Loading...
HomeMy WebLinkAboutPLNTSD2023-00359 - 940 W 200 SERIN MENDENHALL DEPARTMENT of COMMUNITY Mayor and NEIGHBORHOODS PLANNING DIVISION SALT LAKE CITY CORPORATION 451 SOUTH STATE STREET, ROOM 406 WWW.SLC.GOV P.O. BOX 1580, SALT LAKE CITY, UTAH 84114 TEL 801.535.7757 June 5, 2024 Travis Nicholes JZW Architects 45 E Center Street, Suite 202 North Salt Lake, Utah, 84054 RE: Transit Station Area Development Score Review for Petition PLNTSD2023-00359 2nd South Apartments, 940 W 200 S Dear Travis, This letter is a notification of the development score review as determined by the Planning Division staff. Pursuant to chapter 21A.10 of the Salt Lake City Zoning Ordinance, a notice of application was sent out on March 12, 2024. The noticing period ended on March 25, 2024. No response was received from abutting property owners related to the project. After completing a review of the revised plans, staff has given the proposed building a score of 147 out of the submitted 147. Please see attached scoring sheets for more information. This means that no public hearing is required, and the project is now authorized to go through the standard building permit process. The development score is approved with the following conditions: 1. Legally binding documentation confirming that at least 33% of the dwelling units within the development will remain affordable to those with 60% or less of the area median household income for at least 15 years must be submitted to the Planning Division before building permits can be issued for this project. 2. Any significant changes made to the approved plans, elevations, or site plan must be approved by the Planning Division to verify the development maintains a sufficient development review score for administrative approval. 3. Any other changes made to the plans or other documentation (including the affordable housing agreements) that may reduce the score must be reviewed and approved by the Planning Division to ensure that the proposal remains in compliance with the minimum score for administrative approval. As the applicant, you have the option to appeal this development score review to the Planning Commission. If you choose to appeal, a public hearing will be required per the requirements of the Salt Lake City Zoning Ordinance. If you are satisfied with the score given, you can continue with your building permit submittal with Building Services. A full zoning review will be completed as part of the building permit review to verify that the drawings submitted for your building permit comply with the applicable zoning requirements. Additionally, the plans submitted for your development score will be compared with the plans submitted for your building permit, and you will be notified if there are any discrepancies between the two set s. If you have any further questions about this process, please contact me at 801-535-7168 or by e-mail at: trevor.ovenden@slcgov.com Sincerely, Trevor Ovenden Principal Planner Attachments: 1.TSA Development Guidelines Scoring Sheet from City Staff 2.Preliminary Zoning Review Comments 3.Pages from Submitted Plans 4.Affordability details from Applicant Transit Station Area Development Guidelines Checklist See full Design Guideline document for all applicable point details. CA T E G O R Y (Unless otherwise noted, points may only be obtained from one item in each guideline section.) GUIDELINE SECTION ITEM DESCRIPTION VA L U E AP P L I C A N T R E V I E W ST A F F R E V I E W More than 50 dwelling units per acre; Buildings that are up to 80% of the allowable building height; or Buildings with a Floor to Lot Area ration of 3 or more. 20 More than 30 dwelling units per acre; Buildings that are up to 70% of the allowable building height; or Buildings with a floor to lot area ratio of 2 or more.15 More than 20 dwelling units per acre; Buildings that are at least 60% of the allowable building height; or Buildings with a floor to lot area ratio of 1 or more.10 More than 25 dwelling units per acre; Buildings that are up to 80% of the allowable building height; or Buildings with a Floor to Lot Area ratio of 2 or more.12 12 12 More than 20 dwelling units per acre; Buildings that are up to 70% of the allowable building height; or Buildings with a floor to lot area ratio of 1.5 or more.8 More than 15 dwelling units per acre; Buildings that are at least 60% of the allowable building height; or Buildings with a floor to lot area ratio of 1 or more.5 100% of the gross floor area on the ground floor is dedicated to a use different than what is on the floors above. 