Loading...
HomeMy WebLinkAboutTSA Score Letter - 830 W Emeril AvePLANNING DIVISION ERIN MENDENHALL NICK NORRIS MAYOR DIRECTOR April 26, 2023 Jeff Douglas & Pierre Langue Axis Architects 927 S. State Street Salt Lake City, UT 84111 RE: Transit Station Area Development Score Review for Petition #PLNTSD2023-00097 at 830, 842, & 846 W Emeril Ave – Emeril 2 - Townhomes Jeff and Pierre, This letter is a notification of the development score review as determined by the Planning Department staff. Pursuant to chapter 21A.10 of the Salt Lake City Zoning Ordinance, a notice of application was sent out on April 11th, 2023. The noticing period ended on April 25th, 2023. No response was received from abutting property owners related to the project. After completing a review of the revised plans, staff has given all four proposed buildings a score of 128 out of the submitted 128. Please see attached scoring sheets for more information. This means that no public hearing is required, and the project is now authorized to go through the standard building permit process. The project is approved with the following conditions: •Any significant changes made to the approved plans, elevations or site plan must be approved by the Planning Department. As the applicant, you have the option to appeal this development score review to the Planning Commission. If you choose to appeal, a public hearing will be required per the requirements of the Salt Lake City Zoning Ordinance. If you are satisfied with the score given, you can continue with your building permit submittal with Building Services. A full zoning review will be completed as part of the building permit review to verify that the drawings submitted for your building permit comply with the applicable zoning requirements. Additionally, the plans submitted for your development score will be compared with the plans submitted for your building permit, and you will be notified if there are any discrepancies between the two sets. If you have any further questions about the Planning Department process, please contact me at 801-535- 7168 or by e-mail at: trevor.ovenden@slcgov.com Sincerely, Trevor Ovenden Associate Planner Enc. •TSA Score Sheet •Preliminary Zoning Review Transit Station Area Development Guidelines Checklist See full Design Guideline document for all applicable point details. CA T E G O R Y (Unless otherwise noted, points may only be obtained from one item in each guideline section.) GUIDELINE SECTION ITEM DESCRIPTION VA L U E AP P L I C A N T R E V I E W ST A F F R E V I E W More than 50 dwelling units per acre; Buildings that are up to 80% of the allowable building height; or Buildings with a Floor to Lot Area ration of 3 or more. 20 20 20 More than 30 dwelling units per acre; Buildings that are up to 70% of the allowable building height; or Buildings with a floor to lot area ratio of 2 or more. 15 More than 20 dwelling units per acre; Buildings that are at least 60% of the allowable building height; or Buildings with a floor to lot area ratio of 1 or more. 10 More than 25 dwelling units per acre; Buildings that are up to 80% of the allowable building height; or Buildings with a Floor to Lot Area ratio of 2 or more.12 More than 20 dwelling units per acre; Buildings that are up to 70% of the allowable building height; or Buildings with a floor to lot area ratio of 1.5 or more.8 More than 15 dwelling units per acre; Buildings that are at least 60% of the allowable building height; or Buildings with a floor to lot area ratio of 1 or more. 5 100% of the gross floor area on the ground floor is dedicated to a use different than what is on the floors above. 20 At least 75% of the gross floor area on the ground floor is dedicated to a use different than what is on the floors above. 15 At least 50% of the gross floor area on the ground floor is dedicated to a use different than what is on the floors above.10 A project that includes at least two uses that are different than existing uses on adjacent properties. 6 La n d U s e 1.A. Intensity and Density of Use (Applicable to Core Area Only.) A project that meets at least one of the following requirements: 1.B. Intensity and Density of Use (Applicable to Transition Area only.) A project that meets at least one of the following requirements: 2. Integrated Mixed of Uses: If the ground floor of a building is designed for retail, restaurant, or other use other than residential on the ground floor. The guideline applies to street facing habitable space only and not the entire ground floor area. The following points shall be added to the development score: NOTES Greater than 50 units per acre July 2017 1 of 18 Subtotal (For Page): Transit Station Area Development Guidelines Checklist See full Design Guideline document for all applicable point details. 