Loading...
HomeMy WebLinkAboutSigned TSA LetterERIN MENDENHALL DEPARTMENT of COMMUNITY Mayor and NEIGHBORHOODS PLANNING DIVISION SALT LAKE CITY CORPORATION 451 SOUTH STATE STREET, ROOM 406 WWW.SLC.GOV P.O. BOX 1580, SALT LAKE CITY, UTAH 84114 TEL 801.535.7757 October 1, 2025 Brandon Broadstone Office DFK 333 West Pierpont Ave Suite 4 Salt Lake City, UT 84101 RE: Transit Station Area Development Score Review for Petition PLNTSD2025-00701 Trophies Townhomes at 831 West 100 South Dear Brandon, This letter is a notification of the development score review as determined by the Planning Department staff. Pursuant to Chapter 21A.10 of the Salt Lake City Zoning Ordinance, a notice of application was sent out on Wednesday, July 23, 2025. The noticing period ended on Monday, August 4, 2025. No response was received from abutting property owners related to the project. After completing a review of the revised plans, staff has given the proposed building a score of 135 out of the submitted 166 points. Please see attached scoring sheets for more information. This means that no public hearing is required, and the project is now authorized to go through the standard building permit process. The project is approved with the following conditions: • The location of the refuse containers needs to be included in the final plans. Per 21A.26.010.C.1, “Refuse containers must be covered and shall be stored within completely enclosed buildings or screened.” As the applicant, you have the option to appeal this development score review to the Planning Commission. If you choose to appeal, a public hearing will be required per the requirements of the Salt Lake City Zoning Ordinance. If you are satisfied with the score given, you can continue with your building permit submittal with Building Services. A full zoning review will be completed as part of the building permit review to verify that the drawings submitted for your building permit comply with the applicable zoning requirements. Additionally, the plans submitted for your development score will be compared with the plans submitted for your building permit, and you will be notified if there are any discrepancies between the two sets. If you have any further questions about this process, please contact me at 801-535-7758 or by e-mail at: seth.rios@slc.gov. Sincerely, Seth Rios Principal Planner Enc. • TSA Score Sheet • Preliminary Zoning Review cc: File Transit Station Area Development Guidelines Checklist See full Design Guideline document for all applicable point details. CA T E G O R Y (Unless otherwise noted, points may only be obtained from one item in each guideline section.) GUIDELINE SECTION ITEM DESCRIPTION VA L U E AP P L I C A N T R E V I E W ST A F F R E V I E W More than 50 dwelling units per acre; Buildings that are up to 80% of the allowable building height; or 20 Buildings that are up to 70% of the allowable building height; or 15 Buildings that are at least 60% of the allowable building height; or Buildings with a floor to lot area ratio of 1 or more.10 More than 25 dwelling units per acre; Buildings that are up to 80% of the allowable building height; or Buildings with a Floor to Lot Area ratio of 2 or more.12 12 12 Buildings that are up to 70% of the allowable building height; or Buildings with a floor to lot area ratio of 1.5 or more.8 Buildings that are at least 60% of the allowable building height; or Buildings with a floor to lot area ratio of 1 or more.5 100% of the gross floor area on the ground floor is dedicated to a use different than what is on the floors above. 20 dedicated to a use different than what is on the floors above. 15 dedicated to a use different than what is on the floors above.10 existing uses on adjacent properties. 6 33% or more of the total dwelling units. 40 20% or more of the total dwelling units. 30 10% or more of the total dwelling units. 20 Areas rated 5 or greater 20 Area rated 3 or greater 10 33% or more of the total dwelling units.815% or more of the total dwelling units 5 10% or more of the total dwelling units.3 A minimum of 1500 square feet.15 A minimum of 1000 square feet 10 With 6 units on the parcel of 0.16 acres, the units per acre is 37.5. 