Loading...
HomeMy WebLinkAboutPLNTSD2023-00714_44 & 48 N 1000 WERIN MENDENHALL DEPARTMENT of COMMUNITY Mayor and NEIGHBORHOODS PLANNING DIVISION SALT LAKE CITY CORPORATION 451 SOUTH STATE STREET, ROOM 406 WWW.SLC.GOV P.O. BOX 1580, SALT LAKE CITY, UTAH 84114 TEL 801.535.7757 November 2, 2023 Shawn McMillen First Step House 440 South 500 East Salt Lake City, UT 84102 RE: Transit Station Area Development Score Review for Petition PLNTSD2023-00714 44 North Multifamily 44 North 1000 West, & 48 North 1000 West Dear Shawn, This letter is a notification of the development score review as determined by the Planning Department staff. Pursuant to chapter 21A.10 of the Salt Lake City Zoning Ordinance, a notice of application was sent out on Thursday, October 19, 2023. The noticing period ended on Tuesday, October 31, 2023. No response was received from abutting property owners related to the project. After completing a review of the project plans, Planning Staff has given the proposed project a score of 213 out of the submitted 192 points. Please see attached scoring sheets for more information. The project achieved enough points for administrative approval; however, Planning Staff has found that some adjustments may need to be made to the design of the project to ensure compliance with the Transit Station Area regulations (Section 21A.26.078 of the Zoning Ordinance) and the specific design regulations (see Chapter 21A.37 of the Zoning Ordinance). Please review your project plans according to these regulations and contact the Planning Staff if you have questions. Please be advised that any significant changes made to the approved plans, elevations or site plan must be approved by the Planning Department. As the applicant, you have the option to appeal this development score review to the Planning Commission. If you choose to appeal, a public hearing will be required per the requirements of the Salt Lake City Zoning Ordinance. If you are satisfied with the score given, you can continue with your building permit submittal with Building Services. A full zoning review will be completed as part of the building permit review to verify that the drawings submitted for your building permit comply with the applicable zoning requirements. Additionally, the plans submitted for your development score will be compared with the plans submitted for your building permit, and you will be notified if there are any discrepancies between the two sets. If you have any further questions about this process, please contact me at 801-535- 7282 or by e-mail at: wayne.mills@slcgov.com. Sincerely, Wayne Mills Planning Manager Enc. • TSA Score Sheet cc: File PLNTSD2023-00714 Transit Station Area Development Guidelines Checklist See full Design Guideline document for all applicable point details. CA T E G O R Y (Unless otherwise noted, points may  only be obtained from one item in  each guideline section.) GUIDELINE SECTION ITEM DESCRIPTION VA L U E AP P L I C A N T   RE V I E W ST A F F  RE V I E W More than 50 dwelling units per acre; Buildings that are up to 80% of the allowable building height; or Buildings with a Floor to Lot Area ration of 3 or more. 20 More than 30 dwelling units per acre; Buildings that are up to 70% of the allowable building height; or Buildings with a floor to lot area ratio of 2 or more.15 More than 20 dwelling units per acre; Buildings that are at least 60% of the allowable building height; or Buildings with a floor to lot area ratio of 1 or more.10 More than 25 dwelling units per acre; Buildings that are up to 80% of the allowable building height; or Buildings with a Floor to Lot Area ratio of 2 or more.12 12 12 More than 20 dwelling units per acre; Buildings that are up to 70% of the allowable building height; or Buildings with a floor to lot area ratio of 1.5 or more.8 More than 15 dwelling units per acre; Buildings that are at least 60% of the allowable building height; or Buildings with a floor to lot area ratio of 1 or more.5 100% of the gross floor area on the ground floor is dedicated to a use different than what is on the floors above. 20 At least 75% of the gross floor area on the ground floor is dedicated to a use different than what is on the floors above. 15 At least 50% of the gross floor area on the ground floor is dedicated to a use different than what is on the floors above.10 10 10 A project that includes at least two uses that are different than existing uses on adjacent properties. 6 33% or more of the total dwelling units. 40 40 40 20% or more of the total dwelling units. 30 10% or more of the total dwelling units. 20 Areas rated 5 or greater 20 Area rated 3 or greater 10 33% or more of the total dwelling units.8 15% or more of the total dwelling units 5 10% or more of the total dwelling units.3 3 3 A minimum of 1500 square feet.15 15 A minimum of 1000 square feet 10 A minimum of 500 Square feet 5 50% or more of the existing surface parking lot is covered by new buildings.15 35% or more of the existing surface parking lot is covered by new buildings.10 25% or more of the existing surface parking lot is covered by new buildings.5 A new building that meets the standards of the TSA zoning district and replaces a building that does not meet the standards.10 A project that includes replacing a nonconforming use with a use that is allowed in the TSA zoning district. 5 8. Removal of Billboards A project that includes redevelopment of a site containing a An existing billboard is legally removed by the developer as part of a redevelopment project. 