HomeMy WebLinkAboutPLNZAD2026-00058 - 1144 S 500 WestFebruary 10, 2026
ADMINISTRATIVE INTERPRETATION
DECISION AND FINDINGS
PLNZAD2026-00058
REQUEST:
This is a request for an administrative interpretation regarding the use and expansion of an
existing building to operate as a Place of Worship, Homeless Resource Center, and a Large
Group Home. The applicant has requested confirmation that the uses are allowed and that they
may occur within the same building. The applicant has also requested confirmation regarding
occupancy limits for Homeless Resource Center and Large Group Home uses. The parcel is
addressed as 1144 S 500 W (Tax ID# 15-12-304-008-0000). The parcel is located in the MU-11
Mixed Use 11 zoning district.
DECISION:
Based on the findings below, the Zoning Administrator finds that:
1. A Place of Worship and Large Group Home use are permitted within the MU-11
district, are allowed at the proposed location, and may occur in the same
building.
2. A Homeless Resource Center use may occur as part of a Place of Worship use,
pursuant to 21A.34.160.D and subject to the provisions of 21A.36.350.
3. A Homeless Resource Center use has a maximum occupancy of 200 unsheltered
persons as per 21A.36.350.A.1.
4. There is no maximum occupancy specified in the City Zoning Code for a
large group home use.
FINDINGS:
1 – Permitted Uses
Pursuant to the “Table of Permitted and Conditional Uses” for Mixed-Use Districts (Section
21A.33.030 of the Salt Lake City Code), the following uses, as defined below, are listed as
“permitted” uses in the MU-11 zoning and the property owner will not need to obtain a
conditional use permit for such use:
• Place of Worship:
o A church, synagogue, temple, mosque or other place of religious worship,
including any accessory use or structure used for religious worship.
• Dwelling - Group Home (large):
o A residential treatment facility, occupied by seven (7) or more individuals,
licensed by the State of Utah under title 62A, chapter 2 of the Utah Code
or its successor that provides a twenty four (24) hour group living
environment for individuals unrelated to the owner or provider that offers
room or board and specialized treatment, behavior modification,
rehabilitation, discipline, emotional growth, or habilitation services for
persons with emotional, psychological, developmental, or behavioral
dysfunctions, impairments, or chemical dependencies. A group home
dwelling includes a recovery residence, but does not include a boarding
school or foster home as defined in title 62A, chapter 2 of the Utah Code or
its successor, or a residential support dwelling as defined in this chapter.
There is no standard in Title 21A Zoning that requires the uses be in separate buildings. The
uses may be located in the same building, subject to compliance with any other applicable
adopted codes, such as Fire or Building code.
2 – Place of Worship and Homeless Resource Center Use
Pursuant to the “Homeless Resource Center Overlay District” regulations (Section 21A.34.160.D
of the Salt Lake City Code), a place of worship is not required to petition for a zoning map
amendment to apply the Homeless Resource Center Overlay Zoning District (Section
21A.50.055 of the Salt Lake City Code), “provided any emergency shelter provided is part of the
ecclesiastic function of the place of worship.” The applicable code in 21A.34.160.D is as follows:
D. Applicability To Places of Worship. A place of worship is not required to
petition for a zoning map amendment to apply this overlay provided any emergency
shelter provided is part of the ecclesiastic function of the place of worship. A place of
worship that provides emergency shelter to people experiencing homelessness shall
comply with the provisions of Section 21A.36.350.
As noted, such use must also comply with the applicable regulations in “Standards for Homeless
Resource Centers” in Section 21A.36.350 of the Salt Lake City Code.
3 – Homeless Resource Center Occupancy Limit
Pursuant to the “Standards For Homeless Resource Centers” regulations (Section 21A.36.350 of
the Salt Lake City Code), subsection 21A.36.350.A.1, the capacity limit for a Homeless Resource
Center is “two hundred (200) unsheltered persons.”