20 At least 75% of the gross floor area on the ground floor is dedicated to a use different than what is on the floors above. 15 At least 50% of the gross floor area on the ground floor is dedicated to a use different than what is on the floors above.10 A project that includes at least two uses that are different than existing uses on adjacent properties. 6 La n d U s e 1.A. Intensity and Density of Use (Applicable to Core Area Only.) A project that meets at least one of the following requirements: 1.B. Intensity and Density of Use (Applicable to Transition Area only.) A project that meets at least one of the following requirements: 2. Integrated Mixed of Uses: If the ground floor of a building is designed for retail, restaurant, or other use other than residential on the ground floor. The guideline applies to street facing habitable space only and not the entire ground floor area. The following points shall be added to the development score: NOTES 105 units on .63 acres = approximately 167 units/acre. July 2017 1 of 18 Subtotal (For Page): Transit Station Area Development Guidelines Checklist See full Design Guideline document for all applicable point details. 33% or more of the total dwelling units. 40 40 40 20% or more of the total dwelling units. 30 10% or more of the total dwelling units. 20 Areas rated 5 or greater 20 Area rated 3 or greater 10 33% or more of the total dwelling units.8 15% or more of the total dwelling units 5 10% or more of the total dwelling units.3 A minimum of 1500 square feet.15 A minimum of 1000 square feet 10 A minimum of 500 Square feet 5 50% or more of the existing surface parking lot is covered by new buildings.15 35% or more of the existing surface parking lot is covered by new buildings.10 25% or more of the existing surface parking lot is covered by new buildings.5 A new building that meets the standards of the TSA zoning district and replaces a building that does not meet the standards.10 A project that includes replacing a nonconforming use with a use that is allowed in the TSA zoning district. 5 8. Removal of Billboards A project that includes redevelopment of a site containing a billboard: An existing billboard is legally removed by the developer as part of a redevelopment project.10 The project utilizes a roof design, such as a landscaped roof, that is intended to reduce energy use, storm drainage runoff or other similar sustainable policy of the City. 10 The project utilizes landscape designs and materials that conserves energy, reduces the urban heat island, conserves water, retains or reuses storm drainage or other similar sustainable policy of the City. Documentation must be provided to indicate how the project will incorporate this guideline.5 La n d U s e Bu i l d i n g a n d S i t e D e s i g n 5. Community Serving Uses Projects the include the following area of community serving uses: (Refer to Guidelines for qualifying uses.) 6. Redevelopment of Surface Parking Lots A project that includes the redevelopment of an existing surface parking lot to an active use or structured parking: 4. Accessible Dwelling Units A project which includes dwelling units designed as ADA accessible: 3.A. Mixed Income Housing A project that includes affordable housing available to those with 60% or less of the median household income of the City for sale or lease shall have the following number of points added to the development score: 3.B. Mixed Income Housing An affordable housing project that is located in an area identified in the “Opportunity Index” map (as used in the latest available Utah Housing Corporation Allocation Plan) or its successor as determined by the Planning Director, with a rating of at least 3 or greater shall receive the following points: 9. Sustainable Site and Open Space Design A project that incorporates adopted sustainable policies of the City: (Points may be obtained from both items.) 7. Redevelopment of Nonconforming Use or Noncomplying Building A project that includes redevelopment of a site containing a nonconforming use or non- complying building: Legally binding documentation confirming that at least 33% of the dwelling units within the development will remain affordable to those with 60% or less of the area median household income for at least 15 years must be submitted to the Planning Division before building permits can be issued for this project. July 2017 2 of 18 Subtotal (For Page): Transit Station Area Development Guidelines Checklist See full Design Guideline document for all applicable point details. Platinum 50 Gold 40 Silver 30 1. The project is certified as having 100% of its energy needs served by renewable power either from