February 5, 2025
Jack Waldher
JF 9th Note Partners QOZB, LLC
1216 W Legacy Crossing Blvd
Suite 300
Centerville, UT 84014
RE: Transit Station Area Development Score Review for Petition PLNTSD2025-00026
9th Note at 915 W North Temple
Dear Jack Waldher,
This letter is a notification of the development score review as determined by the Planning Department
staff. Pursuant to Chapter 21A.10 of the Salt Lake City Zoning Ordinance, a notice of application was sent
out on January 23, 2025. The noticing period ended on February 4. No response was received from
abutting property owners related to the project. After completing a review of the revised plans, staff gave
the proposed building a score of 191 out of the submitted 203 points.
Please see the attached scoring sheets for more information. This means that no public hearing is
required, and the project is now authorized to go through the standard building permit process. The
project is approved with the following conditions:
• Any significant changes made to the approved plans, elevations or site plan must be approved by the
Planning Department.
As the applicant, you have the option to appeal this development score review to the Planning
Commission. If you chose to appeal, a public hearing will be required per the requirements of the Salt
Lake City Zoning Ordinance.
If you are satisfied with the score given, you can continue with your building permit submittal with
Building Services. A full zoning review will be completed as part of the building permit review to verify
that the drawings submitted for your building permit comply with the applicable zoning requirements.
Additionally, the plans submitted for your development score will be compared with the plans submitted
for your building permit, and you will be notified if there are any discrepancies between the two set s. If
you have any further questions about this process, please contact me at 801-535-7758 or by e-mail at:
seth.rios@slc.gov.
Sincerely,
Seth Rios
Principal Planner
Enc.
• TSA Score Sheet
• Preliminary Zoning Review
cc: File
Transit Station Area Development Guidelines Checklist
See full Design Guideline document for all applicable point details.
CA
T
E
G
O
R
Y
(Unless otherwise noted, points may
only be obtained from one item in
each guideline section.)
GUIDELINE SECTION ITEM DESCRIPTION VA
L
U
E
AP
P
L
I
C
A
N
T
R
E
V
I
E
W
ST
A
F
F
R
E
V
I
E
W
More than 50 dwelling units per acre;
Buildings that are up to 80% of the allowable building height;
or
Buildings with a Floor to Lot Area ration of 3 or more. 20 20 20
More than 30 dwelling units per acre;
Buildings that are up to 70% of the allowable building height;
or
Buildings with a floor to lot area ratio of 2 or more.15
More than 20 dwelling units per acre;
Buildings that are at least 60% of the allowable building
height; or
Buildings with a floor to lot area ratio of 1 or more.10
More than 25 dwelling units per acre;
Buildings that are up to 80% of the allowable building height;
or
Buildings with a Floor to Lot Area ratio of 2 or more.12
More than 20 dwelling units per acre;
Buildings that are up to 70% of the allowable building height;
or
Buildings with a floor to lot area ratio of 1.5 or more.8
More than 15 dwelling units per acre;
Buildings that are at least 60% of the allowable building
height; or
Buildings with a floor to lot area ratio of 1 or more.5
100% of the gross floor area on the ground floor is dedicated to
a use different than what is on the floors above. 20 15 15
At least 75% of the gross floor area on the ground floor is
dedicated to a use different than what is on the floors above. 15
At least 50% of the gross floor area on the ground floor is
dedicated to a use different than what is on the floors above.10
A project that includes at least two uses that are different than
existing uses on adjacent properties.
6
La
n
d
U
s
e
1.A. Intensity and Density of Use
(Applicable to Core Area Only.)
A project that meets at least one of the
following requirements:
1.B. Intensity and Density of Use
(Applicable to Transition Area only.)
A project that meets at least one of the
following requirements:
2. Integrated Mixed of Uses:
If the ground floor of a building is
designed for retail, restaurant, or other
use other than residential on the
ground floor. The guideline applies to
street facing habitable space only and
not the entire ground floor area. The
following points shall be added to the
development score:
85% provided
NOTES
With 110 units on the parcel of
0.745 acres, the units per acre is
147.
July 2017 1 of 6 Subtotal (For Page):
Transit Station Area Development Guidelines Checklist
See full Design Guideline document for all applicable point details.
33% or more of the total dwelling units.
40 40 40
20% or more of the total dwelling units.
30
10% or more of the total dwelling units.
