HomeMy WebLinkAboutPLNTSD2023-00358 - 1223 W North Temple
PLANNING DIVISION
ERIN MENDENHALL NICK NORRIS
MAYOR DIRECTOR
June 20, 2023
Elizabeth Morgan
FFKR Architects
730 Pacific Avenue
Salt Lake City, Utah 84104
RE: Transit Station Area Development Score Review for Petition #PLNTSD2023-00358
1223 W North Temple – Rocky Mountain Power Headquarters Office
Building
This letter is notification of the development score review as determined by Planning Department
staff. Pursuant to chapter 21A.10 of the Salt Lake City Zoning Ordinance, notice of application was
sent out on May 17, 2023. The noticing period ended on May 30, 2022.
After completing a review of the revised plans, staff has given the proposed development the
following score:
• A score of 185 points out of the submitted 203 points
Please see attached scoring sheet for more information. As the development received at least 125
points through the development score review, no public hearing is required, and the project is
now authorized to go through the standard building permit process. The project is approved with
the following conditions:
1. Any significant changes made to the approved plans, elevations or site plan must be approved
by the Planning Department to verify the development maintains a sufficient development
review score for administrative review.
As the applicant, you have the option to appeal this development score review to the Appeals
Hearing Officer. If you chose to appeal, a public hearing will be required per the requirements of
the Salt Lake City Zoning Ordinance.
If you are satisfied with the score given, you can continue with your building permit submittal
with Building Services. A full zoning review will be completed as part of the building permit review
to verify that the drawings submitted for your building permit comply with the applicable zoning
requirements. Additionally, the plans submitted for your development score will be compared
with the plans submitted for your building permit, and you will be notified if there are any
discrepancies between the two sets.
For your convenience, a preliminary zoning review was done on the plans and is attached to this
document. Please see that document for zoning advisories and areas where additional information
may be needed for your building permit plans.
If you have any further questions about the Planning Department process, please contact me at
801-535-7780 or by e-mail at: Kristina.Gilmore@slcgov.com.
Sincerely,
Krissy Gilmore
Senior Planner
Attachments:
1. TSA Development Guidelines Scoring Sheet from City Staff
2. Preliminary Zoning Review Comments
Transit Station Area Development Guidelines Checklist
See full Design Guideline document for all applicable point details.
CA
T
E
G
O
R
Y
(Unless otherwise noted, points may
only be obtained from one item in
each guideline section.)
GUIDELINE SECTION ITEM DESCRIPTION VA
L
U
E
AP
P
L
I
C
A
N
T
RE
V
I
E
W
ST
A
F
F
RE
V
I
E
W
More than 50 dwelling units per acre;
Buildings that are up to 80% of the allowable building
height; or
Buildings with a Floor to Lot Area ration of 3 or more. 20 20 20
More than 30 dwelling units per acre;
Buildings that are up to 70% of the allowable building
height; or
Buildings with a floor to lot area ratio of 2 or more.15
More than 20 dwelling units per acre;
Buildings that are at least 60% of the allowable building
height; or
Buildings with a floor to lot area ratio of 1 or more.10
More than 25 dwelling units per acre;
Buildings that are up to 80% of the allowable building
height; or
Buildings with a Floor to Lot Area ratio of 2 or more.12
More than 20 dwelling units per acre;
Buildings that are up to 70% of the allowable building
height; or
Buildings with a floor to lot area ratio of 1.5 or more.8
More than 15 dwelling units per acre;
Buildings that are at least 60% of the allowable building
height; or
Buildings with a floor to lot area ratio of 1 or more.5
100% of the gross floor area on the ground floor is dedicated
to a use different than what is on the floors above. 20
At least 75% of the gross floor area on the ground floor is
dedicated to a use different than what is on the floors above. 15
At least 50% of the gross floor area on the ground floor is
dedicated to a use different than what is on the floors above.10
A project that includes at least two uses that are different than
existing uses on adjacent properties.
6 6 6
Applicant provided evidence that
the proposed uses, office and retail,
are different than adjacent uses.
Adjacent uses include warehousing,
surface parking, government facility,
and brownfield/vacant land.
NOTES
Building is proposed at more than
80% of the allowable height.
1.A. Intensity and Density of Use
(Applicable to Core Area Only.)
A project that meets at least one of
the following requirements:
1.B. Intensity and Density of Use
(Applicable to Transition Area only.)