on or off-site sources. If development relies on off-site power, documentation must be provided showing at least 20 year commitment to power source 50 2. The project is certified as having 50% its energy needs served by renewable power either from on or off-site sources. If development relies on off-site power, documentation must be provided showing at least 20 year commitment to power source 25 3. Solar array: 5 points for every 500 square feet of solar panels. Maximum 20 points.20 4. Geothermal heating and cooling systems 10 5. The project is designed with passive, energy efficient features that include awnings or solar shades over all windows, or other similar passive energy saving features. 5 Architectural detailing is wrapped around all four sides. See guideline document for specific detailing requirements. 20 Architectural detailing is wrapped around both side facades of a building, but not on the rear façade. See guideline document for specific detailing requirements.15 Local Register: New construction, major alterations and additions that are approved by the Historic Landmark Commission that include reuse of the site.40 National Register: State Historic Preservation Office review and approval of exterior alterations to buildings not locally designated, but on the national register and seeking federal tax credits 40 Projects that are adjacent to a local or national designated property that are compatible with the historic property through building mass and bulk, setbacks and design features as determined by the Planning Director 20 Local Register: Projects that receive administrative approval in accordance with Zoning Ordinance Section 21A.34.020.5 Projects that add historically significant sites to the Salt Lake City Register of Cultural Resources if they qualify as defined in Zoning Ordinance Section 21A.34.50 Bu i l d i n g a n d S i t e D e s i g n 10. Green Building The following points will be awarded based on the level of LEED certification: 11. Energy Efficiency Projects that incorporate energy efficiency into the design of the project shall have the following points added to the development score: (For guidelines 1 through 4, points may only be obtained from one item. Points from guidelines 1 through 4 may be combined with points from guideline 5.) 12. 360 Degree Architecture A project that incorporates architecture features on building facades that are not adjacent to a street: (See Guideline for required elements.)13. Historic Preservation Projects that preserve, rehabilitate, restore, reuse a historic property or new construction that contributes to the character of a historic property or district: July 2017 3 of 18 Subtotal (For Page): Transit Station Area Development Guidelines Checklist See full Design Guideline document for all applicable point details. At least 80% of the street facing façades above the ground floor are clad in durable, high quality materials, as listed above, excluding glazing, doors, and trim 20 20 20 At least 70% of the street facing facades above the ground floor are clad in high quality, durable materials as listed above, excluding glazing, doors, and trim 15 15. Corner Buildings Buildings located on the corners of intersecting streets that address both streets: When located on the corner of two intersecting streets, the primary entrance of the building addresses the corner by including a hinged, rounded, beveled, open bay, mitered orientation or similar entrance feature.10 A rooftop of a building is used as a common space for the building occupants.6 6 6 A roof includes at least one of the following design features: Two or more sloping planes visible from a public street; An arched or barrel vaulted design; A distinguishable cornice or parapet; Overhangs that are a minimum of 12 inches in depth to create a shadow line. 5 17. Eyes on the Street and Public Spaces Buildings that are designed to have windows, doors, balconies or other similar features facing public streets and open spaces: Operable openings, balconies, verandas or other similar features on all levels of the building that face a public space and allow visibility into the public space. Balconies need to have a minimum depth of 5 feet and include at least 30 square feet of space 15 18. Lighting A project that includes a lighting plan that accomplishes at least one of the following: Casts light from store fronts onto the sidewalk; Highlights unique architectural features of a building; or Highlights artwork or unique landscape features. 