4. Accessible Dwelling Units A project which includes dwelling units designed as ADA accessible: 1.A. Intensity and Density of Use (Applicable to Core Area Only.) following requirements: 1.B. Intensity and Density of Use (Applicable to Transition Area only.) A project that meets at least one of the following requirements: 2. Integrated Mixed of Uses: If the ground floor of a building is use other than residential on the street facing habitable space only and not the entire ground floor area. The following points shall be added to the development score: 3.A. Mixed Income Housing A project that includes affordable housing available to those with 60% or less of the median household income of the City for sale or lease shall have the following number of points added to the development 3.B. Mixed Income Housing An affordable housing project that is located in an area identified in the “Opportunity Index” map (as used in the latest available Utah Housing Corporation Allocation Plan) or its successor as determined by the Planning Director, with a rating of at least 3 or greater shall receive the following points: La n d U s e La n d U s e Projects the include the following area of community serving uses:July 2017 1 of 5 Subtotal (For Page): Transit Station Area Development Guidelines Checklist See full Design Guideline document for all applicable point details. A minimum of 500 Square feet 5 50% or more of the existing surface parking lot is covered by new buildings. 35% or more of the existing surface parking lot is covered by new buildings.15 15 25% or more of the existing surface parking lot is covered by new buildings.5 A new building that meets the standards of the TSA zoning district and replaces a building that does not meet the standards. 10 10 10 use that is allowed in the TSA zoning district. 5 A project that includes redevelopment of a site containing a billboard: part of a redevelopment project.10 The project utilizes a roof design, such as a landscaped roof, that is intended to reduce energy use, storm drainage runoff or other similar sustainable policy of the City.10 5 0 conserves energy, reduces the urban heat island, conserves water, retains or reuses storm drainage or other similar sustainable policy of the City. Documentation must be provided to indicate how the project will incorporate this guideline.5 Platinum 50 Gold 40 Silver 30 1.The project is certified as having 100%of its energy needs served by renewable power either from on or off-site sources. If development relies on off-site power,documentation must be provided showing at least 20 year commitment to power source 50 5 0 2.The project is certified as having 50%its energy needs served by renewable power either from on or off-site sources. If development relies on off-site power,documentation must be provided showing at least 20 year commitment to power source 25 3.Solar array:5 points for every 500 square feet of solar panels. Maximum 20 points. 4. Geothermal heating and cooling systems 10 5.The project is designed with passive,energy efficient features that include awnings or solar shades over all windows, or other similar passive energy saving features. 5 Architectural detailing is wrapped around all four sides.See guideline document for specific detailing requirements. 20 a building,but not on the rear façade.See guideline for specific detailing requirements.15 15 15 Local Register:New construction,major alterations and additions that are approved by the Historic Landmark 40 and approval of exterior alterations to buildings not locally designated,but on the national register and seeking federal 40 plans facades and inset 2 inches into the wall plane. The building material changes also qualify. the building setback, which does not comply with the 5 foot maximum setback limitation of the TSA zone. The existing building is a noncomplying structure different material, so this does not count. 9. Sustainable Site and Open Space Design A project that incorporates adopted sustainable policies of the City: (Points may be obtained from both items.) 10. Green Building The following points will be awarded based on the level of LEED certification: 11. Energy Efficiency Projects that incorporate energy efficiency into the design of the added to the development score: (For guidelines 1 through 4, points may only be obtained from one item. Points from guidelines 1 through 4 may be combined with points from guideline 5.) 12. 360 Degree Architecture A project that incorporates architecture features on building facades that are not adjacent to a street: (See Guideline for required elements.) 13. Historic Preservation Projects that preserve, rehabilitate, restore, reuse a historic property or new construction that contributes to the character of a historic property or district: Bu i l d i n g a n d S i t e D e s i g n Bu i l d i n g a n d S i t e D e s i g n (Refer to Guidelines for qualifying uses.) Parking Lots A project that includes the redevelopment of an existing surface parking lot to an active use or structured parking: 7. Redevelopment of Nonconforming Use or Noncomplying Building A project that includes redevelopment of a site containing a nonconforming use or non-complying building: July 2017 2 of 5 Subtotal (For Page): Transit Station Area Development Guidelines Checklist See full Design Guideline document for all applicable point details. Projects that are adjacent