20
Areas rated 5 or greater
20
Area rated 3 or greater
10
33% or more of the total dwelling units.8
15% or more of the total dwelling units 5
10% or more of the total dwelling units.3
A minimum of 1500 square feet.15
A minimum of 1000 square feet 10
A minimum of 500 Square feet 5
50% or more of the existing surface parking lot is covered by
new buildings.15 15 15
35% or more of the existing surface parking lot is covered by
new buildings.10
25% or more of the existing surface parking lot is covered by
new buildings.5
A new building that meets the standards of the TSA zoning
district and replaces a building that does not meet the
standards.10 10 10
A project that includes replacing a nonconforming use with a
use that is allowed in the TSA zoning district.
5
8. Removal of Billboards
A project that includes redevelopment
of a site containing a billboard:
An existing billboard is legally removed by the developer as
part of a redevelopment project.10
The project utilizes a roof design, such as a landscaped roof,
that is intended to reduce energy use, storm drainage runoff or
other similar sustainable policy of the City.10
The project utilizes landscape designs and materials that
conserves energy, reduces the urban heat island, conserves
water, retains or reuses storm drainage or other similar
sustainable policy of the City. Documentation must be
provided to indicate how the project will incorporate this
guideline.5
La
n
d
U
s
e
Bu
i
l
d
i
n
g
a
n
d
S
i
t
e
D
e
s
i
g
n
5. Community Serving Uses
Projects the include the following area
of community serving uses:
(Refer to Guidelines for qualifying
uses.)
6. Redevelopment of Surface Parking
Lots
A project that includes the
redevelopment of an existing surface
parking lot to an active use or
structured parking:
7. Redevelopment of
Nonconforming Use or
Noncomplying Building
A project that includes redevelopment
of a site containing a nonconforming
use or non-complying building:
4. Accessible Dwelling Units
A project which includes dwelling
units designed as ADA accessible:
3.A. Mixed Income Housing
A project that includes affordable
housing available to those with 60%
or less of the median household
income of the City for sale or lease
shall have the following number of
points added to the development
score:
3.B. Mixed Income Housing
An affordable housing project that is
located in an area identified in the
“Opportunity Index” map (as used in
the latest available Utah Housing
Corporation Allocation Plan) or its
successor as determined by the
Planning Director, with a rating of at
least 3 or greater shall receive the
following points:
9. Sustainable Site and Open Space
Design
A project that incorporates adopted
sustainable policies of the City:
(Points may be obtained from both
items.)
100% of all three surface parking
lots will be covered by new
buildings
100% of the units will be rented to
those to those at 60% AMI
Existing building does not comply
with the 5 foot front yard setback
requirement and is noncomplying.
July 2017 2 of 6 Subtotal (For Page):
Transit Station Area Development Guidelines Checklist
See full Design Guideline document for all applicable point details.
Platinum 50
Gold 40
Silver 30
1.The project is certified as having 100%of its energy needs
served by renewable power either from on or off-site sources.
If development relies on off-site power,documentation must be
provided showing at least 20 year commitment to power source
50
2.The project is certified as having 50%its energy needs
served by renewable power either from on or off-site sources.
If development relies on off-site power,documentation must be
provided showing at least 20 year commitment to power source
25
3.Solar array:5 points for every 500 square feet of solar
panels. Maximum 20 points.20
4. Geothermal heating and cooling systems 10
5.The project is designed with passive,energy efficient
features that include awnings or solar shades over all windows,
or other similar passive energy saving features. 5
Architectural detailing is wrapped around all four sides.See
guideline document for specific detailing requirements. 20
Architectural detailing is wrapped around both side facades of
a building,but not on the rear façade.See guideline document
for specific detailing requirements.15
Local Register:New construction,major alterations and
additions that are approved by the Historic Landmark
Commission that include reuse of the site.40
National Register:State Historic Preservation Office review
and approval of exterior alterations to buildings not locally
designated,but on the national register and seeking federal tax
credits 40
Projects that are adjacent to a local or national designated
property that are compatible with the historic property through
building mass and bulk,setbacks and design features as
determined by the Planning Director 20
Local Register:Projects that receive administrative approval
in accordance with Zoning Ordinance Section 21A.34.020.5
Projects that add historically significant sites to the Salt Lake
City Register of Cultural Resources if they qualify as defined in
Zoning Ordinance Section 21A.34.50
Bu
i
l
d
i
n
g
a
n
d
S
i
t
e
D
e
s
i
g
n
10. Green Building
The following points will be awarded
based on the level of LEED
certification:
11. Energy Efficiency
Projects that incorporate energy
efficiency into the design of the
project shall have the following points
added to the development score:
(For guidelines 1 through 4, points
may only be obtained from one item.