6 A sign that is mounted perpendicular to the primary building façade and oriented to the pedestrian (projecting business storefront sign).2 An awning or canopy sign that is integrated into the design of the building.2 A monument sign that is integrated into the site and compatible with the building architecture.2 A project includes a minimum of 15% of the total lot area.15 A project includes a minimum of 10% of the total lot area.10 A project includes a minimum of 5% of the total lot area. 5 A public space, regardless of size, that is located near a transit station and includes seating, art, protection from the elements or other feature intended to activate the space or make it comfortable (must be within 330 feet of transit station).3 Bu i l d i n g a n d S i t e D e s i g n Pu b l i c S p a c e s 20. Public Spaces and Plazas Projects that include active, outdoor spaces, that are accessible to the public and adjacent to a public right of way: 19. Signs Signs that meet the intent of this guideline shall have the following points added to the development score: 16. Rooftop Design and Use A project that incorporates a rooftop use: (Points may be obtained from both items.) 14. Building Materials Projects that incorporate high quality, durable and low maintenance building materials: Fiber cement panels and brick veneer will be used on the upper floors of the street facing façade.Small amount of stucco used on front elevation above the first floor. Rooftop courtyard area is shown on the plans. July 2017 4 of 18 Subtotal (For Page): Transit Station Area Development Guidelines Checklist See full Design Guideline document for all applicable point details. At least 4 street furnishings 3 At least 3 street furnishings 2 3 3 At least 2 street furnishings 1 22. Public Artwork Projects that include public art in a location where it is readily visible from a public space: 2 points per art piece, up to a maximum of 6 points 6 Projects that include a minimum six foot wide ADA accessible walkway through a parking lot that is separated from vehicle drive aisles.4 4 4 Projects that include a minimum six foot wide ADA accessible sidewalk from private property to public open spaces.4 The project includes lockers, changing rooms for cyclists and showers.6 The project includes any bicycle amenity identified in the Bicycle Amenity section of the Transit Station Area Development Guidelines.3 3 3 The project incorporates art into the design of the bicycle amenity.3 The project is located within 300 feet, measured along the most direct, legal walking path. 15 The project is located within 750 feet, measured along the most direct, legal walking path. 10 The project is located within 1500 feet, measured along the most direct legal walking path. 5 25.B. Access to Transit: A development that provides transit passes to residents as follows: A multi-family residential development that provides transit passes to residents through the City’s transit pass program for a minimum period of three years from the development’s initial occupancy. Passes shall be available for free to residents at request. At least one pass shall be available per unit. Verification from Transportation division of minimum 3 year participation is required.15 The project includes a narrow street or alley through the project that accommodates people walking, biking and driving.30 The project includes a walkway accessible to the public that is a minimum of 10 feet wide that connects through the property to a public space, such as park, trail or street or similar area and allows for the walkway to be continued on adjacent properties.20 Ci r c u l a t i o n 23. Connections and Walkways Projects that include connections and walkways from buildings, parking lots and private open space to public spaces: (Points may be obtained from both items.) 24. Bicycle Amenities A project that includes bicycle parking amenities in addition to what is already required in the zoning ordinance: (Points may be obtained from multiple items.) 26. Public Walkways Interior to the Block A development that includes public walkways through the interior of blocks: (To qualify for these points, the walkways cannot be fenced or gated.) Pu b l i c S p a c e s 21. Streetscape Amenities A project that includes street furniture, pedestrian amenities, public art or other similar features intended to improve the streetscape: 25.A. Access to Transit: A project located within close proximity to a transit station shall have the following number of points added to the development score: (Applies to any TRAX or Frontrunner station platform or any bus stop where three or more separate bus routes come together.) Outdoor benches shown on page A1.11 of drawints. 