4 – Group Home Occupancy Limit
Pursuant to the “Definitions of Terms” (Section 21A.62.040 of the Salt Lake City Code), there is
no maximum occupancy specified in the municipal zoning code for a large group home use. A
large group home use is defined as follows:
DWELLING, GROUP HOME (LARGE): A residential treatment facility, occupied by
seven (7) or more individuals, licensed by the State of Utah under title 62A, chapter 2 of
the Utah Code or its successor that provides a twenty four (24) hour group living
environment for individuals unrelated to the owner or provider that offers room or
board and specialized treatment, behavior modification, rehabilitation, discipline,
emotional growth, or habilitation services for persons with emotional, psychological,
developmental, or behavioral dysfunctions, impairments, or chemical dependencies. A
group home dwelling includes a recovery residence, but does not include a boarding
school or foster home as defined in title 62A, chapter 2 of the Utah Code or its
successor, or a residential support dwelling as defined in this chapter.
The provisions of section 21A.36.360 “Regulations for Shared Housing Use” apply to the
separately listed and defined land use “Shared Housing” and do not apply to a “Dwelling, Group
Home (Large)” use.
5 – Other Related Occupancy Limits
All uses are subject to off-street parking requirements, which can impact the total occupancy or
total allowed area of each use. See section 21A.44.040 “Required Off Street Parking” for the
required amount of off-street parking per use. Parking requirements can be modified through
the provisions of section 21A.44.050 “Alternatives to Minimum and Maximum Parking
Calculations.” Other applicable codes and regulations may limit occupancy, such as, but not
limited to Public Utility regulations, Fire Code, Building Code, and Utah State Code.
If you have any questions regarding this interpretation, please contact Alicia Seeley at (801) 535-
7922 or by email at alicia.seeley@slc.gov.
APPEAL PROCESS:
An applicant or any other person or entity adversely affected by a decision administering or
interpreting this Title may appeal to the Appeals Hearing Officer. Notice of appeal shall be filed
within ten (10) days of the administrative decision. The appeal shall be filed with the Planning
Division and shall specify the decision appealed and the reasons the appellant claims the
decision to be in error. Applications for appeals are located on the Planning Division website at
https://www.slc.gov/planning/applications/ along with information about how to apply and
processing fees.
Alicia Seeley
Principal Planner
CC: Nick Norris, Planning Director
Daniel Echeverria, Zoning Administrator
Casey Stewart, Planning Manager and Development Review Supervisor
Posted to Web
Attachments:
Vicinity map of subject properties
Proposed site plan
A-110.31.25
Rescue Mission of Salt Lake
1144 South 500 West, SLC, UT 84116
Cover Page
ST186
S
80
Salt Lake
S Foothill Dr
tS
e
t
a
t
S
S
E
0
0
7
S
W
0
0
3
N
W No rth Temple
E 500 SW 500 S
Kearns
EastMillcreek
Canyon Rim
Cottonwood
CottonwoodMeadows
Hunter
Liberty W ells
People'sFreeway
CentralCity/LibertyWells
Central City
Fairpark
WasatchHollows
Capitol Hill
DowntownSalt LakeCity
Bonneville Hills
Yalecrest
ArcadiaHeights
Rio Grande
East Central
GreaterAvenues
Mount
JordanMeadows
East Bench
Sugar House
South Salt Lake
Taylorsville
Murray
Holladay
Cottonwood Heights
Millcreek
Salt Lake City
West V alley City
PROPERTY
201
215
PROPERTY
EC10.31.25
Rescue Mission of Salt Lake
1144 South 500 West, SLC, UT 84116
Existing Site Plan
Site Plan
–14,734 SF Oce/Showroom
–Large Executive Oces
–Private Oces
–Large Conference Rooms
–Showroom/Retail Display
–Significant Upgrades Throughout
–3 Men’s Restrooms, 1 with a shower
–5 Women’s Restrooms, 1 with a
shower
–Break Room
–Polished Concrete Flooring
–2 Covered Executive Parking Stalls
–Secure Gate Entry on North and South
Parking/Yard Entrances
–5,395 SF
–(1) 14’ x 16’ Ground Level Door with 3 additional glass
cutouts ready for removal with door systems in place
–18’ Clear Height
–Full HVAC System
–Free Span Building
–4,712 SF
–2 Grade Level Doors
–12.5' – 18’ Clear Height
–2 Quonset Hut Tents Optional
–Seller is open to leaving for more
covered storage if desired
–4,569 SF
–(6) 16’ x 16’ Ground Level Roll Up
Doors
–2 Drive thru bays
–Overhead Crane
–26’ Clear Height
–Free Span Building
Oce Main Warehouse
Storage Building
Optional Storage
–1,892 SF
–2 Dock High Doors
–1 Grade Level Door
–12'-16.5' Clear Height
Loading Dock/Corridor
West Warehouse
EC10.31.25
Rescue Mission of Salt Lake
1144 South 500 West, SLC, UT 84116
Existing Site Plan
Floor Plan
EXISTING MAIN FLOOR PLAN
SCALE:3/32"=1'-0"25,750 S.F.