A project that meets at least one of
the following requirements:
2. Integrated Mixed of Uses:
If the ground floor of a building is
designed for retail, restaurant, or
other use other than residential on
the ground floor. The guideline
applies to street facing habitable
space only and not the entire ground
floor area. The following points shall
be added to the development score:
La
n
d
Us
e
Page 1 TSA Score Sheet ‐ PLNTSD2023‐00358 ‐ 2nd review
Transit Station Area Development Guidelines Checklist
See full Design Guideline document for all applicable point details.
33% or more of the total dwelling units.
40
20% or more of the total dwelling units.
30
10% or more of the total dwelling units.
20
Areas rated 5 or greater
20
Area rated 3 or greater
10
33% or more of the total dwelling units.8
15% or more of the total dwelling units 5
10% or more of the total dwelling units.3
A minimum of 1500 square feet.15
A minimum of 1000 square feet 10
A minimum of 500 Square feet
5
50% or more of the existing surface parking lot is covered by
new buildings.15 15 15
35% or more of the existing surface parking lot is covered by
new buildings.10
25% or more of the existing surface parking lot is covered by
new buildings.5
A new building that meets the standards of the TSA zoning
district and replaces a building that does not meet the
standards.10
A project that includes replacing a nonconforming use with a
use that is allowed in the TSA zoning district.
5
8. Removal of Billboards
A project that includes
redevelopment of a site containing a
An existing billboard is legally removed by the developer as
part of a redevelopment project.
10
The project utilizes a roof design, such as a landscaped roof,
that is intended to reduce energy use, storm drainage runoff
or other similar sustainable policy of the City.
10
The project utilizes landscape designs and materials that
conserves energy, reduces the urban heat island, conserves
water, retains or reuses storm drainage or other similar
sustainable policy of the City. Documentation must be
provided to indicate how the project will incorporate this
guideline.5 5 5
North end of site is currently used as
surface parking for the Jordan River
Parkway and as parking for RMP.
Lot will be redeveloped as public
open space and boat ramp.
Plans include permeable road
surface, stormwater detention basin,
and other green areas.
4. Accessible Dwelling Units
A project which includes dwelling
units designed as ADA accessible:
3.A. Mixed Income Housing
A project that includes affordable
housing available to those with 60%
or less of the median household
income of the City for sale or lease
shall have the following number of
points added to the development
score:
3.B. Mixed Income Housing
An affordable housing project that is
located in an area identified in the
“Opportunity Index” map (as used
in the latest available Utah Housing
Corporation Allocation Plan) or its
successor as determined by the
Planning Director, with a rating of at
least 3 or greater shall receive the
following points:
9. Sustainable Site and Open Space
Design
A project that incorporates adopted
sustainable policies of the City:
(Points may be obtained from both
items.)
La
n
d
Us
e
Bu
i
l
d
i
n
g
an
d
Si
t
e
De
s
i
g
n
5. Community Serving Uses
Projects the include the following
area of community serving uses:
(Refer to Guidelines for qualifying
uses.)
6. Redevelopment of Surface
Parking Lots
A project that includes the
redevelopment of an existing surface
parking lot to an active use or
structured parking:
7. Redevelopment of
Nonconforming Use or
Noncomplying Building
A project that includes
redevelopment of a site containing a
nonconforming use or non-
complying building:
Page 2 TSA Score Sheet ‐ PLNTSD2023‐00358 ‐ 2nd review
Transit Station Area Development Guidelines Checklist
See full Design Guideline document for all applicable point details.
Platinum 50
Gold 40
Silver 30
1. The project is certified as having 100% of its energy needs
served by renewable power either from on or off-site sources.
If development relies on off-site power, documentation must
be provided showing at least 20 year commitment to power
source 50
2. The project is certified as having 50% its energy needs
served by renewable power either from on or off-site sources.