6' wide path ADA path shown on page A1.11 of drawings. Bike storage room is shown on plans. July 2017 5 of 18 Subtotal (For Page): Transit Station Area Development Guidelines Checklist See full Design Guideline document for all applicable point details. 100% of the parking structure is wrapped with high quality, durable materials or habitable space with a depth of at least 25’ on all street facing facades.25 25 25 75% of the parking structure is wrapped in high quality, durable materials or habitable space with a depth of at least 25’ on all street facing facades.20 For below grade parking structures, there is no visible evidence of the parking garage other than the parking entrance. The ground floor uses must have entrances at grade, without the use of ramps, to qualify.25 Parking for alternative fuel vehicles, scooters, mopeds, motorcycles, or other similar vehicle is provided at a rate equal to 7% of the total number of spaces provided for automobiles.5 A project includes dedicated parking stalls/equipment for a car sharing program.3 A project includes a charging station for electric vehicles: Level 1 Station: 2 pts per stall, max. 6 Level 2 Station: 3 pts per stall, max 9 Level 3 Station: 4 pts per stall, max. 12 12 9 9 Residential developments with a parking ratio less than 1 stall per unit: 25 25 25 Residential development with a parking ratio less than 1.25 stall per unit 15 Non-residential developments with a parking ratio less than 2 stalls per 1,000 gross square feet 20 Projects that have been presented to the associated community council and have notified residents and property owners within 300 feet via mail about when and where the community council presentation will be held 10 Projects that have been presented at an open house for the proposal on the development site and have notified residents and property owners within 300 feet via mail about when and where the open house will be held 10 Approval Process Ap p l i c a n t To t a l St a f f T o t a l Administrative (Staff) Approval 125 points or more 147 147 27. Parking Struture Design Parking structures that incorporate the following: 29. Parking Ratios Projects that provide parking in the ratios indicated: Co m m u n i t y En g a g e m e n t 30. Neighborhood Input Pa r k i n g 28. Alternative Vehicle Parking Projects that include dedicated parking stalls for alternative fuel vehicles, scooters, mopeds or motorcycles: (Points may be obtained from multiple items.) Habitible space with a depth of at least 25' is shown on the ground floor street facing façade. Parking strucutre is wrapped with durable materials on the street facing façade. Three charging stations shown on plans. 77 parking stalls provided for 105 units. July 2017 6 of 18 Subtotal (For Page): SALT LAKE CITY CORPORATION 451 SOUTH STATE STREET, ROOM 406 WWW.SLC.GOV/PLANNING PO BOX 145480 SALT LAKE CITY, UT 84114-5480 Document Version 10/14/2020 TEL 801-535-7757 FAX 801-535-6174 Preliminary Zoning Review The below is a preliminary review of the development for zoning compliance as part of your TSA Development Score review. Further review will be performed as part of your building permit review and additional compliance issues may be identified. Proposed Land Use ☒Permitted ☐Conditional ☐Not Allowed ☐Not Listed/Defined Comments: Multifamily dwellings are permitted in TSA-UN-T 21A.26.010 General Provisions: ☒Applicable ☐Not Applicable Are applicable standards complied with? ☐Complies ☐Does Not Comply o Trash Containers (21A.26.010.C.1) • Required to be stored inside or screened (with solid material see 21A.48). ▪ Trash room shown on plans within the building. o Complies o Lighting not directed outside lot (21A.26.010.C.2) • No lighting shown on plans. o Lighting plan will be required for building permit review. o Outdoor Sales/Display/Storage • None. o Parking/Loading/Landscaping/Signs: • See other code review sections for compliance. Base Zoning District Standards 21A.26.078 – TSA-UN-T ☒Applicable ☐Not Applicable Are applicable standards complied with? ☐Complies ☐Does Not Comply o Height (21A.26.078.E): • Min: No minimum • Max: 50’ allowed + one floor ▪ Height shown on plans is 65’ to parapet wall. • Complies o Front Yard Setbacks • No minimum. • At least 50% of façade must be within 5' of the front or corner side property line. ▪ Architecture Site Plan (Pg A0.00) appears to show compliance with this requirement. o Side and Rear Yard Setbacks • None required ▪ Complies ⚫ Page 2 o Minimum Lot Area/Lot Width (21a.26.078.E4): • 2,500 square feet/40 feet. ▪ Properties have not been consolidated – Consolidation is recommended