10 The proposed building is a mixed-use development with social services offices, community rooms, a gym, a conference room on the ground floor, and residential units on the upper floors. The parking is also located on the ground floor, and the applicant reports a ratio of 50 percent. The combined lots have an area of 14,293 square feet or 0.33 acres. The proposed development density is 201 units per acre, which exceeds the minimum requirement of 50 units per acre. The proposed floor area ratio is 4.35, which is also higher than the minimum requirement of 3. NOTES The development is not located in the Core Area. The blue highlighted in the plans represents community social services offices and meeting rooms and is 1,914 square feet, which exceeds the 1,500 square feet requirement. The use will be a supportive services space on the ground level with space for five caseworkers, as well as a large conference room that will be used to teach life skills classes. The counseling center will be providing support to chronically homeless individuals. This project does not include redevelopment of a parking lot This is not applicable. The project is located in an area with an index of 1 to 2. 13% of the units in the building are ADA accessible A 67-unit apartment complex will be created for tenants over the age of 55 with a low income. All units are reserved for those who meet the income requirements and will be deeply affordable. The complex will be fully dedicated to Permanent Supportive Housing (PSH) NA There are no billboards on the property. 4. Accessible Dwelling Units A project which includes dwelling units designed as ADA accessible: 1.A. Intensity and Density of Use (Applicable to Core Area Only.) A project that meets at least one of the following requirements: 1.B. Intensity and Density of Use (Applicable to Transition Area only.) A project that meets at least one of the following requirements: 2. Integrated Mixed of Uses: If the ground floor of a building is designed for retail, restaurant, or other use other than residential on the ground floor. The guideline applies to street facing habitable space only and not the entire ground floor area. The following points shall be added to the development score: 3.A. Mixed Income Housing  A project that includes affordable housing available to those with 60% or less of the median household income of the City for sale or lease shall have the following number of points added to the development score: 3.B. Mixed Income Housing  An affordable housing project that is located in an area identified in the “Opportunity Index” map (as used in the latest available Utah Housing Corporation Allocation Plan) or its successor as determined by the Planning Director, with a rating of at least 3 or greater shall receive the following points: La n d  Us e La n d  Us e 5. Community Serving Uses  Projects the include the following area of community serving uses: (Refer to Guidelines for qualifying uses.) 6. Redevelopment of Surface  Parking Lots A project that includes the redevelopment of an existing surface parking lot to an active use or structured parking: 7. Redevelopment of  Nonconforming Use or  Noncomplying Building A project that includes redevelopment of a site containing a nonconforming use or non- complying building: July 2017 1 of 4            Subtotal (For Page):                                                          Transit Station Area Development Guidelines Checklist See full Design Guideline document for all applicable point details. The project utilizes a roof design, such as a landscaped roof, that is intended to reduce energy use, storm drainage runoff or other similar sustainable policy of the City. 10 The project utilizes landscape designs and materials that conserves energy, reduces the urban heat island, conserves water, retains or reuses storm drainage or other similar sustainable policy of the City. Documentation must be provided to indicate how the project will incorporate this guideline.5 5 5 Platinum 50 Gold 40 Silver 30 1. The project is certified as having 100% of its energy needs served by renewable power either from on or off-site sources. If development relies on off-site power, documentation must be provided showing at least 20 year commitment to power source 50 2. The project is certified as having 50% its energy needs served by renewable power either from on or off-site sources. If development relies on off-site power, documentation must be provided showing at least 20 year commitment to power source 25 3. Solar array: 5 points for every 500 square feet of solar panels. Maximum 20 points.20 4. Geothermal heating and cooling systems 10 5. The project is designed with passive, energy efficient features that include awnings or solar shades over all windows, or other similar passive energy saving features. 5 Architectural detailing is wrapped around all four sides. See guideline document for specific detailing requirements. 20 Architectural detailing is wrapped around both side facades of a building, but not on the rear façade. See guideline document for specific detailing requirements.15 15 15 Local Register: New construction, major alterations and additions that are approved by the Historic Landmark Commission that include reuse of the site.40 National Register: State Historic Preservation Office review and approval of exterior alterations to buildings not locally designated, but on the national register and seeking federal tax credits 40 Projects that are adjacent to a local or national designated property that are compatible with the historic property through building mass and bulk, setbacks and design features as determined by the Planning Director 20 Local Register: Projects that receive administrative approval in accordance with Zoning Ordinance Section 21A.34.020.5 Projects that add historically significant sites to the Salt Lake City Register of