Points from guidelines 1 through 4
may be combined with points from
guideline 5.)
12. 360 Degree Architecture
A project that incorporates
architecture features on building
facades that are not adjacent to a
street:
(See Guideline for required
elements.)
13. Historic Preservation
Projects that preserve, rehabilitate,
restore, reuse a historic property or
new construction that contributes to
the character of a historic property or
district:
July 2017 3 of 6 Subtotal (For Page):
Transit Station Area Development Guidelines Checklist
See full Design Guideline document for all applicable point details.
At least 80%of the street facing façades above the ground
floor are clad in durable,high quality materials,as listed
above, excluding glazing, doors, and trim 20 0 0
At least 70%of the street facing facades above the ground
floor are clad in high quality,durable materials as listed above,
excluding glazing, doors, and trim 15
15. Corner Buildings
Buildings located on the corners of
intersecting streets that address both
streets:
When located on the corner of two intersecting streets,the
primary entrance of the building addresses the corner by
including a hinged,rounded,beveled,open bay,mitered
orientation or similar entrance feature.10 10 0
A rooftop of a building is used as a common space for the
building occupants.6
A roof includes at least one of the following design features:
Two or more sloping planes visible from a public street;
An arched or barrel vaulted design;
A distinguishable cornice or parapet;
Overhangs that are a minimum of 12 inches in depth to create a
shadow line.
5
17. Eyes on the Street and Public
Spaces
Buildings that are designed to have
windows, doors, balconies or other
similar features facing public streets
and open spaces:
Operable openings,balconies,verandas or other similar
features on all levels of the building that face a public space
and allow visibility into the public space.Balconies need to
have a minimum depth of 5 feet and include at least 30 square
feet of space
15 15 15
18. Lighting
A project that includes a lighting plan
that accomplishes at least one of the
following:
Casts light from store fronts onto the sidewalk;
Highlights unique architectural features of a building; or
Highlights artwork or unique landscape features.
6 6 6
A sign that is mounted perpendicular to the primary building
façade and oriented to the pedestrian (projecting business
storefront sign).2 2 0
An awning or canopy sign that is integrated into the design of
the building.2
A monument sign that is integrated into the site and compatible
with the building architecture.2
A project includes a minimum of 15% of the total lot area.15
A project includes a minimum of 10% of the total lot area.10
A project includes a minimum of 5% of the total lot area.
5
A public space,regardless of size,that is located near a transit
station and includes seating,art,protection from the elements
or other feature intended to activate the space or make it
comfortable (must be within 330 feet of transit station).3
Bu
i
l
d
i
n
g
a
n
d
S
i
t
e
D
e
s
i
g
n
Pu
b
l
i
c
S
p
a
c
e
s
20. Public Spaces and Plazas
Projects that include active, outdoor
spaces, that are accessible to the
public and adjacent to a public right
of way:
16. Rooftop Design and Use
A project that incorporates a rooftop
use:
(Points may be obtained from both
items.)
19. Signs
Signs that meet the intent of this
guideline shall have the following
points added to the development
score:
14. Building Materials
Projects that incorporate high quality,
durable and low maintenance building
materials:
100% of the material on the upper
floors is metal panel that has not
been approved or verified by the
Planning Director
Northeast corner of the building is
almost flat and does not look to be
beveled at a 45 degree angle as in
the TSA guidelines
Windows open and are operable on
all levels of the building, meeting
this requirement.
Sheet G004 says that there will be
lights over commercial space casting
onto the sidewalk. The projecting
building sign will also be lit up
Business signs looks to be flat signs,
while the overall apartment sign is a
projecting building sign. No points
July 2017 4 of 6 Subtotal (For Page):
Transit Station Area Development Guidelines Checklist
See full Design Guideline document for all applicable point details.
At least 4 street furnishings 3 3 3
At least 3 street furnishings 2
At least 2 street furnishings 1
22. Public Artwork
Projects that include public art in a
location where it is readily visible
from a public space:
2 points per art piece, up to a maximum of 6 points
6 4 4
Projects that include a minimum six foot wide ADA accessible
walkway through a parking lot that is separated from vehicle
drive aisles.4
Projects that include a minimum six foot wide ADA accessible
sidewalk from private property to public open spaces.
