessibility and movement Additionally, the development blacks are the foundation for well proportoned,vsually��, engaging, and h gh perform ng architect — A. illustrated inFIGURE XX Station Center has 7 blocks, each identified byo letter for reference within the document Standards 1. LandP ..11 ation: New development blocks shalladhere to the following specifications: SOUARE EASEMENT FOOTAGE DIMENSIONS REOUIRED ORSTREET eLOCX ID ACREAGE lsn CIE.) OPENSPACE —TION 45o'. ass G 189 ones 82,500 EF 275.S No ves Green L9op 659cres 2 ,150 Sf 1475'.194' Yes No 2. 400 South Frontage EasemeM: Blocks C and G shall adhere to 0 25 foot ent along 400 South frontage road to accommodate future UTA P`".esme„e C""ee.e light roil extension 3. 300 South Street Vacation: New development on Blocks A, B, E, F development can build in the 23.5feet street vacation on either side of 300 South. 40 Station Center Vision and Implementation Plan Figure Number and Caption I Figure Oevel"Pmentel"cx O arement op P p ears° o Lmet90 O 41 IFigure Legend and North Sign I Figure 1.7: Design Standards and Guidelines User Guide 27 The Site Transp°rtatian The Site 2.1 Downtown Context The Rio Grande District is one of Downtown's key opportunity sites due to its central location. Site Location The Rio Grande District is located in the Depot District on the western edge of Downtown Salt Lake City. The Rio Grande District is bounded by 400 South to the south, 200 South to the north, 600 West and Salt Lake Central Station to the west, and 500 West and the Rio Grande Depot to the east. The Rio Grande District is within a 10-minute-walk of major destinations such as the Delta Center, The Gateway, Pioneer Park, the West Quarter, and the Salt Palace Convention Center. Recent Development: Within Downtown, The Depot District, The Granary, and Central 9th neighborhoods have seen significant development and investment over the past few years, building thousands of new housing units and new jobs. On the 500 West segment of the Rio Grande District, two projects are either under construction or in the pipeline - The Rio, a seven -story, 210-unit apartment building with ground floor retail and The Nest @ Rio Grande, a 220-unit apartment building. Central Station Plan (UTA) In 2019, UTA and RDA led an area plan for 38 acres of land in and around Salt Lake Central and North Temple Transit Stations. The parcels are identified in yellow in FIGURE 2.1. Rio Grande Depot Renovation In 2020, an earthquake and its subsequent aftershocks damaged the 114-year-old Rio Grande Depot. The building is currently undergoing seismic upgrades and a major renovation with a target reopening in 2028. Pioneer Park Vision Plan Pioneer Park has undergone a comprehensive vision plan encompassing the northern end of the park to include a new playground, plaza, pavilion, ranger station, shade lawn, mist fountain, and habitat area. Phase 1 construction is anticipated in 2025. 51--d P.,h Figure 2.1: Downtown Context Map Pa P'ar Gru < Pali: 30 Rio Grande District Vision and Implementation Plan Solt Lak.• C,ly F— Po•k Jordan Park i i i i i / i i i Salt Lake Central Station 1 1 15 I 1 1 i 1 I 1 Project Site Depot District I Downtown Boundary L._._._ Temple Square Union Pacific DepotT ----------- i Delta Center i r—PI, square 1 L._._._._.. The Gateway 1 •oosq�th Salt Palace I Gallivan Center . i Soo so.,en I I Rio Grande Depot cnrr n • Rio Rio � � City and t Grande 300South County Library District Building Square . _ Pioneer Park .nlvorslty Boulovord I Washington i squoro Park ! ;00 South O O P O 6O0 South I I • I 1 70c south I I I I I City Fleet Block \ — ---------------------J ......... ........ Porn Parks Central Station Properties 1 Major Destinations 5-Minute Walkshed . National Historic Register Sites 10-Minute Walkshed Local Historic Register Sites O 31 The Site 2.2 Transportation Context The site is located at the convergence of extensive existing and future multi -modal transportation. Transit Connectivity The Rio Grande District is currently served by the TRAX Blue Line, Frontrunner (Ogden to Provo), Amtrak, Greyhound Bus at Salt Lake Central Station; TRAX Blue Line at the Old Greektown Station, and UTA local bus service on 400 South and 200 South. The Green Loop The Downtown Neighborhood Plan proposes a series of major long- range active transportation capital projects. The most prominent is a proposed linear park called the Green Loop. 500 West is currently the western alignment for the Loop, serving as a north -south connection through Downtown. Future of Light Rail Study The Future of Light Rail (FOLR) Study developed a concept design for the Granary District Ballpark Spur to Salt Lake Central via 400 South and 600 West. This allows through running operation, such as interlining of the proposed Orange Line with the existing Green Line or proposed Strategic Blue Line operation. Due to the 400 South viaduct approach crossing the Frontrunner and Union Pacific tracks, there are limited options at this location. Connection to Westside Salt Lake City is currently divided by Interstate 15 and Union Pacific Railroad (UPRR) mainline and intermodal terminal, a regional north -south corridor that has bi- furcated east -west connectivity, altered community cohesion, and embedded socio-economic inequities, and environmental injustice. ` Existing connections to the Westside neighborhoods adjacent to the Rio Grande District include: • 400 South via Viaduct 200 South at grade The Folsom Trail via 600 West and North Temple * Critical Connections: Healing Salt Lake City's East-West Divide Flahor Man�Ion Sherwood Park t ' PoPlar Grove Pork Q Figure 2.2 Transportation Context Map 32 Rio Grande District Vision and Implementation Plan Folsom Trail � i/ i i i / i Ri G. 15 Ulsl ■ • 1 "0 1 Soo. 1'1 goo 1 Jordan River Trail •• 1 ,1 goo,. Project Site Depot District Downtown Boundary \ —.—.—..-.—.—.— .r TRAX Lines 1111111111 Tech Link Corridor Frontrunner i Folsom Trail The Green Loop 9 Line Trail ---------- Jordan River Trail O 33 The Site 2.2 Transportation Context The Vision Plan takes into consideration transportation capital projects that are currently being implemented or planned in both Salt Lake City and UTA's Capital Plans. PROJECT ID CORRIDOR SEGMENT PROJECT NAME DESCRIPTIONS Complete StreetTransit 400 West to 900 improvements, Buffered Bicycle Lanes, Pedestrian 1 200 South / Transit Corridor East Improvements, Curbside Parking and Loading Zones Reconstruction Post Street (900 Two-way multi -use trail for pedestrian and bicyclist on south side 2 400 South Viaduct Trail West) to 400 West of 400 South. New barricades between motor vehicles and trail Salt Lake Central 600 West to 300 Provide bikeway connection between Salt Lake Central station 3 300 South Station Bikeway West and existing 300 South bicycle facilities. Connection 300 West to 1000 4 300 South n/a Pavement maintenance and bike lane upgrades East 300 West to Main 400 South Bicycle 5 400 South Bicycle Lanes are currently in design by Salt Lake City Street Lanes North Temple to Buffered Bike b 600 West Buffered or Protected Bike Lanes 300 South Lanes Convert existing street space to include more green space and 7 Multiple Multiple Green Loop active transportation options Improve east -west Downtown and regional transit connectivity. UTA Tech Link 8 n/a n/a Realign the TRAX Red Line TRAX Line New TRAX Orange line along 400 South Increased Increase train frequency: Peak from 30 minutes to 15 minutes; 9 n/a n/a Frontrunner Off-peak from 60 minutes to 30 minutes. Frequency Table 1: Relevant Transportation Capital Projects 34 Rio Grande District Vision and Implementation Plan L • � rn ■ .. ■ 6 1G0 South —fir • .oC. • 200 South OaiNvon •: 0 CMMI It V/ wo ........ ...�. • {] 15 �J � N Piom.r • Pork f/p�� University Boulevard�rf^-�! 400 South f • 500 South Qp ` O 0 0 O 3 600 South j O700 South i 800 South 900 South ■ ■ l.n Park � i Figure 2.3 Relevant Transportation Capital Projects Sq=m Project Site The Green Loop .......... Project ID Segments lYJ iIP 35 The Site 2.3 Site History The Vision and Implementation Plan acknowledges and celebrates the site's rich history. The area around the Rio Grande In 1911, the Rio Grande Depot District was originally settled by the Fremont Tribe of Native Americans who benefited from the fertile soils in the area. Mormon Pioneers arrived in the Great Salt Lake Basin in 1847 and drew up a plat of the City a couple months later, which brought the Rio Grande District blocks into existence. There were eight original owners on each block, equally divided into 1.25-acre segments. In 1870, the railroad was built on the west side of Salt Lake City, bringing with it a regional commerce connection while also creating a demarcation line between east and west in the City that still exists today. By 1900, the area had been densely settled by a large number of Greek families and other immigrant workers who were mainly laborers for the railroad. Greek -owned businesses began to spring up along 200 South at that time and the area became known as Greek Town. opened its doors and became the city's central rail station for transporting people, industrial goods, minerals, and agricultural products. This new building replaced two smaller Rio Grande depots that existed where the Salt Lake Central Station now stands. The new Depot connected Salt Lake City to Denver and to the west coast. This building also had the effect of further dividing the City's more affluent residents on the East from the immigrant communities to the west. The direct connection to the railroad in the district spurred a transition from residential land uses towards manufacturing and industrial uses, which resulted in a jumbled mix of residential and industrial uses intermixed with rail spurs and roads. Businesses located on the two blocks of the Rio Grande District included Utah Ice & Storage, The Jensen Creamery Companies, J.I.Case Implement, Z.C.M.I. General Warehouse, Western Macaroni Manufacturing Company, Salt Lake Mattress and Manufacturing Company and the Z.C.M.I. Stables. By 1949, the rail boom had hit its peak and Interstate 15 was built just to the west in the 1960's. By 1977, passenger rail ceased operations at this location. This marked a steady decline in the area until the Gateway and Central Station were built in the early 2000's and signaled a new future for this part of the city.' Summary of Site History from Station Center Design Standards and Guidelines (2075) 36 Rio Grande District Vision and Implementation Plan Alft'44. ■ 1191 IL - 1 Figure 2.4 Historic Photographs of Rio Grande Depot and Salt Lake Mattress Building. Credit: Utah State Historical Society Figure 2.5 Historic Site Map from 1911. Credit: History of The Hub, Salt Lake City Brick Iron Wood Frame Adobe/ Fire Proof O Stone 37 The Site 2.4 Site Ownership Today, the Rio Grande District consists of a consortium of property owners and businesses. PROPERTY OWNERS ACREAGE PARCELS Redevelopment Agency