GATES
DN
DOWN
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE OFFICE
LOUNGEAREA
LAV.
SHOWER
LAV.LAV.
VENDING
PRODUCTPHOTOS
PRODUCTPREP
OFFICE
OFFICEOFFICEOFFICEOFFICE
OFFICE
MAIN WAREHOUSE
OFFICEOFFICEOFFICEPACKAGING
PACKAGING
LAV.LAV.FILES SHIPPINGSHIPPINGSHIPPING LAV.
WOMENS
STORAGE
PRIVATE
ACCOUNTING
FINANCE OFFICE
MEETING
ROOM
OFFICEOFFICEACCOUNTING OFFICE
CONFERENCE ROOM
COVERED PARKINGAREA
CORRIDOR
COR
RIDO
R
MAIN
ENTRANCE
60x193compw/fs hs
LAV.
SHOWER
MENS MENS
WOMENS LAV.WOMENS
LAV.WOMENS
LAV.WOMENS
FILES
OFFICE OFFICE OFFICE OFFICE LOUNGE RM.
LAV.MENS
CONFERENCE ROOM
CORRIDOR
TASTING LAB
OFFICE OFFICE OFFICE OFFICE
RAMP DOWN
RAM
P
D
O
WN
DN
DOCK AREA
RAMP DOWN
RAMP DOWN
RETAIL SALES
COUNTER
LAN
D
S
CAPE
LAN
D
S
CAPE
LAN
D
S
CAPE
LAN
D
S
CAPE
LAN
D
S
CAPE
LAN
D
S
CAPE
PACKAGING
WEST WAREHOUSE
4,569.17 Sq.Ft., OCC.'B'
OCC.LOAD =45
5,395.06 Sq. Ft., OCC.'S-1'
OCC.LOAD =10
DOCK AREA/CORRIDOR
1,892 Sq.Ft., OCC.'B' OCC.LOAD = 6
PRODUCT DISPLAY 1,239.80
Sq. Ft., OCC.'M' OCC.LOAD =
20
CORRIDOR
COR
RIDO
R
DN
OCC.'B',2921.82Sq.Ft.
CORRIDOROCC.'B',2921.82 Sq.Ft.
COR
RIDO
R
OC
C
.
'B
'
,
29
2
1
.
8
2
Sq.
Ft.
OCC.'B',249.22Sq.Ft.
OCC.'B',236.27Sq.Ft.
OCC.'B',236.27Sq.Ft.
OCC.'B',254.56Sq.Ft.
OCC.'B',388.09Sq.Ft.
OCC.'B',159.18 Sq.Ft.
OCC.'B',159.23Sq.Ft.OCC.'B',159.23 Sq.Ft.
OCC.'B',159.18Sq.Ft.
OCC.'B'91 Sq.Ft.OCC.'B'91 Sq.Ft.
OCC.'B',173.22Sq.Ft.
EMPLOYEE REC.ROOM
OCC.'B',574.44Sq.Ft.
OC
C
.