Cultural Resources if they qualify as defined in Zoning Ordinance Section 21A.34.50 At least 80% of the street facing façades above the ground floor are clad in durable, high quality materials, as listed above, excluding glazing, doors, and trim 20 20 At least 70% of the street facing facades above the ground floor are clad in high quality, durable materials as listed above, excluding glazing, doors, and trim 15 15 15. Corner Buildings Buildings located on the corners of intersecting streets that address both streets: When located on the corner of two intersecting streets, the primary entrance of the building addresses the corner by including a hinged, rounded, beveled, open bay, mitered orientation or similar entrance feature.10 A rooftop of a building is used as a common space for the building occupants.6 A roof includes at least one of the following design features: Two or more sloping planes visible from a public street; An arched or barrel vaulted design; A distinguishable cornice or parapet; Overhangs that are a minimum of 12 inches in depth to create a shadow line. 5 17. Eyes on the Street and Public  Spaces Buildings that are designed to have windows, doors, balconies or other similar features facing public streets and open spaces: Operable openings, balconies, verandas or other similar features on all levels of the building that face a public space and allow visibility into the public space. Balconies need to have a minimum depth of 5 feet and include at least 30 square feet of space 15 15 15 18. Lighting A project that includes a lighting plan that accomplishes at least one of the following: Casts light from store fronts onto the sidewalk; Highlights unique architectural features of a building; or Highlights artwork or unique landscape features. 6 6 A sign that is mounted perpendicular to the primary building façade and oriented to the pedestrian (projecting business storefront sign).2 2 2 An awning or canopy sign that is integrated into the design of the building.2 A monument sign that is integrated into the site and compatible with the building architecture.2 The front entrance features a perpendicular entry and lit signage. The building's sidewalk-level front is designed to be welcoming and well- lit, with lighting illuminating the storefront and landscape furniture around the front entrance. The sign is hanging perpendicular to the wall by the front entry. The building is constructed using high-quality, durable, and low- maintenance materials that cover 85% of its street-facing facade.90% meeting the standard described in Section 14 of the TSA Design Guidelines if wood is approved. NA NA NA The project does not meet the requirements for LEED Certification. NA 14. Building Materials Projects that incorporate high quality, durable and low maintenance building materials: Green highlighted areas are proposed low-water use, landscaped areas including publicly accessible site furniture, which are proposed for low- water use.The roof is a white roof membrane. 16. Rooftop Design and Use A project that incorporates a rooftop use: (Points may be obtained from both items.) 19. Signs Signs that meet the intent of this guideline shall have the following points added to the development score: 9. Sustainable Site and Open Space  Design A project that incorporates adopted sustainable policies of the City: (Points may be obtained from both items.) 10. Green Building The following points will be awarded based on the level of LEED certification: 11. Energy Efficiency Projects that incorporate energy efficiency into the design of the project shall have the following points added to the development score: (For guidelines 1 through 4, points may only be obtained from one item. Points from guidelines 1 through 4 may be combined with points from guideline 5.) 12. 360 Degree Architecture A project that incorporates architecture features on building facades that are not adjacent to a street: (See Guideline for required elements.) 13. Historic Preservation Projects that preserve, rehabilitate, restore, reuse a historic property or new construction that contributes to the character of a historic property or district: Bu i l d i n g  an d  Si t e  De s i g n Bu i l d i n g  an d  Si t e  De s i g n Bu i l d i n g  an d  Si t e  De s i g n July 2017 2 of 4            Subtotal (For Page):                                                          Transit Station Area Development Guidelines Checklist See full Design Guideline document for all applicable point details. A project includes a minimum of 15% of the total lot area.15 A project includes a minimum of 10% of the total lot area.10 A project includes a minimum of 5% of the total lot area. 5 A public space, regardless of size, that is located near a transit station and includes seating, art, protection from the elements or other feature intended to activate the space or make it comfortable (must be within 330 feet of transit station).3 At least 4 street furnishings 3 3 3 At least 3 street furnishings 2 At least 2 street furnishings 1 22. Public Artwork Projects that include public art in a location where it is readily visible from a public space: 2 points per art piece, up to a maximum of 6 points 6 Projects that include a minimum six foot wide ADA accessible walkway through a parking lot that is separated from vehicle drive aisles.4 Projects that include a minimum six foot wide ADA accessible sidewalk from private property to public open spaces.4 4 4 The project includes lockers, changing rooms for cyclists and showers.6 The project includes any bicycle amenity identified in the Bicycle Amenity section of the Transit Station Area Development Guidelines.3 3 3 The project incorporates art into