33% or more of the total dwelling units. 40 20% or more of the total dwelling units. 30 10% or more of the total dwelling units. 20 Areas rated 5 or greater 20 Area rated 3 or greater 10 33% or more of the total dwelling units.8 15% or more of the total dwelling units 5 10% or more of the total dwelling units.3 A minimum of 1500 square feet. 15 A minimum of 1000 square feet 10 A minimum of 500 Square feet 5 50% or more of the existing surface parking lot is covered by new buildings.15 35% or more of the existing surface parking lot is covered by new buildings.10 25% or more of the existing surface parking lot is covered by new buildings.5 A new building that meets the standards of the TSA zoning district and replaces a building that does not meet the standards. 10 10 10 A project that includes replacing a nonconforming use with a use that is allowed in the TSA zoning district. 5 8. Removal of Billboards A project that includes redevelopment of a site containing a billboard: An existing billboard is legally removed by the developer as part of a redevelopment project. 10 The project utilizes a roof design, such as a landscaped roof, that is intended to reduce energy use, storm drainage runoff or other similar sustainable policy of the City. 10 The project utilizes landscape designs and materials that conserves energy, reduces the urban heat island, conserves water, retains or reuses storm drainage or other similar sustainable policy of the City. Documentation must be provided to indicate how the project will incorporate this guideline. 5 La n d U s e Bu i l d i n g a n d S i t e D e s i g n 5. Community Serving Uses Projects the include the following area of community serving uses: (Refer to Guidelines for qualifying uses.) 6. Redevelopment of Surface Parking Lots A project that includes the redevelopment of an existing surface parking lot to an active use or structured parking: 7. Redevelopment of Nonconforming Use or Noncomplying Building A project that includes redevelopment of a site containing a nonconforming use or non-complying building: 4. Accessible Dwelling Units A project which includes dwelling units designed as ADA accessible: 3.A. Mixed Income Housing A project that includes affordable housing available to those with 60% or less of the median household income of the City for sale or lease shall have the following number of points added to the development score: 3.B. Mixed Income Housing An affordable housing project that is located in an area identified in the “Opportunity Index” map (as used in the latest available Utah Housing Corporation Allocation Plan) or its successor as determined by the Planning Director, with a rating of at least 3 or greater shall receive the following points: 9. Sustainable Site and Open Space Design A project that incorporates adopted sustainable policies of the City: (Points may be obtained from both items.) Project will replace several noncomplying buildings July 2017 2 of 18 Subtotal (For Page): Transit Station Area Development Guidelines Checklist See full Design Guideline document for all applicable point details. Platinum 50 Gold 40 Silver 30 1.The project is certified as having 100%of its energy needs served by renewable power either from on or off-site sources.If development relies on off-site power,documentation must be provided showing at least 20 year commitment to power source 50 2.The project is certified as having 50%its energy needs served by renewable power either from on or off-site sources.If development relies on off-site power,documentation must be provided showing at least 20 year commitment to power source 25 3.Solar array:5 points for every 500 square feet of solar panels. Maximum 20 points.20 4. Geothermal heating and cooling systems 10 5.The project is designed with passive,energy efficient features that include awnings or solar shades over all windows,or other similar passive energy saving features. 5 Architectural detailing is wrapped around all four sides.See guideline document for specific detailing requirements. 20 Architectural detailing is wrapped around both side facades of a building,but not on the rear façade.See guideline document for specific detailing requirements. 