to a local or national designated property that are compatible with the historic property through building mass and bulk,setbacks and design features as determined by the Planning Director 20 in accordance with Zoning Ordinance Section 21A.34.020.5 City Register of Cultural Resources if they qualify as defined in Zoning Ordinance Section 21A.34.50 At least 80%of the street facing façades above the ground floor are clad in durable,high quality materials,as listed 20 20 20 At least 70%of the street facing facades above the ground floor are clad in high quality,durable materials as listed above, excluding glazing, doors, and trim 15 Buildings located on the corners of intersecting streets that address both streets: primary entrance of the building addresses the corner including a hinged,rounded,beveled,open bay,mitered orientation or similar entrance feature.10 10 10 A rooftop of a building is used as a common space for the building occupants.6 6 6 A roof includes at least one of the following design features: Two or more sloping planes visible from a public street; An arched or barrel vaulted design; A distinguishable cornice or parapet; Overhangs that are a minimum of 12 inches in depth to a shadow line. 5 Spaces Buildings that are designed to have windows, doors, balconies or other similar features facing public streets and open spaces: features on all levels of the building that face a public and allow visibility into the public space.Balconies need have a minimum depth of 5 feet and include at least 30 feet of space 15 15 15 18. Lighting A project that includes a lighting plan that accomplishes at least one of the following: Highlights unique architectural features of a building; or Highlights artwork or unique landscape features.6 6 A sign that is mounted perpendicular to the primary building façade and oriented to the pedestrian (projecting 2 0 the building. 2 2 0 with the building architecture. 2 A project includes a minimum of 15% of the total lot area.15 A project includes a minimum of 10% of the total lot area.10 A project includes a minimum of 5% of the total lot area.5 A public space,regardless of size,that is located near a transit station and includes seating,art,protection from the elements or other feature intended to activate the space or make it comfortable (must be within 330 feet of transit station).3 includes lighting information for balconies highlighting the recess of the wall plane. the submittal materials. The sign awning sign, or monument sign durable materials on 100% of all street facing facades requirement for corner buildings. and are at least 5 feet in depth 14. Building Materials Projects that incorporate high quality, materials: 16. Rooftop Design and Use A project that incorporates a rooftop use: (Points may be obtained from both items.) 19. Signs Signs that meet the intent of this guideline shall have the following points added to the development score: Bu i l d i n g a n d S i t e D e s i g n Pu b l i c S p a c e s Projects that include active, outdoor spaces, that are accessible to the public and adjacent to a public right of way: July 2017 3 of 5 Subtotal (For Page): Transit Station Area Development Guidelines Checklist See full Design Guideline document for all applicable point details. At least 4 street furnishings 3 At least 3 street furnishings 2 At least 2 street furnishings 1 Projects that include public art in a location where it is readily visible from a public space:6 2 Projects that include a minimum six foot wide ADA accessible walkway through a parking lot that is separated from vehicle drive aisles.4 sidewalk from private property to public open spaces. 4 The project includes lockers,changing rooms for cyclists and showers. The project includes any bicycle amenity identified in the Bicycle Amenity section of the Transit Station Area 3 amenity.3 The project is located within 300 feet,measured along the most direct, legal walking path. 15 most direct, legal walking path. 10 most direct legal walking path.5 A development that provides transit passes to residents as follows: passes to residents through the City’s transit pass program for a minimum period of three years from the development’s initial occupancy.Passes shall be available for free to residents at request.At least one pass shall be available per unit. Verification from Transportation division of minimum 3 year participation is required.15 The project includes a narrow street or alley through the project that accommodates people walking, biking and driving.30 The project includes a walkway accessible to the public that is a minimum of 10 feet wide that connects through the to a public space,such as park,trail or street or similar area and allows for the walkway to be continued on adjacent properties.20 100%of the parking structure is wrapped with high quality, durable materials or habitable space with a depth of at least on all street facing facades.25 75%of the parking structure is wrapped in high quality, durable materials or habitable space with a depth of at least on all street facing facades.20 For below grade parking structures,there is no visible evidence of the parking garage other than the parking entrance. ground floor uses must have entrances at grade,without use of ramps, to qualify.25 Parking for alternative fuel vehicles,scooters,mopeds, motorcycles,or other similar vehicle is provided at a rate to 7% of the total number of spaces provided for automobiles.5 3 elevation. 