4
The project includes lockers,changing rooms for cyclists and
showers.6 3 3
The project includes any bicycle amenity identified in the
Bicycle Amenity section of the Transit Station Area
Development Guidelines.3
The project incorporates art into the design of the bicycle
amenity.3
The project is located within 300 feet,measured along the most
direct, legal walking path.
15 10
The project is located within 750 feet,measured along the most
direct, legal walking path.
10 10
The project is located within 1500 feet,measured along the
most direct legal walking path.
5
25.B. Access to Transit:
A development that provides transit
passes to residents as follows:
A multi-family residential development that provides transit
passes to residents through the City’s transit pass program for a
minimum period of three years from the development’s initial
occupancy.Passes shall be available for free to residents at
request.At least one pass shall be available per unit.
Verification from Transportation division of minimum 3 year
participation is required.15
The project includes a narrow street or alley through the
project that accommodates people walking, biking and driving.30
The project includes a walkway accessible to the public that is
a minimum of 10 feet wide that connects through the property
to a public space,such as park,trail or street or similar area
and allows for the walkway to be continued on adjacent
properties.20
Ci
r
c
u
l
a
t
i
o
n
23. Connections and Walkways
Projects that include connections and
walkways from buildings, parking lots
and private open space to public
spaces:
(Points may be obtained from both
items.)
24. Bicycle Amenities
A project that includes bicycle
parking amenities in addition to what
is already required in the zoning
ordinance:
(Points may be obtained from
multiple items.)
26. Public Walkways Interior to the
Block
A development that includes public
walkways through the interior of
blocks:
(To qualify for these points, the
walkways cannot be fenced or gated.)
Pu
b
l
i
c
S
p
a
c
e
s
21. Streetscape Amenities
A project that includes street
furniture, pedestrian amenities, public
art or other similar features intended
to improve the streetscape:
25.A. Access to Transit:
A project located within close
proximity to a transit station shall
have the following number of points
added to the development score:
(Applies to any TRAX or Frontrunner
station platform or any bus stop
where three or more separate bus
routes come together.)
5 streetscape amenities provided on
the north side of the building
1 art installation on north side,
second story, and 1 on the east side
on the ground level
Secure indoor parking
The legal walking path to the nearest
transit station is approximately 550
feet from the building entrance.
July 2017 5 of 6 Subtotal (For Page):
Transit Station Area Development Guidelines Checklist
See full Design Guideline document for all applicable point details.
100%of the parking structure is wrapped with high quality,
durable materials or habitable space with a depth of at least 25’
on all street facing facades.25 25
75%of the parking structure is wrapped in high quality,
durable materials or habitable space with a depth of at least 25’
on all street facing facades.20 25
For below grade parking structures,there is no visible evidence
of the parking garage other than the parking entrance.The
ground floor uses must have entrances at grade,without the use
of ramps, to qualify.25
Parking for alternative fuel vehicles,scooters,mopeds,
motorcycles,or other similar vehicle is provided at a rate equal
to 7% of the total number of spaces provided for automobiles.5
A project includes dedicated parking stalls/equipment for a car
sharing program.3
A project includes a charging station for electric vehicles:
Level 1 Station: 2 pts per stall, max. 6
Level 2 Station: 3 pts per stall, max 9
Level 3 Station: 4 pts per stall, max. 12 12
Residential developments with a parking ratio less than 1 stall
per unit: 25 25
Residential development with a parking ratio less than 1.25
stall per unit 15 25
Non-residential developments with a parking ratio less than 2
stalls per 1,000 gross square feet 20
Projects that have been presented to the associated community
council and have notified residents and property owners within
300 feet via mail about when and where the community council
presentation will be held 10
Projects that have been presented at an open house for the
proposal on the development site and have notified residents
and property owners within 300 feet via mail about when and
where the open house will be held 10
Approval Process Ap
p
l
i
c
a
n
t
To
t
a
l
St
a
f
f
T
o
t
a
l
Planning Commission Review Required 124 points or less 203 191
Administrative (Staff) Approval 125 points or more 203 191
27. Parking Struture Design
Parking structures that incorporate the
following:
29. Parking Ratios
Projects that provide parking in the
ratios indicated:
Co
m
m
u
n
i
t
y
En
g
a
g
e
m
e
n
t
30. Neighborhood Input
Pa
r
k
i
n
g
28. Alternative Vehicle Parking
Projects that include dedicated
parking stalls for alternative fuel
vehicles, scooters, mopeds or
motorcycles:
(Points may be obtained from
multiple items.)