of 10.8 acres 29 Salt Lake City Nicholas & Co. Artspace University of Utah Foundation Property ownership is subject to change. Table 2: Site Ownership Matrix 3.3 acres 1 1.6 acres 3 1.9 acres 7 BUILDINGS ON PROPERTY Fill the Pot / A Place for your Stuff SDI Printex Salt Lake Mattress Building Intermountain Furniture Building Blue Warehouse Nicolas & Co. Building Artspace City Center Artspace Macaroni Flats Artspace Bridge None 3 0 Figure 2.6: Site Ownership Diagram 38 Rio Grande District Vision and Implementation Plan Artspace I I Artspace Salt Lake Mattress City Center III III Macaroni Flats Building The Blue Warehouse RDA Owned Properties Nicolas & Co. Properties Artspace Properties University of Utah Properties Parcel Lines Site Boundary Buildings to be Replaced W, a 39 The Site 2.5 Site Today 0 Figure 2.7: Key Map for Site Existing Condition Photographs Ol View of 500 West and 400 South looking west toward the Blue Warehouse. OView from Artspace parking lot looking south-east toward 500 West and the Rio Grande Depot 40 Rio Grande District Vision and Implementation Plan OView of Artspace City Center and Macaroni Flats looking north-east from 300 South. OView of 400 South underpass parking area looking east from 600 West. �7 View of the existing Salt Lake Mattress Building looking south from 300 South.. O4 View of the Rio Grande Depot looking east from 300 South. OView of WRR Industries building to the east, TRAX on 600 West to the west, and the 400 South viaduct in the background. O$ View of Eccles Avenue and the Artspace Bridge and City Center buildings looking east toward 500 West. 41 561 W 200 South The Site 2.6 Site Zoning The two primary blocks are zoned Gateway Mixed - Use. The site is home to three buildings on the historic register. The Rio Grande District area is zoned The areas closest to the Salt Lake G-MU Gateway Mixed -Use District. Central Station and its extensive The intended purpose of the G-MU District is as follows: "to ... encourage the mixture of residential, commercial and assembly uses within an urban neighborhood atmosphere... the 500 West corridor is intended to be a primary residential corridor from North Temple to 400 South. Development in this district is intended to create an urban neighborhood that provides employment and economic development opportunities that are oriented toward the pedestrian with a strong emphasis on a safe and attractive streetscape. The standards are intended to achieve established objectives for urban and historic design, pedestrian amenities and land use regulation." The land use intent in the Design Standards and Guidelines is to balance the site with both residential and commercial uses. transit infrastructure are envisioned to become an office employment center due to the ease of commute via transit from all areas of the city and from large portions of the Wasatch Front. The Zoning Ordinance intends for the 500 West corridor to be primarily residential in nature, and requires structures fronting 500 West to contain residential units that occupy at least 50% of the structure's gross square footage. All ground -level floors of buildings facing onto the Festival Street at 300 South Street are required to be occupied with retail uses, including restaurants and bars, in order to encourage activity and liveliness along this important corridor. The uses, densities, and design components envisioned in the Rio Grande District Design Standards and Guidelines are intended to conform with objectives outlined in the Salt Lake City Downtown Master Plan (2016), and all proposals must comply with the Salt Lake City Zoning Ordinance.' Summary of Site History from Station Center Design Standards and Guidelines (2075) Historic Register: National Figure 2.8: Site Zoning and Historic Properties Map 42 Rio Grande District Vision and Implementation Plan Western Macaroni Manufacturing Company Factory Rio Grande Railroad Station Historic Register: National Historic Register: National and Local CYO G-MU: Gateway Mixed -Use Zoning OS: Open Space D-3: Downtown Warehouse/Residential District Landmark Sites CG: General Commercial O r 43 The Public Realm 3.1 Development Blocks 3.4 Stormwater Management 46 69 3.2 Open Spaces 3.5 48 3.3 Planting, Ecology, Habitat 3.6 68 Paving 70 Site Furnishing 71 The Public Realm 3.1 Development Blocks The layout of development blocks at the Rio Grande District is critical to establishing a fine grain, human -scaled neighborhood. The development blocks contribute to a successful urban fabric with a functional network of connected public rights -of -way and urban open spaces that provide people with a variety of engaging routes to choose from and encourage pedestrian accessibility and movement. Development blocks are the foundation for well-proportioned, visually engaging, and high -performing architecture. As illustrated in FIGURE 3.1, the Rio Grande District has 7 blocks, each identified by a letter for reference within the document. Standards 1. Land Parcelization: New development blocks shall adhere to the following specifications: SQUARE EASEMENT FOOTAGE DIMENSIONS REQUIRED OR STREET BLOCK ID ACREAGE (SF) (FEET) OPEN SPACE VACATION 450' x 320' A 3.27 acres 142,500 SF Yes Yes 470' x 300' B 1.96 acres 85,500 SF 300' x 285' Yes Yes C 1.79 acres 78,375 SF 275' x 285' No Yes D 1.65 acres 72,000 SF 240' x 300' No No E 1.03 acres 45,000 SF 130' x 300' No Yes F 2.06 acres 90,000 SF 300' x 300' No Yes G 1.89 acres 82,500 SF 275' x 300' No Yes Green Loop 6.5 acres 286,150 Sf 1475' x 194' Yes No Table 3: Development Block Matrix 2. 400 South Frontage Easement: Blocks C and G shall adhere to a 25 foot easement along 400 South frontage road to accommodate future UTA light rail extension. 3. 300 South Street Vacation: New development on Blocks A, B, E, F development can build in the 23.5 feet street vacation on either side of 300 South. Figure 3.1: Development Blocks Diagram 46 Rio Grande District Vision and Implementation Plan Development Block Required Open Space Area Easement Street Vacation O 47 The Public Realm 3.2 Open Spaces The integration of various types of public open spaces is critical for successful placemaking and urban development at the Rio Grande District. The public realm sets out a vision for a thriving and healthy community open and engaging for all. The following principles are intended to guide all future public agencies, developers, and designers in the creation of Rio Grande District public spaces: Scale and Rhythm: Fully respect the scale and rhythm of historic buildings and the neighborhood while providing a diversity of open space types. Indoor -Outdoor Interface: Promote active edges between open spaces and buildings for a vibrant community. n n Biophilia: Consider biophilic design approaches for all the open space areas from programs to material selection. Integrated Infrastructure: Showcase n (� innovative stormwater treatment and other sustainability elements in the public realm for educational purposes. Adaptability and Resiliency: Create resilient landscapes to support a thriving and healthy long-term development. The following spreads provide design standards and guidelines for four major public spaces: 3.2.1: The Green Loop 3.2.2: The Festival Street 3.2.3: The Arts Campus 3.2.4: The Underpass Park Figure 3.2: Rio Grande District Open Spaces Diagram PAI 48 Rio Grande District Vision and Implementation Plan O A M 3.2.1: The Green Loop 3.2.3: The Arts Campus 3.2.2: The Festival Street 3.2.4: The Underpass Park 49 The Public Realm 3.2.1 The Green Loop 500 West is the preferred alignment for the Green Loop, a proposed 5.5 mile urban trail and linear park that connects the Rio Grande District to Downtown SLC. The Rio Grande District segment of the Green Loop is envisioned to be a lush urban forest providing biophilic respite within a dense urban setting. It will foster community wellbeing by promoting alternate modes of mobility to navigate through Downtown and provide options for active outdoor activities. It will create vibrancy with pockets of recreational and passive congregate spaces designed to cultivate a sense of community, support local businesses, and celebrate the arrival to the Rio Grande District. Standards 1. Dimensions and Siting: The park space is 1450 feet long and 101 feet wide and aligned to the eastern edge of 500 West right-of-way. 2. City Coordination and Approval: The street, park and utility design for the green loop shall be in coordination and reviewed by City departments. 3. Pedestrian Promenade: A shared path at least 20 feet wide shall be incorporated into the park design. 5. Intersections and Gateways: The intersections of 200 South and 400 South at 500 West are designated as gateways to the Rio Grande District via the Green Loop. Design of intersections shall consolidate various transportation modes for safe and efficient crossing. 6. Rio Grande Depot: A civic plaza, measuring 150 feet by 101 feet, shall be positioned in front of the Rio Grande Depot, ensuring clear visibility and access to the depot structure. It will serve as a gateway to cross over 500 West Street into the Rio Grande District on 300 South, also known as Festival Street. The ground floor of the central bay of the depot structure shall be made public for greater east west porosity on 300 South. 7. Active Edges: All ground floor uses along 500 West shall adhere to the Parkfront Zone Ground Floor Use. Refer to Section 5.3. 8. Secondary Open Spaces: The site design, materiality, and plant selection of secondary open 4. Vehicular Access: Vehicular access spaces along 500 West, such as shall be provided to existing the spectator plaza on Block 2, the developments on the east side of spaces in front of the Blue Warehouse the park. Vehicular access for new building, and Artspace City Center on development on the eastern edge of Blocks 1 and 3, respectively, shall be 500 West is prohibited. designed as extension of the Green Loop. 50 Rio Grande District Vision and Implementation Plan i Figure 3.3: Green Loop Standards Diagram Green Loop Park Area Rio Grande Plaza Open Spaces Along Green Loop e Green Loop Shared Trail JOpen Space Boundary �# vYeY • Improved Intersections OParking/Service Access Crossings OVehicular Access 51 The Public Realm 3.2.1 The Green Loop The Green Loop programming ensures that Rio Grande District residents, workers, and visitors enjoy the benefits of sustainable urban life by having convenient access to a wide array of outdoor spaces and activities. Guidelines 1. Retail Cluster: The park should feature outdoor retail kiosks and additional spaces for shopping and dining, strategically clustered around the Rio Grande Depot. 