15 Local Register:New construction,major alterations and additions that are approved by the Historic Landmark Commission that include reuse of the site.40 National Register:State Historic Preservation Office review and approval of exterior alterations to buildings not locally designated, but on the national register and seeking federal tax credits 40 Projects that are adjacent to a local or national designated property that are compatible with the historic property through building mass and bulk,setbacks and design features as determined by the Planning Director 20 Local Register:Projects that receive administrative approval in accordance with Zoning Ordinance Section 21A.34.020.5 Projects that add historically significant sites to the Salt Lake City Register of Cultural Resources if they qualify as defined in Zoning Ordinance Section 21A.34. 50 Bu i l d i n g a n d S i t e D e s i g n 10. Green Building The following points will be awarded based on the level of LEED certification: 11. Energy Efficiency Projects that incorporate energy efficiency into the design of the project shall have the following points added to the development score: (For guidelines 1 through 4, points may only be obtained from one item. Points from guidelines 1 through 4 may be combined with points from guideline 5.) 12. 360 Degree Architecture A project that incorporates architecture features on building facades that are not adjacent to a street: (See Guideline for required elements.) 13. Historic Preservation Projects that preserve, rehabilitate, restore, reuse a historic property or new construction that contributes to the character of a historic property or district: July 2017 3 of 18 Subtotal (For Page): Transit Station Area Development Guidelines Checklist See full Design Guideline document for all applicable point details. At least 80%of the street facing façades above the ground floor are clad in durable,high quality materials,as listed above,excluding glazing, doors, and trim 20 20 20 At least 70%of the street facing facades above the ground floor are clad in high quality,durable materials as listed above,excluding glazing, doors, and trim 15 15. Corner Buildings Buildings located on the corners of intersecting streets that address both streets: When located on the corner of two intersecting streets,the primary entrance of the building addresses the corner by including a hinged, rounded,beveled,open bay,mitered orientation or similar entrance feature.10 A rooftop of a building is used as a common space for the building occupants.6 A roof includes at least one of the following design features: Two or more sloping planes visible from a public street; An arched or barrel vaulted design; A distinguishable cornice or parapet; Overhangs that are a minimum of 12 inches in depth to create a shadow line. 5 17. Eyes on the Street and Public Spaces Buildings that are designed to have windows, doors, balconies or other similar features facing public streets and open spaces: Operable openings,balconies,verandas or other similar features on all levels of the building that face a public space and allow visibility into the public space.Balconies need to have a minimum depth of 5 feet and include at least 30 square feet of space 15 15 15 18. Lighting A project that includes a lighting plan that accomplishes at least one of the following: Casts light from store fronts onto the sidewalk; Highlights unique architectural features of a building; or Highlights artwork or unique landscape features. 6 6 6 A sign that is mounted perpendicular to the primary building façade and oriented to the pedestrian (projecting business storefront sign). 2 An awning or canopy sign that is integrated into the design of the building.2 A monument sign that is integrated into the site and compatible with the building architecture.2 A project includes a minimum of 15% of the total lot area.15 A project includes a minimum of 10% of the total lot area.10 A project includes a minimum of 5% of the total lot area. 5 A public space,regardless of size,that is located near a transit station and includes seating,art,protection from the elements or other feature intended to activate the space or make it comfortable (must be within 330 feet of transit station).3 Bu i l d i n g a n d S i t e D e s i g n Pu b l i c S p a c e s 20. Public Spaces and Plazas Projects that include active, outdoor spaces, that are accessible to the public and adjacent to a public right of way: 16. Rooftop Design and Use A project that incorporates a rooftop use: (Points may be obtained from both items.) 