If development relies on off-site power, documentation must
be provided showing at least 20 year commitment to power
source 25
3. Solar array: 5 points for every 500 square feet of solar
panels. Maximum 20 points.20
4. Geothermal heating and cooling systems 10
5. The project is designed with passive, energy efficient
features that include awnings or solar shades over all
windows, or other similar passive energy saving features. 5
Architectural detailing is wrapped around all four sides. See
guideline document for specific detailing requirements. 20 20 20
Architectural detailing is wrapped around both side facades
of a building, but not on the rear façade. See guideline
document for specific detailing requirements.15
Local Register: New construction, major alterations and
additions that are approved by the Historic Landmark
Commission that include reuse of the site.40
National Register: State Historic Preservation Office review
and approval of exterior alterations to buildings not locally
designated, but on the national register and seeking federal
tax credits 40
Projects that are adjacent to a local or national designated
property that are compatible with the historic property
through building mass and bulk, setbacks and design features
as determined by the Planning Director 20
Local Register: Projects that receive administrative approval
in accordance with Zoning Ordinance Section 21A.34.020.5
Projects that add historically significant sites to the Salt Lake
City Register of Cultural Resources if they qualify as defined
in Zoning Ordinance Section 21A.34.50
10. Green Building
The following points will be awarded
based on the level of LEED
certification:
11. Energy Efficiency
Projects that incorporate energy
efficiency into the design of the
project shall have the following
points added to the development
score:
(For guidelines 1 through 4, points
may only be obtained from one
item. Points from guidelines 1
through 4 may be combined with
points from guideline 5.)
12. 360 Degree Architecture
A project that incorporates
architecture features on building
facades that are not adjacent to a
street:
(See Guideline for required
elements.)
13. Historic Preservation
Projects that preserve, rehabilitate,
restore, reuse a historic property or
new construction that contributes to
the character of a historic property or
district:
Bu
i
l
d
i
n
g
an
d
Si
t
e
De
s
i
g
n
Page 3 TSA Score Sheet ‐ PLNTSD2023‐00358 ‐ 2nd review
Transit Station Area Development Guidelines Checklist
See full Design Guideline document for all applicable point details.
At least 80% of the street facing façades above the ground
floor are clad in durable, high quality materials, as listed
above, excluding glazing, doors, and trim 20 20 20
At least 70% of the street facing facades above the ground
floor are clad in high quality, durable materials as listed
above, excluding glazing, doors, and trim 15
15. Corner Buildings
Buildings located on the corners of
intersecting streets that address both
streets:
When located on the corner of two intersecting streets, the
primary entrance of the building addresses the corner by
including a hinged, rounded, beveled, open bay, mitered
orientation or similar entrance feature.10
A rooftop of a building is used as a common space for the
building occupants.6 6 6
A roof includes at least one of the following design features:
Two or more sloping planes visible from a public street;
An arched or barrel vaulted design;
A distinguishable cornice or parapet;
Overhangs that are a minimum of 12 inches in depth to create
a shadow line.
5 5 5
17. Eyes on the Street and Public
Spaces
Buildings that are designed to have
windows, doors, balconies or other
similar features facing public streets
and open spaces:
Operable openings, balconies, verandas or other similar
features on all levels of the building that face a public space
and allow visibility into the public space. Balconies need to
have a minimum depth of 5 feet and include at least 30
square feet of space 15 15 15
18. Lighting
A project that includes a lighting
plan that accomplishes at least one of
the following:
Casts light from store fronts onto the sidewalk;
Highlights unique architectural features of a building; or
Highlights artwork or unique landscape features.
6 6 0
A sign that is mounted perpendicular to the primary building
façade and oriented to the pedestrian (projecting business
storefront sign).2 2 0
An awning or canopy sign that is integrated into the design of
the building.2
A monument sign that is integrated into the site and
compatible with the building architecture.2
A project includes a minimum of 15% of the total lot area.15 15 15
A project includes a minimum of 10% of the total lot area.10
A project includes a minimum of 5% of the total lot area.
5
A public space, regardless of size, that is located near a
transit station and includes seating, art, protection from the
elements or other feature intended to activate the space or
make it comfortable (must be within 330 feet of transit
station).3
Project exceeds 15%.
Balconies face riverfront public
space and sidewalk.
Images and some details were
provided, but a full lighting plan is
required to verify points.
After further reviewing the TSA
Guidelines, the proposed signage
does not qualify.
100% of the upper floors are clad in
durable materials. NOTE: Phenolic
resin panel and aluminum composite
metal panel have approval from the
Planning Director to be considered
durable materials.
Plans include occupiable roof space
on lower levels.
Overhang provided
14. Building Materials
Projects that incorporate high
quality, durable and low maintenance
building materials:
16. Rooftop Design and Use
A project that incorporates a rooftop
use:
(Points may be obtained from both
items.)