25.A. Access to Transit: A project located within close proximity to a transit station shall have the following number of points added to the development score: (Applies to any TRAX or Frontrunner station platform or any bus stop where three or more separate bus routes come together.) 27. Parking Struture Design Parking structures that incorporate the following: Pa r k i n g Projects that include dedicated parking stalls for alternative fuel vehicles, scooters, mopeds or motorcycles: Ci r c u l a t i o n Projects that include connections and walkways from buildings, parking lots and private open space to public spaces: (Points may be obtained from both items.) 24. Bicycle Amenities A project that includes bicycle parking amenities in addition to what is already required in the zoning ordinance: (Points may be obtained from multiple items.) 26. Public Walkways Interior to the Block A development that includes public walkways through the interior of blocks: (To qualify for these points, the walkways cannot be fenced or gated.) Pu b l i c S p a c e s 21. Streetscape Amenities A project that includes street art or other similar features intended July 2017 4 of 5 Subtotal (For Page): Transit Station Area Development Guidelines Checklist See full Design Guideline document for all applicable point details. A project includes a charging station for electric vehicles: Level 1 Station: 2 pts per stall, max. 6 Level 2 Station: 3 pts per stall, max 9 Level 3 Station: 4 pts per stall, max. 12 12 18 Residential developments with a parking ratio less than 1 stall per unit: 25 Residential development with a parking ratio less than 1.25 stall per unit 15 15 15 Non-residential developments with a parking ratio less than 2 stalls per 1,000 gross square feet 20 Projects that have been presented to the associated community council and have notified residents and property owners within 300 feet via mail about when and where the community 10 10 0 Projects that have been presented at an open house for the proposal on the development site and have notified residents and property owners within 300 feet via mail about when and where the open house will be held 10 Approval Process St a f f To t a l Planning Commission Review Required 166 135 Administrative (Staff) Approval 166 135 level 2 stations are maxed out at 9 points. 4 stalls is good for 9 points presented at a community council meeting 29. Parking Ratios Projects that provide parking in the ratios indicated: Co m m u n i t y En g a g e m e n t 30. Neighborhood Input (Points may be obtained from multiple items.) July 2017 5 of 5 Subtotal (For Page): 831 W 100 S TSA Review Requirement Proposed Zoning/Use Single Family attached The townhomes will be on their own lot and will be for sale Permitted in the TSA zones. Zone TSA UN T Transit Station Area Urban Neighborhood Tranisiton General Provisions Refuse containers must be covered All light directed on-site Need to show where garbage will be stored on site Sidwell 15-02-232-001-0000 Subdivision Franklin Subdivision Number of dwelling units No minimum or maximum Setbacks Front: - none - 50% of street facing façade within 5 feet Interior Side: None Corner Side: - none Rear Yard: None - Front: none - Interior Side: none - Corner Side: none - Rear: 24 feet Height 50 feet 41 feet 8 inches Minimum lot width 40 feet This will remain unchanged. COMPLIES Area 2,500 Existing lot is 123.75 feet long and 58.50 feet wide 7,239 sq ft. Is not changing complies Building Coverage None Complies Open Space 5. Open Space Area: Open space areas shall be provided at a rate of one square foot for every ten (10) square feet of land area included in the development, up to five thousand (5,000) square feet for core areas, and up to two thousand five hundred (2,500) square feet for transition areas. 