Loading...
PLNTSD2020-00501 - 675 E 500 S ERIN MENDENHALL NICK NORRIS MAYOR PLANNING DIVISION DIRECTOR Page 1 of 1 August 2, 2022 Mark Issac Pinyon8 Consulting 1165 Wilmington Ave Salt Lake City, Utah 84106 RE: Transit Station Area Development Score Review Petition #PLNTSD2020-00501 – 675 E 500 S Dear Mr. Isaac, This letter is a notification of the development score review as determined by the Planning Department staff. Pursuant to chapter 21A.10 of the Salt Lake City Zoning Ordinance, a notice of application was sent out on July 19, 2022. The noticing period ended on August 2, 2022. Staff received one comment over the phone regarding the project from an abutting property owner. They were concerned about the blank concrete wall adjacent to their building to the north of the property. Specifically, they had concerns about the size and setback. While no action is necessary for this request, these concerns may need to be addressed for approval of the required New Construction Petition. After completing a review of the revised plans, staff has given the proposed building a score of 129 out of the submitted 202 points. Please see attached scoring sheets for more information. This means that no Design Review petition is required, and the project is now authorized to go through the remaining required processes (see below). The project is approved with the following conditions: • A New Construction petition must be approved by the Salt Lake City Historic Landmarks Commission. • A Petition to demolish the contributing structure at approximately 470 S 700 E (currently a Big Daddy’s Pizza) in the Central City Historic District must be approved by the Salt Lake City Historic Landmarks Commission. o Alternatively, you may submit an Administrative Interpretation request concerning the contributing status of the building. An intensive level survey of the building will be required with your submittal. • A petition to demolish the remaining noncontributing structures in the Central City Historic District must be submitted. • A Parcel Consolidation request to consolidate the three lots and private alley must be submitted. • Any significant changes made to the approved plans, elevations, or site plan must be approved by the Planning Department. As the applicant, you have the option to appeal this development score review to the Planning Commission. If you chose to appeal, a public hearing will be required per the requirements of the Salt Lake City Zoning Ordinance.If you are satisfied with the score given, you can continue with the remaining required applications. A full zoning review will be completed as part of the building permit review to verify that the drawings submitted for your building permit comply with the applicable zoning requirements. Additionally, the plans submitted for your development score will be compared with the plans submitted for your building permit, and you will be notified if there are any discrepancies between the two sets. If you have any further questions about the Planning Department process, please contact me at 801-535-6182 or by e-mail at: aaron.barlow@slcgov.com Sincerely, Aaron Barlow, AICP Principal Planner Enc. Transit Station Area Development Guidelines Checklist CA T E G O R Y Unless otherwise noted, points may only be obtained from one item in each guideline section. GUIDELINE ITEM DESCRIPTION VA L U E AP P L I C A N T R E V I E W ST A F F R E V I E W More than 50 dwelling units per acre; Buildings that are up to 80% of the allowable building height; or Buildings with a Floor to Lot Area ration of 3 or more. 20 More than 30 dwelling units per acre; Buildings that are up to 70% of the allowable building height; or Buildings with a floor to lot area ratio of 2 or more.15 More than 20 dwelling units per acre; Buildings that are at least 60% of the allowable building height; or Buildings with a floor to lot area ratio of 1 or more.10 More than 25 dwelling units per acre; Buildings that are up to 80% of the allowable building height; or Buildings with a Floor to Lot Area ratio of 2 or more.12 More than 20 dwelling units per acre; Buildings that are up to 70% of the allowable building height; or Buildings with a floor to lot area ratio of 1.5 or more.8 More than 15 dwelling units per acre; Buildings that are at least 60% of the allowable building height; or Buildings with a floor to lot area ratio of 1 or more.5 100%of the gross floor area on the ground floor is dedicated to a use different than what is on the floors above. 20 At least 75%of the gross floor area on the ground floor is dedicated to a use different than what is on the floors above. 