19. Signs Signs that meet the intent of this guideline shall have the following points added to the development score: 14. Building Materials Projects that incorporate high quality, durable and low maintenance building materials: Metal panels with 30 year warranty Windows are operable Lights will be used to highlight landscaping July 2017 4 of 18 Subtotal (For Page): Transit Station Area Development Guidelines Checklist See full Design Guideline document for all applicable point details. At least 4 street furnishings 3 At least 3 street furnishings 2 At least 2 street furnishings 1 22. Public Artwork Projects that include public art in a location where it is readily visible from a public space: 2 points per art piece, up to a maximum of 6 points 6 Projects that include a minimum six foot wide ADA accessible walkway through a parking lot that is separated from vehicle drive aisles. 4 Projects that include a minimum six foot wide ADA accessible sidewalk from private property to public open spaces. 4 The project includes lockers,changing rooms for cyclists and showers.6 The project includes any bicycle amenity identified in the Bicycle Amenity section of the Transit Station Area Development Guidelines. 3 3 3 The project incorporates art into the design of the bicycle amenity. 3 The project is located within 300 feet, measured along the most direct, legal walking path. 15 The project is located within 750 feet, measured along the most direct, legal walking path. 10 The project is located within 1500 feet,measured along the most direct legal walking path. 5 5 5 25.B. Access to Transit: A development that provides transit passes to residents as follows: A multi-family residential development that provides transit passes to residents through the City’s transit pass program for a minimum period of three years from the development’s initial occupancy. Passes shall be available for free to residents at request.At least one pass shall be available per unit.Verification from Transportation division of minimum 3 year participation is required. 15 The project includes a narrow street or alley through the project that accommodates people walking, biking and driving.30 The project includes a walkway accessible to the public that is a minimum of 10 feet wide that connects through the property to a public space,such as park,trail or street or similar area and allows for the walkway to be continued on adjacent properties.20 Ci r c u l a t i o n 23. Connections and Walkways Projects that include connections and walkways from buildings, parking lots and private open space to public spaces: (Points may be obtained from both items.) 24. Bicycle Amenities A project that includes bicycle parking amenities in addition to what is already required in the zoning ordinance: (Points may be obtained from multiple items.) 26. Public Walkways Interior to the Block A development that includes public walkways through the interior of blocks: (To qualify for these points, the walkways cannot be fenced or gated.) Pu b l i c S p a c e s 21. Streetscape Amenities A project that includes street furniture, pedestrian amenities, public art or other similar features intended to improve the streetscape: 25.A. Access to Transit: A project located within close proximity to a transit station shall have the following number of points added to the development score: (Applies to any TRAX or Frontrunner station platform or any bus stop where three or more separate bus routes come together.) Bicycle area provided in garage space About 1000' July 2017 5 of 18 Subtotal (For Page): Transit Station Area Development Guidelines Checklist See full Design Guideline document for all applicable point details. 100%of the parking structure is wrapped with high quality,durable materials or habitable space with a depth of at least 25’on all street facing facades.25 75%of the parking structure is wrapped in high quality,durable materials or habitable space with a depth of at least 25’on all street facing facades.20 For below grade parking structures,there is no visible evidence of the parking garage other than the parking entrance.The ground floor uses must have entrances at grade, without the use of ramps, to qualify. 25 Parking for alternative fuel vehicles,scooters,mopeds,motorcycles, or other similar vehicle is provided at a rate equal to 7%of the total number of spaces provided for automobiles.5 5 5 A project includes dedicated parking stalls/equipment for a car sharing program.3 A project includes a charging station for electric vehicles: Level 1 Station: 2 pts per stall, max. 6 Level 2 Station: 3 pts per stall, max 9 Level 3 Station: 4 pts per stall, max. 12 12 9 9 Residential developments with a parking ratio less than 1 stall per unit: 25 25 25 Residential development with a parking ratio less than 1.25 stall per unit 15 Non-residential developments with a parking ratio less than 2 stalls per 1,000 gross square feet 20 Projects that have been presented to the associated community council and have notified residents and property owners within 300 feet via mail about when and