There is 25 feet of habitable
commercial space on both street
facing facades. The patterned
concrete is technically considered a
durable material and is wrapped
around the entire parking garage.
0
0.48 parking stalls per unit
July 2017 6 of 6 Subtotal (For Page):
Zoning Comments that will need to be addressed in the Building Permit Stage
915 West North Temple
TSA-UN-C Zone
Chapter 21A.26.078.E.2- TSA Building Height Regulations
The elevations need to be updated to include height measurements to the highest point of the
building. This includes the stairway tower. The stairway tower is allowed to go taller than the 75’
height limit, but even the building is showing 75’ 2”, which is a few inches over the TSA zone
height limit. This will need to be corrected in the building permits phase.
Chapter 21A.37.050.B.4 TSA Design Standard Upper Floor Building Material
“4. Upper Floor Building Materials: Floors above the ground floor level shall include
durable materials on a minimum amount of any street facing building facade of those
additional floors according to Section 21A.37.060, Table 21A.37.060 of this chapter.
Windows and doors are not included in that minimum amount. Durable materials
include stone, brick, masonry, textured or patterned concrete, and fiber cement board
or other material that includes a minimum manufacturer warranty of twenty (20)
years from color fading, weather, and local climate induced degradation of the
material.”
You will need to show that the proposed metal paneling has a warranty for 20 years because it is
not one of the listed durable materials.
Chapter 21A.37.050.F.2.b.2- TSA Front and Corner Side Yard Landscaping and Outdoor Space
Requirement
(2) At least fifty percent (50%) of the front or corner side yards shall be covered in live
plant material. This can include raised planter boxes. This percentage can be reduced
to thirty percent (30%) if the yard includes outdoor dining, patios, outdoor public
space, or private yards for ground floor residential uses that cover at least fifty percent
(50%) of the provided front or corner side yard.
(3) At least thirty percent (30%) of the front or corner side yard shall by occupied by
outdoor dining areas, patios, outdoor public space, or private yards for ground floor
residential uses.”
A site or landscaping plan will need to show compliance with these two standards. You will need
to show the total square footage of the front and corner side yard and then demonstrate how you
meet the minimum two percentage requirements. I could not find a measurement of this
number in the existing plans.
Chapter 21A.F.2.c TSA Entry Feature Requirement
“c. Entry Feature Requirements: All required building entries shall include at least one of the
following features:
(1) An awning or canopy over the entrance that extends a minimum of five feet (5')
from the street facing building facade;
(2) A recessed entrance that is recessed at least five feet (5') from the street facing
facade;
(3) A covered porch that is at least five feet (5') in depth and at least forty (40) square
feet in size; or
(4) A stoop that is at least two feet (2') above sidewalk level and that includes an
awning or canopy that extends at least three feet (3') from the street facing building facade.”
I see that the proposal has awnings on the east and north sides of the building. The site plan will
need to show that they extend at least 5 feet from the facades to meet this requirement.
Chapter 21A.44.060.A.6.b.9 Vehicle Staging Requirement
(9) Garage Doors and Vehicle Staging: All driveways providing access to a garage
shall have a minimum vehicle staging area. Garage doors for passenger vehicles shall
be setback at least 17 feet 6 inches from the back edge of sidewalk, or property line
when a sidewalk is not provided. Garage doors for large trucks shall be setback at least
100 feet from back edge of sidewalk, or property line when a sidewalk is not provided.
This requirement does not apply to garage doors abutting alleys.
I could not find a measurement in the plans that demonstrated compliance with this
requirement. When I checked the distance in Bluebeam, it looked like the proposal compliance
with this requirement. It just needs to be clearly shown in the plans.
Chapter 21A.48 Landscaping
You will need to provide plans that show compliance with this chapter of the zoning ordinance.
Chapter 21A.46 Signs
Your plans show two projecting building signs on the building. Projecting signs are only allowed
in this zone if they are oriented for individual storefronts. There are very strict size limitations
for storefront oriented projecting signs. The current design, where the projecting building signs
advertise the name of the apartment building, would not be allowed in the TSA zone.