2. Outdoor Recreation Facilities: To complement the urban trail, the park should include other active uses such as an outdoor gym and sports courts, playground, and dog run. All uses should be located with consideration to adjacent land uses. 3. Programming: The Green Loop may include but are not limited to the following events and activities: EVENTS FREQUENCY Fitness Class Sports Demonstrations Street Performers and Musicians Daily Recharge Stations Community Gardening Classes Community Volleyball Youth Sports Club Parenting Lunch and Play Movie Night Weekly Live Music Mobile Health Clinic Youth, Elite, Collegiate, Para -competitions Monthly Symphony Night at Rio Grande Depot State, National, International Competitions Film Festival Annual Winter Clothing Drive Table 4: Green Loop Programming Table N Figure 3A Green Loop Guidelines Diagram 52 Rio Grande District Vision and Implementation Plan ,._' -- �_;_ '+�'°�,.-" ►r� yea RM Figure 3.5: Photograph of the historic Ferry Building in San Francisco, which has spill out space for outdoor dining and a Saturday farmers' market. a Figure 3.6: Photograph of a community playground in Philadelphia which provides outdoor space for families living in the neighborhood. 53 L L LATTE lva5 iff fcxAi IT I a ITA & ir • At -mom M "ary �t wlr p 4 7 The Public Realm 3.2.2 The Festival Street The 300 South Festival Street is a curbless central urban square flanked by shops and restaurants spilling out at the edges. Year-round, the street prioritizes people with generous tree lined pathways and clear views to the historic depot. Standards 1. Dimensions and Siting: The Festival 5. Intersections: Pedestrian safety at Street is 660 feet long and 84 feet wide segment of 300 South right- of-way between 500 West and 600 West. 2. City Coordination and Approval: The street and utility design for the festival street shall be in coordination and reviewed by City departments. 3. Pedestrian Promenade: A 23.5-foot street vacation is approved along both edges of the 300 South right- of-way. Building construction is permitted in these spaces, on the condition that ground floor uses shall be active and contribute to street -level vibrancy. Uses that deter pedestrian engagement and street activity are prohibited. 4. Vehicular Access: The eastern half of 300 South, extending from Woodbine Court to 500 West, shall feature a curbless design with restricted vehicular access. To enforce this restriction, traffic control measures, including retractable bollards, shall be placed at each end of this section. the intersections of Festival Street with 600 West and 500 West shall implement well -marked crosswalks, pedestrian -friendly signals, and raised intersections for traffic calming. 6. Preserve View of the Rio Grande Depot: Direct visual access to the Rio Grande Depot building shall be preserved from the Salt Lake Central Station. 7. Active Edges: Retail frontage that directly interfaces with the public is required on both sides. It may include the storefront, windows, entrance, and any displays or signage. The frontage shall be designed to be inviting, visually appealing, and strategically organized to showcase products or services. The design shall contribute to the overall character and vitality of Festival Street. 8. Gateway on 600 West: To establish a distinctive gateway at 300 South and 600 West intersection, the ground floors of buildings along 600 West shall be recessed as illustrated in FIGURE 3.8. In the defined recess zone, the upper floorplates of the building podium can extend to the property line. See FIGURE 4.12, 4.13 for additional information. Figure 3.8: Festival Street Standards Diagram MA 56 Rio Grande District Vision and Implementation Plan 4�� Pedestrian Priority Areas Open Spaces Along Festival Street _ JOpen Space Boundary EILI Ground Floor Recess M Rio Grande Plaza Intermodal Hub Active Edges Crossings Curbless Street Improved Intersections 57 The Public Realm 3.2.2 The Festival Street The Festival Street is a major shopping street for the Depot District framed by Salt Lake Central Station to the west and the historic Rio Grande Depot to the east. Guidelines 1. Outdoor Spil lout Spaces: The Festival 3. Programming: The Festival Street Street should be designed to include may include but are not limited to the outdoor dining areas, spaces for following events and activities: outdoor farmers market stalls, and EVENTS FREQUENCY outdoor work environments. Sidewalk Retail and Dining 2. Public Art: To convey an innovative Daily and iconic downtown main street, the Public Art Displays design of the festival street should Farmers Market include signature urban furnishing, lighting, and public art. Downtown Arts & Craft Market Weekly Food Truck Fridays Urban Flea Market Holiday Market Illuminate Salt Lake Slug Magazine Brewstillery Skiswap Craft Lake City SLC Table 5: Festival Street Programming Table Monthly Annual Figure 3.9: Festival Street Guidelines Diagram 58 Rio Grande District Vision and Implementation Plan Figure 3.10: Photograph of the neighborhood street converted into a farmers market in London, England. Figure 3.11: Photograph of the Pitt Street Pedestrian Mall, a curbless street with unique paving and retail spill out spaces in Sydney Australia. 59 The Public Realm 3.2.3 The Arts Campus Bounded by the Artspace Macaroni Flats and the Salt Lake Mattress Building, the Arts Campus is a temporal public canvas where SLC artists, makers, students and non-profit organizations come together. Standards 1. Dimensions and Siting: Situated on the east side of Woodbine Court, The Arts Campus plaza encompasses a 180-foot segment on the Southwest part of Block A and a 300-foot segment on the Northwest part of Block B. For precise dimensions and placement details, refer to FIGURE 3.12 illustrating the campus layout. 2. City Coordination and Approval: The plaza, street and utility design for the Arts Campus and Woodbine Court shall be in coordination and reviewed by City departments. 3. Curbless Street: Woodbine Court Street segment between Pierpont Avenue and Market Street shall be curbless prioritizing pedestrians but maintain slow vehicular access. The design shall provide designated loading zones and services spaces to cater to commercial and maker's needs while fostering a pedestrian - friendly environment. 4. Intersections and Gateways: The intersection of 300 South and Woodbine Court shall be designed to clearly delineate vehicle, freight, and pedestrian movement. 5. View to Salt Lake Mattress and Artspace: Design of plaza shall maintain visual connectivity between Festival Street, Salt Lake Mattress Building (South), and Macaroni Flats (North). Plaza design shall utilize public art, materiality, and vegetation to reinforce the connection between Salt Lake Mattress and Artspace. 6. Ground Floor Uses and Active Edges: All ground floors shall be curated by the RDA to foster the optimal Arts Campus environment. Figure 3.12 The Arts Campus Standards Diagram 60 Rio Grande District Vision and Implementation Plan EmuCurbless Zone Open Spaces Open Space Boundary N Existing buildings _ Active Edges View Corridor O 61 The Public Realm 3.2.3 The Arts Campus The flexible open grounds create a canvas for surreal sculptures, dynamic art installations, open-air studios, and interactive exhibits. It is also a comfortable hang- out spot for locals with shaded outdoor seating, affordable food options and an eclectic crowd. This artistic hub invites students and visitors to collaborate, and immerse themselves in a vibrant cultural tapestry. Guidelines 1. Public Art: Public art installations and events should be curated by organizations like the Salt Lake City Arts Council. 2. Programming: The Arts Campus may include but are not limited to the following events and activities: EVENTS FREQUENCY Kids Arts Day camp Daily Adult Art Classes and Workshops Kids Storytime Trivia Night and Happy Hour Weekly Private Events and Receptions Studio Tours Young Innovators Night Writers Workshop Monthly Open Zen Meditation Rotating Sculpture Installation International Arts Festival Ice Sculpture Festival Annual Craft Lake City DIY Fest Table 6: The Arts Campus Programming Table Figure 3.13 The Arts Campus Guidelines Diagram 62 Rio Grande District Vision and Implementation Plan Z C rc�r 011 Figure 3.14: Figure 3.15: Photograph of temporal public art installations in Aarhus, Denmark that serve Photograph of urban plaza space that can accommodate larger community as cultural destinations. festivals. 63 =I 64/ I 0011 LAS f.: \ N ........... �' �,§`yam rr� �"����� t�'��..� I �I � � '�w ��,•�:. �Swf� i _ � 4 l"'H� The Public Realm 3.2.4 The Underpass Park The Underpass Park infuses new life in abandoned infrastructure, providing an active recreation focused community park. The park is a programmatic bridge between the Rio Grande District and the industrial areas south of 400 South. Standards 1. City Coordination: All programs and activities shall comply with the City Transportation Department standards for access to roadway infrastructure. Guidelines 1. Design Elements: Elements may include dog park, rock climbing area, skate park, sports courts, art installations with lights and murals. 2. Programming: The Underpass Park may include but are not limited to the following events: EVENTS FREQUENCY After school Urban Sports `^ _ Daily Strength Training / Exercise Classes Basketball Tournaments Weekly Skateboarding Clinic Figure 3.17 Skateboarding or BMX Events The Underpass Park Guidelines Diagram Rotating Mural Event Monthly Parkour Workshops Street Art Festival Annual Table 7: The Underpass Park Programming Table 66 Rio Grande District Vision and Implementation Plan Figure 3.18: Photograph of a revitalized underpass park in Toronto with public murals and basketball courts. w gyp. y s s. Figure 3.19: Photograph of an urban skatepark in Venice Beach which is very conducive and can activates these types of underutilized spaces. 67 The Public Realm 3.3 Planting, Ecology, and Habitat Planting elements are integrated in part to support the biophilic design approach of the public realm, to help protect and feed local habitat, to frame public open spaces, and enhance pedestrian comfort. Standards 1. City Coordination: Selection of urban forestry and plant palettes for public open spaces shall be coordinated with appropriate SLC departments and other regulatory agencies. Guidelines 1. Native Planting: Native plant species that are well -adapted to an urban site and non -potable irrigation are strongly recommended for the planting palette. Avoid any invasive species. Low water -use plants are strongly preferred. 2. Habitat Support: Plant species throughout the site should provide habitat for biodiverse local wildlife, including food and nesting/shelter sources. 3. Urban Agriculture: Edible gardens, community gardens and other edible plants should be located in zones of imported clean soil and/ or implemented with raised beds isolated from soil. 4. Canopy Trees: Canopy trees and shade structures should be strategically located to ensure shaded plaza areas and streets for comfortable pedestrian movement in the hot summer. 