where the community council presentation will be held 10 Projects that have been presented at an open house for the proposal on the development site and have notified residents and property owners within 300 feet via mail about when and where the open house will be held 10 10 10 Approval Process Ap p l i c a n t To t a l St a f f T o t a l Planning Commission Review Required 124 points or less 128 128 Administrative (Staff) Approval 125 points or more 128 128 27. Parking Struture Design Parking structures that incorporate the following: 29. Parking Ratios Projects that provide parking in the ratios indicated: Co m m u n i t y En g a g e m e n t 30. Neighborhood Input Pa r k i n g 28. Alternative Vehicle Parking Projects that include dedicated parking stalls for alternative fuel vehicles, scooters, mopeds or motorcycles: (Points may be obtained from multiple items.) Applicant held an open house 4/10/23 3 Motorcycle spots provided in northeast corner Charging stations in garages 32 stalls provided for 36 units. .89 ratio July 2017 6 of 18 Subtotal (For Page): SALT LAKE CITY CORPORATION 451 SOUTH STATE STREET, ROOM 406 WWW.SLC.GOV/PLANNING PO BOX 145480 SALT LAKE CITY, UT 84114-5480 Document Version 10/14/2020 TEL 801-535-7757 FAX 801-535-6174 Preliminary Zoning Review The below is a preliminary review of the development for zoning compliance as part of your TSA Development Score review. Further review will be performed as part of your building permit review and additional compliance issues may be identified. Proposed Land Use ☒Permitted ☐Conditional ☐Not Allowed ☐Not Listed/Defined Comments: Single-family attached & multifamily uses are permitted in TSA-UN-C 21A.26.010 General Provisions: ☒Applicable ☐Not Applicable Are applicable standards complied with? ☐Complies ☐Does Not Comply o Trash Containers (21A.26.010.C.1) o Required to be stored inside or screened (with solid material see 21A.48).  Dumpster shown on plans, but nothing indicates that it is screened. o Lighting not directed outside lot (21A.26.010.C.2) o LED Uplighting shown for proposed landscaping. No other lighting shown on plans. o Outdoor Sales/Display/Storage o None. o Parking/Loading/Landscaping/Signs: o See other code review sections for compliance. Base Zoning District Standards 21A.26.078 – TSA-UN-C ☒Applicable ☐Not Applicable Are applicable standards complied with? ☐Complies ☐Does Not Comply • Height (21A.26.078.E): o TSA-UN-C:  Max: 75' -  Min: 25' -  Proposed: 36' at top of parapet feature. • Complies • Front Yard Setbacks  Minimum: none  At least 50% of façade must be be within 5' of the front or corner side property line. • 100% of the building facades appear to be within 5’ of the front property line. o Complies • Side and Rear Yard Setbacks o None required  Complies  Page 2 • Lot Area/Lot Width (21a.26.078.E4): o Properties have not been consolidated – Consolidation is recommended before building permit review. • Open Space Area (21a.26.078.E5): o 1 square foot or open space for every 10 square feet of lot area, up to 5,000 square feet.  Plans appear to meet this standard with courtyard and rear yard area. • Circulation and Connectivity (21A.26.078.E): o No parking lot provided. o Parking prohibited between building façade and front/corner side property line. • Front Yard Design Requirements (21A.26.078.F.2.b.(2): o At least 30% of the provided front yard must be covered in live plant material.  The provided front yard is the area between the front property line and the building setback, not the area shown in yellow on the “open space and front yard landscaping plan”.  There appears to be approximately 793.8 square feet in this area based on the provided dimensions, and only 227.5 square feet of this area is shown in yellow. 227.5 is approximately 29% of 793.8, which does not meet this requirement.  The City’s Engineering and Transportation Divisions may have additional requirements that may include additional sidewalk width. • Dimensioned drawing on plans appear to show compliance with this standard Overlay Zoning District Standards 21A.34 ☒Applicable ☐Not Applicable Comment: Airport Flight Path Protection Zone H - 21A.34.040 Are applicable standards complied with? ☐Complies ☐Does Not Comply 21A.36 General Provisions: ☒Applicable ☐Not Applicable o Recycling And Construction Waste Management (21a.36.250) o Recycling collection station required o Construction Waste Management Plan required  Page 3 21A.37 Design Standards ☒Applicable ☐Not Applicable Are applicable standards complied with? ☐Complies ☒Does Not Comply • Ground Floor Use: o Ground Floor Use: A use other than parking must occupy at least 80% of the street facing building façade ground floor.  