'B
'
,
10
0
Sq.
Ft.
OCC.'B',119.25 Sq.Ft.
OCC.'B'223.89 Sq.Ft.
OCC.'B'323.78 Sq.Ft.
OCC.'B',313.83Sq.Ft.OCC.'B',236.49 Sq.Ft.
RESTROOMSOCC.'B',260.71Sq.Ft.
OCC.'B',148.70Sq.Ft.OCC.'B',255.87Sq.Ft.
OCC.'B',241.99Sq.Ft.OCC.'B'165.41 Sq.Ft.OCC.'B'128.24 Sq.Ft.
OCC.'B'166.94 Sq.Ft.
OCC.'B',233.46Sq.Ft.OCC.'B',217.10Sq.Ft.OCC.'B',291.12Sq.Ft.
OCC.'B',456.00Sq.Ft.
OCC.'B',234.82Sq.Ft.
OCC.'B',119.63Sq.Ft.
OCC.'B'133.64 Sq.Ft.
OCC.'B',209.68Sq.Ft.
OCC.'B',369.03Sq.Ft.
OFFICE
OCC.'B'131.30 Sq.Ft.OCC.'B'153.80 Sq.Ft.OCC.'B'140.16 Sq.Ft.OCC.'B'168.91 Sq.Ft.
OCC.'B'102.81 Sq.Ft.
OCC.'B'131.30 Sq.Ft.
OCC.'B'137.59 Sq.Ft.
OCC.'B'106.66 Sq.Ft.OCC.'B'89.78 Sq.Ft.OCC.'B'89.78 Sq.Ft.OCC.'B'98.99 Sq.Ft.
OCC.'B'276.28 Sq.Ft.
OCC.'B'104.83 Sq.Ft.OCC.'B'116.17 Sq.Ft.OCC.'B'93.97 Sq.Ft.OCC.'B'136.00 Sq.Ft.OCC.'B'127.94 Sq.Ft.
OCC.'B'170.88 Sq.Ft.
UP
UPPER CALL CENTER AREA
DN
840 Sq. Ft., OCC.'B' Occ.
Load = 8
EXISTING MEZZANINE PLAN
SCALE:3/32"=1'-0"840 S.F.
EC10.31.25
Rescue Mission of Salt Lake
1144 South 500 West, SLC, UT 84116
Phase 1 Construction
Floor Plan
EXISTING MAIN FLOOR PLAN
SCALE:3/32"=1'-0"25,750 S.F.
GATES
DN
DOWN
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE OFFICE
LOUNGEAREA
LAV.
SHOWER
LAV.LAV.
VENDING
PRODUCTPHOTOS
PRODUCTPREP
OFFICE
OFFICEOFFICEOFFICEOFFICE
OFFICE
MAIN WAREHOUSE
OFFICEOFFICEOFFICEPACKAGING
PACKAGING
LAV.LAV.FILES SHIPPINGSHIPPINGSHIPPING LAV.
WOMENS
STORAGE
PRIVATE
ACCOUNTING
FINANCE OFFICE
MEETING
ROOM
OFFICEOFFICEACCOUNTING OFFICE
CONFERENCE ROOM
COVERED PARKINGAREA
CORRIDOR
COR
RIDO
R
MAIN
ENTRANCE
60x193compw/fs hs
LAV.
SHOWER
MENS MENS
WOMENS LAV.WOMENS
LAV.WOMENS
LAV.WOMENS
FILES
OFFICE OFFICE OFFICE OFFICE LOUNGE RM.