68 Rio Grande District Vision and Implementation Plan Figure 3.20: Tree canopy provides welcome shade in the summer months and critical habitat area for local fauna. Figure 3.21: Landscape that provides habitat for insects and other fauna helps sustain a more robust ecosystem. 3.4 Stormwater Management Stormwater management and water conservation is a critical part of supporting landscape resiliency to climate change. Standards 1. City Coordination: Design of Stormwater facilities for Rio Grande District public open spaces and streets shall be coordinated with SLC Public Lands, Public Utilities, and all other appropriate regulatory agencies. Guidelines 1. Preferred Treatment Methods: Preferred treatment methods should include green roofs, rain gardens, bioswales and flow -through bioretention planters. 2. Water Storage Basin: Design of new public spaces such as the Green Loop should consider an underground stormwater storage tank dedicated for irrigation. 3. Educational Features: Educational and interactive water features should be integrated with public realm design for community engagement with sustainable practices. Figure 3.22: Rain gardens and bioswales help to manage stormwater on site, while also providing new habitat areas. Figure 3.23: Landscapes with low -drought plantings will support district resilience and water conservation. 69 The Public Realm 3.5 Paving Paving design and materials should be the primary element that give identity to the open spaces and help integrate the various parts of outdoor spaces into a distinctive whole. Standards 1. ADA Compliance: ADA compliance shall be required for paving design and materials in all public areas. 2. Emergency Vehicles: All paving and routes which must accommodate emergency vehicles shall comply with SLC Fire Department load -bearing requirements. Guidelines 1. Historic Character: The Green Loop, Festival Street, and The Arts Campus should include pedestrian paving which relates to the character of the historic buildings and respect their geometry and alignment. 2. Permeable Pavers: To promote stormwater infiltration, permeable pavers should be used where appropriate, specifically along the Green Loop. 3. High Albedo: Paving should utilize high-albedo content to reduce the urban heat island effect and promote cooling of the site. 4. Local Sourcing: Local sourcing of paving materials should be encouraged to take advantage of local manufacturers and suppliers and reduce embodied carbon. S. Intersection Paving: Major crossings such as 600 West and 300 South from Salt Lake Central Station to the Festival Street or 500 West and 300 South to the Rio Grande Depot should incorporate a special paving pattern to emphasize pedestrian priority. Figure 3.24: Paving design and material helps create a sense of place and distinct identity to an open space. Figure 3.25: Permeable pavers can help with stormwater infiltration and reduction of urban heat island. 70 Rio Grande District Vision and Implementation Plan 3.6 Site Furnishing Site furnishings should help to establish the unique identity of the Rio Grande District and help create an inviting, comfortable, and biophilic environment for users. Standards 1. City Coordination: All site furnishings such as exterior light fixtures or benches in the right-of-way shall meet Salt Lake City standards and be approved by all relevant City departments. 2. Full Shielded Exterior Light Fixtures: All exterior light fixtures shall be fully shielded to minimize glare, light trespass and light pollution throughout the Rio Grande District. 3. Dark Sky Compliance: Exterior light fixtures shall meet or exceed applicable energy -efficiency standards while adhering to specifications of the International Dark Sky Association to prevent negative health impacts on humans and wildlife. 4. Key Pedestrian Lighting: Exterior light fixtures shall reinforce key active transportation pathways and shall be scaled to the pedestrian and bicycle experience. Guidelines Complementary Contrast to Existing Buildings: Site furnishings such as benches, trash bins, and exterior light fixtures should consider compatibility or complementary contrast with the character of adjacent historic buildings such as the Rio Grande Depot or the Salt Lake Mattress Building. 2. Material Reuse: Site furnishings should provide an opportunity for material reuse and carbon sequestering within salvaged materials. This could include concrete from old building foundations or interior building materials. 3. Green Loop Coordination: Site furnishings such as light post banners and wayfinding along 500 West should incorporate the Green Loop branding and select elements of the linear park design palette to provide accessible navigability for pedestrians and cyclists along the urban trail. However, the Rio Grande District segment of the Green Loop should celebrate design elements that make it distinctive and unique. Figure 3.26: Site furnishings can be designed to enhance the character of an existing place. W ' W ONON - 1- Figure 3.27: Exterior street lights that adhere to dark sky standards help mitigate light pollution and disruption of circadian rhythms. 71 Mobility Network 4.1 Mobility Overview 4.4 74 4.2 Active Transportation 4.5 76 4.3 Vehicles 78 Street Sections 80 Shared Parking 96 The Mobility Network 4.1 Mobility Overview Transportation and circulation are critical components of the safe and effective movement of people and goods within the Rio Grande District. The mobility network accommodates all modes of travel with an emphasis on people - powered modes directly connecting to transit. By concentrating high -density development around Salt Lake Central Station with a diversity of uses and a multi -modal network, the Vision and Implementation Plan aims to reduce the reliance on private vehicles, helping to minimize traffic congestion and the amount of land dedicated to parking. The mobility network envisions the following: Pedestrian Priority: An integrated pedestrian network of generous sidewalks, plazas, and curbless streets that (9 put people first. Low Stress Bike Network: Bicycle network that builds upon the existing City plans and capital projects, with �Ofeo- routes to Downtown as well as connections to westside neighborhoods via 400 South, the 9-Line Trail, and the Folsom Trail. Transit Connectivity: A circulation plan that prioritizes 0 0 transit access over private vehicles and supports options such as car share and ride share. Functional Roadways: A vehicular circulation plan that 0 o serves the needs of on -site development and connects to the surrounding arterials and freeways. Figure 4.1: Mobility Network Map 74 Rio Grande District Vision and Implementation Plan J 300 South (84' R.O.W.) 500 West (93' R.O.W.) Pierpont Avenue (70' R.O.W.) Woodbine Court Green Loop Park Area (101' Wide) Eccles Avenue (60' R.O.W.) (50' R.O.W. - North of Pierpont Ave.) (60' R.O.W. - South of Pierpont Ave.) O Market Street (70' R.O.W.) I I Alleyways The Rio Grande Plan The Rio Grande Plan (not to be confused with this District Plan) was developed by two advocates, a local engineer and an urban designer. The vision suggests the relocation of freight and Frontrunner rails into an underground trench to open up over 100 acres of development, restore the use of a historic train station, and solve train -related east -west barriers to mobility. In February 2023, Salt Lake City was awarded nearly $2 million from the U.S. Department of Transportation to study solutions for eliminating barriers caused by transportation infrastructure, and the train box concept is one option being considered. 75 i The Mobility Network 4.2 Active Transportation All streets and pathways are designed with people and place in mind. The layout and design of streets include generous sidewalks, buffered bike lanes, and slow streets to improve the safety and convenience of pedestrians and cyclists. Standards 1. Public Rights -of -Way: All public rights -of -way shall comply with SLC Roadway Design Standards. 2. Sidewalks: All existing and new streets shall include a minimal sidewalk width of eight (8) feet. 3. Pedestrian Priority Zones: Specific portions of 500 West, 300 South, Woodbine Court, and 600 West are designated as pedestrian priority zones. Refer to FIGURE 4.2 for the zones of pedestrian priority. 4. Bikeways: The mobility network shall establish a bike network link between the Salt Lake Central Station to 500 West and the Rio Grande Depot. 500 West shall include a low -stress, separated bike facility as part of the future Green Loop and bi-directional bike facilities within the reconfigured roadway. 600 West shall include bi- directional bike facilities for north - south connections to the 9-Line Trail and the Folsom Trail. 5. Mobility Hubs: Mobility hubs are places in a community that brings together public transit, GREENbike, scooters, car sharing, and other ways for people to get where they want to go without a private vehicle. Refer to Figure 4.2 for the location of future mobility hubs. 6. Rio Grande Depot: The Rio Grande Depot shall provide public pedestrian access through the main concourse to create a seamless east -west connection on 300 South. Bicyclists shall be allowed to dismount within the Depot to connect to the existing 300 South buffered bikeway. 7. Intersections and Traffic Calming: All signalized intersections shall Comply with SLC Intersection Design Standards. Where crosswalks at uncontrolled intersections are proposed, an appropriate combination of traffic calming strategies shall be employed to maximize visibility and safe pedestrian crossing. Figure 4.2: Active Transportation Network Map W 76 Rio Grande District Vision and Implementation Plan Pedestrian Priority Zone Pedestrian Priority Intersections Signalized Intersection Curbless Shared Streets �..� Mobility Hub 1 Pedestrian and Bike Shared Path Alleyways 744 Key Pedestrian Connections Bike Lanes tim- O� ©� Transit Stops % Transit Lines External Pedestrian Connections O 77 The Mobility Network 4.3 Vehicles The street network has been laid out to serve the needs of the private development blocks for access, parking, servicing, and loading. Standards 1. Vehicle Circulation: All streets shall have two-way traffic circulation, with the exception of 400 South Frontage Road, which shall have one-way traffic in the westbound direction only. 2. Emergency Vehicle Access: In coordination with the Salt Lake City Fire Department, the vehicle network shall be laid out to ensure emergency vehicle access to all necessary points. Emergency vehicles shall be allowed to traverse non -vehicle sections on curbless streets to ensure a rapid response. 3. Curb Zone: The curb zone consists of areas within the roadway for on -street parking, loading, and pick-up/drop-off with the intent that each of these zones is close to the travelers' intended destination. Refer to Figure 4.3 for locations and recommended lengths of these zones. 