COMPLIES • Building Materials: Ground Floor o At least 90% of ground floor building materials must be clad in durable materials.  Ground floor façade material is brick. • COMPLIES • Building Materials: Upper floors o At least 60% of upper floor building materials must be clad in durable materials.  Upper floor material “PAC-CLAD” metal panels with 30-year warranty. • COMPLIES • Glass: Ground Floor o 60% ground floor glass required between 3’ and 8’ when facing a street.  Applicant has provided dimensioned drawings and calculations that verify that 65% ground floor glass will be provided. • COMPLIES • Building Entrances (Feet) 21a.37.050 Design Standard Regulations #'/% Complies? Comment Ground floor use (%) (21A.37.050A1) 80% Y Ground floor use + visual interest (%) (21A.37.050A2) 60/25 NA Building materials: ground floor (%) (21A.37.050B1) 90% Y Building materials: upper floors (%) (21A.37.050B2) 60% Y Glass: ground floor (%) (21A.37.050C1) 60% Y Building entrances (feet) (21A.37.050D) 40' Y Blank wall: maximum length (feet) (21A.37.050E) 15' Y Street facing facade: maximum length (feet) (21A.37.050F) 200' Y Lighting: exterior (21A.37.050H) X ? Lighting not shown on plans Lighting: parking lot (21A.37.050I) X N/A Screening of mechanical equipment (21A.37.050J) X Y Screening of service areas (21A.37.050K) X ? Dumpster noted on plans but no indication that it is screened  Page 4 o At least one operable building entrance is required for every street facing façade, and at least one building entrance is required every 40’ of façade.  Entrances are provided on Emeril Ave and approximately every 15’ for each townhome. • COMPLIES • Blank Wall: Maximum Length o The maximum length of a blank wall is 15’  COMPLIES • Street Facing Façade: Maximum Length o 200’ maximum street facing façade .  COMPLIES • Lighting: Exterior o Lighting shall be shielded and directed down  Lighting not shown on plans • Lighting plan will be required for building permit review. • Lighting: Parking Lot o Parking lot light poles limited to 16’ in height, must be shieled and pointing down.  No parking lot provided • Screening of mechanical equipment o Mechanical equipment must be screened from public view and sited to minimize visibility and impact.  Mechanical equipment is located on the roof and screened • Screening of service areas o Service areas must be screened from public view  Dumpster noted on plans but no indication that it is screened. • Ground floor residential entrances o The primary entrance for each unit facing a street must face street.  COMPLIES 21A.40 Accessory Uses, Buildings, and Structures ☒Applicable ☐Not Applicable Comment: No accessory buildings shown. Are applicable standards complied with? ☐Complies ☒Does Not Comply Comment: Transformer is not shown on plans. Transformer location will need to meet the requirements in 21A.40.160.  Page 5 21A.44 Off Street Parking ☒Applicable ☐Not Applicable Are applicable standards complied with? ☐Complies ☐Does Not Comply Comments: • No minimum spaces required. • 4 spaces/DU maximum • Electric vehicle charging stations provided in all garage spaces. • Bike storage area provided in all garage spaces. o COMPLIES o 21A.44.060.B.2.b.(2) Unless a second driveway is necessary to comply with the fire code, a maximum of one driveway and drive aisle shall be permitted per street frontage.  Two driveways shown on plans • May not comply 21A.46 Signs ☐Applicable ☒Not Applicable Comment: No signs shown on plans. Are applicable standards complied with? ☒Complies ☐Does Not Comply 21A.48 Landscaping and Buffers ☒Applicable ☐Not Applicable Are applicable standards complied with? ☐Complies ☒Does Not Comply Comment: Landscape plan will be required for building permit review. Standards not complied with: • Water Efficient Landscaping: Information regarding hydrozones of plants and specific plants will need to be provided for permitting to verify compliance with 21A.48.055. Hydrozone list and allowed plants: Salt Lake City Plant List and Hydrozone Schedule 2013. • Private Tree Removal: Information regarding existing trees will need to be provided at permits to verify compliance with 21A.48.135 regarding private property tree preservation. The ordinance requires payment to the city for loss of existing trees if not replaced at the required ratios. Existing healthy trees are encouraged to be preserved.  Page 6 21A.58 Site Plan Requirements ☒Applicable ☐Not Applicable Is all required information shown on site plan? ☐Complies ☒Does Not Comply Missing requirements: A complete plan set with all requirements listed in 21A.58.060 will be required for building permit review.