15 At least 50%of the gross floor area on the ground floor is dedicated to a use different than what is on the floors above.10 A project that includes at least two uses that are different than existing uses on adjacent properties.6 La n d U s e 1.A. Intensity and Density of Use (Applicable to Core Area Only.) A project that meets at least one of the following requirements: 1.B. Intensity and Density of Use (Applicable to Transition Area only.) A project that meets at least one of the following requirements: 2. Integrated Mixed of Uses: If the ground floor of a building is designed for retail, restaurant, or other use other than residential on the ground floor. The guideline applies to street facing habitable space only and not the entire ground floor area. The following points shall be added to the development score: July 2017 1 of 6 Subtotal (For Page): The below are a condensed version of each guideline, please see the complete guidelines for all applicable requirements and documentation requirements. Transit Station Area Development Guidelines Checklist 33% or more of the total dwelling units. 40 20% or more of the total dwelling units. 30 10% or more of the total dwelling units. 20 Areas rated 5 or greater 20 Area rated 3 or greater 10 33% or more of the total dwelling units.8 15% or more of the total dwelling units 5 10% or more of the total dwelling units.3 A minimum of 1500 square feet.15 A minimum of 1000 square feet 10 A minimum of 500 Square feet 5 50%or more of the existing surface parking lot is covered by new buildings.15 35%or more of the existing surface parking lot is covered by new buildings.10 25%or more of the existing surface parking lot is covered by new buildings.5 A new building that meets the standards of the TSA zoning district and replaces a building that does not meet the standards.10 A project that includes replacing a nonconforming use with a use that is allowed in the TSA zoning district. 5 8. Removal of Billboards A project that includes redevelopment of a site containing a billboard: An existing billboard is legally removed by the developer as part of a redevelopment project. 10 The project utilizes a roof design,such as a landscaped roof,that is intended to reduce energy use,storm drainage runoff or other similar sustainable policy of the City.10 The project utilizes landscape designs and materials that conserves energy,reduces the urban heat island, conserves water,retains or reuses storm drainage or other similar sustainable policy of the City. Documentation must be provided to indicate how the project will incorporate this guideline.5 La n d U s e Bu i l d i n g a n d S i t e De s i g n 5. Community Serving Uses Projects the include the following area of community serving uses: (Refer to Guidelines for qualifying uses.) 6. Redevelopment of Surface Parking Lots A project that includes the redevelopment of an existing surface parking lot to an active use or structured parking: 7. Redevelopment of Nonconforming Use or Noncomplying Building A project that includes redevelopment of a site containing a nonconforming use or non-complying building: 4. Accessible Dwelling Units A project which includes dwelling units designed as ADA accessible: 3.A. Mixed Income Housing A project that includes affordable housing available to those with 60% or less of the median household income of the City for sale or lease shall have the following number of points added to the development score: 3.B. Mixed Income Housing An affordable housing project that is located in an area identified in the “Opportunity Index” map (as used in the latest available Utah Housing Corporation Allocation Plan) or its successor as determined by the Planning Director, with a rating of at least 3 or greater shall receive the following points: 9. Sustainable Site and Open Space Design A project that incorporates adopted sustainable policies of the City: (Points may be obtained from both items.) July 2017 2 of 6 Subtotal (For Page): Transit Station Area Development Guidelines Checklist Platinum 50 Gold 40 Silver 30 1.The project is certified as having 100%of its energy needs served by renewable power either from on or off-site sources.If development relies on off- site power,documentation must be provided showing at least 20 year commitment to power source 50 2.The project is certified as having 50%its energy needs served by renewable power either from on or off-site sources.If development relies on off-site power,documentation must be provided showing at least 20 year commitment to power source 25 3.Solar array:5 points for every 500 square feet of solar panels. Maximum 20 points.20 4. Geothermal heating and cooling systems 10 5.The project is designed with passive,energy efficient features that include awnings or solar shades over all windows,or other similar passive energy saving features.5 Architectural detailing is wrapped around all four sides.See guideline document for specific detailing requirements. 