4. Service and Loading: Streets within the mobility network have been laid out with sufficient width and turning radii at corners to allow service vehicles to access all portions of the site and buildings that are likely to need servicing and loading facilities. These facilities are restricted to certain sides of buildings and areas of open spaces to minimize their visual intrusion into the public realm. Refer to Figure 4.3 for portions of the site where servicing and loading is allowed. Figure 4.3: Vehicle Network Map 78 Rio Grande District Vision and Implementation Plan Pedestrian Pathways Curbless Shared Streets Alleyway O©� Transit Stops f Curb Zone 11 Signalized Intersection � Parking/Service Access 10 Preferred Vehicularingress/Egress Locations Transit Lines ` Proposed Transit Line Extensions Green Loop Shared Trail O C 79 The Mobility Network 4.4 Street Sections The mobility network proposes to redesign existing streets and build new streets in order to align with Salt Lake City's goals of creating a complete network of people -friendly streets. This includes the reconfiguration of existing public streets within the project site, including 500 West, 300 South, 600 West, and 400 South Frontage Road, as well as extension of public streets such as Market Street, Woodbine Court, and Pierpont Avenue. The proposed typical street sections are based on the standards and guidelines provided in the Salt Lake City Street and Intersection Typologies Design Guide. The typical street sections have been modified to accurately adapt to the Site's context. ET pNp INTERSECTION Salt Lake City GVIDE STRE OGIES DESIGN I Street Description I The MohH fty N etwwk 4.4.3 Market Street Market Street is a bi-directional east - west local street which connects 600 West to 500 West. The street provides two-way vehicular movement and loading/service access to adjacent blocks. Market Street is the primary entry to the muncipal parking structure. Standards: Pedestrian Clear Zone 8 Feet Green / Stationary Zone 6 Feet Vehl[le Travel lanes 11 Feet. with Bike Sharrows One Lone in Each Direr Curb Zone 9 Feet Frontage I Setback Building Entries T.W. 10; Mwkdt S&W 5Wrrdwd, Figure 4.4: Street Standards Guide Q Feet New development shal Standards Matrix 80 Rio Grande District Vision and Implementation Plan tic tion Key Map I I Typical Street Section I I provide entries on Market Street Typical Street Plan I Street Dimensions I 81 The Mobility Network 4.4.1500 West 500 West is a north -south complete street which accommodates the Green Loop park area on the eastern edge of the street. A double alley of trees shades generous pedestrian and bike paths. The street provides two-way vehicle movement and on -street parking. �=U_.M Pedestrian Clear Zone 8 Feet Green / Stationary Zone 7 Feet Between Clear Walkway and Southbound Bike lane Bicycle Facility Separated Buffered Raised Bike Lanes 6.5 Feet Bike Lane 5 Feet Buffer with Tree bed Vehicle Travel Lanes 11 Feet One Lane in Each Direction Curb Zone 9 Feet Frontage / Setback 0 Feet Building Entries New development shall provide a primary entry or entries on 500 West. Table 8: 500 West Street Standards 82 Rio Grande District Vision and Implementation Plan c" 71 C) OC C � A y .. 0 Qeor Zone 4 T Graoru' (D 1 1 '! Stationary Zona y .�. Sorthbound o, p Bike Lane u± 7 i Stormvrpter NEW IafrOStrUttu'!a zCurb Zone .a o Sorthb t 1 Traval Lane Lan "D Northbound Traval Lane Curb Zane Stor—atar frostructure - NOrth6CUn 9ike LaneU-' Gratin/ Stationary y Zane Pedestrian A Clear Zona m Green Loap a 00 Pork Area 0 The Mobility Network 4.4.2 300 South 300 South is a east -west festival street which links Salt Lake Central Station to the Rio Grande Depot. It is designed as a slow street with two- way vehicular lanes flanked on both sides with generous flexible spaces for parklets, market stalls, on -street parking or loading. Segment 1 between 500 West and Woodbine Court is curbless. Section 2 between Woodbine Court and 600 West has typical curbs. Standards: 00 Ground Floor Spillover 8 Feet Pedestrian Clear Zone Green / Stationary Zone Curb Zone Vehicle Travel Lanes with Bike Sharrows Building Entries Table 9: 300 South Street Standards 8 Feet 6 Feet 10 Feet 11 Feet One Lane in Each Direction New development shall provide a primary entry or entries on 300 South. 84 Rio Grande District Vision and Implementation Plan Ground Floor Spillover ion Clearie., z Zone MGreen/ Stationary C• Zone Curb Zone p E �y Westbound Travel Lane q z Eastbound Travel Lane Curb Zone D Green] StoEionory v Zone Pedestrian Ganr Zone Ground Floor Spillover - o0"1 0C DOC cn c A m 0 H K N W En CD rl 0 7 Ground floor ax Spillover Pedestrian m Clear Zana Green) Stotianary ot Zane \ Curb Zone Z5 f ._ Westboundovel j� j� Te j� Lane 'ti �I�RT i ■ Eastbound Travel Lane CurbZone p Green/ Stotianary P Zane Pedestrian a, Cieor Zone Ground Floor Spillover J 0 00 al The Mobility Network 4.4.3 Market Street Market Street is a bi-directional east - west local street which connects 600 West to 500 West. The street provides two-way vehicular movement and loading/service access to adjacent blocks. Market Street is the primary entry to the shared parking structure. Standards: Pedestrian Clear Zone Green / Stationary Zone Vehicle Travel Lanes with Bike Sharrows Curb Zone Frontage / Setback Building Entries Table 10: Market Street Standards 9 Feet 6 Feet 11 Feet One Lane in Each Direction 9 Feet 0 Feet New development shall provide entries on Market Street 86 Rio Grande District Vision and Implementation Plan T T4 i0'R.b.W. W 9' 6' 9' ® �r A 0 P v Ck� v wr. V atj Figure 4.8: Market Typical Street Section - Looking East 87 The Mobility NetworkT`� 4.4.4 Woodbine Court e Woodbine Court is a north -south local street that runs parallel to the Arts Campus on the western edge of the plaza. The street connects Eccles Avenue and the 400 South Frontage Road. There are two typical cross sections for Woodbine Court determined by adjacency to the Arts Campus plaza. Standards: 0 Pedestrian Clear Zone 8 Feet Green / Stationary Zone Alternatively on Eastern or Western Edge: 5 Feet Vehicle Travel Lanes 11 Feet with Bike Sharrows One Lane in Each Direction Curb Zone Alternatively on Eastern or Western Edge: 7 Feet Frontage / Setback None Building Entries Ground Floor Makers Spaces shall have primary entries on Woodbine Court O Pedestrian Clear Zone 7 Feet Green / Stationary Zone 4 Feet Vehicle Travel Lanes 11 Feet with Bike Sharrows One Lane in Each Direction Curb Zone 8 Feet Frontage / Setback Western Edge: none Eastern Edge: 0 - 90 Feet (Arts Campus Plaza) Building Entries Ground Floor Makers Spaces shall have primary entries on Woodbine Court Table 11: Woodbine Court Standards 88 Rio Grande District Vision and Implementation Plan 0 rV Pedestrian ,w Clear Zone r,zrl Green/ I Stationary t._. Zane Curb Zone ca S rovel Lam Travel nd Lana G Northbound -. -, Travel Lone l Cerb Zane W+ i Green/ Stationary n Zore Pedestrian Cieor Zone be Art Campus Plaza O :� ,! 00 C, ;o z m .. 0 0 sc CD to CD n 0 Pedestrian m Clear Zone Green/ Stationary N Zone f $i Lonn Traavel Lone e f� 6 Nwthbound Travel Lane Curb Zone .N 'Z Pedestrian wl Clear Zone O co 10 The Mobility Network 4.4.5 Pierpont Avenue Pierpont Avenue is a east -west local street which connects 600 West to Woodbine Court. Standards: Pedestrian Clear Zone Green / Stationary Zone Vehicle Travel Lanes with Bike Sharrows Curb Zone Frontage / Setback Building Entries Table 12: Pierpont Court Standards 9 Feet 6 Feet 11 Feet One Lane in Each Direction 9 Feet 0 Feet New development shall provide entries on Pierpont Avenue 90 Rio Grande District Vision and Implementation Plan :p 2! CD <o O N :3 A D c.. N � 7 G N rn CD n O 7 A"r Zone ClearZon _ } Green/ Stationary Dane Curb Zone n DIM 'UFLI Westbound estb Trawl Lane all �Cr Gh Eostbound iune u I` Curb Zones Graenl Stat'Onary r3: Zane `L. Pedestrian Clear Zane IO The Mobility Network 4.4.6 600 West 600 West is a major north -south street connecting the Granary District to the Depot District. The Rio Grande District segment of 600 West is in front of Salt Lake Central Station and includes TRAX infrastructure within the right-of-way. The standards only apply to curb zone to building edge. Standards: 0 Pedestrian Clear Zone 8 Feet Landscape / Furniture Zone 7 Feet Bicycle Facility Separated Buffered Bike Lanes 6.5 Feet Bike Lane, 3 Feet Buffer Vehicle Travel Lanes 11 Feet, One Lane in Each Direction Curb Zone Eastern Edge: 9 Feet Frontage / Setback Eastern Edge: 0 Feet (at Eccles Ave) to 20 Feet (at 300 South) Ground Floor Recess from Property Line. Building Entries New development shall provide a primary entry or entries on 600 West. Standards: 0 Pedestrian Clear Zone 8 Feet Landscape / Furniture Zone 7 Feet Bicycle Facility Separated Buffered Bike Lanes 6.5 Feet Bike Lane, 3 Feet Buffer Vehicle Travel Lanes 11 Feet, One Lane in Each Direction Frontage / Setback Eastern Edge: 0 Feet (at Market St.) to 20 Feet (at 300 South) Ground Floor Recess from Property Line. Building Entries New development shall provide a primary entry or entries on 600 West. Table 13: 600 West Standards 92 Rio Grande District Vision and Implementation Plan a rn N N fD 0 n O 7 O O x ca O G 7' U T O CC) C C � y A rn W N co n O N 0 Privately Owned Public Space Q Pedestrian w Clear Zone Green/ Stationary �± Zone Northbound er Bike Lane a? Buffer w Curb2one O Privately Ownad Pubic Space p Pedestrian w Cleo, Zane Green/ $totianary _ Zone Northbound a Bike Lane Buffer W Property Line F"*arty73ns O �O W The Mobility Network 4.4.7 400 South Frontage 400 South Frontage Road is a westbound street connecting 500 West to 600 West. The street includes a required 25 foot easement to accommodate the potential for a future light rail extension. Standards: Pedestrian Clear Zone Green / Stationary Zone Bicycle Facility Vehicle Travel Lanes Parking / Loading Easement Building Entries Table 14: 400 South Frontage Standards 8 Feet 5 Feet n/a 11 Feet n/a 25 Feet (Northern Edge) n/a 0 Figure 4.14: 400 South Frontage Street Section - Looking East 94 Rio Grande District Vision and Implementation Plan * Eccles Avenue 4.4.8 Alleyways Alleyways are shared publicly accessible pathways between buildings without curbs. These pathways create a safe mixing area for all modes of transportation and loading and servicing. * Eccles Avenue is a special condition and will be designed to seamlessly connect with the eastern segment of the street. Standards: Shared Path 20 Feet Landscape / Furniture Zone 3 Feet Bicycle Facility n/a Parking / Loading No On -Street Parking Frontage / Setback n/a Building Entries n/a Table 15: Alleyway Standards 3' 20 3' v u m n v m U A 4 Figure 4.15: Alleyway Section 95 The Mobility Network 4.5 Shared Parking To leverage the Rio Grande District's location to the Salt Lake Central Station and support the RDA's sustainable development policy, the design framework outlines a shared parking strategy, including a centralized shared parking garage. A successful approach for district parking at the Rio Grande District adheres to the following: Park Once: A shared parking garage Depot District Parking Agreement: RDA on the southern edge of the site will proposes a shared parking agreement reduce the presence of automobiles and with surrounding underutilized parking encourage people to use sustainable garages within the larger Depot District, modes of transportation such as walking, which can ensure that near -term biking, and transit. Shared Parking: Accommodating on -site demand in a shared parking garage supports the utilization of parking spaces at different times of the day and night. Productive Land Use: The proposed parking strategy transforms land traditionally designated for cars, into more productive spaces for housing, commerce, and community life. parking demand is provided without over parking the site. Shuttle Connector Service: If a shared parking agreement is successful within the Depot District, the Rio Grande District may provide a shuttle connector service to connect the district to available off -site parking. Future studies will confirm the route, frequency, and provider of a sustainable and convenient shuttle service. This is also a future opportunity for an autonomous vehicle shuttle system. Figure 4.16: Shared Parking District Diagram 96 Rio Grande District Vision and Implementation Plan V C (n m � � C C Y Y 7 O t O d � d The Mobility Network 4.5 Shared Parking r 1. District Parking Garage Location: The primary district parking garage shall be located on Block C with access on Market Street, 400 South Frontage Road, and Woodbine Court. 