before building permit review. o Open Space Area (21a.26.078.E5): • 1 square foot or open space for every 10 square feet of lot area, up to 2,500 square feet. ▪ Rooftop common space appears to meet this requirement. o Circulation and Connectivity (21A.26.078.E): • No parking lot provided. • Parking prohibited between building façade and front/corner side property line. o EIFS and Stucco Limitation (21A.26.078.F.2.a) • EIFS or traditional stucco is not allowed as a building material on the ground floor of street facing building facades. Stucco is allowed for up to ten percent (10%) of the upper level street facing facades. • Fiber cement paneling and brick veneer will be used as ground floor façade materials. • Approximately 349 square feet of stucco is shown on upper elevations. o Complies. o Front Yard Design Requirements (21A.26.078.F.2.b.(2): • At least 30% of the provided front yard must be covered in live plant material. ▪ May or may not comply. Landscape plan will be required for building permit submission. o Entry Feature Requirements (21A.26.078.F.2.c): All required building entries shall include at least one of the following features: 1) An awning or canopy over the entrance that extends a minimum of five feet (5') from the street facing building facade; 2) A recessed entrance that is recessed at least five feet (5') from the street facing facade; 3) A covered porch that is at least five feet (5') in depth and at least forty (40) square feet in size; or 4) A stoop that is at least two feet (2') above sidewalk level and that includes an awning or canopy that extends at least three feet (3') from the street facing building facade. ▪ Cannot verify with submitted plans. • 5’ recessed entry features included o Complies ⚫Page 3 Overlay Zoning District Standards 21A.34 ☒Applicable ☐Not Applicable Comment: Airport Flight Path Protection Zone H - 21A.34.040 Are applicable standards complied with? ☒Complies ☐Does Not Comply 21A.36 General Provisions: ☒Applicable ☐Not Applicable o Recycling And Construction Waste Management (21a.36.250) o Recycling collection station provided ▪Complies 21A.37 Design Standards ☒Applicable ☐Not Applicable Are applicable standards complied with? ☐Complies ☐Does Not Comply 21a.37.050 Design Standard Regulations #'/% Complies? Comment Ground floor use (%) (21A.37.050A1)80% No* *Application was deemed complete before new active ground floor use requirements were adopted. Ground floor use + visual interest (%) (21A.37.050A2)60/25 N/A Building materials: ground floor (%) (21A.37.050B1)90% Yes 100% durable materials used on ground floor street-facing facade Building materials: upper floors (%) (21A.37.050B2)60% Yes 6% stucco used on upper floors Glass: ground floor (%) (21A.37.050C1)60% Yes 60% glazing used on ground floor Building entrances (feet) (21A.37.050D)40' Yes At least one entrance every 40’ Blank wall: maximum length (feet) (21A.37.050E)15' Yes No blank walls longer than 15’ Street facing facade: maximum length (feet) (21A.37.050F)200' Yes Could not verify with submitted plans Lighting: exterior (21A.37.050H)X ? Lighting not shown on plans Lighting: parking lot (21A.37.050I)X N/A N/A Screening of mechanical equipment (21A.37.050J)X ? Mechanical equipment located on roof and screened by parapet wall Screening of service areas (21A.37.050K)X No Loading berth is not screened. Ground floor residential entrances (21A.37.050L) X N/A ⚫ Page 4 21A.40 Accessory Uses, Buildings, and Structures ☒Applicable ☐Not Applicable Comment: • Ground Mounted Utility Boxes (21A.40.160.C.1.a) • Utility boxes must be set back at least one foot from a side or rear property line. o Utility box shown on plan appears to be set back from the side property line, but a dimension has not been provided. ▪ May or may not comply. Are applicable standards complied with? ☐Complies ☒Does Not Comply 21A.44 Off Street Parking ☒Applicable ☐Not Applicable Are applicable standards complied with? ☐Complies ☐Does Not Comply Comments: • Required Parking Spaces (21A.44.040) o 36 studios = 0 spaces required o 37 one-bedroom = .5 space/DU ▪ 19 spaces required o 32 two/three bedroom = 1 space required/DU ▪ 32 spaces required • 51 spaces required • 51 spaces provided o Complies. • Electric Vehicle Parking (21A.44.040.C) o Each multi-family use shall provide a minimum of one parking space dedicated to electric vehicles for every twenty-five parking spaces provided on-site. ▪ Three electric vehicle parking spaces shown on plans. • Complies. • Accessible Parking (21A.44.040.D) o One ADA parking space is required for every 25 spaces provided. ▪ Two ADA spaces shown on plans. • Complies. ⚫ Page 5 • Bicycle Parking (21A.44.040.E) o 1 bicycle parking space required per 4 units. ▪ Complies. • Off-Street Loading Areas (21A.44.070) o 1 short loading berth required, at least 10’ by 35’. ▪ Loading berth provided. • Complies. 