20 Architectural detailing is wrapped around both side facades of a building,but not on the rear façade.See guideline document for specific detailing requirements.15 Local Register:New construction,major alterations and additions that are approved by the Historic Landmark Commission that include reuse of the site.40 National Register:State Historic Preservation Office review and approval of exterior alterations to buildings not locally designated,but on the national register and seeking federal tax credits 40 Projects that are adjacent to a local or national designated property that are compatible with the historic property through building mass and bulk, setbacks and design features as determined by the Planning Director 20 Local Register:Projects that receive administrative approval in accordance with Zoning Ordinance Section 21A.34.020.5 Projects that add historically significant sites to the Salt Lake City Register of Cultural Resources if they qualify as defined in Zoning Ordinance Section 21A.34.50 Bu i l d i n g a n d S i t e D e s i g n 10. Green Building The following points will be awarded based on the level of LEED certification: 11. Energy Efficiency Projects that incorporate energy efficiency into the design of the project shall have the following points added to the development score: (For guidelines 1 through 4, points may only be obtained from one item. Points from guidelines 1 through 4 may be combined with points from guideline 5.) 12. 360 Degree Architecture A project that incorporates architecture features on building facades that are not adjacent to a street: (See Guideline for required elements.) 13. Historic Preservation Projects that preserve, rehabilitate, restore, reuse a historic property or new construction that contributes to the character of a historic property or district: July 2017 3 of 6 Subtotal (For Page): Transit Station Area Development Guidelines Checklist At least 80%of the street facing façades above the ground floor are clad in durable,high quality materials,as listed above,excluding glazing,doors, and trim 20 At least 70%of the street facing facades above the ground floor are clad in high quality,durable materials as listed above,excluding glazing,doors, and trim 15 15. Corner Buildings Buildings located on the corners of intersecting streets that address both streets: When located on the corner of two intersecting streets,the primary entrance of the building addresses the corner by including a hinged,rounded, beveled,open bay,mitered orientation or similar entrance feature.10 A rooftop of a building is used as a common space for the building occupants.6 A roof includes at least one of the following design features: Two or more sloping planes visible from a public street; An arched or barrel vaulted design; A distinguishable cornice or parapet; Overhangs that are a minimum of 12 inches in depth to create a shadow line.5 17. Eyes on the Street and Public Spaces Buildings that are designed to have windows, doors, balconies or other similar features facing public streets and open spaces: Operable openings, balconies, verandas or other similar features on all levels of the building that face a public space and allow visibility into the public space. Balconies need to have a minimum depth of 5 feet and include at least 30 square feet of space 15 18. Lighting A project that includes a lighting plan that accomplishes at least one of the following: Casts light from store fronts onto the sidewalk; Highlights unique architectural features of a building; or Highlights artwork or unique landscape features.6 A sign that is mounted perpendicular to the primary building façade and oriented to the pedestrian (projecting business storefront sign).2 An awning or canopy sign that is integrated into the design of the building.2 A monument sign that is integrated into the site and compatible with the building architecture.2 A project includes a minimum of 15%of the total lot area.15 A project includes a minimum of 10%of the total lot area.10 A project includes a minimum of 5%of the total lot area.5 A public space,regardless of size,that is located near a transit station and includes seating,art, protection from the elements or other feature intended to activate the space or make it comfortable (must be within 330 feet of transit station).3 Bu i l d i n g a n d S i t e D e s i g n Pu b l i c S p a c e s 20. Public Spaces and Plazas Projects that include active, outdoor spaces, that are accessible to the public and adjacent to a public right of way: 14. Building Materials Projects that incorporate high quality, durable and low maintenance building materials: 16. Rooftop Design and Use A project that incorporates a rooftop use: (Points may be obtained from both items.) 