LAV.MENS
CONFERENCE ROOM
CORRIDOR
TASTING LAB
OFFICE OFFICE OFFICE OFFICE
RAMP DOWN
RAM
P
D
O
WN
DN
DOCK AREA
RAMP DOWN
RAMP DOWN
RETAIL SALES
COUNTER
LAN
D
S
CAPE
LAN
D
S
CAPE
LAN
D
S
CAPE
LAN
D
S
CAPE
LAN
D
S
CAPE
LAN
D
S
CAPE
PACKAGING
WEST WAREHOUSE
4,569.17 Sq.Ft., OCC.'B'
OCC.LOAD =45
5,395.06 Sq. Ft., OCC.'S-1'
OCC.LOAD =10
DOCK AREA/CORRIDOR
1,892 Sq.Ft., OCC.'B' OCC.LOAD = 6
PRODUCT DISPLAY 1,239.80
Sq. Ft., OCC.'M' OCC.LOAD =
20
CORRIDOR
COR
RIDO
R
DN
OCC.'B',2921.82Sq.Ft.
CORRIDOROCC.'B',2921.82 Sq.Ft.
COR
RIDO
R
OC
C
.
'B
'
,
29
2
1
.
8
2
Sq.
Ft.
OCC.'B',249.22Sq.Ft.
OCC.'B',236.27Sq.Ft.
OCC.'B',236.27Sq.Ft.
OCC.'B',254.56Sq.Ft.
OCC.'B',388.09Sq.Ft.
OCC.'B',159.18 Sq.Ft.
OCC.'B',159.23Sq.Ft.OCC.'B',159.23 Sq.Ft.
OCC.'B',159.18Sq.Ft.
OCC.'B'91 Sq.Ft.OCC.'B'91 Sq.Ft.
OCC.'B',173.22Sq.Ft.
EMPLOYEE REC.ROOM
OCC.'B',574.44Sq.Ft.
OC
C
.
'B
'
,
10
0
Sq.
Ft.
OCC.'B',119.25 Sq.Ft.
OCC.'B'223.89 Sq.Ft.
OCC.'B'323.78 Sq.Ft.
OCC.'B',313.83Sq.Ft.OCC.'B',236.49 Sq.Ft.
RESTROOMSOCC.'B',260.71Sq.Ft.
OCC.'B',148.70Sq.Ft.OCC.'B',255.87Sq.Ft.
OCC.'B',241.99Sq.Ft.OCC.'B'165.41 Sq.Ft.OCC.'B'128.24 Sq.Ft.
OCC.'B'166.94 Sq.Ft.
OCC.'B',233.46Sq.Ft.OCC.'B',217.10Sq.Ft.OCC.'B',291.12Sq.Ft.
OCC.'B',456.00Sq.Ft.
OCC.'B',234.82Sq.Ft.
OCC.'B',119.63Sq.Ft.
OCC.'B'133.64 Sq.Ft.
OCC.'B',209.68Sq.Ft.
OCC.'B',369.03Sq.Ft.
OFFICE
OCC.'B'131.30 Sq.Ft.OCC.'B'153.80 Sq.Ft.OCC.'B'140.16 Sq.Ft.OCC.'B'168.91 Sq.Ft.
OCC.'B'102.81 Sq.Ft.
OCC.'B'131.30 Sq.Ft.
OCC.'B'137.59 Sq.Ft.
OCC.'B'106.66 Sq.Ft.OCC.'B'89.78 Sq.Ft.OCC.'B'89.78 Sq.Ft.OCC.'B'98.99 Sq.Ft.
OCC.'B'276.28 Sq.Ft.
OCC.'B'104.83 Sq.Ft.OCC.'B'116.17 Sq.Ft.OCC.'B'93.97 Sq.Ft.OCC.'B'136.00 Sq.Ft.OCC.'B'127.94 Sq.Ft.
OCC.'B'170.88 Sq.Ft.
UP
UPPER CALL CENTER AREA
DN
840 Sq. Ft., OCC.'B' Occ.
Load = 8
EXISTING MEZZANINE PLAN
SCALE:3/32"=1'-0"840 S.F.
Executive Offices
Scheduled For Demolition
Storage / Warehousing Finance / Fundraising
Programing / Counceling
Processing & Circulation
UPPER CALL CENTER AREA
DN
840 Sq. Ft., OCC.'B' Occ.
Load = 8
EXISTING MEZZANINE PLAN
SCALE:3/32"=1'-0"840 S.F.