10 % of total land required to be open space = 723 square feet of open space Open rooftop patios are 1020 sq ft. COMPLIES with open space requirement. Discussed this requirement with Daniel. Design Standards 831 W 100 S TSA Review Ground Floor Use a. For single-family attached uses, the required use depth may be reduced to ten feet (10'). residential uses may count towards the ground floor use requirement. APPLIES TO ALL STREET FACING FACADES 80% 100 % of front façade is office/residential use. This use extends 11 feet into the building on the west façade. Durable Building Materials Ground Floor Durable materials include stone, brick, masonry, textured or patterned concrete, fiber cement board or other material that includes a minimum manufacturer warranty of twenty (20) years from color fading, weather, and local climate induced degradation of the material. APPLIES TO ALL STREET FACING FACADES 90% COMPLIES. Changed materials to fiber cement siding and a metal siding that is included in the approved durable materials folder in the I drive. Durable Building materials upper floors Durable materials include stone, brick, masonry, textured or patterned concrete, fiber cement board or other material that includes a minimum manufacturer warranty of twenty (20) years from color fading, weather, and local climate induced degradation of the material. APPLIES TO ALL STREET FACING FACADES 60% The applicant changed the material to fiber cement and a metal paneling that is in the approved durable materials folder. Ground Floor Glass Requirement 45% West façade: 55% (340/618 sq ft) North Façade: 64% (110/172 sq ft) The ground floor is occupied by a residential use, so the normal 60% 831 W 100 S TSA Review requirement is reduced to 45%. Building Entrances Every 40 feet The building has entrances on both street facing facades. The biggest gap without an entrance is 15 feet. COMPLIES Blank Wall Maximum Length The maximum length of any blank wall uninterrupted by windows, doors, art or architectural detailing at the ground floor level along any street facing facade 15 feet Complies Street facing face maximum building length 200 feet Longest side of the building is 124 ft. COMPLIES Lighting Exterior Design Standard Lighting Shielded Down Lighting shown underneath west façade balconies COMPLIES Lighting Parking Lot Requirement Not Applicable Mechanical Equipment Screening Design Requirement Screened from Public View Inside of garage and not visible from the public right-of-way. COMPLIES Screening of Service Area Design Standard Cannot be on street-facing façade Does not apply TSA Base Design Standards Ground floor residential entrances for dwellings with individual unit entries Design Standard Each unit on the first floor has to have an entrance COMPLIES Circulation and Connectivity Easily accessible from the public space. No parking between building and front façade Two accesses from public roads. COMPLIES F2a. Stucco and EIFS limitation Not allowed on street facing facades COMPLIES F2b2 Front and Corner Yard Landscaping At least fifty percent (50%) of the front or corner side yards shall be covered in live plant material. No yard area is provided, so this is not applicable F2c Entry Feature Requirement (2) A recessed entrance that is recessed at least five feet (5') from the street facing facade; All building entrances are recessed exactly 5 feet. 831 W 100 S TSA Review COMPLIES Parking 21A.44.040 Parking Stalls Required 6 Stalls Required TSA Requires 1 stall per DU MU-5 will still require 1 stall because it is .3 miles from fixed light rail station. Urban parking context. COMPLIES Electric Vehicle Parking Not multi-family, so this is not applicable COMPLIES EV Ready Stalls Not multi-family, so this is not applicable COMPLIES ADA Parking Does not apply Bicycle parking Does not apply A6b3 Number of Curb Cuts Only one curb cut permitted Only one proposed. COMPLIES A6b5 Distance from street corner Driveways and drive approaches for Single and Two- Family Dwellings shall be located at least 20 feet from street corner property lines. Driveway is roughly 49 feet from the corner. COMPLIES A6b7 driveway width 12 ft minimum 30 feet maximum 24 foot width. COMPLIES A7 Parking Stall Size 8’ 3” by 17’ 6” Need to indicate parking stall dimensions A10 Sight Distance Triangle Requirements B. For intersections of street and driveways or alleys: Extending ten feet (10') from each intersecting edge of the driveway or alley and street curb line, or edge of roadway where curbing is not provided. C. For alleys or driveways crossing a sidewalk: Extending ten feet (10') from each intersecting edge of the alley or driveway and back edge of the sidewalk. 30 ft x 30 ft for 100 South/ Jeremy St intersection 10 ft x 10 ft for driveways COMPLIES Landscaping North Park Strip 50 feet wide - 2 small trees or - 1 medium tree or - 1 large tree Updated site plan complies with this. 831 W 100 S TSA Review West Park Strip 123 feet - 6 small trees or - 4 medium trees or - 3 large trees Fence 6 ft limit No fence shown. Signs No signage plans included Will need to include this information in their submittal