19. Signs Signs that meet the intent of this guideline shall have the following points added to the development score: July 2017 4 of 6 Subtotal (For Page): Transit Station Area Development Guidelines Checklist At least 4 street furnishings 3 At least 3 street furnishings 2 At least 2 street furnishings 1 22. Public Artwork Projects that include public art in a location where it is readily visible from a public space: 2 points per art piece, up to a maximum of 6 points 6 Projects that include a minimum six foot wide ADA accessible walkway through a parking lot that is separated from vehicle drive aisles.4 Projects that include a minimum six foot wide ADA accessible sidewalk from private property to public open spaces.4 The project includes lockers,changing rooms for cyclists and showers.6 The project includes any bicycle amenity identified in the Bicycle Amenity section of the Transit Station Area Development Guidelines.3 The project incorporates art into the design of the bicycle amenity.3 The project is located within 300 feet,measured along the most direct, legal walking path. 15 The project is located within 750 feet,measured along the most direct, legal walking path. 10 The project is located within 1500 feet,measured along the most direct legal walking path. 5 25.B. Access to Transit: A development that provides transit passes to residents as follows: A multi-family residential development that provides transit passes to residents through the City’s transit pass program for a minimum period of three years from the development’s initial occupancy.Passes shall be available for free to residents at request.At least one pass shall be available per unit.Verification from Transportation division of minimum 3 year participation is required.15 The project includes a narrow street or alley through the project that accommodates people walking, biking and driving.30 The project includes a walkway accessible to the public that is a minimum of 10 feet wide that connects through the property to a public space,such as park,trail or street or similar area and allows for the walkway to be continued on adjacent properties.20 Ci r c u l a t i o n 23. Connections and Walkways Projects that include connections and walkways from buildings, parking lots and private open space to public spaces: (Points may be obtained from both items.) 24. Bicycle Amenities A project that includes bicycle parking amenities in addition to what is already required in the zoning ordinance: (Points may be obtained from multiple items.) 26. Public Walkways Interior to the Block A development that includes public walkways through the interior of blocks: (To qualify for these points, the walkways cannot be fenced or gated.) Pu b l i c S p a c e s 21. Streetscape Amenities A project that includes street furniture, pedestrian amenities, public art or other similar features intended to improve the streetscape: 25.A. Access to Transit: A project located within close proximity to a transit station shall have the following number of points added to the development score: (Applies to any TRAX or Frontrunner station platform or any bus stop where three or more separate bus routes come together.) July 2017 5 of 6 Subtotal (For Page): Transit Station Area Development Guidelines Checklist 100%of the parking structure is wrapped with high quality,durable materials or habitable space with a depth of at least 25’ on all street facing facades.25 75%of the parking structure is wrapped in high quality,durable materials or habitable space with a depth of at least 25’ on all street facing facades.20 For below grade parking structures,there is no visible evidence of the parking garage other than the parking entrance.The ground floor uses must have entrances at grade,without the use of ramps,to qualify.25 Parking for alternative fuel vehicles,scooters, mopeds,motorcycles,or other similar vehicle is provided at a rate equal to 7%of the total number of spaces provided for automobiles.5 A project includes dedicated parking stalls/equipment for a car sharing program.3 A project includes a charging station for electric vehicles: Level 1 Station: 2 pts per stall, max. 6 Level 2 Station: 3 pts per stall, max 9 Level 3 Station: 4 pts per stall, max. 12 12 Residential developments with a parking ratio less than 1 stall per unit: 25 Residential development with a parking ratio less than 1.25 stall per unit 15 Non-residential developments with a parking ratio less than 2 stalls per 1,000 gross square feet 20 Projects that have been presented to the associated community council and have notified residents and property owners within 300 feet via mail about when and where the community council presentation will be held 10 Projects that have been presented at an open house for the proposal on the development site and have notified residents and property owners within 300 feet via mail about when and where the open house will