2. Parking Garage Orientation and Height: The parking garage rectilinear footprint shall have the shorter expanse along Market Street to minimize impact on the Salt Lake Mattress building. 3. Rooftop Recreation Area: The rooftop of the district parking garage shall be used as a publicly accessible recreational facility such as a soccer field or outdoor gym. As such, public access to the field shall be provided by elevator and stairs during hours of public use. Signage that is clearly visible shall be posted, directing the public to the field, and indicating its hours of operation and means of access. 4. Pedestrian Connections: The district parking garage shall allow at least one walkway connecting through the building at grade for frontages on Market Street, Woodbine Court, and 400 South Frontage Road. 5. Facade Screening: Due to it's prime location along 400 South the district parking garage shall be architecturally or artistically screened and designed with attention to detail compatible with adjacent buildings. The facades are an ideal location for interpretive elements, environmental signage, public art, and green walls. Figure 4.17: The Central Parking Garage at the University of Utah is a prime example of rooftop recreation on top of a parking structure. Credit: Hunt Electric Figure 4.18: The Parking Garage Facade P22a designed by Wulf Architekten in Koln Germany successfully creates a facade that is light, transparent, and playful, both during the day and night. Credit: Tobias Vollmer 98 Rio Grande District Vision and Implementation Plan Guidelines 1. Floor Slabs: Floor slabs that are set at a slope, such as speed ramps, should not be expressed at the facade of the parking structure. Where they occur, they should be visually screened. Floor slabs visible from the street must be flat. 2. Ground Floor Materials: Higher quality building materials should be emphasized in the fagade design on the ground floor, as well as at pedestrian touch points and in circulation areas. 3. Light Trespass: Light spillage from within the district parking garage should be minimized impacts to the surrounding development, especially residential. Parapet edges of the parking trays should be higher than the vehicle headlights. 4. Wayfinding: Take opportunities to be playful and creative with wayfinding and environmental graphics, particularly on the southern facade facing 400 South and signage directing the public to the rooftop recreational area. 5. Parking and Transportation Demand Management (TDM) Strategies: In order to significantly reduce the parking demand for Rio Grande District development, the RDA and development partners should employ parking and transportation demand management (TDM) strategies. CATEGORY STRATEGIES Unbundled Parking Reduce parking Parking ratios Shared Parking Agreement Shuttle Connector Service Micromobility TDM Discounted or Subsidized Transit Pass Financial Incentives DESCRIPTION Cost of parking spaces is separate from cost to lease building space. Utilize parking ratios lower than maximum requirement. Enter shared parking agreement to utilize underutilized parking at nearby developments. Provide first/last mile connection to near -by destinations Utilize shared micromobility (e-scooters, e-bikes) services Provide discounted or subsidized transit passes for residents or employees Provide financial incentives for residents/ employees for using other modes Table 16: Parking and Transportation Demand Management (TDM) Strategies Menu Ensure reserved spaces are being utilized. Lower supply can lead to lower demand Way to provide additional parking inventory for site. Connects the Rio Grande District to other destinations Can be utilized to connect with off -site parking. Convenient mode when traveling across the Rio Grande District or to near -by destinations. Encourage use of transit Encourages use of other modes 99 Land Use and Urban Form 5.1 Urban Form Overview 702 5.2 Land Use 706 5.3 Ground Floor Uses 708 5.4 Building Heights 772 5.5 Podiums 114 5.5 Building Massing and Orientation 116 5.6 Sustainable Design 720 Land Use and Urban Form 5.1 Urban Form Overview The Rio Grande District is a gateway site and a landmark destination serving Salt Lake City and the Wasatch Front. As a highly visible location in Downtown that embraces the future, building design shall embody a bold and expressive urban identity. An inviting urban form, well-balanced between high -density development and a pedestrian -friendly public realm, is critical to the success of delivering a welcoming and inclusive place. The vision for the public and private buildings within the Rio Grande District is to create a distinctive, pedestrian -oriented, high -density, sustainable neighborhood that embodies the following fundamental values: Create a distinct sense of place: Celebrate the 2 unique aspects of the site by designing a memorable destination. Capitalize on transit investments: The existing and future transit investments will generate long-term returns on investments for surrounding transit -oriented development. �J Celebrate the history: Showcase the history of the Rio Grande District by integrating the existing architectural heritage into an inspiring new development. Y Maximize the development potential: Establish � fit I a balanced mix -of -uses and a high -quality urban IBM environment while maximizing the development potential of the site. Establish a vibrant district: The mix -of -uses, ground Q Q Q floor activation and public realm will provide the stage for a 24/7 vibrant, engaging, and safe new district. 2A Figure 5.1: Urban Form and Land Use Overview Diagram 102 Rio Grande District Vision and Implementation Plan Arl "' JV +� �� �.� •�� +'�.. '� /IIr (i �y 11 i �� :i df 1F if/ fit Zia • r i 1 G1 It •• � 'S12LA � z law AM Ar s ` ¢. sZZ71 �. am ri �t lam�:. :*- S t �Sq p 4 ` ';Y. •r -LjiL"`g. mm AV T� ��as -�1! � ;.£:� +c�i� � :F1� � pyq�;,'y +.r � � .n - R � _ __ S. •_ ..s,�T•n i a -. J. j➢IR� i �Y 7;,Mfl, J •� ' ��1`� 4r �N#lK"'�t?i ' ij 4 = �1- � �, ,,',� �, ' i � 3," -� �'�' 1 _ �r r' i it ty 'Pip NOW, N,/ y •" Figure 5.2: Illustrative rendering of the Rio Grande District at full buildou 4 ' by � f ��i°' `' - ~• �Ib, *o, Land Use and Urban Form 5.2 Land Use The Rio Grande District aims for a diverse, balanced mix -of -uses that invites more people to live, work, play, and learn in the Depot District. Standards 1. Permitted Uses: The Rio Grande District site is within the Gateway Mixed -Use Zoning District. All permitted and conditional land uses shall be governed by 21A.33.060 of the Salt Lake City Zoning Code. 2. Open Spaces: Proposed parks and plaza spaces are included within the land use categories in FIGURE 5.3. Applicants shall adhere to the open space specifications outlined in SECTION 3.2. 3. Parking Garage: The preferred site for the district parking garage is on the west portion of Block C. Refer to SECTION 4.5 for more information on shared parking. Guidelines 1. High -Intensity Employment Hub: Aligned with the G-MU zoning, Blocks E and F bounded by 600 West and 300 South, should be high -intensity commercial use to capitalize on the direct proximity to Salt Lake Central Station. This can include a wide range of commercial uses, including tech headquarters, lab spaces, and creative office. 2. 500 West Residential Corridor: Per the G-MU zoning district, the 500 West corridor is intended to be a primary residential corridor from North Temple to 400 South, as such, Blocks A and C should be high intensity residential mixed -use. 3. Enhancing the Rio Grande Depot: The State of Utah is planning to re -locate several state departments into the renovated Rio Grande Depot as well as potential spaces for high education and cultural programming. To support this civic node, Block B is identified as a civic anchor/regional attraction. 4. Transitioning to the Neighborhood: To support a smooth land use transition to the existing multi -family residential along 200 South and Artspace, Block D is identified as residential mixed use. Figure 5.3: Land Use Diagram 106 Rio Grande District Vision and Implementation Plan i ® Residential Mixed -Use Park ® Commercial Mixed -Use O Parking Potential National Governing Body O 107 Land Use and Urban Form 5.3 Ground Floor Uses The ground floor is where the activity of a building meets the public realm, and therefore plays the greatest role in shaping the pedestrian experience. Each building frontage has a role to play in the definition and activation of streets and open spaces. Standards 1. Active Uses: Regardless of building type or use, ground floor active uses shall be required where indicated in FIGURE 6.4. The complete table of permitted and conditional ground floor uses in the Gateway District are found in 21A.33.060 of the Salt Lake City Zoning Code. Rio Grande District active uses are organized by the following character zones: Festival Retail Zone, Parkfront Zone, Transit Street Zone, Maker Spaces Zone, Tech Lake Zone, and Neighborhood Street Zone. 2. Festival Retail Zone: The Festival Retail Zone located along 300 South represents the highest level of intensity of shops, cafes, and retail at the Rio Grande District. The Festival Street and the street corners on 600 West and 500 West shall have a required retail use. A corner shall be measured from the first 30 feet from building edge on either side. 3. Parkfront Zone: The Parkfront Zone shall provide a high level of activity with a mix of building lobbies for upper floor uses, retail, residential, entertainment and sports recreation venues, that enlivens the Green Loop. 4. Maker Spaces Zone: The Maker Spaces Zone fronting on the Arts Campus Plaza shall include light industrial, production, fabrication, manufacturing, and studios for local artists and artisans. 