the design of the bicycle amenity.3 The project is located within 300 feet, measured along the most direct, legal walking path. 15 The project is located within 750 feet, measured along the most direct, legal walking path. 10 10 The project is located within 1500 feet, measured along the most direct legal walking path. 5 5 25.B. Access to Transit: A development that provides transit passes to residents as follows: A multi-family residential development that provides transit passes to residents through the City’s transit pass program for a minimum period of three years from the development’s initial occupancy. Passes shall be available for free to residents at request. At least one pass shall be available per unit. Verification from Transportation division of minimum 3 year participation is required.15 The project includes a narrow street or alley through the project that accommodates people walking, biking and driving.30 The project includes a walkway accessible to the public that is a minimum of 10 feet wide that connects through the property to a public space, such as park, trail or street or similar area and allows for the walkway to be continued on adjacent properties.20 100% of the parking structure is wrapped with high quality, durable materials or habitable space with a depth of at least 25’ on all street facing facades.25 25 25 75% of the parking structure is wrapped in high quality, durable materials or habitable space with a depth of at least 25’ on all street facing facades.20 For below grade parking structures, there is no visible evidence of the parking garage other than the parking entrance. The ground floor uses must have entrances at grade, without the use of ramps, to qualify.25 Parking for alternative fuel vehicles, scooters, mopeds, motorcycles, or other similar vehicle is provided at a rate equal to 7% of the total number of spaces provided for automobiles.5 5 5 A project includes dedicated parking stalls/equipment for a car sharing program.3 A project includes a charging station for electric vehicles: Level 1 Station: 2 pts per stall, max. 6 Level 2 Station: 3 pts per stall, max 9 Level 3 Station: 4 pts per stall, max. 12 12 Residential developments with a parking ratio less than 1 stall per unit: 25 25 25 Residential development with a parking ratio less than 1.25 stall per unit 15 Non-residential developments with a parking ratio less than 2 stalls per 1,000 gross square feet 20 Projects that have been presented to the associated community council and have notified residents and property owners within 300 feet via mail about when and where the community council presentation will be held 10 Projects that have been presented at an open house for the proposal on the development site and have notified residents and property owners within 300 feet via mail about when and where the open house will be held 10 Two E.V. charging stations are provided, one of which is accessible. There is no access to the public alley The garage is equipped with durable materials and is separated from the street by a 25-degree-deep habitation space, with only the garage doors visible from the street. The project includes a bike rack and covered bicycle storage lockers. There is secure bicycle storage for 28 bikes in two locations. The project is within .3 miles or 1584 square feet along the most direct legal walking path. NA station is .3 miles or 1584 feet from the location. The front entrance features three site benches, outdoor trash reception areas, and a patio space. No public artwork. There is a 6' wide A.D.A. compliant walkway connects front entrance to Madsen Park. 25.A. Access to Transit: A project located within close proximity to a transit station shall have the following number of points added to the development score: (Applies to any TRAX or Frontrunner station platform or any bus stop where three or more separate bus routes come together.) 27. Parking Struture Design Parking structures that incorporate the following: 29. Parking Ratios Projects that provide parking in the ratios indicated: Co m m u n i t y   En gagem e n t 30. Neighborhood Input Pa r k i n g 28. Alternative Vehicle Parking Projects that include dedicated parking stalls for alternative fuel vehicles, scooters, mopeds or motorcycles: (Points may be obtained from multiple items.) Ci r c u l a t i o n 23. Connections and Walkways Projects that include connections and walkways from buildings, parking lots and private open space to public spaces: (Points may be obtained from both items.) 24. Bicycle Amenities A project that includes bicycle parking amenities in addition to what is already required in the zoning ordinance: (Points may be obtained from multiple items.) 26. Public Walkways Interior to the  Block A development that includes public walkways through the interior of blocks: (To qualify for these points, the walkways cannot be fenced or gated ) Pu b l i c  Sp a c e s Pu b l i c  Sp a c e s 20. Public Spaces and Plazas Projects that include active, outdoor spaces, that are accessible to the public and adjacent to a public right of way: 21. Streetscape Amenities A project that includes street furniture, pedestrian amenities, public art or other similar features intended to improve the streetscape: July 2017 3 of 4            Subtotal (For Page):                                                          Transit Station Area Development Guidelines Checklist See full Design Guideline document for all applicable point details. Approval Process Ap p l i c a n t   To t a l St a f f   To t a l Planning Commission Review Required 124 points or less 192 213 Administrative (Staff) Approval 125 points or more 192 213 July 2017 4 of 4            Subtotal (For Page):