21A.46 Signs ☒Applicable ☐Not Applicable Comment: • A sign is shown on the plan but is not dimensioned. o Sign details to be reviewed with building permit. Are applicable standards complied with? ☒Complies ☐Does Not Comply 21A.48 Landscaping and Buffers ☒Applicable ☐Not Applicable Are applicable standards complied with? ☐Complies ☒Does Not Comply Comment: Standards not complied with: Landscape plan will be required for building permit review. Standards not complied with: • Private Tree Removal: Information regarding existing trees will need to be provided at permits to verify compliance with 21A.48.135 regarding private property tree preservation. The ordinance requires payment to the city for loss of existing trees if not replaced at the required ratios. Existing healthy trees are encouraged to be preserved. 21A.58 Site Plan Requirements ☒Applicable ☐Not Applicable Is all required information shown on site plan? ☐Complies ☒Does Not Comply Missing requirements: A complete plan set with all requirements listed in 21A.58.060 will be required for building permit review. April 3, 2024 RE: 2nd South Apartments MEM ORANDUM To: From: Date: Subject: UHC Trustees David C. Damschen President February 1, 2024 Resolution 2024-03, Reimbursement Resolution for 2nd South Apartments RECOMMENDATION: It is recommended that the Trustees adopt Resolution 2024-03, a reimbursement resolution regarding the issuance of tax-exempt bonds for the financing of a multifamily rental housing project, 2nd South Apartments, located at approximately 934-948 West 200 South, Salt Lake City, Utah 84104. The resolution states UHC's intention of reimbursing certain qualified costs incurred by the Project Owner with proceeds of the tax-exempt bonds. The Internal Revenue Code permits an issuer to pass a reimbursement resolution to enable the owner's qualified expenses incurred in advance of the issuance of bonds to be eligible for financing with tax-exempt bonds. Adoption of the resolution will accomplish the following: •Enable the project owner to incur costs that may be reimbursed with proceeds of the bond issue if sold by UHC. •Enable the project owner to start working on fmancing the project with professionals in the field of tax-exempt bond financing. BACKGROUND: A reimbursement resolution is neither binding on UHC to sell b onds, nor the project owner to use UHC as the issuer for the project. Commitments of that nature will only arise after more information is known about the proposed transaction, and assurances have been given that the bonds will be repaid on time through proper structuring and credit enhancements. A reimbursement resolution must be adopted in order to include the developer's expenses on land or building acquisition, design work, legal expense and so forth, in any project financed by UHC-issued tax-exempt bonds. The reimbursement resolution "starts the clock" for purposes of recovering costs as permitted by the tax code. The project may qualify at a later date for non-competitive, 4% tax credits, once it has received tax-exempt bond authority and the actual issuance of the bonds is expected. Because the 4% credit is non-competitive, the application is not scored and will not be reviewed by the Multifamily Committee. Additional steps must occur before UHC will be committed to sell bonds for the project. The fmancing team must assemble a financing package that will satisfy UHC and the other parties to the transaction. UHC will hold a "TEFRA Hearing" which is a required public hearing to receive comments from the public on the issuance of bonds for the project. The governor must approve the issuance of the bonds. Enclosed herewith is information regarding the project including a brief project description, and a site map. State of Utah Housing Credit Program Qualified Allocation Plan 5/11/23 138 Exhibit 7F COMPREHENSIVE REIMBURSEMENT RESOLUTION CERTIFICATION I hereby certify that the following statements and information, including information contained in any attachments to this Comprehensive Reimbursement Resolution Certification, are, to the best of my knowledge based upon due inquiry, true, accurate and complete. The information is submitted to Utah Housing Corporation in order that _________________ ____________________ (an entity in which I have an interest) may obtain approval for passage of a Reimbursement