5. Transit Street Zone: The Transit Street Zone shall create a welcoming, pedestrian friendly environment on 600 West for transit patrons. Primary lobbies for upper floor uses shall be placed on 600 West. Ground floors shall include neighborhood uses such as medical offices, daycares, hotels, among other uses. 6. Tech Lake Zone: The Tech Lake Zone shall apply to frontages indicated in Figure 5.4 which allows for ground floor commercial uses such as offices, dry and wet labs, and common spaces and amenities. Figure 5A Ground Floor Edges Diagram u 108 Rio Grande District Vision and Implementation Plan Festival Retail Zone Parkfront Zone Makers Spaces Zone UTA Redevelopment Area Neighborhood Street Zone Tech Lake Zone ® Loading/Services Transit Street Zone Potential National Governing Body Green Loop E F 109 Land Use and Urban Form 5.3 Ground Floor Uses 7. Neighborhood Street Zone: The Neighborhood Street Zone shall apply residential frontages along streets that are quieter in character, and serve to make up the neighborhood feeling of the Rio Grande District. If the ground floor residential has individual entries, the units shall have elevated stoops. Refer to Section 5.4 for more information on elevated ground floor residential units. 8. Building Servicing and Loading Zone: To minimize the visual impact of back of house operations of buildings such as deliveries, maintenance, and parking shall be located in areas indicated in Figure 5.4. 9. Combine Building Services: Wherever possible, servicing entries shall be combined such as combining a parking entry with a loading dock. 1O.Corner Zone: To minimize pedestrian, bike, and vehicular conflicts with servicing activities, servicing entries shall not be located within 30 feet of a block corner. Figure 5.5: Elevated stoops create a semi private space for an intimate social setting. Figure 5.6: Active ground floor uses can also include internal uses such as conference/ assembly spaces where passerbys can look in from the sidewalk. 110 Rio Grande District Vision and Implementation Plan Guidelines 1. Permeable Openings: Active Edges should consider permeable openings such as sliding and folding doors to encourage activity spill out onto the sidewalk and plaza spaces. Roll up doors or other large doors are highly encouraged along the Arts Campus plaza to provide views into makers spaces. 2. Proximity to National Governing Body: Uses along the Parkfront Zone should allow for outdoor spaces that enable event viewing in the National Governing Body spectator plaza. Ground floor spaces along the Green Loop have the opportunity to spill out into the park, activating the edge and taking advantage of the park and view of the Rio Grade Depot. The proximity to the National Governing Body means that food and entertainment uses should be designed to anticipate larger crowds of pedestrians. Figure 5.7: Sliding or roll up doors can facilitate the movement of people, equipment, and goods in and out of the ground floor. Figure 5.8: Well defined lobby entries can help provide visual interest and activity along major streets. Land Use and Urban Form 5.4 Heights Maximum height limits establish a neighborhood fabric that is sculpted, withr heights ramping up to the Festival Street and stepping down to the surrounding neighborhood. Standards 1. Maximum Height: The height of buildings shall not exceed the applicable maximum height as shown in Figure 5.9 and Table 17. BLOCK MAXIMUM HEIGHT ID ENVELOPES A 400 Feet / 150 Feet B 75 Feet C 150 Feet D 200 Feet E 260 Feet F 300 Feet / 200 Feet G 180 Feet / 120 Feet Table 17: Maximum Heights Table 2. Ground Floor Heights: Ground floor with non-residential uses shall be a minimum of 15 feet, clear height between finished floor and finished ceiling. Ground floor residential units shall be a minimum of 2 feet above the adjacent sidewalk, with ADA compliant access provided for accessible units. Figure 5.9: Maximum Height Diagram 112 Rio Grande District Vision and Implementation Plan `i Land Use and Urban Form 5.5 Podium The building podiums are intended to respect and complement the existing historic structures while creating visual interest and encouraging a diversity of experiences. Standards Guidelines 1. Podium Heights: Development 1. Balconies and Terraces: The adjacent to existing structures such as Artspace Macaroni Flats, Salt Lake Mattress Building, and the Rio Grande Depot shall have a podium height that matches the roof datum of the adjacent structure. The podium height shall be measured to the highest point on the identified structure. Block B, C, and G are exempt. 2. 600 West Ground Floor Recess: Ground floors along 600 West shall be recessed as per FIGURE 3.8. The resulting space shall be publicly accessible and be used for amenities for improved pedestrian experience. inclusion of balconies and terraces are encouraged adjacent to public open spaces such as the Green Loop, Festival Street, and Arts Campus plaza to take advantage of views and allow greater programmatic and visual connection between uses in the buildings and the public realm. 2. Terrace Access: All terraces resulting from stepbacks should be accessible and well -landscaped with amenities such as seating, greenery, and gathering spaces to complement the vibrancy on the ground plane. 3. Podium Modulation: The mass of the podium should be broken down into smaller masses. These massing moves should relate to the overall building design, upper building design, and to other prominent building elements such as fenestration patterns and buildina entries. _�J Figure 5.10: Building Podium Diagram 114 Rio Grande District Vision and Implementation Plan Stepdowns 1 Match Podium Heights Important Open Spaces of Human Scale Existing Buildings O 115 Land Use and Urban Form 5.6 Building Orientation and Massing The upper portions of buildings are important contributing elements to the SLC skyline and project a strong urban identity. Standards 1. Tower Orientation: The longer axis of mid -rise and high-rise building floor plates shall be oriented east -west for maximum solar performance. The exception is Block A, which is designed to be a point tower. 2. Maximum Tower Bulk Controls: Tower floorplate shall adhere to the following controls: TOWER MAX DIAGONAL TOWER MAX PLAN LAND USE DIMENSION DIMENSION Typical 260 Feet Residential Tower Typical Commercial 270 Feet Lower Tower Typical Commercial 180 Feet Upper Tower Mixed -Use Point 130 Feet Tower Table 18: Maximum Tower Floorplate Table 100 Feet 130 Feet 100 Feet 100 Feet Figure 5.11: Building Orientation and Massing Diagram I 0- 116 Rio Grande District Vision and Implementation Plan Typical Residential Tower ® Typical Commercial Lower Tower Typical Commercial Upper Tower Mixed -Use Point Tower 0 117 Land Use and Urban Form 5.6 Building Orientation and Massing Guidelines .......... I ------------ 1. 600 West Stepdowns: The western facades of towers along 600 West that exceed 200 feet should step down as it approaches the street and Salt Lake Central Station. These stepdowns should serve as vegetated, occupiable terraces which provide a biophilic entry into the City. 2. Views to Natural Environs: Towers exceeding 200 feet should carve out observation balcony areas to surrounding natural features such as the Wasatch Mountains, the Orquirrh Range, and the Great Salt Lake. 3. Preserve view of the Rio Grande Depot from 400 South: Development on Block G should be sculpted to provide a peek of the Rio Grande Depot sign from the 400 South Viaduct. Figure 5.12: Building Orientation and Massing Diagram 2 118 Rio Grande District Vision and Implementation Plan m Land Use and Urban Form 5.8 Sustainable Design To support the goals and targets of Salt Lake City's Climate Plan, the design framework focuses on strategies to shape the urban form for a more comfortable, energy -efficient, and high -performing district that has a rich biophilic experience. Standards 1. RDA Sustainable Development 4. Green Roofs and Terraces: Terraces Policy: All new development shall adhere to the RDA Sustainable Development Policy which provides requirements for enhanced energy performance, emission free building operations, and net zero building standards. 2. Stormwater Management: New horizontal and vertical development shall employ decentralized strategies to address runoff such as permeable surfaces, green roofs, and rain gardens, to manage and absorb stormwater at its source. This approach minimizes strain on centralized systems, promotes biophilia, mitigates urban flooding and water pollution. 3. Embodied Carbon: Vacant existing structures such as the Salt Lake Mattress Building and Blue Warehouse shall be preserved and retrofitted for new uses. shall be designed to manage stormwater, alleviate heat island effect, and create aesthetically pleasing and biodiverse outdoor spaces. Rooftop vegetation should optimize building energy efficiency with increased thermal insulation, providing natural shading, and cooling through evapotranspiration and prevent excessive heating and cooling in buildings. Figure 5.13: Sustainable Design Diagram 120 Rio Grande District Vision and Implementation Plan r I I � ,y 6 i .r Renewable Energy Retrofit Existing Buildings r Net Zero Building Systems �', Decentralized Stormwater .A Management Native Landscaping Green Roofs • Op7O Active Mobility Q Mobility Hubs 121 Land Use and Urban Form 5.8 Sustainable Design Guidelines 1. Bird -Safe Building Design: The Great Salt Lake is part of a vast Great Basin haven for shorebirds migrating along the Pacific Flyway. The vast amount of bird -species in the region paired with a more vegetated public realm and the addition of reflective glass towers can lead to a high risk of bird -strikes. To mitigate the risk of bird -strikes, all development that has facades exceeding 30 percent glazing should utilize bird safe design strategies on the first 60 feet measured from the ground plane. This includes fritted glass, etched glass, UV coated glass, frosted glass, and exterior apparati such as louvers, fins, and mullions. 2. Natural Daylight: Passive lighting and access to natural daylight should be used where possible. Access to natural daylight can improve human health and artificial lighting can be one of the largest demands on building energy. 4. Photovoltaic Panels: Portions of the roof area with direct solar access should be considered for solar energy or heating systems (including PV panels). Wherever possible, mount solar energy or heating systems over mechanical equipment, or structures over green roofs, or structures used for human shading. Where solar energy systems are combined with green roofs, incorporate shade tolerant species. 