19. Signs
Signs that meet the intent of this
guideline shall have the following
points added to the development
score:
Bu
i
l
d
i
n
g
an
d
Si
t
e
De
s
i
g
n
Pu
b
l
i
c
Sp
a
c
e
s
20. Public Spaces and Plazas
Projects that include active, outdoor
spaces, that are accessible to the
public and adjacent to a public right
of way:
Page 4 TSA Score Sheet ‐ PLNTSD2023‐00358 ‐ 2nd review
Transit Station Area Development Guidelines Checklist
See full Design Guideline document for all applicable point details.
At least 4 street furnishings 3 3 3
At least 3 street furnishings 2
At least 2 street furnishings 1
22. Public Artwork
Projects that include public art in a
location where it is readily visible
from a public space:
2 points per art piece, up to a maximum of 6 points
6
Projects that include a minimum six foot wide ADA
accessible walkway through a parking lot that is separated
from vehicle drive aisles.4
Projects that include a minimum six foot wide ADA
accessible sidewalk from private property to public open
spaces.4 4 4
The project includes lockers, changing rooms for cyclists and
showers.6 6 6
The project includes any bicycle amenity identified in the
Bicycle Amenity section of the Transit Station Area
Development Guidelines.3 3 3
The project incorporates art into the design of the bicycle
amenity.3
The project is located within 300 feet, measured along the
most direct, legal walking path.
15
The project is located within 750 feet, measured along the
most direct, legal walking path.
10
The project is located within 1500 feet, measured along the
most direct legal walking path.
5 5 5
25.B. Access to Transit:
A development that provides transit
passes to residents as follows:
A multi-family residential development that provides transit
passes to residents through the City’s transit pass program for
a minimum period of three years from the development’s
initial occupancy. Passes shall be available for free to
residents at request. At least one pass shall be available per
unit. Verification from Transportation division of minimum 3
year participation is required.15
The project includes a narrow street or alley through the
project that accommodates people walking, biking and
driving.30
The project includes a walkway accessible to the public that
is a minimum of 10 feet wide that connects through the
property to a public space, such as park, trail or street or
similar area and allows for the walkway to be continued on
adjacent properties.20
Includes lockers, changing rooms,
showers, and secure storage.
Project is located approximately
1000 feet from the nearest TRAX
station, which is the Fairpark
Station.
25.A. Access to Transit:
A project located within close
proximity to a transit station shall
have the following number of points
added to the development score:
(Applies to any TRAX or
Frontrunner station platform or any
bus stop where three or more
separate bus routes come together.)
Ci
r
c
u
l
a
t
i
o
n
23. Connections and Walkways
Projects that include connections and
walkways from buildings, parking
lots and private open space to public
spaces:
(Points may be obtained from both
items.)
24. Bicycle Amenities
A project that includes bicycle
parking amenities in addition to what
is already required in the zoning
ordinance:
(Points may be obtained from
multiple items.)
26. Public Walkways Interior to the
Block
A development that includes public
walkways through the interior of
blocks:
(To qualify for these points, the
walkways cannot be fenced or
gated )
Pu
b
l
i
c
Sp
a
c
e
s
21. Streetscape Amenities
A project that includes street
furniture, pedestrian amenities,
public art or other similar features
intended to improve the streetscape:
Page 5 TSA Score Sheet ‐ PLNTSD2023‐00358 ‐ 2nd review
Transit Station Area Development Guidelines Checklist
See full Design Guideline document for all applicable point details.
100% of the parking structure is wrapped with high quality,
durable materials or habitable space with a depth of at least
25’ on all street facing facades.25
75% of the parking structure is wrapped in high quality,
durable materials or habitable space with a depth of at least
25’ on all street facing facades.20
For below grade parking structures, there is no visible
evidence of the parking garage other than the parking
entrance. The ground floor uses must have entrances at grade,
without the use of ramps, to qualify.25
Parking for alternative fuel vehicles, scooters, mopeds,
motorcycles, or other similar vehicle is provided at a rate
equal to 7% of the total number of spaces provided for
automobiles.5 5 5
A project includes dedicated parking stalls/equipment for a
car sharing program.3
A project includes a charging station for electric vehicles:
Level 1 Station: 2 pts per stall, max. 6
Level 2 Station: 3 pts per stall, max 9
Level 3 Station: 4 pts per stall, max. 12 12 12 12
Residential developments with a parking ratio less than 1
stall per unit: 25
Residential development with a parking ratio less than 1.25
stall per unit 15
Non-residential developments with a parking ratio less than 2
stalls per 1,000 gross square feet 20 20 20
Projects that have been presented to the associated
community council and have notified residents and property
owners within 300 feet via mail about when and where the
community council presentation will be held 10
Projects that have been presented at an open house for the
proposal on the development site and have notified residents
and property owners within 300 feet via mail about when and
where the open house will be held 10 10 0
Approval Process Ap
p
l
i
c
a
n
t
To
t
a
l
St
a
f
f
To
t
a
l
Planning Commission Review Required 124 points or less
203 185
Administrative (Staff) Approval 125 points or more
203 185
Open house held Dec. 15, 2022,
however, the applicant did not
provide documentation of sending a
mailed notice.