Chapel & Chapel Support
Courtyard / Park (Exterior)
Proposed New Building forDormatory, Kitchen, Laundry,
Future RecreationGrounds for ProgramMembers
EC10.31.25
Rescue Mission of Salt Lake
1144 South 500 West, SLC, UT 84116
Building Expansion Concept
Floor Plan
EXISTING MAINFLOORPLAN
SCALE:3/32"=1'-0"25,750S.F.
GATES
DN
DOWN
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE OFFICE
LOUNGEAREA
LAV.
SHOWER
LAV.LAV.
VENDING
PRODUCTPHOTOS
PRODUCTPREP
OFFICE
OFFICEOFFICEOFFICEOFFICE
OFFICE
MAIN WAREHOUSE
OFFICEOFFICEOFFICEPACKAGING
PACKAGING
LAV.LAV.FILES SHIPPINGSHIPPINGSHIPPING LAV.WOMENS STORAGEPRIVATE ACCOUNTING
FINANCE OFFICE
MEETINGROOM
OFFICEOFFICEACCOUNTING OFFICE
CONFERENCE ROOM
COVEREDPARKINGAREA
CORRIDOR
COR
RIDO
R
MAIN ENTRANCE
60x193compw/fs hs
LAV.
SHOWER
MENS MENS
WOMENS LAV.WOMENS
LAV.WOMENS
LAV.WOMENS
FILES
OFFICE OFFICE OFFICE OFFICE LOUNGERM.
LAV.MENS
CONFERENCE ROOM
CORRIDOR
TASTINGLAB
OFFICE OFFICE OFFICE OFFICE
RAMP DOWN
RAM
P
D
O
WN
DN
DOCK AREA
RAMP DOWN
RAMP DOWN
RETAILSALES COUNTER
LAN
D
S
CAPE
LAN
D
S
CAPE
LAN
D
S
CAPE
LAN
D
S
CAPE
LAN
D
S
CAPE
LAN
D
S
CAPE
PACKAGING
WEST WAREHOUSE
4,569.17Sq.Ft., OCC.'B' OCC.LOAD =45
5,395.06Sq. Ft., OCC.'S-1'OCC.LOAD=10
DOCK AREA/CORRIDOR1,892 Sq.Ft., OCC.'B' OCC.LOAD= 6
PRODUCTDISPLAY 1,239.80Sq. Ft., OCC.'M' OCC.LOAD=20
CORRIDOR
COR
RIDO
R
DN
OCC.'B',2921.82Sq.Ft.
CORRIDOROCC.'B',2921.82Sq.Ft.
COR
RIDO
R
OCC
.
'B
'
,
292
1
.
8
2
Sq.Ft.
OCC.'B',249.22Sq.Ft.
OCC.'B',236.27Sq.Ft.
OCC.'B',236.27Sq.Ft.
OCC.'B',254.56Sq.Ft.
OCC.'B',388.09Sq.Ft.
OCC.'B',159.18Sq.Ft.
OCC.'B',159.23Sq.Ft.OCC.'B',159.23Sq.Ft.
OCC.'B',159.18Sq.Ft.
OCC.'B'91Sq.Ft.OCC.'B'91Sq.Ft.
OCC.'B',173.22Sq.Ft.
EMPLOYEEREC.ROOMOCC.'B',574.44Sq.Ft.
OCC
.
'B
'
,
100
Sq.Ft.
OCC.'B',119.25Sq.Ft.
OCC.'B'223.89 Sq.Ft.
OCC.'B'323.78 Sq.Ft.
OCC.'B',313.83Sq.Ft.OCC.'B',236.49Sq.Ft.
RESTROOMSOCC.'B',260.71Sq.Ft.
OCC.'B',148.70Sq.Ft.OCC.'B',255.87Sq.Ft.
OCC.'B',241.99Sq.Ft.OCC.'B'165.41 Sq.Ft.OCC.'B'128.24 Sq.Ft.OCC.'B'166.94 Sq.Ft.