5. Mass Timber Construction: Changes in modern building codes are making mass timber structures as tall as 18 stories possible. Development should explore utilizing mass timber elements like cross -laminated timber panels (CLT). Mass timber structures offer significant environmental benefits including long-term carbon sequestration, reduced greenhouse gas emissions, reduced embodied and operational energy footprint. 3. Solar Control and Exterior Shading: 6. Building Amenities for Wellness: Facades that are south- or west - facing can be exposed to greater amounts of thermal energy from the sun, causing heat gain to the building and requiring energy for cooling. Consider using passive means of shading including less glazing, louvers. This will support the bird -safe building design strategy. Building amenities should include fitness rooms that are close to and visible to outdoor spaces, indoor bike parking and showers for commercial development. 122 Rio Grande District Vision and Implementation Plan Implementation 6.1 Phasing Plan 726 6.2 RDA Role in Rio Grande District 732 Implementation 6.1 Phasing Plan This ambitious Plan will be built in phases over many years and will be influenced by changing market conditions and funding sources. This section describes a potential phasing scenario. Phase 1 Infrastructure Development Market Street Potential National Governing Body Woodbine Court (South Headquarters and Training Center Segment) Salt Lake Mattress Renovation Phase 1 300 South Shared Parking Garage Arts Campus Plaza (South Blue Warehouse Renovation Segment) Potential National Governing Body Spectator Plaza Pierpont Avenue Rio Grande Depot Renovation Phase 2 Woodbine Court (North Mixed -Use Residential Development Segment) Renovation of Blue Warehouse 500 West Commercial Mixed -Use Phase 3 Development Green Loop Arts Campus Plaza (North Residential Mixed -Use Landmark Phase 4 Segment) Tower Underpass Park Commercial Mixed -Use Development Table 19: Phasing Plan Infrastructure and Development Figure 6.1: Phasing Plan Diagram 126 Rio Grande District Vision and Implementation Plan ❑o E N N Implementation 6.1.1 Phase 1 Phase 1 infrastructure investment and development is focused on the southeastern portion of the site. New infrastructure investment includes the following: Construction of Market Street and a segment of Woodbine Court. Major mobility and access improvements to the existing 300 South (Festival Street) and 400 South Frontage Road rights -of -way. Construction of the southern portion of the Arts Campus plaza and the potential National Governing Body spectator plaza fronting along 500 West. Vertical development includes the following: Potential National Governing Body Headquarters and Training Facility on Block B. The Salt Lake Mattress Building is proposed to be renovated in Phase 1 as part of the potential National Governing Body project. A RDA -owned shared parking garage on Block C. Renovation of the existing Blue Warehouse with an active use such as a brewery or commercial space for workforce development, educational programming. Potential National Governing Body Headquarters and Training Facility Shared Parking Garage Renovation of the Blue Warehouse Potential National Governing Body Spectator Plaza Improvements to 400 South Frontage Road v Southern portion of Arts Campus Southern portion of Woodbine Court Y Construction of 300 South Festival Street Figure 6.2: Phase 1 Proposed Infrastructure and Development '_ Z) Construction of Market Street Renovation of Salt Lake Mattress Building Phase 1 O 128 Rio Grande District Vision and Implementation Plan 6.1.2 Phase 2 Phase 2 infrastructure investment and development is focused on the re- opening of the Rio Grande Depot and adding housing onto the site. New infrastructure investment includes the following: Construction of Pierpont Avenue from 600 West to Woodbine Court and the northern segment of Woodbine Court from 300 South to Eccles Avenue. Vertical development includes the following: Completion of the Rio Grande Depot renovation with State of Utah departments and additional civic tenants moving into the Depot along with a publicly accessible grand concourse with new active uses. IConstruction of transit supported commercial high rise towers Z Multi -Family Residential Construction of Pierpont Avenue and Development Northern Segment of Woodbine Court. Figure 6.3: Phase 2 Proposed Infrastructure and Development New multi -family residential projects on Block C and Block D, with active uses on the ground floor. Anticipated construction of commercial mixed -use high- rise tower on Block E. The project can accommodate a tech anchor tenant in an urban campus setting or multiple tenants including allowances for new wet and dry lab spaces to support Tech Lake City initiative. Re -opening of the Rio Grande Depot Multi -Family Residential Development .11.. Phase 2 O 129 Implementation 6.1.3 Phase 3 Phase 3 infrastructure investment and development is focused on the parcels adjacent to Salt Lake Central Station and the Green Loop. New infrastructure investment includes the following: Reconfiguration of 500 West as a multi -modal street, including improved intersections at 400 South and 200 South. The construction of the Green Loop urban trail and linear park on the eastern portion of 500 West. Construction of transit supported commercial high rise towers Figure 6A: Phase 3 Proposed Infrastructure and Development Vertical development includes the following: Anticipated construction of commercial high-rise towers on Block F. These buildings can accommodate a tech anchor tenant in an urban campus setting or multiple tenants including allowances for new wet and dry lab spaces to support Tech Lake City initiative. 500 West redesign and Green Loop urban trail and park Phase 3 O 130 Rio Grande District Vision and Implementation Plan 6.1.4 Phase 4 Phase 4 infrastructure investment and development is focused on the landmark mixed -use residential tower on 500 West and the mixed -use development along the 400 South Overpass. New infrastructure investment includes the following: I Construction of the northern portion of the Arts Campus plaza. Construction of permanent park programming at the 400 South underpass such as dog park and soccer courts. Fy- Construction of commercial and residential development Vertical development includes the following: Construction of the landmark residential mixed -use tower along 500 West and 300 South on Block A. Construction of commercial and residential development on Block G. Construction of landmark residential tower Figure 6.5: Phase 4 Proposed Infrastructure and Development Construction of park programming at 400 South underpass r� i r _ + r'._ 1 Phase 4 O 1 131 Implementation 6.2 RDA Role in the Rio Grande District The development of the Rio Grande District has the potential to cultivate a vibrant urban district that exemplifies what makes Salt Lake City special and stamps its position as the best transit -oriented district in the State. Several key goals for the development, programming, and positioning of the Rio Grande District have emerged through conversations with stakeholders. Governance can facilitate the following goals: Development: Establish the Rio Grande District as the standard for sustainable transit -oriented development in Salt Lake City and the State of Utah. Programming: Create a new urban scale development that leverages local organizations to create a programmed and activated district for art, community health and wellness, and organic economic growth for SLC. Positioning: Foster a walkable community that takes advantage of density to create a mixed -use, mixed - income, and inclusive district. The RDA will play a pivotal role in the development operations, and long-term success of the Rio Grande District. The RDA is slated to serve four primary roles: • Land Owner: As the primary landowner, the RDA should manage and optimize development on the land in perpetuity. • Infrastructure Developer: The RDA and the City will develop, own, and operate infrastructure and public space throughout the district in alignment with its vision of walkability and transit orientation. • Programming Manager: The RDA will lead the activation and programming of the Rio Grande District, with collaboration from nearby partners and property owners. The RDA will maintain ownership of ground -level space when able. • District Curator: The RDA may provide incentives to private parties, including developers and space users, to advance RDA policy goals, such as discounted space for start up businesses, participation in programming and activation, and dedicated public space. 132 Rio Grande District Vision and Implementation Plan 1 Rk y a1 _ r Figure 6.6: Close up of Arts Campus plaza. RDA will lead the activation and programming of the Rio Grande District such as maintaining ownership of ground level spaces and curating programming in spaces like the Arts Campus plaza. 133 Y - p m. 4 LjiL AV � i• � Imo! Los ..,..i �til _� tea! �, ■ . �- � �k '� T�� ��as �1!,^ � ;.£:fix +c�i� � :�� � � �pyq�;,'y +.r � � .�n - R � _ -_ �. •_ f Y r s��T1£ar .w -,,9�*(AKV,"I RDA Resolution 21 of 2024 - Vision & Implementation Plan - Rio Grande District Final Audit Report 2024-12-23 Created:2024-12-12 By:STEPHANIE ELLIOTT (STEPHANIE.ELLIOTT@slc.gov) Status:Signed Transaction ID:CBJCHBCAABAAXOqHUAwWtsI-ISUI6O8HVyNK2MqB6f8t "RDA Resolution 21 of 2024 - Vision & Implementation Plan - Ri o Grande District" History Document created by STEPHANIE ELLIOTT (STEPHANIE.ELLIOTT@slc.gov) 2024-12-12 - 10:07:20 PM GMT Document emailed to Allison Parks (allison.parks@slc.gov) for signature 2024-12-12 - 10:10:37 PM GMT Email viewed by Allison Parks (allison.parks@slc.gov) 2024-12-12 - 10:43:16 PM GMT Document e-signed by Allison Parks (allison.parks@slc.gov) Signature Date: 2024-12-12 - 10:44:21 PM GMT - Time Source: server Document emailed to alejandro.puy@slc.gov for signature 2024-12-12 - 10:44:23 PM GMT Email viewed by alejandro.puy@slc.gov 2024-12-12 - 10:44:37 PM GMT Signer alejandro.puy@slc.gov entered name at signing as Alejandro Puy 2024-12-12 - 11:03:52 PM GMT Document e-signed by Alejandro Puy (alejandro.puy@slc.gov) Signature Date: 2024-12-12 - 11:03:54 PM GMT - Time Source: server Document emailed to Erin Mendenhall (erin.mendenhall@slc.gov) for signature 2024-12-12 - 11:03:56 PM GMT Email viewed by Erin Mendenhall (erin.mendenhall@slc.gov) 2024-12-13 - 6:21:38 AM GMT Email viewed by Erin Mendenhall (erin.mendenhall@slc.gov) 2024-12-17 - 2:19:15 AM GMT Document e-signed by Erin Mendenhall (erin.mendenhall@slc.gov) Signature Date: 2024-12-19 - 8:27:01 PM GMT - Time Source: server Document emailed to Cindy Trishman (cindy.trishman@slc.gov) for signature 2024-12-19 - 8:27:02 PM GMT Document e-signed by Cindy Trishman (cindy.trishman@slc.gov) Signature Date: 2024-12-23 - 6:10:04 PM GMT - Time Source: server Agreement completed. 2024-12-23 - 6:10:04 PM GMT