150 EV charging stations out of 584
stalls (25%).
5 Level 3 Stations are provided in
the on-street parking area.
1.37 stalls per 1,000 gsf
27. Parking Structure Design
Parking structures that incorporate
the following:
29. Parking Ratios
Projects that provide parking in the
ratios indicated:
Co
m
m
u
n
i
t
y
En
g
a
g
e
m
e
n
t
30. Neighborhood Input
Pa
r
k
i
n
g
28. Alternative Vehicle Parking
Projects that include dedicated
parking stalls for alternative fuel
vehicles, scooters, mopeds or
motorcycles:
(Points may be obtained from
multiple items.)
Page 6 TSA Score Sheet ‐ PLNTSD2023‐00358 ‐ 2nd review
Salt Lake City Planning Division 1 6/20/23
Planning Division Review Comments –
Zoning Regulation Compliance
Petition Number: PLNTSD2023-00358
Application Name: RMP HQ
Property Address: 1223 W North Temple
Date: June 20, 2023
The below are advisories regarding zoning compliance based on a preliminary review of your
plans. Your plans have not received a complete zoning review but will have such a review done
during the building permit phase and additional corrections may be required. Please ensure that
the items below have been addressed in your plans when submitting them for building permits.
Base Zoning District Standards (21A.26.078)
1. Building Height (Table 21A.26.078.E.2):
a. Height okay as long as points are met for administrative approval on the
TSA score. Otherwise, the building height is limited to 90’ in this zone.
2. Setback Standards (Table 21A.26.078.E.3.b):
a. 50 percent of the street facing building façade along street facing façade
must be built to the minimum setback of 5 feet. Please ensure this standard
is met and considered when you are deciding property lines.
3. Open Space Area (21A.26.078.E.5):
a. Open space areas shall be provided at a rate of one square foot for every ten (10) square
feet of land area included in the development, up to five thousand (5,000) square feet for
core areas, and up to two thousand five hundred (2,500) square feet for transition areas.
Open space areas includes landscaped yards, patios, public plazas, pocket parks,
courtyards, rooftop and terrace gardens and other similar types of open space area
amenities. All required open space areas shall be accessible to the users of the building(s).
Plans appear to comply, however final plans to verify.
4. Front And Corner Side Yard Design Requirements (21A.26.078.F.2.b)
a. (1) In yards greater than ten feet (10') in depth, one shade tree shall be planted for
every thirty feet (30') of street frontage. For the purpose of this section, a shade tree
is any tree that has a mature minimum tree canopy of thirty feet (30') and a mature
height that is forty feet (40') or greater.
(2) At least fifty percent (50%) of the front or corner side yards shall be covered in
live plant material. This can include raised planter boxes. This percentage can be
reduced to thirty percent (30%) if the yard includes outdoor dining, patios, outdoor
public space, or private yards for ground floor residential uses that cover at least fifty
percent (50%) of the provided front or corner side yard.
(3) At least thirty percent (30%) of the front or corner side yard shall by occupied by
outdoor dining areas, patios, outdoor public space, or private yards for ground floor
residential uses.
Final landscape plans must demonstrate how the project will meet these
standards (include calculations).
General Provisions (21A.36)
Salt Lake City Planning Division 2 6/20/23
5. Recycling and Construction Waste Management (21A.36.250):
a. Recycling Collection Station: 21A.36.250.D requires a recycling collection station
(recycling dumpster). To be verified at building permits.
b. Construction Waste Management Plan: A Construction Waste Management
Plan will be required at permits. (21A.36.250.F) Demolition permits will also be
required for removal of the associated buildings.