OCC.'B',233.46Sq.Ft.OCC.'B',217.10Sq.Ft.OCC.'B',291.12Sq.Ft.
OCC.'B',456.00Sq.Ft.
OCC.'B',234.82Sq.Ft.
OCC.'B',119.63Sq.Ft.
OCC.'B'133.64 Sq.Ft.OCC.'B',209.68Sq.Ft.
OCC.'B',369.03Sq.Ft.
OFFICE
OCC.'B'131.30 Sq.Ft.OCC.'B'153.80 Sq.Ft.OCC.'B'140.16 Sq.Ft.OCC.'B'168.91 Sq.Ft.
OCC.'B'102.81 Sq.Ft.
OCC.'B'131.30 Sq.Ft.
OCC.'B'137.59 Sq.Ft.
OCC.'B'106.66 Sq.Ft.OCC.'B'89.78 Sq.Ft.OCC.'B'89.78 Sq.Ft.OCC.'B'98.99 Sq.Ft.
OCC.'B'276.28 Sq.Ft.
OCC.'B'104.83 Sq.Ft.OCC.'B'116.17 Sq.Ft.OCC.'B'93.97 Sq.Ft.OCC.'B'136.00 Sq.Ft.OCC.'B'127.94 Sq.Ft.
OCC.'B'170.88 Sq.Ft.
UP
UPPERCALLCENTERAREA
DN
840Sq. Ft., OCC.'B' Occ.
EXISTING MEZZANINE PLAN
SCALE:3/32"=1'-0"840S.F.
21,472.79 sf
FIRST FLOOR SECOND FLOOR THIRD FLOOR
SSPREP SS SSPREP
PREPPREP MOBILE PREP MOBILE PREP
MOBILE PREPMOBILE PREP
MOBILE PREP MOBILE PREP
MOBILE PREPMOBILE PREP
F.D.F.D.F.D.F.D.
F.D.
F.D.F.D.
F.D.F.D.F.S.G
F.S.G F.S.G F.S.G
F.S.
G
F.S.
G
F.S.G
F.S.G
F.S.G
F.S.G
F.S.G F.S.G
J
J
J
J
5-20DROPREEL 10'
CLG
5-20DROPREEL 10'
CLG
WP WP
WPWP
what is thisreceptacle for 100A 208/3 servingwhole line
what is thisreceptacle for what is thisreceptacle for
'LCK'-27,29,31
'LCK'-2 'LCK'-4 'LCK'-6 'LCK'-8 'LCK'-10'LCK'-10
'LCK'-12,14,16'LCK'-18 'LCK'-18
'L
C
K
'
-
2
0
'L
C
K
'
-
2
2
'LCK'-24'LCK'-26'LCK'-28'LCK'-30'LCK'-32'LCK'-34
'L
C
K
'
-
3
0
'L
C
K
'
-
3
0
'LC'-5,7'LC'-1,3'LC'-11 'LC'-9
'L
C
'
-
1
9
,
2
1
,
2
3
'L
C
'
-
1
3
,
1
5
,
1
7
'LC'-25
'LC'-27
'L
C
'
-
2
9
,
3
1
'L
C
'
-
3
3
,
3
5
,
3
7
'LC'-39 'LC'-41 'LC'-2 'LC'-41
'LC'-4
'LC'-41
'LC'-6
'H
C
'
-
1
,
3
,
5
'H
C
'
-
7
,
9
,
1
1
'H
C
'
-
1
3
,
1
5
,
1
7
'H
C
'
-
1
9
,
2
1
,
2
3
'LCK'-1,3,5 'LC'-8
'L
C
'
-
1
0
'L
C
'
-
1
2
,
1
4
'L
C
'
-
2
0
'L
C
'
-
1
6
,
1
8
'LC'-20 'LC'-22
'LC'-24
'LC'-32
'LC'-26,28,30
KEF-3(ON ROOF)KEF-4(ON ROOF)