Resolution for __________________________________________________ (the Project). If the answer to any of the following questions is YES, please provide a signed, comprehensive narrative regarding past and current facts describing the matter on separate pages. Include facts about such real estate developments including a listing of principals related to the real estate development, the financing and Equity sources and the addresses. For the period beginning ten (10) years prior to the date of this certification: 1.Yes No The undersigned is or was a principal in a residential rental project (located in any state) for which an Allocation of Federal Low Income Housing Tax Credits under Section 42 of the Internal Revenue Code of 1986, or Private Activity Bond Volume Cap under Section 146 of the Internal Revenue Code of 1986 was made to the residential rental project or its Developer or sponsor, but which Allocation was not fully utilized and any portion of such Allocation expired and was unable to be utilized within the state of its Allocation. 2.Yes No Neither the undersigned, any Interested Party (as set forth in the attached list), nor a person or entity related to the undersigned or any such Interested Party, had an ownership interest in the residential rental project (including the project site) to be financed at any time during the preceding five (5) years. 3.Yes No The undersigned is or was a principal in a real estate development (located in any state) in which there has been or was alleged to have been a default or Non-Compliance regarding: Tax-exempt bond compliance requirements, or Low Income Housing Tax Credit compliance requirements, or A mortgage loan, construction, bridge or interim loan (including any assignment, deed-in-lieu of foreclosure, foreclosure, or lender relief) or Real estate development partnership or operating (investor) agreements, or Rent-up / vacancy requirements, or Federal, state or local building, housing maintenance and/or construction codes or laws. 2nd South Apartments West 200 South UT, LLLP X X X State of Utah Housing Credit Program Qualified Allocation Plan 5/11/23 139 4.Yes No There is or has been litigation or a judgment related to: The ownership or operation of any real estate which could materially and adversely impact the financial condition of the undersigned, or The undersigned’s ownership interest in any real estate ownership, development, or management entity, or Any entity in which the undersigned owns a significant interest (5% or greater) which could materially and adversely impact the entity’s financial condition. 5.Yes No There are unresolved findings raised as a result of audits, management reviews or other investigations by federal, state, or local government entities concerning the undersigned or real estate developments in which the undersigned is a principal. 6.Yes No The undersigned has been convicted of or plead guilty to fraud, a felony, or securities violation or is presently the subject of a material civil complaint, criminal charge, or indictment charging fraud, felony, or securities violation. (A felony is defined as any offense punishable by imprisonment for a term exceeding one year but does not include any offense classified as a misdemeanor under the laws of a state and punishable by imprisonment of two years or less). 7.Yes No The undersigned has been suspended, disbarred, debarred or otherwise restricted by any department or agency of the federal government or any state from doing business with such department or agency. 8.Yes No The undersigned is or was the subject of any bankruptcy or insolvency proceeding or is subject to unsatisfied liens or judgments. 9.Yes No The Project or the land upon which it is located, or any other real estate development in which the undersigned is a principal has any environmental or hazardous violations claimed against it. 10.Yes No The Project is located in a jurisdiction in which there is a court decision or court entered plan to address housing desegregation or remedy some other violation of law. [If the Project is located in such a jurisdiction provide the evidence for your conclusion that it is consistent with such court decision or court entered plan in an attachment to this omnibus certification]. Name ________________________________________ Title _________________________________________ % of Interest in Project Developer: _________ % (check one box) Signature _____________________________________ X X X X X X X X 100 Charles A. Schmid Date February 5, 2024_________________________________________ Trustee of the Charles A. Schmid Living Trust