Design Standards (21A.37)
6. Ground Floor Use and Visual Interest (21A.37.050.A)
a. This standard's purpose is to increase the amount of active uses and/or visual
interest on the ground floor of a building. There are two (2) options for achieving
this, one dealing solely with the amount of ground floor use, and the other combining
a lesser amount of ground floor use with increased visual interest in the building
facade's design.
1. Ground Floor Use Only: This option requires that on the ground floor of a new
principal building, a permitted or conditional use other than parking shall occupy a
minimum portion of the length of any street facing building facade according to
section 21A.37.060, table 21A.37.060 of this chapter. All portions of such ground
floor spaces shall extend a minimum of twenty five feet (25') into the building.
Parking may be located behind these spaces.
Please label depth/length of ground floor spaces on final plans.
7. Building Materials (21A.37.050.B):
a. 1. Ground Floor Building Materials: Other than windows and doors, a minimum
amount of the ground floor facade's wall area of any street facing facade shall be clad
in durable materials according to section 21A.37.060, table 21A.37.060 of this
chapter. Durable materials include stone, brick, masonry, textured or patterned
concrete, and fiber cement board. Other materials may be used for the remainder of
the ground floor facade adjacent to a street. Other materials proposed to satisfy the
durable requirement may be approved at the discretion of the Planning Director if it
is found that the proposed material is durable and is appropriate for the ground floor
of a structure.
2. Upper Floor Building Materials: Floors above the ground floor level shall
include durable materials on a minimum amount of any street facing building facade
of those additional floors according to section 21A.37.060, table 21A.37.060 of this
chapter. Windows and doors are not included in that minimum amount. Durable
materials include stone, brick, masonry, textured or patterned concrete, and fiber
cement board. Other materials may be approved at the discretion of the Planning
Director if it is found that the proposed material is durable and is appropriate for the
upper floor of a structure.
90% of ground floor and 60% of upper floors required to meet durable
materials requirement. Please provide calculations on the final plan set.
Do not include openings in calculations.
8. Glass (21A.37.050.C):
a. 1. Ground Floor Glass: The ground floor building elevation of all new buildings
facing a street, and all new ground floor additions facing a street, shall have a
Salt Lake City Planning Division 3 6/20/23
minimum amount of glass, or within a specified percentage range, between three feet
(3') and eight feet (8') above grade according to section 21A.37.060, table 21A.37.060
of this chapter. All ground floor glass shall allow unhampered and unobstructed
visibility into the building for a depth of at least five feet (5'), excluding any glass
etching and window signs when installed and permitted in accordance with chapter
21A.46, "Signs", of this title. 60% of street facing ground floor required to be
covered in glass. Please provide glass coverage figure for ground floor.
9. Lighting: exterior (21A.37.050.H)
a. All exterior lighting shall be shielded and directed down to prevent light trespass
onto adjacent properties. Exterior lighting shall not strobe, flash or flicker. To be
verified at permits.
10. Screening of mechanical equipment (21A.37.050.J)
a. All mechanical equipment for a building shall be screened from public view and sited
to minimize their visibility and impact. Examples of siting include on the roof,
enclosed or otherwise integrated into the architectural design of the building, or in a
rear or side yard area subject to yard location restrictions found in
section 21A.36.020, table 21A.36.020B, "Obstructions In Required Yards." To be
verified at permits.
11. Screening of service areas (21A.37.050.K)
a. Service areas, loading docks, refuse containers and similar areas shall be fully
screened from public view. All screening enclosures viewable from the street shall be
either incorporated into the building architecture or shall incorporate building
materials and detailing compatible with the building being served. All screening
devices shall be a minimum of one foot (1') higher than the object being screened,
and in the case of fences and/or masonry walls the height shall not exceed eight feet
(8'). Dumpsters must be located a minimum of twenty five feet (25') from any
building on an adjacent lot that contains a residential dwelling or be located inside of
an enclosed building or structure. To be verified at permits.
Parking (21A.44)
12. Minimum/Maximum Parking (21A.44.030):
a. Parking to be provided off-site and must be provided before Certificate of Occupancy
is issued. On final plan set, please provide parking calculations for provided uses. If
shared parking is proposed, please provide that calculation as well (21A.44.050).
13. Signs (21A.46)
Signs will need to verified at permits with separate sign plans.