be held 10 Approval Process Ap p l i c a n t To t a l St a f f To t a l Planning Commission Review Required 124 points or less Administrative (Staff) Approval 125 points or more 27.Parking Structure Design Parking structures that incorporate the following: 29. Parking Ratios Projects that provide parking in the ratios indicated: Co m m u n i t y En g a g e m e n t 30. Neighborhood Input Pa r k i n g 28. Alternative Vehicle Parking Projects that include dedicated parking stalls for alternative fuel vehicles, scooters, mopeds or motorcycles: (Points may be obtained from multiple items.) July 2017 6 of 6 Subtotal (For Page): Standard Proposed Finding Minimum Lot Area: 2,500 square feet ~65,000 square feet PARCEL CONSOLIDATION REQUIRED Complies Minimum Lot Width: 40 feet 215 feet at the narrowest face along 700 E Complies Maximum Building Height: 75 feet + an extra story with TSA score (±85 ft) Minimum Building Height: 25 feet Without the top story, the building does not exceed 75 feet. The building’s maximum height is ~85 feet Complies Front Yard Setback: 500 S: minimum is equal to average setback of block face; no maximum 700 E: 5-ft minimum and at least 50% of street-facing façade built to minimum 500 S: setback ranges from zero to 10 feet 700 E: setback ranges from 2 to 15 feet Complies Interior Side Setback: none n/a no interior side yards N/A Rear Yard Setback: none Ranges from zero to five feet Complies Open Space: 1 sqft per 10 sq ft of lot area, up to 5,000 square feet in core areas There are more than 20,000 square feet of qualifying open space proposed Complies Landscaping: At least 30% of the front or corner side yard is covered with live plant material (if patios or other outdoor public spaces are present) At least 30% of the front and corner side yards will be covered with live plant material Complies Landscaping: At least 1 shade tree per 30 ft within yards at least 10 feet deep Shade trees are present wherever the front yard setback is greater than 10 feet Complies Outdoor Public Space: At least 30% of the front or corner side yard has an outdoor plaza, dining, or patio The area within the front and corner side yards appear to be designed as outdoor public space Complies Entries: Must have a design feature listed under 21A.26.078.F.2.c There is a 5-ft awning over all entrances Complies Applicable Design Standards (see table 21A.37.060.B) Requirement Standard Proposed Finding Ground Floor Use (21A.37.050.A) Option 1: Must occupy at least 60% of ground-floor façade length (excluding parking access) 100% of the ground floor is occupied by permitted uses with at least a 25-foot depth Complies The loading area facing Green Street may be an issue. I will find out more information. No changes to the plans are necessary at this point in the process. Building Materials, ground floor (21A.37.050.B.1) At least 90% of street-facing facades must be clad in durable materials (excluding doors and windows) 100% of the upper floor facades are proposed to be clad in either brick or fiber cement board (excluding doors and windows) Complies Building Materials, upper floors (21A.37.050.B.2) At least 60% of street-facing facades must be clad in durable materials (excluding doors and windows) 100% of the ground floor will be clad in either brick or fiber cement board (excluding doors and windows) Complies Glass: ground floor (21A.37.050.C.1) 60% of street-facing façades must have transparent glass ~60% all street-facing-facing façades are covered in transparent glass Complies Building Entrances (21A.37.050.D) Required every 40 feet Present Complies Blank wall: maximum length (21A.37.050.E) 15 feet The longest blank wall is 7 feet Complies Max Length of Street-facing Façade (21A.37.050.F) 200 ft The 400 S façade is ~85 feet wide and the 700 E façade is ~185 feet wide. Complies Lighting: exterior (21A.37.050.H) All proposed exterior lighting must be directed downward. No lighting plan has been submitted. Materials submitted by the applicant indicate that the proposed project will comply with this standard. This standard will be reviewed during the building permit application stage Lighting: parking lot (21A.37.050.I) All lighting for parking lots cannot exceed 16 feet in height and must be directed downward when adjacent to a residential zoning district There is no residential district adjacent to the subject property. Complies Screening of mechanical equipment (21A.37.050.J) All mechanical equipment must be screened from view All mechanical equipment will either be located on the roof or within the building Complies Screening of service areas (21A.37.050.K) Screened from public view All services areas are located within the proposed building Complies Ground-floor Residential Entrances (21A.37.050.L) Not required. This is not a single- family dwelling n/a n/a