KEF-1(ON ROOF)KEF-2(ON ROOF)
'LCC'-27,29'LCC'-17 'LCC'-17
'LCC'-17'LCC'-17
'LCC'-19,21 'LCC'-23,25
'LCC'-31,33
3
E401
3
E401
MO
B
I
L
E
P
R
E
P
MO
B
I
L
E
P
R
E
P
MO
B
I
L
E
P
R
E
P
MO
B
I
L
E
P
R
E
P
MO
B
I
L
E
P
R
E
P
MO
B
I
L
E
P
R
E
P
MO
B
I
L
E
P
R
E
P
MO
B
I
L
E
P
R
E
P
MO
B
I
L
E
P
R
E
P
MO
B
I
L
E
P
R
E
P
MO
B
I
L
E
P
R
E
P
MO
B
I
L
E
P
R
E
P
Fridge / Freezer
MO
B
I
L
E
P
R
E
P
MO
B
I
L
E
P
R
E
P
MO
B
I
L
E
P
R
E
P
MO
B
I
L
E
P
R
E
P
MO
B
I
L
E
P
R
E
P
MO
B
I
L
E
P
R
E
P
MO
B
I
L
E
P
R
E
P
MO
B
I
L
E
P
R
E
P
MO
B
I
L
E
P
R
E
P
MO
B
I
L
E
P
R
E
P
MO
B
I
L
E
P
R
E
P
MO
B
I
L
E
P
R
E
P
MO
B
I
L
E
P
R
E
P
MO
B
I
L
E
P
R
E
P
MO
B
I
L
E
P
R
E
P
MO
B
I
L
E
P
R
E
P
MO
B
I
L
E
P
R
E
P
MO
B
I
L
E
P
R
E
P
MO
B
I
L
E
P
R
E
P
MO
B
I
L
E
P
R
E
P
MO
B
I
L
E
P
R
E
P
MO
B
I
L
E
P
R
E
P
MO
B
I
L
E
P
R
E
P
MO
B
I
L
E
P
R
E
P
MO
B
I
L
E
P
R
E
P
MO
B
I
L
E
P
R
E
P
MO
B
I
L
E
P
R
E
P
MO
B
I
L
E
P
R
E
P
MO
B
I
L
E
P
R
E
P
MO
B
I
L
E
P
R
E
P
MO
B
I
L
E
P
R
E
P
MO
B
I
L
E
P
R
E
P
Loading Dock
Cafeteria / Meeting Hall
OFFICE OFFICE OFFICE OFFICE CONFERENCE ROOM
OFFICE OFFICE OFFICE OFFICE
CORRIDOR
OCC.'B',2921.82 Sq.Ft.
OCC.'B',369.03Sq.Ft.
OFFICE
OCC.'B'131.30 Sq.Ft.OCC.'B'153.80 Sq.Ft.OCC.'B'140.16 Sq.Ft.OCC.'B'168.91 Sq.Ft.
OCC.'B'102.81 Sq.Ft.
OCC.'B'106.66 Sq.Ft.OCC.'B'89.78 Sq.Ft.OCC.'B'89.78 Sq.Ft.OCC.'B'98.99 Sq.Ft.
OFFICE OFFICE OFFICE OFFICE CONFERENCE ROOM
OFFICE OFFICE OFFICE OFFICE
CORRIDOR
OCC.'B',2921.82 Sq.Ft.
OCC.'B',369.03Sq.Ft.
OFFICE
OCC.'B'131.30 Sq.Ft.OCC.'B'153.80 Sq.Ft.OCC.'B'140.16 Sq.Ft.OCC.'B'168.91 Sq.Ft.
OCC.'B'102.81 Sq.Ft.
OCC.'B'106.66 Sq.Ft.OCC.'B'89.78 Sq.Ft.OCC.'B'89.78 Sq.Ft.OCC.'B'98.99 Sq.Ft.
OFFICE
OFFICE
OFFICE
OFFICE
OCC.'B',249.22Sq.Ft.
OCC.'B',236.27Sq.Ft.
OCC.'B',236.27Sq.Ft.
OCC.'B',254.56Sq.Ft.
Kitchen / Prep
Service Area